This project management assignment analyzes the ACME Products PLC case study, focusing on the construction of a new building for manufacturing plastic tableware and integrating it with existing factories. The assignment covers seven key project management principles, success and failure criteria, and the concepts of time, cost, and quality. It also explores human resource management, including roles, responsibilities, organizational structure, and skill requirements. Furthermore, it delves into project processes and procedures, such as network diagrams, critical paths, Gantt charts, and resource histograms, while also addressing project changes, termination methods, and post-project appraisal. The solution provides a comprehensive overview of project management principles and their practical application within a business context.

Project Management
1
1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

TABLE OF CONTENTS
INTRODUCTION................................................................................................................................4
TASK 1- UNDERSTAND PROJECT MANAGEMENT PRINCIPLES (LO1)..................................4
(a)1.1 Main principles of the project management process.............................................................4
(b) 1.2 Success/failure criteria for ACME Project...........................................................................5
(C) 1.3. Explaining concept of time, cost and quality with the help of suitable examples..............5
(d) 1.4. Explaining ways of terminating Acme Project by including key elements and post-project
appraisal...........................................................................................................................................6
TASK 2 - BE ABLE TO MANAGE A PROJECT’S HUMAN RESOURCES (LO2)........................7
(a) 2.1 Roles and responsibilities of each of the participants..........................................................7
(b)2.1 Draw and explain a suitable organisational structure for the ACME Project.......................9
(c) 2.3 Identify the skills and qualities of leader for the ACME Project.........................................9
(d) 2.4 Specifying the human resource requirements for the ACME Project................................10
(e) 2.2 Work break down structure of ACME Project...................................................................10
TASK 3 - BE ABLE TO APPLY PROJECT PROCESSES AND PROCEDURES (LO3)................11
(a)3.1 Draw up network diagram, determine critical path for the project and final duration of the
project............................................................................................................................................11
(b)3.1/3.2 Effect of the delay and the action taken by project manager........................................12
(c) 3.1 Role of Gantt Chart and Resource Histogram in order to improve the management of
ACME Project................................................................................................................................12
(c) 3.2 Crash activities during ACME project in order to complete the project more quickly......13
(d) 3.2 Analysis of Cost and Time performance for AMCE project during its project life...........13
(e) 3.4 Ways to manage any changes which are likely to be required during the life of ACME
project............................................................................................................................................14
(f) 3.1 Ways of Project Closer........................................................................................................15
(g) 3.3/3.4 Evaluation of completed ACME project......................................................................16
CONCLUSION..................................................................................................................................17
REFERENCES...................................................................................................................................18
2
INTRODUCTION................................................................................................................................4
TASK 1- UNDERSTAND PROJECT MANAGEMENT PRINCIPLES (LO1)..................................4
(a)1.1 Main principles of the project management process.............................................................4
(b) 1.2 Success/failure criteria for ACME Project...........................................................................5
(C) 1.3. Explaining concept of time, cost and quality with the help of suitable examples..............5
(d) 1.4. Explaining ways of terminating Acme Project by including key elements and post-project
appraisal...........................................................................................................................................6
TASK 2 - BE ABLE TO MANAGE A PROJECT’S HUMAN RESOURCES (LO2)........................7
(a) 2.1 Roles and responsibilities of each of the participants..........................................................7
(b)2.1 Draw and explain a suitable organisational structure for the ACME Project.......................9
(c) 2.3 Identify the skills and qualities of leader for the ACME Project.........................................9
(d) 2.4 Specifying the human resource requirements for the ACME Project................................10
(e) 2.2 Work break down structure of ACME Project...................................................................10
TASK 3 - BE ABLE TO APPLY PROJECT PROCESSES AND PROCEDURES (LO3)................11
(a)3.1 Draw up network diagram, determine critical path for the project and final duration of the
project............................................................................................................................................11
(b)3.1/3.2 Effect of the delay and the action taken by project manager........................................12
(c) 3.1 Role of Gantt Chart and Resource Histogram in order to improve the management of
