Project Report: AF PLC Automation Plant Construction Management

Verified

Added on  2023/01/12

|20
|4626
|78
Report
AI Summary
This report presents a case study of Automation Futures Plc (AF PLC), focusing on a contract to install an automation plant for TTF PLC. The report analyzes project definition, the importance of the iron triangle parameters (cost, time, scope), and identifies potential risks. It includes a network diagram and Gantt chart to illustrate the critical path and project schedule, along with details of the overall project budget and projected net profit. The report also examines progress management, compares planned versus actual progress, and provides a revised Gantt chart. Furthermore, it applies Earned Value Analysis (EVA) to determine percentage completion and projected completion dates, and offers recommendations regarding project acceleration options. The report covers various aspects of project management, including risk assessment, planning, cost control, and performance analysis, providing a comprehensive overview of the project's lifecycle and challenges.
Document Page
FUNDAMENTAL
OF
PROJECT
MANAGEMENT
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Document Page
Table of Contents
EXECUTIVE SUMMARY.............................................................................................................3
INTRODUCTION...........................................................................................................................4
PART A...........................................................................................................................................5
1. Project definition/Parameters and Risks..................................................................................5
a) Relative importance of various iron triangle parameters in setting overall project
objectives.................................................................................................................................5
b) Identifying risks that AF PLC are likely to face with construction project of this nature. .6
2. Planning and costs...................................................................................................................8
a) Prepare a network diagram showing the critical path and planned duration of the project.8
b) Prepare a Gantt chart for the project...................................................................................9
c) Detail of overall project budget and projected net profit of the contract............................9
3. Managing progress and spending..........................................................................................12
a) Create a table comparing the planned progress against the actual progress values...........12
b) Produce a revised Gantt chart and indentify the new completion date.............................13
4. Earned value analysis and acceleration.................................................................................15
a) Using EVA determine planned % percentage complete compare with actual % complete
...............................................................................................................................................15
b) Create a projected completion date for the entire project using EAC...............................16
c) Recommend which of the options should be accepted and which should be declined.....17
REFERENCES..............................................................................................................................18
Document Page
EXECUTIVE SUMMARY
This project report consists of case study of Automation Futures Plc or AF Plc; in which
company has taken contract to install automation plant for its client company TTF PLC (Train
manufacturing client). This report will discuss about good contracts terms and conditions and
what essential points should be mentioned in the contract. PART A carries four different
questions but sequentially related with each other. First question will discuss about project
definition and risks analysis in a project. Second question will reflect critical path for estimated
scheduled project and also Gantt chart will graphically represent how activities are going on.
Third and fourth part discussed about actual and projected completion percentage and cost
incurred on each. EVM method will show how much extra cost has to be paid by the company
for completion of project.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
INTRODUCTION
A project management is the process of making a temporary plan, which is a temporary effort for
a specified period of time for the organization to plan, execute, and control its resources to fulfill
a specific task, event, or duty. This effort builds a group to achieve specific goals, and to meet
specific success criteria at a specified time. In fact, this team practices from the start to the close
of the project until it achieves the goals. According to the Safety Act, the responsibility of the
accident has been placed on the employers. The accident is usually due to some negligence like
Bhopal gas accident. EVM is a Earned value analysis method however, the most basic
requirement of an EVM system is that it determines progress using PV and EV.
Document Page
PART A
1. Project definition/Parameters and Risks
a) Relative importance of various iron triangle parameters in setting overall project
objectives
All projects are carried out under certain conditions - traditionally, they are cost, time and scope.
These three components (commonly called 'triple constraints') are represented as a triangle
(Kerzner, 2017). Each obstacle corner forms, with quality as the central theme:
Projects must be delivered within cost
Projects must be delivered on time
More, not less - projects must meet the agreed scope
Projects also must meet customer quality requirements
1. Cost: Not all projects have a fixed budget; the customer is willing to spend a certain amount
of money for the delivery of a new product or service. If you reduce the cost of the project, you
will either have to reduce its scope or increase your time. AF Plc is adding to meet new deadlines
as costs rise. Some features of the product are removed and put into a phase two release to
reduce delivery time and meet new start dates. The most important obstacle, in this case, is time
(project schedule).
2. Time (schedule): The saying goes, 'time is money', an object that slips away very easily. The
projects have a deadline date for delivery. When you reduce the time of the project, you must
either increase its cost or reduce its scope. The budget and schedule increase as a result of the
push to the final delivery date. AF Plc is least constrained by the project schedule, thereby
adding to the overall cost increase of the project. The most important constraint, in this case, is
the scope of (product features). In each of these examples, it is the project manager who needs to
balance the project to meet new constraints and deliver success for the client.
