This report, prepared as part of a Managing Projects course, delves into various aspects of project management. It begins with an introduction outlining the report's structure and version control. The background section provides context, including the student's background and objectives. The core of the report examines key project management areas, including integration management, stakeholder management, scope management, resource management, time management, cost management, risk management, quality management, procurement management, and communication management. Each section provides definitions and explains the application of these concepts to the course. The report emphasizes the importance of these aspects in mechanical engineering projects, highlighting the need for effective planning, stakeholder engagement, resource allocation, and risk mitigation. The report concludes by summarizing the key findings and reinforcing the significance of project management principles in achieving project success.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
49002 Managing Projects Spring 2017
Assignment 1 – part 1
Student name:
Student number:
Date submitted:
MP 49002 Managing Projects Spring 2017 version 0.0 page 1 of 21
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of Contents
1 Introduction.......................................................................................................................................3
1.1 Outline...................................................................................................................................3
1.2 Version Control.....................................................................................................................3
2 Background........................................................................................................................................4
2.1 Your Background..................................................................................................................4
2.2 Your objectives.....................................................................................................................4
3 Integration..........................................................................................................................................5
3.1 Definition of Project Integration Management.....................................................................5
3.2 How does this apply to my work in this course?..................................................................5
4 Stakeholders......................................................................................................................................6
4.1 Definition of Project Stakeholder Management....................................................................6
4.2 How does this apply to my work in this course?..................................................................6
5 Scope.................................................................................................................................................7
5.1 Definition of Project Scope Management.............................................................................7
5.2 How does this apply to my work in this course?..................................................................7
6 Resources...........................................................................................................................................8
6.1 Definition of Project Resource Management........................................................................8
6.2 How does this apply to my work in this course?..................................................................8
7 Time...................................................................................................................................................9
7.1 Definition of Project Time Management..............................................................................9
7.2 How does this apply to my work in this course?..................................................................9
8 Cost..................................................................................................................................................10
8.1 Definition of Project Cost Management.............................................................................10
8.2 How does this apply to my work in this course?................................................................10
9 Risk..................................................................................................................................................11
9.1 Definition of Project Risk Management.............................................................................11
9.2 How does this apply to my work in this course?................................................................11
10 Quality...........................................................................................................................................12
10.1 Definition of Project Quality Management.......................................................................12
10.2 How does this apply to my work in this course?..............................................................12
11 Procurement..................................................................................................................................13
MP 49002 Managing Projects Spring 2017 version 0.0 page 2 of 21
Document Page
11.1 Definition of Project Procurement Management..............................................................13
11.2 How does this apply to my work in this course?..............................................................13
12 Communication............................................................................................................................14
12.1 Definition of Project Communication Management.........................................................14
12.2 How does this apply to my work in this course?..............................................................14
13 Conclusions...................................................................................................................................15
14 References.....................................................................................................................................16
MP 49002 Managing Projects Spring 2017 version 0.0 page 3 of 21
Document Page
1 Introduction
1.1 Outline
A report is prepared which will help in evaluating information related with how project should be
managed. In the field of engineering innovation is one of the aspects which is required to be taken
into consideration. Managing innovative projects is relatively tougher than other project, hence it is
required that a project manager indulging in such type of projects should have proper set of
knowledge regarding PMBOK. Hence, a report is developed which will include tactics of project
management provided in PMBOK.
1.2 Version Control
Version Release date Comments
0.0 24/07/2017 Helen created the template
MP 49002 Managing Projects Spring 2017 version 0.0 page 4 of 21
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
2 Background
2.1 Your Background
Mechanical Engineering is a field which includes huge scope for sustainable future. Mechanical
engineering teaches some or the other new thing at each and every step. Mechanical engineering
helps in enhancing the critical thinking skills and provides a better opportunity for future growth.
Developing project management skills is one of the most important aspects in present time. Hence,
a project is developed which will help in developing a better set of understanding with project
management skills. Information related with project management will be availed which is gained
from PMBOK.
2.2 Your objectives
Objective of this report is to evaluate and analyse the information related with project management
tactics. The information gained will help in enhancing the knowledge and skills of an individual
with the effect of which he will be able to manage the project in a proper way.
MP 49002 Managing Projects Spring 2017 version 0.0 page 5 of 21
Document Page
3 Integration
3.1 Definition of Project Integration Management
The process which helps in identifying, combining and coordinating all the aspects of the project is
known as project integration management (Varajão, et. al., 2017). Project integration management
is the aspect which helps in managing the project activities with the effect of which project could be
developed and its requirements could get fulfilled by the project manager. Project integration
management will help in making the engineering projects more effective and will help the team in
managing its activities in a proper and subtle way.
