This consolidated portfolio provides a comprehensive overview of various learning outcomes related to project, program, and portfolio management (PPPM). It delves into the relevance of systems thinking, different systems thinking tools and techniques, and the application of systems engineering in project cases. The portfolio also examines the importance of selecting appropriate project management applications to meet internal and external objectives, how these applications lead to effective knowledge management and decision-making, and the advantages and disadvantages of manual and electronic PPPM systems. Furthermore, it identifies how PPPM application systems assist project managers in monitoring performance and managing changes, discussing contemporary developments in the utilization of PM application systems. The report uses relevant journals, books, and online resources to support its analysis and conclusions.
Document Page
PPMP20012 - CONSOLIDATED PORTFOLIO
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of Contents
Introduction
....................................................................................................................................4
Week one
.........................................................................................................................................5
LO 1: Explain the relevance of system thinking to the project, program and portfolio

manager.
......................................................................................................................................5
Week two
........................................................................................................................................6
LO 2: To Identify different systems are thinking tools and techniques to aid project

managers to solve project problems.
........................................................................................ 6
Week three
......................................................................................................................................7
LO 3: To assess the relevance of systems engineering to project cases.
................................7
Week four
....................................................................................................................................... 8
LO 4: To explain the relevance of systems thinking to the project, program and portfolio

manager.
......................................................................................................................................8
Week five
........................................................................................................................................9
LO 5: To explain the importance of the appropriate selection of project management (PM)

application systems in regards to meeting the internal and external objectives of a project.

......................................................................................................................................................
9
Week sixth
....................................................................................................................................10
LO 6: To describe how the use of project management (PM) application systems can lead

to effective PM knowledge management and decision making.
...........................................10
Week seven
................................................................................................................................... 11
LO 7: To Compare and contrast the advantages and disadvantages of different manual

and electronic project, program and portfolio (PPPM) application systems within each

PPPM knowledge area over the life cycle of a project, program or portfolio.
...................11
Week eight
.................................................................................................................................... 12
LO 8: To identify how project, program and portfolio (PPPM) application systems can

assist project managers to monitor performance and manage changes within a project.
12
Document Page
Week nine..................................................................................................................................... 13
LO 9: Identification of application systems about how PM assists the project managers in

order to monitor the overall performance along with enhancing changes within the overall

project.
...................................................................................................................................... 13
Week Ten
...................................................................................................................................... 14
LO 10: Effective discussion of the contemporary developments in relation to the effective

utilization of the PM application systems.
............................................................................. 14
Discussion and conclusion
...........................................................................................................15
References
.....................................................................................................................................17
Appendix
.......................................................................................................................................19
Document Page
Introduction
The consolidated portfolio can be referred to as the combine information about the different

portfolio. The portfolio management helps to determine the different outcome which has been

gained by the different case studies. This report will give concise information about the different

learning outcomes which have been studied. There will be summarized information about the

gaining from the portfolios. In the case study, there will be a discussion about the system thinking,

relevancy of engineering performance and so on. The particular report will help to understand the

different context of system thinking. The information which will be discussed in the report is

relevant to the particular approaches and have been taken from the relevant journals and activities.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Week one
LO 1: Explain the relevance of system thinking to the project, program and portfolio

manager.

Summary

The study of the portfolio had determined that the system thinking can be stated as the essential

elements of project management. It derives some approaches which help to make the project more

concise and relevant. The manager also achieves advantages from this approach as the manager is

the person who takes care of the relevancy and accuracy of the project. If the project will be

implemented in a successful manner then only it will be impactful. The system thinking helps to

make the determination about the different needs and requirements of project implementation. The

major benefit of implementing system thinking is derived towards the basic assumptions of the

project which helps to make the project more effective (Jordan, 2018). As it helps to make the

project more effective so the benefit is that the stakeholders get more engaged towards the project

which boosts up the performance of project management. The effective system thinking includes

critical observation over the project planning. The particular observation helps to analyse the risk

factors. The assumption of risk is most necessary as these affect the project in a negative manner.

Consequently, it helps to make some approaches to reduce such risk and provides better project

structure.

Evidence

The information which has been discussed above is relevant and taken from some applicable

journals and books. The specific which have been described have taken from the SEBok units,

these units provided the appropriate information about system thinking. Other sources which have

been used to attain the information were the sources of the internet like websites, links and so on.
Document Page
Week two
LO 2: To Identify different systems are thinking tools and techniques to aid project

managers to solve project problems.

