This report presents a project management plan developed for UK Care Services Ltd, focusing on promoting cancer awareness. The report begins with an introduction to project management principles, emphasizing the importance of effective planning, initiation, execution, and closure. It identifies required project outcomes, delivery processes, timelines, and relevant stakeholders, including doctors, nurses, and clients. The report details the five dimensions of project management (scope, quality, time, cost, and risk) and outlines the critical stages of the project life cycle (initiation, planning, execution, and closure). It then delves into the creation of a project plan, including critical path analysis, time estimation, and the allocation of responsibilities to ensure the project's success. The project's scope is defined as reducing the impact of cancer through awareness, with a budget of £260.00 and a timeline of three months. The report concludes by highlighting the significance of a well-structured project plan in achieving the desired outcomes and promoting awareness about cancer.

Project Management
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION...........................................................................................................................1
LO1. Identify required outcomes, delivery process, timelines and relevant shareholders as part of
establishing a project team...............................................................................................................1
Five dimensions of project:....................................................................................................2
Timeline of critical stages of Project Life Cycle :..................................................................3
Project Life Cycle :.................................................................................................................5
LO2. Prepare and produce a project plan with defined roles and responsibilities using critical
path analysis.....................................................................................................................................6
Estimation of the times:..........................................................................................................6
Critical Path Analysis:............................................................................................................7
Allocation of the responsibilities:...........................................................................................7
Turning the plan into schedule :.............................................................................................7
CONCLUSION................................................................................................................................7
REFERANCES................................................................................................................................9
INTRODUCTION...........................................................................................................................1
LO1. Identify required outcomes, delivery process, timelines and relevant shareholders as part of
establishing a project team...............................................................................................................1
Five dimensions of project:....................................................................................................2
Timeline of critical stages of Project Life Cycle :..................................................................3
Project Life Cycle :.................................................................................................................5
LO2. Prepare and produce a project plan with defined roles and responsibilities using critical
path analysis.....................................................................................................................................6
Estimation of the times:..........................................................................................................6
Critical Path Analysis:............................................................................................................7
Allocation of the responsibilities:...........................................................................................7
Turning the plan into schedule :.............................................................................................7
CONCLUSION................................................................................................................................7
REFERANCES................................................................................................................................9

Promoting awareness about cancer
INTRODUCTION
Project management can be define as a process of managing all activities of a
project in effective and efficient manner. This will helps in conducting project activities
as well as accomplishing desired goals and objectives (Meredith, Mantel and Shafer,
2017). Project management plan includes a proper process which consist of planning as
well as organization all resources of a company in more effective way. Project
management consist of various stages which includes planning, initiation, execution and
closing. Company chosen for this organisation is UK care service Ltd. This is one of the
leading company which is dealing in health care sector. In this report different
dimensions of a project is identify as well as its delivery process. It consist of project life
cycle as well as its timeline of critical stages. Apart from this a proper project plan is
developed with well defined roles and responsibilities. This report includes estimation of
project timeline as well as critical path analysis.
LO1. Identify required outcomes, delivery process, timelines and relevant
shareholders as part of establishing a project team.
It is very important to analyse the desired outcomes as well as delivery process
of a project in order to achieved set goal and objectives. Project management is a
crucial activities it is essential to analyse and evaluate each and every aspect related to
project. This will helps in conducting project activities in more effective and efficient
manner. Respective company is conducting a project of promoting the awareness about
cancer. It is very important that each and every individual is well aware about cancer as
well as how to deal with the issues of cancer. By promoting awareness about cancer,
this company will be able to help various patients to understand about the how they can
deal with this as cancer has no cure but it can be remission when its is detected early
as well as properly treated and person to live a healthy life (Schwalbe, 2015). In order to
conduct project activities in more effective and efficient manner respective company
needs to analyse and identify the outcomes that must be achieved from this project.
There are various relevant shareholders which play a crucial role in effective and
efficient management of project activities as well as responsible for success of project.
