This project management assignment details the process of buying a summer apartment in London, encompassing various project management methodologies. The project begins with a system approach, identifying stakeholders, and defining assumptions and constraints. It progresses through developing a business case and project charter, including project deliverables, team roles, and a stakeholder communication matrix. The project employs a triple constraint view, project scope statement, work breakdown structure (WBS), responsibility assignment matrix (RAM), Program Evaluation and Review Technique (PERT), Critical Path Methodology (CPM), and a Gantt chart for scheduling. It also includes cost estimation techniques, earned value management, quality management, risk management, and change request management. The assignment concludes with issue and project closure reports. This comprehensive project provides a practical application of project management principles.

Running head: PROJECT MANAGEMENT
Project: Buying a summer apartment in London
Name of the Student
Name of the University
Author’s Note
Project: Buying a summer apartment in London
Name of the Student
Name of the University
Author’s Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1
PROJECT MANAGEMENT
Table of Contents
1. System Approach...................................................................................................................2
2. Business Initiative..................................................................................................................2
3. Identify Project Stakeholders.................................................................................................2
4. Assumptions and Constraints.................................................................................................3
4.1 Assumptions.....................................................................................................................3
4.2 Constraints........................................................................................................................3
5. Business Case.........................................................................................................................3
6. Develop the Project Charter...................................................................................................4
6.1 Project description............................................................................................................4
6.2 Project deliverables..........................................................................................................4
6.3 High level project deliverables.........................................................................................4
6.4 Team members and roles.................................................................................................5
7. Stakeholder Communication Matrix......................................................................................6
8. Triple Constraint View...........................................................................................................6
9. Project Scope Statement........................................................................................................7
9.1 Business Process..............................................................................................................7
9.2 Project Goals....................................................................................................................7
9.3 Project work statement.....................................................................................................7
9.4 Deliverables......................................................................................................................7
9.5 Milestones........................................................................................................................8
9.6 Constraints........................................................................................................................8
PROJECT MANAGEMENT
Table of Contents
1. System Approach...................................................................................................................2
2. Business Initiative..................................................................................................................2
3. Identify Project Stakeholders.................................................................................................2
4. Assumptions and Constraints.................................................................................................3
4.1 Assumptions.....................................................................................................................3
4.2 Constraints........................................................................................................................3
5. Business Case.........................................................................................................................3
6. Develop the Project Charter...................................................................................................4
6.1 Project description............................................................................................................4
6.2 Project deliverables..........................................................................................................4
6.3 High level project deliverables.........................................................................................4
6.4 Team members and roles.................................................................................................5
7. Stakeholder Communication Matrix......................................................................................6
8. Triple Constraint View...........................................................................................................6
9. Project Scope Statement........................................................................................................7
9.1 Business Process..............................................................................................................7
9.2 Project Goals....................................................................................................................7
9.3 Project work statement.....................................................................................................7
9.4 Deliverables......................................................................................................................7
9.5 Milestones........................................................................................................................8
9.6 Constraints........................................................................................................................8

2
PROJECT MANAGEMENT
10. Work Breakdown Structure..................................................................................................8
11. Responsibility Assignment Matrix.....................................................................................10
12. Program Evaluation and Review Technique......................................................................13
13. Critical Path Methodology.................................................................................................14
14. Gantt Chart.........................................................................................................................15
15. Costs Estimate Techniques................................................................................................16
16. Earned Value Management................................................................................................16
17. Quality Management..........................................................................................................19
18. Issue Progress Report.........................................................................................................20
19. Project Risks.......................................................................................................................21
20. Manage Risks.....................................................................................................................21
21. Manage Project Change Request.......................................................................................22
22. Issue Lesson Learned Report.............................................................................................22
23. Issue Project Closure Report..............................................................................................22
Bibliography.............................................................................................................................24
PROJECT MANAGEMENT
10. Work Breakdown Structure..................................................................................................8
11. Responsibility Assignment Matrix.....................................................................................10
12. Program Evaluation and Review Technique......................................................................13
13. Critical Path Methodology.................................................................................................14
14. Gantt Chart.........................................................................................................................15
15. Costs Estimate Techniques................................................................................................16
16. Earned Value Management................................................................................................16
17. Quality Management..........................................................................................................19
18. Issue Progress Report.........................................................................................................20
19. Project Risks.......................................................................................................................21
20. Manage Risks.....................................................................................................................21
21. Manage Project Change Request.......................................................................................22
22. Issue Lesson Learned Report.............................................................................................22
23. Issue Project Closure Report..............................................................................................22
Bibliography.............................................................................................................................24
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3
PROJECT MANAGEMENT
1. System Approach
It is found that for analyzing the initiative of the project from its initial stage, it is the
responsibility of the project manager to hire experienced as well as right stakeholders of the
project. The project managers must also engage in creating proper project schedule that not
only elaborates the activities that are required to be performed within the project but also
reflects on the budget that is needed in order to finish the project. In addition to this, the
project must reflect the requirement of resources for each of the project activities so that
depending on their ability and experience they are appointed within the project.