Summary

This has been summarized from the learning outcome that this is most necessary to make the

project implementation appropriate. If the project will be implemented effectively then the

outcomes will also be attractive and will set the bar to gain success. The manager had implemented

the approaches of system thinking to attain the relevancy in the project implementation. The

foremost approach which has been attained is about the determination of the issue and also made

segregation of issues in terms of their impact. This segregation helps to make the relevant

resolution over the challenges (
Kerzner & Kerzner, 2017). Another tool which has been
implemented by the manager was the implementation of computer technologies. The computer

technologies help to make the determination about the complex and uncertain challenges. The

other method which has been used was about the brainstorming techniques those techniques helped

to make the determination about the impacts of the issues on project management. The other tool

which used to make the determination about the issues was the approaches of thinking tool it

includes diffrent5 graphics and diagrams to make the determination about different issues and

challenges (
Patanakul, 2015). Thus, it can be stared that these approaches help to understand
different issues which can impact the program management.

Evidence

The information which has been discussed above is taken from the relevant theories and

approaches. The different books and journals were the major resources to attain information. The

journal and books of different authors helped to attain the information. The internet sources were

also used to attain relevant information.
Document Page
Week three
LO 3: To assess the relevance of systems engineering to project cases.

Summary

This can be stated that the implementation of the project requires some different concepts which

need to be followed in an effective manner. To make the project insignificant manner this is most

necessary to attain some resources and approaches which helps to make the proper determination

about the project evaluation. It has been discussed that the manager is the essential requirement to

manage the project but it is also a fact that the manager needs an effective team also which helps to

make the implementation of the project. The process of technical aspects in the project can only be

implemented via the proper and relevant engineers (
Kusters, 2016). The project implementation
requires to have good and relevant approaches but at the same time, it also requires to have the

relevant and effective team and leader who can convert the idea in the real-world entity. The

generation of the project attains some motive which needs to be fulfilled accordingly. The proper

balance between team management and relevant managing helps to enhance the capabilities and

effectiveness of the project. If there will the determination and supportiveness between different

technical and non-technical team members to then the implementation of the project will become

more significant and reliable.

Evidence

The information which has been discussed above is concise to the importance of system

engineering in the project management. Different type of journals and studies of authors helped to

make the determination about the relevancy and necessity of the approaches. The substantiation

which has been used to attain the information are some relevant books and internet sources.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Week four
LO 4: To explain the relevance of systems thinking to the project, program and portfolio

manager.

Summary

The project is not an easy task it needs to apply some different and relevant approaches which help

to make the project more efficient. The project manager can also apply some approaches or

methodologies which can help to achieve the relevancy in the working structure. The methods of

system engineering help in some significant manner to attain the different approaches to project

management. The effective approaches of system engineering help to make the determination

about the issues and challenges which can affect the project implementation in a negative manner.

Another of the approach is that it includes the high level of technologies which provides the

opportunity to make the understanding about the error checking and also help to make some

advanced and technical implementation which argue the requirements of current market values

(Jordan, 2018). The portfolio manager also helps to make the effective and attractive structure of

the project. If the manager will be concerned towards the project management then he can attain the

required and appropriate changes and innovation by the right time. The appropriate changes and

innovation help to make the implementation of the project more effective and strong. It will help

the manager to make some resolutions over different risk which has assumed.

Evidence

The information which has been discussed above taken from the relevant and justified journals and

books. There are some different authors had provided some applicable information about the same

which has been gathered from the library and used to make the proper determination in a concise

manner.
Document Page
Week five
LO 5: To explain the importance of the appropriate selection of project management (PM)

application systems in regards to meeting the internal and external objectives of a project.

Summary

The effective and impactful implementation of project needs to have a brief analysis of the internal

and external factors which affects the project. The observation includes different aspect which

needs to be determined. As this is most necessary to make the observation about the possibilities of

advantages and disadvantages includes under different factors because both of the factors have

different significant over the project management (
Berecibar, et. al., 2016). The internal factors
help to make the determination about This is discussed that the internal and external both factors

are necessary to be determined while implementing the project, but the other thing which is most

necessary is about the determination of the application of project management. These applications

help to manage the project structure in a significant manner. The execution and implementation of

the project. It also helps to make the determination and balance between the effective team

management and working performance of project implementation. The external factors determine

the requirement and needs of the current market (
Berecibar, et. al., 2015). Another benefit of this
approach is that helps to determine and evaluate the cultural values while implementing the project

management. It helps to enhance the communication balance which helps to determine the needs of

clients further, it helps to maintain the budget and enhance the decision-making skills.

Evidence

The relevant journal and books have been used to make the analysis over the approaches. There are

some relevant theories and books available on the internet as well which helped to make the

relevant information in a significant manner.
Document Page
Week sixth
LO 6: To describe how the use of project management (PM) application systems can lead to

effective PM knowledge management and decision making.