Different shareholders that are involved in this project are doctors, nurses, carers,
1
INTRODUCTION
Project management can be define as a process of managing all activities of a
project in effective and efficient manner. This will helps in conducting project activities
as well as accomplishing desired goals and objectives (Meredith, Mantel and Shafer,
2017). Project management plan includes a proper process which consist of planning as
well as organization all resources of a company in more effective way. Project
management consist of various stages which includes planning, initiation, execution and
closing. Company chosen for this organisation is UK care service Ltd. This is one of the
leading company which is dealing in health care sector. In this report different
dimensions of a project is identify as well as its delivery process. It consist of project life
cycle as well as its timeline of critical stages. Apart from this a proper project plan is
developed with well defined roles and responsibilities. This report includes estimation of
project timeline as well as critical path analysis.
LO1. Identify required outcomes, delivery process, timelines and relevant
shareholders as part of establishing a project team.
It is very important to analyse the desired outcomes as well as delivery process
of a project in order to achieved set goal and objectives. Project management is a
crucial activities it is essential to analyse and evaluate each and every aspect related to
project. This will helps in conducting project activities in more effective and efficient
manner. Respective company is conducting a project of promoting the awareness about
cancer. It is very important that each and every individual is well aware about cancer as
well as how to deal with the issues of cancer. By promoting awareness about cancer,
this company will be able to help various patients to understand about the how they can
deal with this as cancer has no cure but it can be remission when its is detected early
as well as properly treated and person to live a healthy life (Schwalbe, 2015). In order to
conduct project activities in more effective and efficient manner respective company
needs to analyse and identify the outcomes that must be achieved from this project.
There are various relevant shareholders which play a crucial role in effective and
efficient management of project activities as well as responsible for success of project.
Different shareholders that are involved in this project are doctors, nurses, carers,
1
You're viewing a preview
Unlock full access by subscribing today!

government, clients and many more. It is significant for analysing delivery process with
set timelines of a project plan. So that desired goals could be achieved and project can
accomplish its desired outcomes.
Five dimensions of project:
There are five dimensions of project management which helps in conducting
project activities in more effective manner. A project is to be measured on five specific
dimensions such as efficiency, customer, business-now, business-future, and team
success. Through these dimensions business, customer and process ranges must form
the fundamentals for several standard measurements of project (Burke, 2013). A
healthy organization have different sets of goals such as long term goals, mid-term
goals and immediate goals. Business features analyse the future outcomes of the
projects. The overall success of the project depends on sum total of all the success and
failures. Checking out project requirements is the major key that effects the quality of
project. And finance keep record of every bit of expense involve in the project. Hence
these are some key dimensions of the project to take into account.
Scope: Scope refers to determining future goals and objective of the project.
This is basically used to describe the important of project as well as benefits for the
society. Scope of promoting awareness about the cancer is to reduce this disease from
the global area. This project is conducted in order to provide the awareness of about the
cancer.
Quality: It is very important that each and every data as well as information
collected to conduct this project should be high quality. Since the topic of this project is
promoting awareness about the cancer so data collected for this project should be
correct and accurate. This will help in maintain the quality of project.
Time: For successful completion of this report approximately three months of
time duration will be requirement. Time is one of the most important dimension of
project management as it helps in providing estimated timeline to complete all activities
of project in effective and efficient manner.
Cost: This dimension of project management includes the financial amount that
is requirement to conduct project activities in more effective way. Cost and funds should
be appropriate to successful completion of all activities in order to achieve goals and
2
set timelines of a project plan. So that desired goals could be achieved and project can
accomplish its desired outcomes.
Five dimensions of project:
There are five dimensions of project management which helps in conducting
project activities in more effective manner. A project is to be measured on five specific
dimensions such as efficiency, customer, business-now, business-future, and team
success. Through these dimensions business, customer and process ranges must form
the fundamentals for several standard measurements of project (Burke, 2013). A
healthy organization have different sets of goals such as long term goals, mid-term
goals and immediate goals. Business features analyse the future outcomes of the
projects. The overall success of the project depends on sum total of all the success and
failures. Checking out project requirements is the major key that effects the quality of
project. And finance keep record of every bit of expense involve in the project. Hence
these are some key dimensions of the project to take into account.