3. Scope: Many projects fail on this hurdle because the scope of the project is either not fully
defined or understood from the beginning. When you increase the scope of a project, you will
have to either increase its cost or time. Scope is cut, quality is reduced, and time is pushed back,
Document Page
so that cheaper resources can be found. The most important obstacle, in the case of AF Plc, is the
cost (the money the company is willing to spend).
Educate your clients about the triple hurdle of project management, make the best balance, and
be aware of the cost, time, and scope that will affect all changes. The triple barrier is a project
that, when well balanced, represents the core element of leadership for success. Ideally AF Plc
one-box process project management method works perfectly for every client. But customers
come in all types and sizes and one size does not fit all. Project smart project management
resource that helps managers at all levels improve their performance (Meredith, Mantel Jr, and
Shafer, 2017).
b) Identifying risks that AF PLC are likely to face with construction project of this
nature
Construction has many risks while completing its project for expected time period. Every
construction project has its own unique and set of challenges face by company handling the
project. Every project management firm has a risk while doing some project; only those
company’s get competitive advantage which can minimize the risk. The technique of risk
management helps firm in reducing overall costs and time. This increases the profit of the firm.
Some of the types of risks are discussed below:
1. Safety risk to workers through accidents and injuries on work: The bodily injury or loss that a
laborer incurs while working in construction work in which his limb is dislocated and is partially
and completely denied, is called an accident. A skilled laborer performs his work safely like a
good sportsman. Company tries to avoid the risk and the possibility of accidents because labor
has to work on very complex and expensive machines for production. Therefore, there is a
possibility of accident. A little mistake can endanger the life of an artisan and he may die in an
accident. Which becomes a huge curse for dependents? Therefore, in case of any possibility of
accident, work should be stopped immediately and all security arrangements should be made
(Heagney, 2016).
2. Risk of change in orders: Constructional change occurs when a company makes some desired
future state from a transition to its current state. If there was no change, the manager's job would
have become easier. Handling change is the job of every manager. For employees, change is the
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
cause of stress. A large number of employees are under stress due to a dynamic and uncertain
environment. Stress is a complex issue. Tension is increasing among employees due to
constraints and demands.
3. Unknown site conditions: Many times condition of site where project manager is going to
work is not clear and results come after project has been started. Thus it is also a risk face at the
time implementation of project for client.
4. Poorly written contracts: Every project management company, especially construction
contractors, keep alert while signing contract; it goes through every terms and conditions
mentioned in contract. But still there is risk of hidden terms which generates the situation of
misunderstanding and stuck of project amount.
5. Unexpected increases in material costs: While signing a contract; every company needs to
disclose its budgets; which is based on per unit cost of raw materials but still with changes in
government policies or market conditions; there is risk of fluctuation in market prices. This could
increase the overall material cost of the project (Turner, 2016).
6. Labor shortages: Some projects have good environmental condition at site; but some have
uneconomic and unhygienic conditions at site; which can increase the chances of hazardous with
labor. This risk stops labor to take initiative to work at that condition and could result in labor
shortages. This risk increases the time of finishing the project.
7. Damage or theft to equipment and tools: Fresh labor that has little bit knowledge of how to
operate particular machine equipment and tools have more risk that they could damage the parts.
Labors who worked on daily wage rate bases could theft the expensive machine parts and this
can increase the cost of the project.
8. Natural disasters: This lies under unexpected or unconditional risks which is independent from
all other factors. It could impact project with major affect; sometimes whole project could be
destruct and redo may required. Hence, it’s a major risk which affects both schedule, time and
cost of the project (Kerzner, 2019).
9. Availability of building materials: While signing a contract; some building materials like
tungsten, steel and other building materials are common in demand while doing construction
Document Page
work. There is a chance in which changing in governments rules and regulations, application of
some materials or import of required construction product may restrict by government.
10. Poor project management: This risk can hinder both cost and time together. If project
manager is not capable to handle the project or making proper schedule and planning or
implement controlling while handling materials will result in disaster for whole project. It could
easily convert profit making project into loss and bad impression on clients as well.
2. Planning and costs
a) Prepare a network diagram showing the critical path and planned duration of the
project
A network diagram is a graphical representation of work breakdown structure; which shows
predecessor and successor activities and also shows the critical path under which whole project
will be finished. On the basis of network diagram it was found that total 58 weeks will be the
duration taken by project to complete assignment (Marchewka, 2016). Network diagram is given
below:
In the above diagram; red line shows the critical path of the project which is minimum time will
be taken by AF contractors. The total time required to complete the project is 58 weeks.