ACME Project................................................................................................................................12
(c) 3.2 Crash activities during ACME project in order to complete the project more quickly......13
(d) 3.2 Analysis of Cost and Time performance for AMCE project during its project life...........13
(e) 3.4 Ways to manage any changes which are likely to be required during the life of ACME
project............................................................................................................................................14
(f) 3.1 Ways of Project Closer........................................................................................................15
(g) 3.3/3.4 Evaluation of completed ACME project......................................................................16
CONCLUSION..................................................................................................................................17
REFERENCES...................................................................................................................................18
2

Index of Tables
Table 1: Success/failure criteria for ACME Project.............................................................................5
Table 2: Roles and responsibilities of different ACME project team members ..................................7
3
Table 1: Success/failure criteria for ACME Project.............................................................................5
Table 2: Roles and responsibilities of different ACME project team members ..................................7
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Illustration Index
Illustration 1: Organisational structure for the ACME Project.............................................................9
Illustration 2: Work break down structure of ACME Project.............................................................11
Illustration 3: Network diagram of ACME Project ............................................................................11
Illustration 4: Network diagram of ACME Project ...........................................................................13
Illustration 5: Project change control procedures for the existing plan..............................................15
4
Illustration 1: Organisational structure for the ACME Project.............................................................9
Illustration 2: Work break down structure of ACME Project.............................................................11
Illustration 3: Network diagram of ACME Project ............................................................................11
Illustration 4: Network diagram of ACME Project ...........................................................................13
Illustration 5: Project change control procedures for the existing plan..............................................15
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

INTRODUCTION
Project management is a combination of diversified skills, techniques, knowledge and tools
which are needed to meet the requirements of a project plan. In other words, it can be said that it
includes a careful planning and well organized efforts to complete a project in a successful manner.
There are different phases which help in managing and implementing the project plan in a right
manner (Kerzner, 2013). The following research is related to project management and to understand
its role in business operation, ACME Products PLC case study has taken into consideration.
Company wants to construct a new building for manufacturing of plastic tableware which is used
for outdoor dining and picnics. Along with this, organization also wants to arrange a production
setup in new facility which will be integrated with other existing factories across the world in near
future (Meredith and Mantel, 2011). Objectives covered under the following study are related to
understand project management principles, managing human resources, analysing skills and
qualities required in project manager as well as identifying success and failure criteria for ACME
Project.
TASK 1- UNDERSTAND PROJECT MANAGEMENT PRINCIPLES (LO1)
(a) 1.1 Main principles of the project management process
There are seven principles of project management process that can be directly linked to life
cycle of ACME Project which are as follows: Success: It is hard to measure the success of a project without considering any criteria. It is
need to develop some key benchmarks that can help in defining the success of project plan.
For ACME Project, the success benchmarking for the following project has scope, quality
and relevance (Kshama, 2012). Commitment: The project manager and its team members should show commitment
towards the project. In the case of ACME Project, the project manager and its supportive
staff must be committed to achieve goal, scope, quality, time and cost of project plan.
Tetrad-Trade off: This principle states that scope, quality, cost and time must be in balanced
state. For ACME Project, top managers’ work to achieve the objectives. It has required that
scope, quality, cost and time has to be at a balanced stage to accomplish success of project. Primary Communication channels: As per this principle, the project manager of ACME
Project should develop a single communication channels so that informatics about the
project can be easily communicated with team members as well as client (Hamel, 2008).
5
Project management is a combination of diversified skills, techniques, knowledge and tools
which are needed to meet the requirements of a project plan. In other words, it can be said that it
includes a careful planning and well organized efforts to complete a project in a successful manner.
There are different phases which help in managing and implementing the project plan in a right
manner (Kerzner, 2013). The following research is related to project management and to understand
its role in business operation, ACME Products PLC case study has taken into consideration.
