Project Management: AON Diagram, Critical Path, and Schedule Analysis

Verified

Added on  2023/04/17

|8
|770
|343
Project
AI Summary
This project management assignment involves creating an Activity on Node (AON) network diagram, calculating Early Start (ES), Early Finish (EF), Late Start (LS), and Late Finish (LF) times for each activity, identifying the critical path, and developing Gantt charts. The project activities are listed with their durations and predecessors, starting on April 10, 2019, with a seven-day work week. The assignment includes determining the critical path as A-B-F-K-L-M, tabulating activities with ES, LS, EF, LF, Free Float (FF), and Total Float (TF), and presenting the schedule with corresponding dates. The total project duration is calculated to be 42 days, with a completion date of May 21, 2019. The assignment demonstrates a comprehensive understanding of project scheduling and critical path method.
Document Page
Running head: PROJECT MANAGEMENT
Project Management
Name of Student-
Name of University-
Author’s Note-
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT MANAGEMENT
A. START 0 -
B. Clear & Grub 12 A. START
C. Order & Delivery
Reinforcement
4 A. START
D. Order & Delivery PC
Slabs
5 A. START
E. Excavate Footings and
Utilities
7 B. Clean & Grub
F. Delivery Frames, Channel
etc.
9 B. Clean & Grub
G. RC Footings 9 C. Order & Delivery
Reinforcement
H. Form Footings 12 E. Excavate Footings and
Utilities (SS+2)
I. Masonry & Bearing Walls 9 D. Order & Delivery PC
Slabs
G. RC Footings (FF +3)
J. Erect Joists and Deck 7 I. Masonry & Bearing Walls
K. Foundation Block 12 F. Delivery Frames, Channel
Document Page
2PROJECT MANAGEMENT
etc.
G. RC Footings (FS+4)
L. Backfill 9 H. Form Footings
K. Foundation Block
M. FINISH 0 J. Erect Joists and Deck
L. Backfill
1. AON Diagram
2.
Activities Early Start Early Finish Late Start Late Finish
A 0 0 0 0
Document Page
3PROJECT MANAGEMENT
B 0 12 0 12
C 0 4 4 8
D 0 5 21 26
E 12 19 19 26
F 12 21 12 21
G 4 13 8 17
H 14 26 21 33
I 7 16 26 35
J 16 23 35 42
K 21 33 21 33
L 33 42 33 42
M 42 42 42 42
3. The critical path of the project is A- B- F- K- L- M.
4.
Activities Early Start Early Finish Late Start Late Finish
A 0 0 0 0
B 0 12 0 12
C 0 4 4 8
D 0 5 21 26
E 12 19 19 26
F 12 21 12 21
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT MANAGEMENT
G 4 13 8 17
H 14 26 21 33
I 7 16 26 35
J 16 23 35 42
K 21 33 21 33
L 33 42 33 42
M 42 42 42 42
5.
Activities Early
Start
ES Date Early
Finish
EL
Date
Late
Start
LS Date Late
Finish
LF Date
A 0 Wed
10/04/19
0 Wed
10/04/19
0 Wed
10/04/19
0 Wed
10/04/19
B 0 Wed
10/04/19
12 Sun
21/04/19
0 Mon
11/03/19
12 Tue
26/03/19
C 0 Wed
10/04/19
4 Thu
14/03/19
4 Tue
26/03/19
8 Thu
14/03/19
D 0 Wed
10/04/19
5 Fri
15/03/19
21 Mon
11/03/19
26 Fri
15/03/19
E 12 Mon
22/04/19
19 Sun
28/04/19
19 Fri
15/03/19
26 Wed
27/03/19
F 12 Mon 21 Tue 12 Mon 21 Mon
Document Page
5PROJECT MANAGEMENT
22/04/19 30/04/19 22/04/19 8/04/19
G 4 Sun
14/04/19
13 Mon
22/04/19
8 Mon
8/04/19
17 Fri
15/03/19
H 14 Mon
29/04/19
26 Fri
10/05/19
21 Thu
13/04/19
33 Thu
25/04/19
I 7 Tue
23/04/19
16 Wed
1/05/19
26 35
J 16 Thu
2/05/19
23 Wed
8/05/19
35 Tue
7/05/19
42 Tue
7/05/19
K 21 Wed
1/05/19
33 Sun
12/05/19
21 Wed
1/05/19
33 Thu
25/04/19
L 33 Mon
13/05/19
42 Tue
21/05/19
33 Mon
13/05/19
42 Tue
21/05/19
M 42 Tue
21/05/19
42 Tue
21/05/19
42 Tue
21/05/19
42 Tue
21/05/19
6. The activities that are critical are:
A. START
B. Clear & Grub
F. Delivery Frames, Channel etc.
K. Foundation Block
L. Backfill
Document Page
6PROJECT MANAGEMENT
M. FINISH
7. Gantt Chart using number
A
c
0 1 2 3 4 5 6 7 8 9 1
0
1
1
1
2
1
3
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
2
3
2
4
2
5
2
6
2
7
2
8
2
9
3
0
3
1
3
2
3
3
3
4
3
5
3
6
3
7
3
8
3
9
4
0
4
1
4
2
A
B
C
D
E
F
G
H
I
J
K
L
M
Gantt chart using dates
A
c
0
t
1
s
2
n
3
r
4
t
5
t
6
t
7
t
8
t
9
t
1
0
1
1
1
2
1
3
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
2
3
2
4
2
5
2
6
2
7
2
8
2
9
3
0
3
1
3
2
3
3
3
4
3
5
3
6
3
7
3
8
3
9
4
0
4
1
4
2
A
B
C
D
E
F
G
H
I
J
K
L
M
Activities 0th 1st 2nd
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT MANAGEMENT
A
B
C
D
E
F
G
H
I
J
K
L
M
8. The total project duration is 42 days and the completion date is 21st May, 2019