3.2 How does this apply to my work in this course?
Project integration management is one of the most important aspects attached with the engineering
projects (Hoyle, 2013). It is required that all the processes which are included in it should be taken
into consideration by the project manager as it will help in managing the project activities in a
refined way. Project integration management helps the project manager in many ways like:
(Indelicato, 2009)
MP 49002 Managing Projects Spring 2017 version 0.0 page 6 of 21
Document Page
It helps in availing proper set of information related with the project. Each and every activity is
being explained in the project integration management which helps in managing the things in more
smooth way (Jamali, and Oveisi, 2016).
It helps in enhancing the knowledge and skills of the people indulged in the project. These skills
help them in bringing quality to the project.
A proper direction will be provided which will help the project manager and the team in completing
the same within the required deadlines and budget decided (Maqsood, 2011).
MP 49002 Managing Projects Spring 2017 version 0.0 page 7 of 21
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4 Stakeholders
4.1 Definition of Project Stakeholder Management
Stakeholders are the people who are either directly or indirectly attached with the project and its
activity. They are the people who get benefited as well as affected with every single activity of the
project. Stakeholders play a very vital role in the formulation of a project and provide a support
system which helps in completing the project in which it is required (Rose, 2013). Hence, it is
necessary that all the stakeholders should be taken into consideration and information related with
their needs and requirements should be gathered. This will help in managing the project and
completing the same in a proper and effective way.
4.2 How does this apply to my work in this course?
Stakeholders a termed as one of the most important part of a project. For a project manager it is
required that every single stakeholder should be taken into consideration (Saleh Al-Freidi, 2015).
Hence, analysing all the stakeholders will help the project manager in managing the project and
completing the same in a most appropriate way:
MP 49002 Managing Projects Spring 2017 version 0.0 page 8 of 21
Document Page
(Santos, 2008)
Project manager is the stakeholders who keeps an eye on each and every activity of the project and
manages the team working on the project.
Customers or end users are the most important stakeholders who purchase the end product produced
by the project or for whom the project is being developed.
Project team members are the people who remain indulged in processing every single activity of the
project (Tavan, and Hosseini, 2016). They work to manage the project in a proper way and helps in
completing the same within the required dates.
Sponsors are the stakeholders who provide funding and related help for the project. This helps in
managing the project and availing relevant resources for the same.
Government plays a very vital role for every project as they develop a set framework and
regulations with the effect of which work could be managed and all the project activities could be
processed in a proper way (Varajão, et. al., 2017).
MP 49002 Managing Projects Spring 2017 version 0.0 page 9 of 21
Document Page
MP 49002 Managing Projects Spring 2017 version 0.0 page 10 of 21
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
5 Scope
5.1 Definition of Project Scope Management
Project scope helps in defining the boundaries and objectives for the project. Developing a project
without any objective is of no use because without any objective a project manager could not
succeed in completing the same. Reason behind it is that a project without any objective cannot be
processed as it does not have any direction with the effect of which it completed. Hence, it is
necessary that a project should have proper set of scopes and boundaries so that it could get
completed and should provide a proper set of benefits to the stakeholders available in the market.
5.2 How does this apply to my work in this course?
Mechanical Engineering Project is the projects which cannot be processed without any scope or
boundaries. These are the projects which are related with some or the other objectives and it
becomes necessary that these objectives should get fulfilled in a proper way (Kaczmarska, and
Gierulski, 2015). Hence, it is necessary that the scope for the mechanical engineering projects
should be determined and the same should be processed aiming to fulfil the set objectives are
targets. There are various set of benefits which are being provided with the help of project scope
these benefits are:
Project scope helps in determining the objectives on which the project is required to be processed.
All the requirements related with the project could be determined with the help of project scope
It helps in determining the acceptance criteria of the project which helps in decision making aspects
of whether the project should be initiated or the idea should be dropped (Brioso, 2015).
Boundaries of the project are being developed with the help of which all the activities of the
projects of the project could be processed in a fair way.
It helps in determining all the constraints of the project which helps in fulfilling the project
requirements.
Milestones for each activity are being developed by evaluating the scope for the same. This helps in
scheduling and completing the project within the required dates.
MP 49002 Managing Projects Spring 2017 version 0.0 page 11 of 21
Document Page
Risk related with the project are also being evaluated in the scope. It helps in the development of
the strategies with could help in mitigating the risk aspects and managing the project (Gomes,
2013).
6 Resources
6.1 Definition of Project Resource Management
Project resource management is the process which helps in determining and gathering appropriate
number of people for the progress of the project (Hoyle, 2013). Human resource plays a very vital
role for any project and when it comes to the engineering project it becomes more important that
proper number of human resource should be gathered. Hence, developing a proper recruitment and
selection process could help in managing the project and completing it within the required
deadlines.