Company wants to construct a new building for manufacturing of plastic tableware which is used
for outdoor dining and picnics. Along with this, organization also wants to arrange a production
setup in new facility which will be integrated with other existing factories across the world in near
future (Meredith and Mantel, 2011). Objectives covered under the following study are related to
understand project management principles, managing human resources, analysing skills and
qualities required in project manager as well as identifying success and failure criteria for ACME
Project.
TASK 1- UNDERSTAND PROJECT MANAGEMENT PRINCIPLES (LO1)
(a) 1.1 Main principles of the project management process
There are seven principles of project management process that can be directly linked to life
cycle of ACME Project which are as follows: Success: It is hard to measure the success of a project without considering any criteria. It is
need to develop some key benchmarks that can help in defining the success of project plan.
For ACME Project, the success benchmarking for the following project has scope, quality
and relevance (Kshama, 2012). Commitment: The project manager and its team members should show commitment
towards the project. In the case of ACME Project, the project manager and its supportive
staff must be committed to achieve goal, scope, quality, time and cost of project plan.
Tetrad-Trade off: This principle states that scope, quality, cost and time must be in balanced
state. For ACME Project, top managers’ work to achieve the objectives. It has required that
scope, quality, cost and time has to be at a balanced stage to accomplish success of project. Primary Communication channels: As per this principle, the project manager of ACME
Project should develop a single communication channels so that informatics about the
project can be easily communicated with team members as well as client (Hamel, 2008).
5

Culture Environment: For achieving the success of project, management style should match
with the type of project plan. Similarly, project manager of ACME Project should develop a
suitable culture environment which can support his management style. Process: For any type of project, the process, policies and procedures must be clearly define
and must be in documentation format. It should also explain the roles and responsibilities of
project manager and its supportive team members. For ACME Project, a document should
be prepare which include method, policies and procedures as well as roles and
responsibilities of project manager and team members (Cicmil and et.al., 2006). Developed
guidelines will work as guide throughout the lifespan for whole project.
Life cycle: It includes the four phase of a project which ensure a clear path and determine
important milestones in the project (Meredith and Belbin, 2011). This principle will help
ACME Project to create a clear picture on starting and finishing duration of project plan.
(b) 1.2 Success/failure criteria for ACME Project
Table 1: Success/failure criteria for ACME Project
Success criteria Failure criteria
Strong and visible leadership support of project
manager of ACME project
Poor leadership style of project manager of
ACME project
Committed project team members Lack of different resources such as human,
technology, financial etc.
Clear objectives and vision (Forsberg, Mooz
and Cotterman, 2005)
Undefined and unclear objectives and vision
Effective distribution of important information Lack of motivation
Support of top management of ACME project Poor support of top management of ACME
project (Pohl, 2010)
(C) 1.3. Explaining concept of time, cost and quality with the help of suitable examples
Time plays an important role to manage project operations in the firm. For example,
management of ACME can clearly define its objectives in order to design and process their
activities. This thing can help to design building for manufacturing of plastic items (Atkinson,
Crawford and Ward, 2006). As per the case, cleared objectives contribute effectively to decide time
frame for the completion of infrastructure development of building by dividing objectives into
specific time frame. This thing also helps ACME to manage quality and cost of its project.
6
with the type of project plan. Similarly, project manager of ACME Project should develop a
suitable culture environment which can support his management style. Process: For any type of project, the process, policies and procedures must be clearly define
and must be in documentation format. It should also explain the roles and responsibilities of
project manager and its supportive team members. For ACME Project, a document should
be prepare which include method, policies and procedures as well as roles and
responsibilities of project manager and team members (Cicmil and et.al., 2006). Developed
guidelines will work as guide throughout the lifespan for whole project.
Life cycle: It includes the four phase of a project which ensure a clear path and determine
important milestones in the project (Meredith and Belbin, 2011). This principle will help
ACME Project to create a clear picture on starting and finishing duration of project plan.
(b) 1.2 Success/failure criteria for ACME Project
Table 1: Success/failure criteria for ACME Project
Success criteria Failure criteria
Strong and visible leadership support of project
manager of ACME project
Poor leadership style of project manager of
ACME project
Committed project team members Lack of different resources such as human,
technology, financial etc.