2. Business Initiative
E-business can be helpful in driving the approach of buying property to much more
advances that not only satisfy the customers bit also minimizes the time. With the help of
help of e-business, an individual can get information about the property sellers and can select
their right choice by not wasting much time.
3. Identify Project Stakeholders
The stakeholders who are involved within the project are listed below:
Project manager
Broker
Organizer
Solicitor
Contractor
Project Planner
PROJECT MANAGEMENT
1. System Approach
It is found that for analyzing the initiative of the project from its initial stage, it is the
responsibility of the project manager to hire experienced as well as right stakeholders of the
project. The project managers must also engage in creating proper project schedule that not
only elaborates the activities that are required to be performed within the project but also
reflects on the budget that is needed in order to finish the project. In addition to this, the
project must reflect the requirement of resources for each of the project activities so that
depending on their ability and experience they are appointed within the project.
2. Business Initiative
E-business can be helpful in driving the approach of buying property to much more
advances that not only satisfy the customers bit also minimizes the time. With the help of
help of e-business, an individual can get information about the property sellers and can select
their right choice by not wasting much time.
3. Identify Project Stakeholders
The stakeholders who are involved within the project are listed below:
Project manager
Broker
Organizer
Solicitor
Contractor
Project Planner
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4
PROJECT MANAGEMENT
4. Assumptions and Constraints
4.1 Assumptions
The assumptions of the project are as follows:
To complete the project within the time that is around 40 days
To finish the project within the budget that is around $1,051,640
To follow the scope of the project
4.2 Constraints
The constraints of the project are listed below:
Time: It is the responsibility of the project manager to manage the time of the project
effectively for finishing the entire project within the expected time.
Budget: The project manager must finish the entire project within the budget that is
approved.
Scope: The scope of the project must be followed properly for finishing the project
effectively within the expected time and budget.
5. Business Case
The paper mainly focuses on “buying a summer apartment in Big Ben, London”. It is
found that due to the absence of summer apartment, the family members face lot of problems
and challenges in spending their summer holidays. In order to resolve the challenges, the
family wants to buy an apartment in the area of Big Ben is so that they can relax and can
enjoy their days of summer holidays properly.
PROJECT MANAGEMENT
4. Assumptions and Constraints
4.1 Assumptions
The assumptions of the project are as follows:
To complete the project within the time that is around 40 days
To finish the project within the budget that is around $1,051,640
To follow the scope of the project
4.2 Constraints
The constraints of the project are listed below:
Time: It is the responsibility of the project manager to manage the time of the project
effectively for finishing the entire project within the expected time.
Budget: The project manager must finish the entire project within the budget that is
approved.
Scope: The scope of the project must be followed properly for finishing the project
effectively within the expected time and budget.
