This project management assignment details the development and implementation of a low-cost home automation system. It encompasses project goals, objectives, and both functional and non-functional requirements. The project plan includes a work breakdown structure, time estimation, resource allocation, and cost analysis. Gantt charts and network diagrams illustrate the project schedule. The report further addresses quality planning, stakeholder analysis, communication strategies, and risk management, culminating in a project deployment plan and post-project review recommendations. The project aims to reduce human labor and enhance home security through a cost-effective automation solution, emphasizing the importance of networking skills and coding expertise within the project team. The plan also includes the skills of team members, project deployment, and sign-off procedures, offering a complete overview of the project lifecycle.

1
IT PROJECT MANAGEMENT
IT Project Management
Name of Student
Name of University
Author Note
IT PROJECT MANAGEMENT
IT Project Management
Name of Student
Name of University
Author Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

2
IT PROJECT MANAGEMENT
Executive Summary
A project is chosen that aims in development and deployment of a home automation system. The goal
of this project is to implement the project in a significantly low cost. The project planning document that
is developed provides an idea of the scope, goals and the objective of the project. The project team
members are skilled enough to execute the project as per plan. The plan development identifies the
risks that are needed to be addressed along with the stakeholders linked with the project. The details of
the project deployment and sign off is discussed. The report concludes with post project review
recommendations and recommends the need of training.
IT PROJECT MANAGEMENT
Executive Summary
A project is chosen that aims in development and deployment of a home automation system. The goal
of this project is to implement the project in a significantly low cost. The project planning document that
is developed provides an idea of the scope, goals and the objective of the project. The project team
members are skilled enough to execute the project as per plan. The plan development identifies the
risks that are needed to be addressed along with the stakeholders linked with the project. The details of
the project deployment and sign off is discussed. The report concludes with post project review
recommendations and recommends the need of training.

3
IT PROJECT MANAGEMENT
Table of Contents
1. Goals...........................................................................................................................................4
2. Objectives...................................................................................................................................4
3. Requirements of the Project.......................................................................................................4
3.1. Functional Requirements.....................................................................................................4
3.2. Non-Functional Requirements.............................................................................................5
4. Skills and Expertise of Team Member.........................................................................................5
5. Project Plan.................................................................................................................................6
5.1. Background..........................................................................................................................6
5.2. Scope...................................................................................................................................6
5.3. Work Breakdown Structure.................................................................................................7
5.4. Time Required......................................................................................................................9
5.5. Resource Needs.................................................................................................................11
5.6. Schedule (Gantt Chart and Network Diagram)...................................................................12
5.7. Estimation of Cost..............................................................................................................15
5.8. Quality Planning.................................................................................................................17
5.9. Stakeholders’ Analysis.......................................................................................................17
5.10. Communication Planning.................................................................................................18
5.11. Risk Management............................................................................................................19
5.12. Project Deployment.........................................................................................................19
5. Project Sign off..........................................................................................................................19
6. Post Project Review and Recommendations............................................................................20
References....................................................................................................................................21
IT PROJECT MANAGEMENT
Table of Contents
1. Goals...........................................................................................................................................4
2. Objectives...................................................................................................................................4
3. Requirements of the Project.......................................................................................................4
3.1. Functional Requirements.....................................................................................................4
3.2. Non-Functional Requirements.............................................................................................5
4. Skills and Expertise of Team Member.........................................................................................5
5. Project Plan.................................................................................................................................6
5.1. Background..........................................................................................................................6
5.2. Scope...................................................................................................................................6
5.3. Work Breakdown Structure.................................................................................................7
5.4. Time Required......................................................................................................................9
5.5. Resource Needs.................................................................................................................11
5.6. Schedule (Gantt Chart and Network Diagram)...................................................................12
5.7. Estimation of Cost..............................................................................................................15
5.8. Quality Planning.................................................................................................................17
5.9. Stakeholders’ Analysis.......................................................................................................17
5.10. Communication Planning.................................................................................................18
5.11. Risk Management............................................................................................................19
5.12. Project Deployment.........................................................................................................19
5. Project Sign off..........................................................................................................................19
6. Post Project Review and Recommendations............................................................................20
References....................................................................................................................................21
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