Clear objectives and vision (Forsberg, Mooz
and Cotterman, 2005)
Undefined and unclear objectives and vision
Effective distribution of important information Lack of motivation
Support of top management of ACME project Poor support of top management of ACME
project (Pohl, 2010)
(C) 1.3. Explaining concept of time, cost and quality with the help of suitable examples
Time plays an important role to manage project operations in the firm. For example,
management of ACME can clearly define its objectives in order to design and process their
activities. This thing can help to design building for manufacturing of plastic items (Atkinson,
Crawford and Ward, 2006). As per the case, cleared objectives contribute effectively to decide time
frame for the completion of infrastructure development of building by dividing objectives into
specific time frame. This thing also helps ACME to manage quality and cost of its project.
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Cost aids company to find out estimated expenditure on any type of project. For example:
this concept can help management of ACME to identify approximate spending on the infrastructure
development of building by analysing the cost of raw materials like cement, wood and labour for
constructing building. Further, it monitors quality of materials and proper time frame to analyse
appropriate estimated cost because inflation rate, recession and demand of raw material also affect
its cost (Megginson, 2006). Proper estimated cost can also give specific idea to manage monetary
funds for the infrastructure development of building for the plastic production.
Quality also contributes an effective role to improve the efficiency and performance of
ACME project. For example: this concept can give better reliability to measure quality of materials
by comparing standard performance with the actual performance. It can help firm to improve
quality of project by providing proper guidance to make building (Aubry, Hobbs and Thuillier,
2007). Good quality can also aid ACME to complete the project within given time frame and
estimated cost.
(d) 1.4. Explaining ways of terminating Acme Project by including key elements and post-project
appraisal
There are many ways like extinction, addition, integration as well as starvation for
terminating project in the firm. Extinction- ACME has achieved its desired goals. On the other side, it can be stopped
because it is unsuccessful to execute the objectives of firm. Addition- If, a project of ACME has achieved its success then it will be end through formal
way. Employees worked for project, property and resources will be transferred to new
project from the terminated project (Hobbs, Aubry and Thuillier, 2008). Integration- In this part, if, project leads to major success then project outcomes are
integrated to the activities of clients. In addition to this, used resources of ACME will be
released and it will be given to parent organization. It is the common process to terminate a
project.
Starvation- When management of ACME determines that project is unsuccessful or obsolete
then firm terminates project (Thiry and Deguire, 2007). Organization will take all the
resources from that project. Firm will not invest any money on this project.
Key elements for assess
ACME organization will consider reducing technical reasons during project execution.
Firm will measure that project cost should not higher than the profit.
Management of ACME will also want customer support to fulfil its demand.
7
this concept can help management of ACME to identify approximate spending on the infrastructure
development of building by analysing the cost of raw materials like cement, wood and labour for
constructing building. Further, it monitors quality of materials and proper time frame to analyse
appropriate estimated cost because inflation rate, recession and demand of raw material also affect
its cost (Megginson, 2006). Proper estimated cost can also give specific idea to manage monetary
funds for the infrastructure development of building for the plastic production.
Quality also contributes an effective role to improve the efficiency and performance of
ACME project. For example: this concept can give better reliability to measure quality of materials
by comparing standard performance with the actual performance. It can help firm to improve
quality of project by providing proper guidance to make building (Aubry, Hobbs and Thuillier,
2007). Good quality can also aid ACME to complete the project within given time frame and
estimated cost.
(d) 1.4. Explaining ways of terminating Acme Project by including key elements and post-project
appraisal
There are many ways like extinction, addition, integration as well as starvation for
terminating project in the firm. Extinction- ACME has achieved its desired goals. On the other side, it can be stopped
because it is unsuccessful to execute the objectives of firm. Addition- If, a project of ACME has achieved its success then it will be end through formal
way. Employees worked for project, property and resources will be transferred to new
project from the terminated project (Hobbs, Aubry and Thuillier, 2008). Integration- In this part, if, project leads to major success then project outcomes are
integrated to the activities of clients. In addition to this, used resources of ACME will be
released and it will be given to parent organization. It is the common process to terminate a
project.