Summary

The application of project management helps to reduce the complications of the project. As it

includes some relevant approaches which help to make the project in an effective manner. The

effective implementation and use of application help to attract more stakeholders towards project

management. The involvement of stakeholders directly enhances the ability and performance of

the project management (
Bryde, et. al., 2013). As more stakeholders will include in the project
management the performance will also increase. Another benefit of implementing the application

is that it helps to make the determination about the balanced teamwork. The project management

needs different aspects to be working at the same time as it needs to have better innovation,

effective implementation, appropriate financial structure. All of these elements can only be

attained via the availability of effective and enthusiastic team management. The different

applications of project management help to maintain the working structure in a sequential and

proper manner (
Killen, et. al., 2012). It also helps to attain the records and performance criteria of
different members of the team so that the manager can make the determination about the needs of

changes. It also helps to make the proper determination about the different issue and challenges of

project management. Another benefit of this approach is that it helps to make required and certain

updates in the project management.

Evidence

The information which has been discussed collected from the relevant theories and journals. The

books and journals were the sources to attain the information. Another source which used to gather

the information was the internet.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Week seven
LO 7: To Compare and contrast the advantages and disadvantages of different manual and

electronic project, program and portfolio (PPPM) application systems within each PPPM

knowledge area over the life cycle of a project, program or portfolio.

Summary

The project manager had used some relevant and different methodologies to implement the project

in a significant manner. The manager had applied different approaches to making relevant and

innovative ideas. There was proper implementation of the different innovative ideas which

included different perspective to be followed in a significant manner. The implementation of

different approaches and ideas includes some advantages and disadvantages which needs to be

determined to make the project more effective and impactful (Grønbæk, et. al., 2017). The

foremost advantage of implementing different approaches is that it helps to make the

understanding and determination about the appropriate requirements of the project. It also helps to

manage the working structure of the project. Another advantage of the approaches is that it helps to

attain observation over the things. This observation helps to determine the financial and other

aspects of the projects management in a concise manner. This advantage helps to make the project

more sufficient (Hazır, 2015). There are some disadvantages also included in the application of

approaches. Any of the minor mistake or misconception can lead the project towards the failure.

This can be stared that this is most necessary to attain the proper and relevant approaches while

implementing in the project management.

Evidence

The sources which have been used to gather the information are journals and books. All the sources

are relevant and justify the topic in a significant manner.
Document Page
Week Eight
LO 8: To identify how project, program and portfolio (PPPM) application systems can assist

project managers to monitor performance and manage changes within a project.

Summary

This is most necessary to make the determination about the performance if the manager and the

team want to achieve success in the planning. The monitoring of performance helps the manager to

make the determination about the appropriate needs of the project management. To make the

observation or monitor the working performance the manager can implement some approaches

which significantly helps to measure the performance. The manager can adapt some approaches

which help to make the analysis over the performance like he can implement some rules which

need to be followed and also have to provide the relevant information about the performance of

different employees (Eriksson, et. al., 2017). There should be some activities which measure the

different capabilities and skills of the team members. These monitoring or observation not only

helps to make the determination about the performance apart from that it also helps to make the

determination about the current requirements and needs of the program. The current stage of the

program will help to define and make the changes if required and those change will make the

project more impactful and significant. Another need of analysis is that it helps to make the

understanding about the team members who are performing well and deserves to get an appraisal,

on the other hand, it also determines about those who need some support to perform well.

Evidence

The information which has been discussed is taken from the relevant journal and books. This

sources helped to get the relevant information as per the requirements.
Document Page
Week nine
LO 9: Identification of application systems about how PM assists the project managers in

order to monitor the overall performance along with enhancing changes within the overall

project.

Summary

The observation over the things will help to determine the issues which have been considered in the

project management. After making the determination the further need is to make the determination

about the resolution of issues. To attain the resolution project manager can implement some

effective ideas and approaches. The technical tools will help to make the determination about the

approaches which will help to enhance the changes. The different methods and tools will help to

enhance performance in a significant manner. To attain the impact of the tools this is most

necessary for the higher authority to implement those ideas in an appropriate manner. If the

approaches will be implemented in a significant manner then only the team can attain the

advantages and reduce the risk which has been observed (Todorović, et. al., 2015). The

implementation of methods is critical as if the implementation will not be perfect as it is required

then it will harm the project management and will raise another issue, which will impact the

performance in a negative manner. This is necessary to observe the data and information slightly as

it helps to make the determination about the current and future performance of the project. The

determination about the changes tends the project to become impactful and also helps to attain the

approaches which help to attain the aims and objectives of the implementation of the project.

Evidence

The discussion which has been elaborated above about the project management has been followed

by the relevant journals and books. The other sources which have been used to make the

information are internet sources.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Week Ten
LO 10: Effective discussion of the contemporary developments in relation to the effective

utilization of the PM application systems.