4
IT PROJECT MANAGEMENT
Project Title: Development and Implementation of Home Automation System
Start Date: Tue 28-05-19
End Date: Tue 19-11-19
1. Goals
It is necessary to identify the goals of the chosen project in order to develop a project planning
document. The project that is chosen to be executed in development and implementation of a Home
Automation system.
The requirement and the benefits of home automation system is identified
With the successful deployment of the home automation system, the human labor can
be reduced
The deployment of the home automation system aims in increasing the security of the
houses
2. Objectives
The project planning document identifies the objectives that the project team need to fulfill to
ascertain the successful execution of the project. The most prominent objective with which the
particular project is being undertaken is indicated as follows-
To identify the need of implementation of a Home Automation system
To ascertain that a secure home automation system is deployed
To ascertain that the project is being deployed in a cost effective manner
To ensure that the undertaken project is completed within the time allocation
3. Requirements of the Project
For successful development and deployment of a home automation system, the basic project
requirements are needed to be identified. It is necessary to correctly identify the plan for
implementation of a project in order to develop a project planning document (Pavithra & Balakrishnan,
2015). In this section, both the functional and the non-functional requirements of the system to be
deployed is identified.
3.1. Functional Requirements
IT PROJECT MANAGEMENT
Project Title: Development and Implementation of Home Automation System
Start Date: Tue 28-05-19
End Date: Tue 19-11-19
1. Goals
It is necessary to identify the goals of the chosen project in order to develop a project planning
document. The project that is chosen to be executed in development and implementation of a Home
Automation system.
The requirement and the benefits of home automation system is identified
With the successful deployment of the home automation system, the human labor can
be reduced
The deployment of the home automation system aims in increasing the security of the
houses
2. Objectives
The project planning document identifies the objectives that the project team need to fulfill to
ascertain the successful execution of the project. The most prominent objective with which the
particular project is being undertaken is indicated as follows-
To identify the need of implementation of a Home Automation system
To ascertain that a secure home automation system is deployed
To ascertain that the project is being deployed in a cost effective manner
To ensure that the undertaken project is completed within the time allocation
3. Requirements of the Project
For successful development and deployment of a home automation system, the basic project
requirements are needed to be identified. It is necessary to correctly identify the plan for
implementation of a project in order to develop a project planning document (Pavithra & Balakrishnan,
2015). In this section, both the functional and the non-functional requirements of the system to be
deployed is identified.
3.1. Functional Requirements
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

5
IT PROJECT MANAGEMENT
The functional requirement of a system to be deployed mainly involve the technical needs of the
project. Without considering the critical functional requirement of the project, it is quite difficult to
execute a project in a successful manner. The functional requirements of the system generally specifies
the overall characteristics of the system including the reliability and the cost. The main functional
requirements that are identified for development and deployment of the home automation system is
indicated as follows-
1. The system to be deployed should be cost effective so that it can be adopted by maximum
number of households
2. The home automation system that is to be deployed should be easy to install and should be
less complex
The above two points indicate the two main functional requirements of the system that is being
developed. Development of a home automation system is not a complex task, and therefore, the cost
effectiveness of the system to be deployed is a major functional requirement of the system.
3.2. Non-Functional Requirements
Along with the functional requirement, it is quite necessary to identify the non-functional
requirement of the system as well. The non-functional requirements that are identified for deployment
of the home automation system is indicated as follows.
1. The security of the system to be deployed is a critical non-functional requirement of the
system (Gunge & Yalagi, 2016)
2. The home automation system to be deployed should be reliable and therefore, reliability is
one of the major non-functional requirements of the system.
3. The system to be developed should be scalable.
4. The maintenance need of the system should be reduced.
4. Skills and Expertise of Team Member
The undertaken project is related to networking and therefore, the team members should
possess the skills and knowledge of networking. A group of four people has formed a team to execute
this project and each of the team member possesses necessary networking skills to understand the
IT PROJECT MANAGEMENT
The functional requirement of a system to be deployed mainly involve the technical needs of the
project. Without considering the critical functional requirement of the project, it is quite difficult to
execute a project in a successful manner. The functional requirements of the system generally specifies
the overall characteristics of the system including the reliability and the cost. The main functional
requirements that are identified for development and deployment of the home automation system is
indicated as follows-
1. The system to be deployed should be cost effective so that it can be adopted by maximum
number of households
2. The home automation system that is to be deployed should be easy to install and should be
less complex
The above two points indicate the two main functional requirements of the system that is being
developed. Development of a home automation system is not a complex task, and therefore, the cost
effectiveness of the system to be deployed is a major functional requirement of the system.
3.2. Non-Functional Requirements
Along with the functional requirement, it is quite necessary to identify the non-functional
requirement of the system as well. The non-functional requirements that are identified for deployment
of the home automation system is indicated as follows.
1. The security of the system to be deployed is a critical non-functional requirement of the
system (Gunge & Yalagi, 2016)
2. The home automation system to be deployed should be reliable and therefore, reliability is
one of the major non-functional requirements of the system.
3. The system to be developed should be scalable.
4. The maintenance need of the system should be reduced.
4. Skills and Expertise of Team Member
The undertaken project is related to networking and therefore, the team members should
possess the skills and knowledge of networking. A group of four people has formed a team to execute
this project and each of the team member possesses necessary networking skills to understand the