Document Page
b) Prepare a Gantt chart for the project
A Gantt chart is a type of bar chart which shows work breakdown structure and project schedule.
It also helps in tracking all the schedule activities and tasks assigned by project manager. The bar
shows starting and ending of tasks in weeks or months. It also helps in knowing completion
period and date of entire project (Kerzner, 2017). Below is the Gantt chart of estimated or
planned project having critical path of 58 weeks:
Hence, the completion period of given project is estimated on 7th August, 2020 without any
modification in given schedule.
c) Detail of overall project budget and projected net profit of the contract
Budget - The accounting of the estimated income and expenditure of the government is called
the budget of the government (Heldman, 2018).
Budget deficit and deficit budget - When the estimated expenditure in the budget is higher than
the estimated income, this excess is called the deficit of the budget, which is met by borrowing,
and such budget is called deficit budget.
The details of projects overall estimated cost and projected net profit from the contract has been
calculated below:
Task
s
Fixed
cost
£M (A)
No.
of
Eng
.
No.
of
Sta
ff
Total
week
s
Days
/wee
k
Hr
s
Enginee
r cost
£/h
Sta
ff
cost
£/h
Total
eng.
Cost (B)
Total
staff
cost (C)
Total cost
(B+C) £
X 0.2 0 0 1 0 0 0 0 0 0 0
A 2.8 10 5 3 5 8 69 39 £82,800 £23,400 £106,200
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
B 1.6 10 5 2 5 8 69 39 £55,200 £15,600 £70,800
C 1.5 10 5 1 5 8 69 39 £27,600 £7,800 £35,400
D 3.8 10 5 8 5 8 69 39
£220,80
0 £62,400 £283,200
E 5.4 20 10 8 5 8 69 39
£441,60
0
£124,80
0 £566,400
F 3.4 10 5 10 5 8 69 39
£276,00
0 £78,000 £354,000
G 6.4 20 50 10 5 8 69 39 £20,000 / week £200,000
H 4 30 40 9 5 8 69 39
£745,20
0
£561,60
0
£1,306,80
0
I 3.5 10 60 8 5 8 69 39
£220,80
0
£748,80
0 £969,600
J 2.2 8 20 6 5 8 69 39
£132,48
0
£187,20
0 £319,680
K 2.5 10 5 4 5 8 69 39
£110,40
0 £31,200 £141,600
L 3.1 25 50 6 5 8 69 39
£414,00
0
£468,00
0 £882,000
M 2.2 10 5 4 5 8 69 39
£110,40
0 £31,200 £141,600
N 2.7 10 6 5 5 8 69 39
£138,00
0 £46,800 £184,800
O 2.1 6 20 6 5 8 69 39 £99,360
£187,20
0 £286,560
P 1.2 6 16 6 5 8 69 39 £99,360
£149,76
0 £249,120
£48.6
M
£6,097,76
0
Other adjustments to task costs:
Less:
Christmas off 10 60 2 5 8 69 39 £55,200
£187,20
0 £242,400
Add: other staff cost £462,250
£48.6
M £6.31M
Total cost of the project tasks = £48.6M + £6.31M
= £54.91M
Other staff costs:
Project management
support
Project manager
Project
planne
r
Rate
£/Wee
k
No.
of
week
Total
cost
Document Page
s
2 2 5,500 17 £93,500
1 1 2,000 40 £80,000
Commercial Manager
1 2,750 17 £46,750
2 2,750 44
£242,00
0
£462,25
0
Revenue:
Since it is estimated that project will be finished on 7th Aug, 2020
Hence, the bonus will be get for 18th Sep, 2020 - 7th Aug,2020 is 42 days
Bonus / working day No. of days earlier Total extra bonus
Bonus £50,000 42 £2,100,000
Budget allotted £58,500,000
Total Revenue £60,600,000
Less: Total cost £54,917,610
Surplus: £5,682,390
Less: 50% to
client £2,841,195.0
Estimated profit £2,841,195.0
Indication of what budget components could impact the point at which project become
loss making
Budget components are the events and task performed by project planners and mangers to initiate
project plan (Fuller, and et.al., 2017). Some of the components of budget include: Material
budget, labor budget, and production budget;
Material budget: The material budget is concerned with the determination of the amount of raw
material required for production. The schedule of purchasing raw materials is adjusted according
to the production budget. Arrangements are made for purchasing the material as per the
requirements of the production department. Material requirements are determined. The rate of
consumption of raw materials is also determined. Multiplying the rate of consumption of the