5. Business Case
The paper mainly focuses on “buying a summer apartment in Big Ben, London”. It is
found that due to the absence of summer apartment, the family members face lot of problems
and challenges in spending their summer holidays. In order to resolve the challenges, the
family wants to buy an apartment in the area of Big Ben is so that they can relax and can
enjoy their days of summer holidays properly.

5
PROJECT MANAGEMENT
6. Develop the Project Charter
6.1 Project description
The project reflects on buying a summer apartment in Big Ben area of London. A
summer apartment is generally needed by the family so that the problems that they face in
absence of a summer apartment got resolved and they will get the chance of enjoying their
summer holidays with their family members. The project of buying an apartment will be
completed within 40 days by utilizing budget of around $1,051,640.
6.2 Project deliverables
The deliverables of the project are as follows:
Viewing apartment in London
Valuation survey
Property survey
Building or structural survey
Finalizing an offer
Proper communication
Conveyancing and searches
Exchange of contracts
Enquiries on the property
Transfer of funds
6.3 High level project deliverables
The high-level deliverables of the project are as follows:
Arranging a solicitor
RICS condition report
RICS homebuyer report
PROJECT MANAGEMENT
6. Develop the Project Charter
6.1 Project description
The project reflects on buying a summer apartment in Big Ben area of London. A
summer apartment is generally needed by the family so that the problems that they face in
absence of a summer apartment got resolved and they will get the chance of enjoying their
summer holidays with their family members. The project of buying an apartment will be
completed within 40 days by utilizing budget of around $1,051,640.
6.2 Project deliverables
The deliverables of the project are as follows:
Viewing apartment in London
Valuation survey
Property survey
Building or structural survey
Finalizing an offer
Proper communication
Conveyancing and searches
Exchange of contracts
Enquiries on the property
Transfer of funds
6.3 High level project deliverables
The high-level deliverables of the project are as follows:
Arranging a solicitor
RICS condition report
RICS homebuyer report
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6
PROJECT MANAGEMENT
Finalizing the mortgage
Exchange of contracts
Signing contracts
Transfer of funds
Setting mutually agreed completion date
6.4 Team members and roles
The team members and their roles are provided in the below table:
Team member Roles Mobile E-mail Signature
Project manager The project manager
manages the entire
project.
NA NA William
Watson
Broker The broker engages
in searching for the
summer apartments.
NA NA James
Anderson
Organizer The organizer
engages in
organizing the paper
works for the
apartment.
NA NA James
Anderson
Solicitor They generally help
in surveying
valuation as well as
property.
NA NA Andrew Lee
Contractor The contractor
engages in taking the
NA NA James smith
PROJECT MANAGEMENT
Finalizing the mortgage
Exchange of contracts
Signing contracts
Transfer of funds
Setting mutually agreed completion date
6.4 Team members and roles
The team members and their roles are provided in the below table:
Team member Roles Mobile E-mail Signature
Project manager The project manager
manages the entire
project.
NA NA William
Watson
Broker The broker engages
in searching for the
summer apartments.
NA NA James
Anderson
Organizer The organizer
engages in
organizing the paper
works for the
apartment.
NA NA James
Anderson
Solicitor They generally help
in surveying
valuation as well as
property.
NA NA Andrew Lee
Contractor The contractor
engages in taking the
NA NA James smith
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7
PROJECT MANAGEMENT
contract for buying
an apartment.
Project Planner The project planner
engages in making
proper planning for
the project.
NA NA Stephen
smith
7. Stakeholder Communication Matrix
The stakeholder’s communication matrix is provided in the table below:
Purpose Frequency Responsible person Ways of
communication
To know about the
value of the property
Once Project manager Video conference,
face to face
To finalize the offer Once Contractor Video conference,
face to face
For exchanging the
contracts
weekly Contractor Video conference,
face to face
For organizing
finances
Weekly Organizer Video conference,
face to face
8. Triple Constraint View
The triple constraint view of the project is provided below:
Time:40 days
Scope: To buy summer apartment
Cost: $1,051,640.00
PROJECT MANAGEMENT
contract for buying
an apartment.