6
IT PROJECT MANAGEMENT
project requirements and the process of implementation and execution of the project in an effective
manner. Apart from the networking skills the project team members are skilled in coding and software
engineering, thus helping the project team in implementation of a home automation system.
5. Project Plan
A project planning document for the undertaken home automation project is to be developed to
enable the team member to execute a project in a successful manner. The project plan for the project
that is developed provides a detailed idea of the project background, scope, the work breakdown
structure of the project, the resources and the cost of successful execution of the project. The project
plan further identifies the quality management aspects, the risks linked with the project along with the
plan for deployment of the project (Jacobsson, Boldt & Carlsson, 2016). The detailed plan for project
implementation is discussed in the paragraphs below.
5.1. Background
A home automation system can be described as a technological solution that enables the owner
of the home automation system to automate all the electronic and technology based tasks that are
conducted within a house. One of the most significant benefits of making use of a home automation
system is that it significantly reduces the human error. This particular project is undertaken with an aim
of implementing it in a much lower cost so that it can be adopted by a number of individuals. This
project aims in development of a low-cost home automation system.
5.2. Scope
Scope of a project can be described as a part of project planning that generally helps in
determination and documentation of the major and specific goals, deliverables and the cost
considerations associated with the project. The in scope and the out scope of the home automation
system project is indicated as follows-
In Scope
A home automation system will be delivered in a low cost A secure home automation system will be delivered
Out Scope
IT PROJECT MANAGEMENT
project requirements and the process of implementation and execution of the project in an effective
manner. Apart from the networking skills the project team members are skilled in coding and software
engineering, thus helping the project team in implementation of a home automation system.
5. Project Plan
A project planning document for the undertaken home automation project is to be developed to
enable the team member to execute a project in a successful manner. The project plan for the project
that is developed provides a detailed idea of the project background, scope, the work breakdown
structure of the project, the resources and the cost of successful execution of the project. The project
plan further identifies the quality management aspects, the risks linked with the project along with the
plan for deployment of the project (Jacobsson, Boldt & Carlsson, 2016). The detailed plan for project
implementation is discussed in the paragraphs below.
5.1. Background
A home automation system can be described as a technological solution that enables the owner
of the home automation system to automate all the electronic and technology based tasks that are
conducted within a house. One of the most significant benefits of making use of a home automation
system is that it significantly reduces the human error. This particular project is undertaken with an aim
of implementing it in a much lower cost so that it can be adopted by a number of individuals. This
project aims in development of a low-cost home automation system.
5.2. Scope
Scope of a project can be described as a part of project planning that generally helps in
determination and documentation of the major and specific goals, deliverables and the cost
considerations associated with the project. The in scope and the out scope of the home automation
system project is indicated as follows-
In Scope
A home automation system will be delivered in a low cost A secure home automation system will be delivered
Out Scope
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

7
IT PROJECT MANAGEMENT
The product launch and delivery will only involve demonstration of the product, no formal
training on the use of the home automation system will be delivered The project does not involve maintenance
5.3. Work Breakdown Structure
For better management of the project, the entire project is divided into a number of smaller
phases, which are indicated in the work breakdown structure below-
IT PROJECT MANAGEMENT
The product launch and delivery will only involve demonstration of the product, no formal
training on the use of the home automation system will be delivered The project does not involve maintenance
5.3. Work Breakdown Structure
For better management of the project, the entire project is divided into a number of smaller
phases, which are indicated in the work breakdown structure below-
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

8
IT PROJECT MANAGEMENT
Figure 1: Representing the WBS of the Project
The WBS, in the figure above indicate the tasks that are needed to be executed to successfully develop and deploy the home
automation system project that is undertaken.
IT PROJECT MANAGEMENT
Figure 1: Representing the WBS of the Project
The WBS, in the figure above indicate the tasks that are needed to be executed to successfully develop and deploy the home
automation system project that is undertaken.

9
IT PROJECT MANAGEMENT
5.4. Time Required
The time needed for excution of the project is represented in figure below-
IT PROJECT MANAGEMENT
5.4. Time Required
The time needed for excution of the project is represented in figure below-
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

10
IT PROJECT MANAGEMENT
Figure 2: Representing the Time Needed
IT PROJECT MANAGEMENT
Figure 2: Representing the Time Needed
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

11
IT PROJECT MANAGEMENT
The figure above identifies the time required to complete the entire project along with the time
needed to execute each task of the project.
5.5. Resource Needs
The resources considered for this project is indicated in the resource sheet below-
Figure 3: The Resources considered for the Home Automation Project
The resource overview of the project is indicated in the following figure-
IT PROJECT MANAGEMENT
The figure above identifies the time required to complete the entire project along with the time
needed to execute each task of the project.
5.5. Resource Needs
The resources considered for this project is indicated in the resource sheet below-
Figure 3: The Resources considered for the Home Automation Project
The resource overview of the project is indicated in the following figure-

12
IT PROJECT MANAGEMENT
Figure 4: The Resource Overview of the home automation Project
5.6. Schedule (Gantt Chart and Network Diagram)
The Gantt chart generated provide an idea of the time required to complete a project and the
sequences of execution of the tasks to complete the project in an efficient manner. The Gantt chart
generated for the project is indicated as follows-
IT PROJECT MANAGEMENT
Figure 4: The Resource Overview of the home automation Project
5.6. Schedule (Gantt Chart and Network Diagram)
The Gantt chart generated provide an idea of the time required to complete a project and the
sequences of execution of the tasks to complete the project in an efficient manner. The Gantt chart
generated for the project is indicated as follows-
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 21
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.