Starvation- When management of ACME determines that project is unsuccessful or obsolete
then firm terminates project (Thiry and Deguire, 2007). Organization will take all the
resources from that project. Firm will not invest any money on this project.
Key elements for assess
ACME organization will consider reducing technical reasons during project execution.
Firm will measure that project cost should not higher than the profit.
Management of ACME will also want customer support to fulfil its demand.
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Firm will analyse project completion schedule in order to complete it in an appropriate time
frame (Huemann, Keegan and Turner, 2007).
Reducing uncontrollable problems which will lead forcefully termination of the project of
ACME.
Key Elements involved in post project appraisal
There are many key elements which can be covered during post-project appraisal in the
organization.
Overall Project evaluation
Did project fulfil all the goals and objectives which were decided by firm?
Was the stakeholder complaints and feedback considered in a positive manner? Was project accomplished within a particular time frame and cost? (Crawford, 2005)
Quality of Deliverables
ACME will analyse that stakeholder satisfaction on the quality will be appropriate or not.
Organization will measure that all the deliverable quality are actual as per the document in
order to complete requirements (Pohl, 2010).
Key Accomplishment
Meeting on the project strength like team work, efficient ways of instrument utilization and
other positive accomplishments.
Future Consideration
Discussion of future activities which will be considered regarding the project (Larson and
Gray, 2011)
Discussion of any project maintenance process which will need to manage in a proper way.
In addition to this, management of ACME can also emphasize on sharing the experience of
individuals, opportunities for the improvement and best practices for managing the future projects.
TASK 2 - BE ABLE TO MANAGE A PROJECT’S HUMAN RESOURCES
(LO2)
(a) 2.1 Roles and responsibilities of each of the participants
There are many personnel involved in ACME Project which are as follows.
Table 2: Roles and responsibilities of different ACME project team members
Project Role Responsibilities
8
frame (Huemann, Keegan and Turner, 2007).
Reducing uncontrollable problems which will lead forcefully termination of the project of
ACME.
Key Elements involved in post project appraisal
There are many key elements which can be covered during post-project appraisal in the
organization.
Overall Project evaluation
Did project fulfil all the goals and objectives which were decided by firm?
Was the stakeholder complaints and feedback considered in a positive manner? Was project accomplished within a particular time frame and cost? (Crawford, 2005)
Quality of Deliverables
ACME will analyse that stakeholder satisfaction on the quality will be appropriate or not.
Organization will measure that all the deliverable quality are actual as per the document in
order to complete requirements (Pohl, 2010).
Key Accomplishment
Meeting on the project strength like team work, efficient ways of instrument utilization and
other positive accomplishments.
Future Consideration
Discussion of future activities which will be considered regarding the project (Larson and
Gray, 2011)
Discussion of any project maintenance process which will need to manage in a proper way.
In addition to this, management of ACME can also emphasize on sharing the experience of
individuals, opportunities for the improvement and best practices for managing the future projects.
TASK 2 - BE ABLE TO MANAGE A PROJECT’S HUMAN RESOURCES
(LO2)
(a) 2.1 Roles and responsibilities of each of the participants
There are many personnel involved in ACME Project which are as follows.
Table 2: Roles and responsibilities of different ACME project team members
Project Role Responsibilities
8

Project Manager
Person is liable for establishing
conjunction with the Project Sponsor.
He assures that project is given to
client in an agreed time. He also
manages monetary funds’ to achieve
proper quality standard in the project.
Managing and directing the project team
members of ACME project
Recruiting project employees and consultants.
Managing relations with team members for the
better coordination to continue project work.
Complete project planning and control (Barry,
2015).
Measure project progress and performance.
Determining team training needs of team
members of ACME project.
Project Team Members
Staff members play an important role
to give effective efforts in ACME
project at all the stages. Every
individual is responsible to manage
specific work in the firm.