Scope: Scope refers to determining future goals and objective of the project.
This is basically used to describe the important of project as well as benefits for the
society. Scope of promoting awareness about the cancer is to reduce this disease from
the global area. This project is conducted in order to provide the awareness of about the
cancer.
Quality: It is very important that each and every data as well as information
collected to conduct this project should be high quality. Since the topic of this project is
promoting awareness about the cancer so data collected for this project should be
correct and accurate. This will help in maintain the quality of project.
Time: For successful completion of this report approximately three months of
time duration will be requirement. Time is one of the most important dimension of
project management as it helps in providing estimated timeline to complete all activities
of project in effective and efficient manner.
Cost: This dimension of project management includes the financial amount that
is requirement to conduct project activities in more effective way. Cost and funds should
be appropriate to successful completion of all activities in order to achieve goals and
2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

objectives (Fleming and Koppelman, 2016). The budget that is provided to completing
all activities of this project successful is £260.00.
Risk: There are various risk that occur while conducting activities of project as
well as managing it in effective manner. It is important to analyse and evaluate the
project risk in order to complete project activities without any issue. Risk could be all
those factors that can have negative impact on project. Risk that could occur which
completing this project can be related to lack of funds, issues in managing time as well
as low performance of team.
Timeline of critical stages of Project Life Cycle :
Project life cycle is a combination of activities which are useful for acquiring
project goals and objectives. A project may have various aspects and difficulty levels,
but weather large projects or small, all projects are need to be generalized to the life
cycle structure. All projects basically goes through four phases of project lifestyle which
is initiation, planning, execution and close out (Walker, 2015). Initiation phase is defined
as the phase which is required to start a new project. The main purpose of this phase is
to involve several activities to analyse what project should accomplish. Planning of the
project include half of the whole process. It determines the scope and objectives of the
project. Revising of plans are done until the execution phase starts. Execution phase
converts the planning phase of project into action. It includes activities which is defined
in planning phase. Closing phase is a process that maintain the control shutdown of the
project by including several activities.
3
all activities of this project successful is £260.00.
Risk: There are various risk that occur while conducting activities of project as
well as managing it in effective manner. It is important to analyse and evaluate the
project risk in order to complete project activities without any issue. Risk could be all
those factors that can have negative impact on project. Risk that could occur which
completing this project can be related to lack of funds, issues in managing time as well
as low performance of team.
Timeline of critical stages of Project Life Cycle :
Project life cycle is a combination of activities which are useful for acquiring
project goals and objectives. A project may have various aspects and difficulty levels,
but weather large projects or small, all projects are need to be generalized to the life
cycle structure. All projects basically goes through four phases of project lifestyle which
is initiation, planning, execution and close out (Walker, 2015). Initiation phase is defined
as the phase which is required to start a new project. The main purpose of this phase is
to involve several activities to analyse what project should accomplish. Planning of the
project include half of the whole process. It determines the scope and objectives of the
project. Revising of plans are done until the execution phase starts. Execution phase
converts the planning phase of project into action. It includes activities which is defined
in planning phase. Closing phase is a process that maintain the control shutdown of the
project by including several activities.
3

4
You're viewing a preview
Unlock full access by subscribing today!

Project Life Cycle :
It is a four step process which is followed by almost all project managers of the
organization. A project life cycle includes a framework for managing different types of
projects. This includes standard process through which teams achieve project success.
The project life cycle includes four different phases such as initiation phase, planning
phase, execution phase and termination(closure) phase. Each phase includes different
tasks and activities for completion of the project (Mir and Pinnington, 2014). There are
four major stages of project life cycle that includes initiation, planning, execution and
closure. All of these stages in context on project of UK Care Service company is
mention below.