6.2 How does this apply to my work in this course?
Project resource management is the process in which the number of people required to work upon
the project are evaluated and the most appropriate and skilled people are selected (Indelicato, 2009).
In a mechanical engineering project one of the most important aspects required to be taken into
consideration is the human resource. Proper number of human resource should be availed so that
progress of the project could be maintained and same could be completed in an effective way.
Managing human resource in project management includes:
Developing a proper organisational structure so that each and every individual working on the
project should have the knowledge of on which department he is required to work and from which
managerial head he should take the instructions (Jamali, and Oveisi, 2016).
To manage the project resources it is required that organisational theory should be considered by
the project manager.
Training is another aspect which is required to be focused upon. Providing proper set of training to
each and every team member of the mechanical project will help in refining their skills and will
help in bringing quality to the same.
Cost control is another aspect which is required to be focused upon by the project manager. There
are various set of fluctuations which could occur in the project. In this situation it becomes
MP 49002 Managing Projects Spring 2017 version 0.0 page 12 of 21
Document Page
necessary that cost controlling technique should be applied. Such type of activity helps in managing
the project and processing the work in a smooth way (Maqsood, 2011).
MP 49002 Managing Projects Spring 2017 version 0.0 page 13 of 21
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7 Time
7.1 Definition of Project Time Management
Project time management is the process of the project which helps in evaluating every single
activity of the project so that relevant time could be allotted to every single activity (Rose, 2013).
Allocation of relevant set of time to every single activity helps the team members in availing a set
direction to complete the same. It is required that proper time duration should be allocated to every
single activity so that the project could get completed within the budget and time.
7.2 How does this apply to my work in this course?
Time management activity helps in sequencing and prioritizing the work in a proper way. Setting
priorities helps the project manager in developing a set framework.
Work breakdown structure is one of the aspects which are required to be taken into consideration.
Developing a work breakdown structure helps in bifurcating every single activity into a small unit
with the effect of which work could get managed (Saleh Al-Freidi, 2015). This helps in making a
project process easier and simple with the effect of which the same could get completed in a proper
and effective way.
Estimation of the duration is done in time management. This helps in allocating proper time
duration to every single activity.
Schedule for the project is developed which helps in prioritizing the work and processing the same
within the required framework.
Controlling of the schedule is also done in time management with the help of which project
activities are controlled and work is processed in a smooth manner (Santos, 2008).
Project time management also include selection of the most appropriate technique so as to complete
the project in a more frequent way. Critical path method is used in which a most appropriate and
short way. Shortest path is decided to perform the task in critical path method.
MP 49002 Managing Projects Spring 2017 version 0.0 page 14 of 21
Document Page
(Tavan, and Hosseini, 2016)
8 Cost
8.1 Definition of Project Cost Management
Project cost management is the process with the help of which estimating, budgeting and
controlling of the cost of the project which is being initiated is being done. Project cost management
also helps in evaluating the cost benefits means the benefits which will be gained with the help of
the project formulated by the project manager.
8.2 How does this apply to my work in this course?
In the mechanical engineering project cost management plays a very vital role so as to manage the
expenses which will incur in the project. Mechanical projects requires huge cost and it is required
that estimation should be done so as to reduce the unnecessary expenses and manage the project
progress (Varajão, et. al., 2017). There are certain set of aspects required to be taken into
consideration so as to manage the cost of the project, these aspects are:
Estimating the expenses which will incur in the project, preparing a cost sheet and evaluating the
expense which will incur in every single activity will help in managing the cost of the project and
reducing the unnecessary expenses.
Cost budgeting is another aspect required to be taken into consideration. Cost budgeting helps in
developing a list of expenses and providing a set budget for the project. It is necessary that the
project should get completed within the prepared budget (Kaczmarska, and Gierulski, 2015).
MP 49002 Managing Projects Spring 2017 version 0.0 page 15 of 21
Document Page
9 Risk
9.1 Definition of Project Risk Management
Risk management is the process which includes the activities with the help of which project
manager can identify the risk factors which could occur in the project in near future. It is necessary
that all the risk factors attached with the project should be taken into consideration by the project
manager so that strategies could be developed to mitigate the risk (Tavan, and Hosseini, 2016).
9.2 How does this apply to my work in this course?
Project Risk Management will provide a set direction with the effect of which assurance will be
made that the project management team will sustain in near future and work will be processed in a
smooth way. Following a process of risk management will help in managing the project: process of
risk involve:
Risk Planning in which plans for the management of risk are developed
Identification of all the risk factors is done (Varajão, et. al., 2017)
Qualitative analysis of all the risk factors is done in which evaluation of the qualitative strategies is
done so as to mitigate the risk
Quantitative analysis is another aspect attached with the risk in which calculation of all the
possibilities is done so as to ensure that accuracy could be maintained (Kaczmarska, and Gierulski,
2015).