Give functional expertise in management
process of ACME project
Work with co-associates to assure that project
has completed its needs or not.
Measurement of present and future processes
regarding ACME project (Javidan and et.al.,
2006).
Analysing information needs of the project
Project Sponsor
He is the person who select others
members to deliver the project. They
can be a senior member of staff in a
specific area. Result of project also
affects the project Spencer. He is
responsible from the initiation to
completion of the project. He
supervises that project is actively
reviewed or not.
Work as a supporter in ACME project
Project sponsor is accountable for the outcomes
of planned project.
Take core organisational decisions for
development of ACME project (De Reyck and
et.al., 2005).
Analysing the availability of essential resources
for staff members.
9
Person is liable for establishing
conjunction with the Project Sponsor.
He assures that project is given to
client in an agreed time. He also
manages monetary funds’ to achieve
proper quality standard in the project.
Managing and directing the project team
members of ACME project
Recruiting project employees and consultants.
Managing relations with team members for the
better coordination to continue project work.
Complete project planning and control (Barry,
2015).
Measure project progress and performance.
Determining team training needs of team
members of ACME project.
Project Team Members
Staff members play an important role
to give effective efforts in ACME
project at all the stages. Every
individual is responsible to manage
specific work in the firm.
Give functional expertise in management
process of ACME project
Work with co-associates to assure that project
has completed its needs or not.
Measurement of present and future processes
regarding ACME project (Javidan and et.al.,
2006).
Analysing information needs of the project
Project Sponsor
He is the person who select others
members to deliver the project. They
can be a senior member of staff in a
specific area. Result of project also
affects the project Spencer. He is
responsible from the initiation to
completion of the project. He
supervises that project is actively
reviewed or not.
Work as a supporter in ACME project
Project sponsor is accountable for the outcomes
of planned project.
Take core organisational decisions for
development of ACME project (De Reyck and
et.al., 2005).
Analysing the availability of essential resources
for staff members.
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Project Board
It is a group of management grade
employees who are responsible for
overseeing the progress and
performance of ACME project. They
also react on any strategic problems.
Finalization of strategies, execution plan and
project scope of ACME project
Sort out the project issues.
Prioritization of project goals and objectives of
ACME project (Elo and Kyngäs, 2008).
(b) 2.1 Drawing and explaining a suitable organisational structure for the ACME Project
As per the case study, management of ACME can use hierarchical organisation structure for
ACME project. This structure is appropriate for firm because authority of person can be defined in a
systematic way which helps to improve the efficiency in the project work.
As per the above diagram, Project Board is top authority which prioritizes and designs all
strategies for handling the ACME project. They help in executing the plan which contribute role for
development of the building. Project Sponsor is also liable to analyse that project are implemented
in a proper manner. He also guides the project manager and team members in order to complete
construction of building (Cicmil and et.al., 2006.). In addition to this, he also manages project
operations and identifies its progress and performance. It reports to project sponsor and Board
regarding activities of ACME project. Team members help the firm to complete their assigned
responsibilities in a systematic manner in the project.
10
Illustration 1: Organisational structure for the ACME Project
It is a group of management grade
employees who are responsible for
overseeing the progress and
performance of ACME project. They
also react on any strategic problems.
Finalization of strategies, execution plan and
project scope of ACME project
Sort out the project issues.
Prioritization of project goals and objectives of
ACME project (Elo and Kyngäs, 2008).
(b) 2.1 Drawing and explaining a suitable organisational structure for the ACME Project
As per the case study, management of ACME can use hierarchical organisation structure for
ACME project. This structure is appropriate for firm because authority of person can be defined in a
systematic way which helps to improve the efficiency in the project work.
As per the above diagram, Project Board is top authority which prioritizes and designs all
strategies for handling the ACME project. They help in executing the plan which contribute role for
development of the building. Project Sponsor is also liable to analyse that project are implemented
in a proper manner. He also guides the project manager and team members in order to complete
construction of building (Cicmil and et.al., 2006.). In addition to this, he also manages project
operations and identifies its progress and performance. It reports to project sponsor and Board
regarding activities of ACME project. Team members help the firm to complete their assigned
responsibilities in a systematic manner in the project.