Initiation: Initiation is the first stage which includes figuring out the motive of
project existence. The key feature is to analyse project aim and clarifying approaches.
In this stage UK care service company needs to analyse the major issues as well as
analyse all of the resources to conduct project.
Planning: The second phase is planning which includes activities to develop a
detailed plan for project execution. All communication plans, risk management
strategies etc are the key role of this phase. In this respective company will develop a
proper plan in order to promote awareness about the cancer.
Execution:Third phase include conversion of plans into actions. It is a phase
which makes sure that a projects is running according to the plan and going smoothly.
At this plan that is developed by respective company needs to be analyse and executed
properly.
5
It is a four step process which is followed by almost all project managers of the
organization. A project life cycle includes a framework for managing different types of
projects. This includes standard process through which teams achieve project success.
The project life cycle includes four different phases such as initiation phase, planning
phase, execution phase and termination(closure) phase. Each phase includes different
tasks and activities for completion of the project (Mir and Pinnington, 2014). There are
four major stages of project life cycle that includes initiation, planning, execution and
closure. All of these stages in context on project of UK Care Service company is
mention below.
Initiation: Initiation is the first stage which includes figuring out the motive of
project existence. The key feature is to analyse project aim and clarifying approaches.
In this stage UK care service company needs to analyse the major issues as well as
analyse all of the resources to conduct project.
Planning: The second phase is planning which includes activities to develop a
detailed plan for project execution. All communication plans, risk management
strategies etc are the key role of this phase. In this respective company will develop a
proper plan in order to promote awareness about the cancer.
Execution:Third phase include conversion of plans into actions. It is a phase
which makes sure that a projects is running according to the plan and going smoothly.
At this plan that is developed by respective company needs to be analyse and executed
properly.
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Closure: The last phase of the project life cycle is termination phase. The main
function of this phase is to review project activities and to deliver project report. In this
all project activities are completed and desired objective could be achieved on time.
LO2. Prepare and produce a project plan with defined roles and responsibilities
using critical path analysis.
Project refers to set of activities that are important to be executed in correct
manner for accomplish desired goals and objectives. It is a activities that is created to
for a specific topic or programmes and it is essential that all activities of project should
be completed in some time period (Too and Weaver, 2014). This project is based on
promotion about the awareness of cancer in order to help patients to deal with it and live
a healthy life. UK caring service company needs to make a task list in order to conduct
all activities of this project in effective and efficient manner.
Project activities needs to be distinguish as per particular problems as well as
analyse it properly.
After this project manager should meet with the approval of project.
Project scope should be clearly define to all person who are involved in project.
Creating and setting short term and long term goals.
Identifying different number of deliverables.
A proper project plan should be scheduled with its milestones.
Assignment of task and activities to all individual who are part of project.
Risk assessment in order to successful completion of project activities.
Estimation of the times:
It is very important to estimate the time that will be requirement to complete the
activities of project in successful way. For estimating the time it is essential to analyse
the project outcomes as according to this estimated time could be identity. First stage
that is initiation is most crucial stage as in this most of the activities of project is based.
UK caring Service Ltd is developing a project plan for promoting awareness about the
cancer (Pemsel and Wiewiora, 2013). This project needs to be completed in three
month time period and for first stage, estimate time that will be required is 15 day time
frame. In order to develop a proper plan an estimate time that will be required is one
month and for successful execution as well as implementation of project activities
6
function of this phase is to review project activities and to deliver project report. In this
all project activities are completed and desired objective could be achieved on time.
LO2. Prepare and produce a project plan with defined roles and responsibilities
using critical path analysis.
Project refers to set of activities that are important to be executed in correct
manner for accomplish desired goals and objectives. It is a activities that is created to
for a specific topic or programmes and it is essential that all activities of project should
be completed in some time period (Too and Weaver, 2014). This project is based on
promotion about the awareness of cancer in order to help patients to deal with it and live
a healthy life. UK caring service company needs to make a task list in order to conduct
all activities of this project in effective and efficient manner.