Summary

This is most necessary for the project manager to implement some approaches which help to

enhance the effectiveness of the project. The contemporary development approaches help in a

significant manner to attain the advantages and effectiveness in project management. This is most

necessary to make the determination about the different aspects of the project implementation. This

helps to make the justification to attain the goals and objectives of the project (Kliem, et. al., 2019).

It helps to make the observation over the efficiency and provides relevant and different ways to

overcome the issues and challenges. It can be understood that the risk affects the implementation of

the project in a negative manner. The proper management analysis helps to make the determination

over risk management and gives efficiency to the project management. It provides advanced and

different technologies to be utilized (Jordan, 2018). The advanced technologies help to attain the

aims and objectives in a more significant manner. This can attain the hassle if the information and

data will not be secured at single as it that case it introduced the approaches which provided tools to

collect the data at an appropriate place. It will help the higher authority to attain the information

when it will be required.

Evidence

The information which has been taken in the discussion has been taken from the relevant sources

and used to maintain the study in an effective manner. The sources which have been used in the

study are different journals and books written by different authors. The journals had provided

specific information about the topic.
Document Page
Discussion and conclusion
This case study had informed about the portfolio of project management. There was brief

information about the relevant and significant approaches which needs to be determined while

implementing the project management. The different aspects which have been discussed in the

report were mentioned in the observation of different weeks. The conclusion and discussion about

different portfolio have been discussed below:

Week one:
The information which has been discussed in the first outcome had provided
information about the importance of system thinking. This can be concluded that system thinking is

a relevant approach to maintain project management.

Week two:
the further LO had informed about the tools and methods which can help to maintain
the project management. This can be stated that the tools and methods of system thinking helps to

make the project more effective.

Week three:
This has been discussed about the engineering assets and its importance to make the
determination over the project management.

Week four:
This has been provided with information about the relevance of system tools and also
provided the importance of attaining the different tools.

Week five:
There was a discussion about the internal and external factors of project management
which impacts the performance of the project. It also discussed some methods to make the analysis

over the performance.

Week six:
This LO had discussed the use and implementation of applications of projects
management. There was a piece of brief information about the importance of implementing the

application in project management.

Week seven:
This LO discussed the advantages and disadvantages of different applications of
project management. The issues and challenges of project management also discussed in this

section.

Week eight:
The study of this week helped to determine the issues and challenges which can affect
the project management in a negative manner. It also included information about the relevant

approaches which helps to monitor the performance.
Document Page
Week nine: This has been discussed about the relevant approaches which can help to make the
approaches to resolve the issues and challenges which have been observed in the previous

discussion.

Week ten:
There was a discussion about the methods of contemporary management which helps to
attain the aims and objectives and objectives of project management in a significant manner.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
References
Berecibar, M., Garmendia, M., Gandiaga, I., Crego, J., & Villarreal, I. (2016). State of health
estimation algorithm of LiFePO4 battery packs based on differential voltage curves for the

battery management system application.
Energy, 103, 784-796.
Brand, S., Bartlett, D., Farley, M., Fogelson, M., Hak, J. B., Hu, G., ... & Shen, A. (2015). A
Model Data Management Plan Standard Operating Procedure: Results From the DIA Clinical

Data Management Community, Committee on Clinical Data Management Plan.
Therapeutic
innovation & regulatory science
, 49(5), 720-729.
Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of building information
modelling (BIM).
International journal of project management, 31(7), 971-980.
Eriksson, P. E., Larsson, J., & Pesämaa, O. (2017). Managing complex projects in the
infrastructure sector—A structural equation model for flexibility-focused project

management.
International journal of project management, 35(8), 1512-1523.
Grønbæk, K., Grudin, J., Bødker, S., & Bannon, L. (2017). Achieving cooperative system
design: shifting from a product to a process focus. In
Participatory Design (pp. 79-97). CRC
Press.

Hazır, Ö. (2015). A review of analytical models, approaches and decision support tools in
project monitoring and control.
International Journal of Project Management, 33(4), 808-815.
Jordan, A. (2018). The Technology-Driven Future of Project Management.
Kerzner, H., &Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling
. John Wiley & Sons.
Killen, C. P., Jugdev, K., Drouin, N., & Petit, Y. (2012). Advancing project and portfolio
management research: Applying strategic management theories.
International Journal of
Project Management
, 30(5), 525-538.
Kliem, R. L., & Ludin, I. S. (2019). Reducing project risk.
Kusters, J. F. (2016). The value and necessity of the project management plan: the pre-award
phase of BVP projects from the vendor’s perspective.

Patanakul, P. (2015). Key attributes of effectiveness in managing a project
portfolio.
International Journal of Project Management, 33(5), 1084-1097.
Document Page
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015).
Project success analysis framework: A knowledge-based approach in project management.

International Journal of Project Management, 33(4), 772-783.
Document Page
Appendix
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
chevron_up_icon
1 out of 20
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]