10
Illustration 1: Organisational structure for the ACME Project
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

(c) 2.3 Identifying the skills and qualities of leader for ACME Project
Leader or manager should have appropriate skill and qualities to lead ACME project which
are as follows: Communication skills- It is essential for leader to interact with the team members in the
firm. This skill also help manager to share the goals and objectives of project with
employees in order complete them in specific time frame in the firm. Coordinating skills- This quality also contribute towards effective role for leader of ACME
to share work load with team members to complete in a systematic manner. This skill also
helps the firm to increase its efficiency and performance in the market (Kerzner, 2013).
Problem solving skills- This ability also aids the leader to solve problem of team members of
ACME project. This skill will help the ACME to reduce the risk regarding work and it
provides appropriate direction to finish the job.
(d) 2.4 Specifying human resource requirements for the ACME Project
ACME Organisation needs many human resources like project manager, team members,
quality analyst, architect and human resource manager to complete project in optimistic manner.
Work of Project manager is to manage project operations in appropriate way. He analyses the
current status of project and report to the top authorities in the ACME (Meredith and Mantel, 2011).
Further, team members of firm give their efforts on the specific work to manage project operations
which are assigned by project manager of ACME. Work of quality analyst is to check proper quality
standards of raw material, woods and other resources which are used in the construction of building.
In addition to this, architect of ACME helps to make layout and design building as per client the
requirement (Hamel, 2008). He also monitors on construction work in order to check that work is
being completed in appropriate manner or not. Further, human resource manager of ACME allocate
required human and other resources which are necessary for construction of building.
(e) 2.2 Work break down structure of ACME Project
11
Leader or manager should have appropriate skill and qualities to lead ACME project which
are as follows: Communication skills- It is essential for leader to interact with the team members in the
firm. This skill also help manager to share the goals and objectives of project with
employees in order complete them in specific time frame in the firm. Coordinating skills- This quality also contribute towards effective role for leader of ACME
to share work load with team members to complete in a systematic manner. This skill also
helps the firm to increase its efficiency and performance in the market (Kerzner, 2013).
Problem solving skills- This ability also aids the leader to solve problem of team members of
ACME project. This skill will help the ACME to reduce the risk regarding work and it
provides appropriate direction to finish the job.
(d) 2.4 Specifying human resource requirements for the ACME Project
ACME Organisation needs many human resources like project manager, team members,
quality analyst, architect and human resource manager to complete project in optimistic manner.
Work of Project manager is to manage project operations in appropriate way. He analyses the
current status of project and report to the top authorities in the ACME (Meredith and Mantel, 2011).
Further, team members of firm give their efforts on the specific work to manage project operations
which are assigned by project manager of ACME. Work of quality analyst is to check proper quality
standards of raw material, woods and other resources which are used in the construction of building.
In addition to this, architect of ACME helps to make layout and design building as per client the
requirement (Hamel, 2008). He also monitors on construction work in order to check that work is
being completed in appropriate manner or not. Further, human resource manager of ACME allocate
required human and other resources which are necessary for construction of building.
(e) 2.2 Work break down structure of ACME Project
11

Illustration 2: Work break down structure of ACME Project
TASK 3 - BE ABLE TO APPLY PROJECT PROCESSES AND PROCEDURES
(LO3)
(a) 3.1 Drawing network diagram, determining critical path for the project and final duration of the
project
Critical task: Tasks which are not affecting by any kind of delay S, A, B, D, F, H, K, L.
12
Illustration 3: Network diagram of ACME Project
TASK 3 - BE ABLE TO APPLY PROJECT PROCESSES AND PROCEDURES
(LO3)
(a) 3.1 Drawing network diagram, determining critical path for the project and final duration of the
project
Critical task: Tasks which are not affecting by any kind of delay S, A, B, D, F, H, K, L.