Risk monitoring and controlling is the last step which is required to be taken into consideration
which helps in managing the changes. At every step of the project it is required that risk should be
monitored and things could get controlled in a proper as well as effective way.
MP 49002 Managing Projects Spring 2017 version 0.0 page 16 of 21
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10 Quality
[The risk subject group includes the processes required to identify and manage threats and
opportunities. AS ISO21500, 2016) How does this relate to your need to pass this course ? ]
10.1 Definition of Project Quality Management
[Formal, referenced definition as per PMBOK or your textbook]
10.2 How does this apply to my work in this course?
[Hint: what quality do you want? Do you need to get over 60%, how do you know you’ve done
enough work to pass? ]
MP 49002 Managing Projects Spring 2017 version 0.0 page 17 of 21
Document Page
11 Procurement
[The procurement subject group includes the processes required to plan and acquire products,
services or results, and to manage supplier relationships. AS ISO21500, 2016) How does this
relate to your need to pass this course ? ]
11.1 Definition of Project Procurement Management
[Formal, referenced definition as per PMBOK or your textbook]
11.2 How does this apply to my work in this course?
[Hint: what do you need to purchase? Do you need to get the text book? Do you need to get a
computer? Does procurement mean purchasing the resources listed above? ]
MP 49002 Managing Projects Spring 2017 version 0.0 page 18 of 21
Document Page
12 Communication
[The communication subject group includes the processes required to plan, manage and distribute
information relevant to the project. AS ISO21500, 2016) How does this relate to your need to pass
this course ? ]
12.1 Definition of Project Communication Management
[Formal, referenced definition as per PMBOK or your textbook]
12.2 How does this apply to my work in this course?
[Hint: how are you going to communicate with the stakeholders mentioned above? ]
MP 49002 Managing Projects Spring 2017 version 0.0 page 19 of 21
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
13 Conclusions
[Thank you for reading this. I am going to pass this course and do well – to do this, I am going to
…..]
MP 49002 Managing Projects Spring 2017 version 0.0 page 20 of 21
Document Page
14 References
Brioso, X. (2015). Integrating ISO 21500 Guidance on Project Management, Lean Construction and
PMBOK. Procedia Engineering, 123, pp.76-84.
Gomes, R. (2013). Contributions of the PMBok to the Project Management of an ERP System
Implementation. Revista de Gestão e Projetos, 04(02), pp.153-162.
Hoyle, P. (2013). Characteristics Influencing Project Management Office (PMO) Structure
Adoption in the Supply Chain and Logistics Industry: A Quantitative Study of Self-Report Surveys
and PMBOK Factors. SSRN Electronic Journal, pp.4-7.
Indelicato, G. (2009). A guide to the project management body of knowledge (PMBOK®guide),
fourth edition. Project Management Journal, 40(2), pp.104-104.
Jamali, G. and Oveisi, M. (2016). A Study on Project Management Based on PMBOK and
PRINCE2. Modern Applied Science, 10(6), p.142.
Maqsood, T. (2011). Managing Risk in Projects20111D. Hillson. Managing Risk in Projects.
Farnham: Gower 2009. 102 pp. International Journal Of Managing Projects In Business, 4(1), Pp.
179-180.
Rose, K. (2013). A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Fifth
Edition. Project Management Journal, 44(3), pp.e1-e1.
Saleh Al-Freidi, S. (2015). A Unified Project Management Methodology (UPMM) based on
PMBOK and PRINCE2 protocols: foundations, principles, structures and benefits of the integrated
approach. International Journal of Business Policy and Strategy Management, 2(1), pp.27-38.
Santos, F. (2008). FMEA AND PMBOK APPLIED TO PROJECT RISK
MANAGEMENT. JISTEM Journal of Information Systems and Technology Management, 5(2),
pp.347-364.
Tavan, F. and Hosseini, M. (2016). Comparison and analysis of PMBOK 2013 and ISO
21500. Journal of Project Management, (10), pp.27-34.
Varajão, J., Colomo-Palacios, R. and Silva, H. (2017). ISO 21500:2012 and PMBoK 5 processes in
information systems project management. Computer Standards & Interfaces, 50, pp.216-222.
Kaczmarska, B. and Gierulski, W. (2015). Innovation Map in the Process of Enterprise
Evaluation. Key Engineering Materials, 669, pp.497-513.
MP 49002 Managing Projects Spring 2017 version 0.0 page 21 of 21
chevron_up_icon
1 out of 21
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]