Project Planner The project planner
engages in making
proper planning for
the project.
NA NA Stephen
smith
7. Stakeholder Communication Matrix
The stakeholder’s communication matrix is provided in the table below:
Purpose Frequency Responsible person Ways of
communication
To know about the
value of the property
Once Project manager Video conference,
face to face
To finalize the offer Once Contractor Video conference,
face to face
For exchanging the
contracts
weekly Contractor Video conference,
face to face
For organizing
finances
Weekly Organizer Video conference,
face to face
8. Triple Constraint View
The triple constraint view of the project is provided below:
Time:40 days
Scope: To buy summer apartment
Cost: $1,051,640.00

8
PROJECT MANAGEMENT
9. Project Scope Statement
9.1 Business Process
The paper reflects on buying an apartment in Big Ben, London for providing the
facility of proper relaxation as well as enjoyment during the months of summer to the family
members.
9.2 Project Goals
The main goal of the project is to buy a summer apartment in Big Ben area in London
in order to can relax can enjoy the days of summer holidays properly.
9.3 Project work statement
The project work statement reflects that the entire project will be completed within
the time period of 40 days by utilizing budget of around $1,051,640. The work statement of
the project also helps in elaborating the activities and deliverables of the project.
9.4 Deliverables
The deliverables of the project include:
Viewing apartment in London
Valuation survey
Property survey
Building or structural survey
Finalizing an offer
PROJECT MANAGEMENT
9. Project Scope Statement
9.1 Business Process
The paper reflects on buying an apartment in Big Ben, London for providing the
facility of proper relaxation as well as enjoyment during the months of summer to the family
members.
9.2 Project Goals
The main goal of the project is to buy a summer apartment in Big Ben area in London
in order to can relax can enjoy the days of summer holidays properly.
9.3 Project work statement
The project work statement reflects that the entire project will be completed within
the time period of 40 days by utilizing budget of around $1,051,640. The work statement of
the project also helps in elaborating the activities and deliverables of the project.
9.4 Deliverables
The deliverables of the project include:
Viewing apartment in London
Valuation survey
Property survey
Building or structural survey
Finalizing an offer
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9
PROJECT MANAGEMENT
9.5 Milestones
Milestone Completion date
Milestone 1: Completion of initiation phase Thu 02-08-18
Milestone 2: Solicitor arrangement phase completion Wed 22-08-18
Milestone 3: Mortgage finalization completion Fri 07-09-18
Milestone 4: Completion of closure phase Mon 17-09-18
9.6 Constraints
The constraints of the project include:
Completion of the project within the expected time that is 40 days
Buying the apartment within the budget that is around $1,051,640.
10. Work Breakdown Structure
WBS
level
WBS Task Name Duration Responsible
0 Buying a summer apartment in
London
40 days
1 1 Initiation phase 8 days
2 1.1 Developing plan 1 day Project manager
2 1.2 Organizing finances 3 days Organizer
2 1.3 Register with MylondonHome 1 day Project planner
2 1.4 Search for property 1 day Broker
2 1.5 Viewing apartment in London 1 day Project manager
2 1.6 Putting forward an offer 1 day Project planner
1 2 Arranging a solicitor 14 days
PROJECT MANAGEMENT
9.5 Milestones
Milestone Completion date
Milestone 1: Completion of initiation phase Thu 02-08-18
Milestone 2: Solicitor arrangement phase completion Wed 22-08-18
Milestone 3: Mortgage finalization completion Fri 07-09-18
Milestone 4: Completion of closure phase Mon 17-09-18
9.6 Constraints
The constraints of the project include:
Completion of the project within the expected time that is 40 days
Buying the apartment within the budget that is around $1,051,640.
10. Work Breakdown Structure
WBS
level
WBS Task Name Duration Responsible
0 Buying a summer apartment in
London
40 days
1 1 Initiation phase 8 days
2 1.1 Developing plan 1 day Project manager
2 1.2 Organizing finances 3 days Organizer
2 1.3 Register with MylondonHome 1 day Project planner
2 1.4 Search for property 1 day Broker
2 1.5 Viewing apartment in London 1 day Project manager
2 1.6 Putting forward an offer 1 day Project planner
1 2 Arranging a solicitor 14 days
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10
PROJECT MANAGEMENT
2 2.1 Valuation survey 2 days Organizer
2 2.2 Property survey 2 days Broker
2 2.3 RICS condition report 3 days Contractor
2 2.4 RICS homebuyer report 2 days Organizer
2 2.5 Building or structural survey 3 days Contractor
2 2.6 Finalizing an offer 1 day Project planner
2 2.7 Proper communication 1 day Project manager
1 3 Finalizing the mortgage 12 days
2 3.1 Offer accepted 1 day Contractor
2 3.2 Conveyancing and searches 2 days Project planner
2 3.3 Exchange of contracts 1 day Contractor
2
3.4 Enquiries on the property 2 days
Solicitor, Apartment
cost [1]
2 3.5 Exchange of contracts 2 days Project manager
2 3.6 Signing contracts 1 day Project manager
2 3.7 Transfer of funds 2 days Broker
2
3.8
Setting manually agreed
completion date
1 day Project manager
1 4 Closure phase 6 days
2
4.1 Remaining money owed 2 days
Organizer, Other cost
[1]
2 4.2 Paying a mortgage account fee 2 days Contractor
2 4.3 Paying solicitor bill 1 day Solicitor
2 4.4 Completion 1 day Project planner
PROJECT MANAGEMENT
2 2.1 Valuation survey 2 days Organizer
2 2.2 Property survey 2 days Broker
2 2.3 RICS condition report 3 days Contractor
2 2.4 RICS homebuyer report 2 days Organizer
2 2.5 Building or structural survey 3 days Contractor
2 2.6 Finalizing an offer 1 day Project planner
2 2.7 Proper communication 1 day Project manager
1 3 Finalizing the mortgage 12 days
2 3.1 Offer accepted 1 day Contractor
2 3.2 Conveyancing and searches 2 days Project planner
2 3.3 Exchange of contracts 1 day Contractor
2
3.4 Enquiries on the property 2 days
Solicitor, Apartment
cost [1]
2 3.5 Exchange of contracts 2 days Project manager
2 3.6 Signing contracts 1 day Project manager
2 3.7 Transfer of funds 2 days Broker
2
3.8
Setting manually agreed
completion date
1 day Project manager
1 4 Closure phase 6 days
2
4.1 Remaining money owed 2 days
Organizer, Other cost
[1]
2 4.2 Paying a mortgage account fee 2 days Contractor
2 4.3 Paying solicitor bill 1 day Solicitor
2 4.4 Completion 1 day Project planner

11
PROJECT MANAGEMENT
11. Responsibility Assignment Matrix
Responsibility assignment matrix (RACI) illustrates the participation of different roles
in competing various tasks or deliverables of the project within the business process. RACI
stands for:
R-Responsible
A-Accountable
C-Consult
I-Informed
Activities Project
manager
Broker Organize
r
Solicitor Contractor Project
planner
Developing
plan
R, A I C
Organizing
finances
I R, A C
Register
with
MylondonHome
R, A I C
Search for
property
I R, A C
Viewing
apartment in
I R, A C
PROJECT MANAGEMENT
11. Responsibility Assignment Matrix
Responsibility assignment matrix (RACI) illustrates the participation of different roles
in competing various tasks or deliverables of the project within the business process. RACI
stands for:
R-Responsible
A-Accountable
C-Consult
I-Informed
Activities Project
manager
Broker Organize
r
Solicitor Contractor Project
planner
Developing
plan
R, A I C
Organizing
finances
I R, A C
Register
with
MylondonHome
R, A I C
Search for
property
I R, A C
Viewing
apartment in
I R, A C
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 27
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.