Project activities needs to be distinguish as per particular problems as well as
analyse it properly.
After this project manager should meet with the approval of project.
Project scope should be clearly define to all person who are involved in project.
Creating and setting short term and long term goals.
Identifying different number of deliverables.
A proper project plan should be scheduled with its milestones.
Assignment of task and activities to all individual who are part of project.
Risk assessment in order to successful completion of project activities.
Estimation of the times:
It is very important to estimate the time that will be requirement to complete the
activities of project in successful way. For estimating the time it is essential to analyse
the project outcomes as according to this estimated time could be identity. First stage
that is initiation is most crucial stage as in this most of the activities of project is based.
UK caring Service Ltd is developing a project plan for promoting awareness about the
cancer (Pemsel and Wiewiora, 2013). This project needs to be completed in three
month time period and for first stage, estimate time that will be required is 15 day time
frame. In order to develop a proper plan an estimate time that will be required is one
month and for successful execution as well as implementation of project activities
6

estimated time that is required is one months. And for the last stage of project plan in
which project is completed. It will require approximately 15 day of time duration.
Critical Path Analysis:
It can be describe as a tool which will helps in mapping different activities of
project. So that goals and objective of project could be achieved. Critical path analysis
includes identification of the time that would be necessary for completion of project. For
this project regarding promotion of awareness about the cancer, respective company
needs to analyse and evaluate the critical path in effective manner (Hwang and Ng,
2013). This will help project manager of UK Caring service Ltd to analyse and find out
the way to conduct project activities as achieve desired goal.
Allocation of the responsibilities:
There are various role and responsibilities that should be crucially followed by
individuals who are part of project. It is important that project manager assign as well as
allocate responsibilities as per skills and ability of person. Each and every task and
activity play a crucial role in success of a project as well as achievement of desired
outcome. UK Caring service company is allocating task responsibilities as will
knowledge and capabilities of a person to accomplish set targets. This will help in
conducting project activities in effective and efficient manner as well as achieving set
goals.
Turning the plan into schedule :
It is essential to convert plan into schedule so that desired outcome could be
achieved. This project plan is based on promotion about the awareness of the cancer in
order to reduce this from the world. This project will help patients to deal with this
problem and help them to live as healthy life.
CONCLUSION
From the above conducted report it could be analysed that it is very important to
manage all activities of project in effective and efficient manner as well as achievement
of desired goals. There are five major dimensions that will help in management task and
activities of project. It is essential to develop effective project plan and analyse all stage
carefully in order to conduct a successful project.
7
which project is completed. It will require approximately 15 day of time duration.
Critical Path Analysis:
It can be describe as a tool which will helps in mapping different activities of
project. So that goals and objective of project could be achieved. Critical path analysis
includes identification of the time that would be necessary for completion of project. For
this project regarding promotion of awareness about the cancer, respective company
needs to analyse and evaluate the critical path in effective manner (Hwang and Ng,
2013). This will help project manager of UK Caring service Ltd to analyse and find out
the way to conduct project activities as achieve desired goal.
Allocation of the responsibilities:
There are various role and responsibilities that should be crucially followed by
individuals who are part of project. It is important that project manager assign as well as
allocate responsibilities as per skills and ability of person. Each and every task and
activity play a crucial role in success of a project as well as achievement of desired
outcome. UK Caring service company is allocating task responsibilities as will
knowledge and capabilities of a person to accomplish set targets. This will help in
conducting project activities in effective and efficient manner as well as achieving set
goals.
Turning the plan into schedule :
It is essential to convert plan into schedule so that desired outcome could be
achieved. This project plan is based on promotion about the awareness of the cancer in
order to reduce this from the world. This project will help patients to deal with this
problem and help them to live as healthy life.
CONCLUSION
From the above conducted report it could be analysed that it is very important to
manage all activities of project in effective and efficient manner as well as achievement
of desired goals. There are five major dimensions that will help in management task and
activities of project. It is essential to develop effective project plan and analyse all stage
carefully in order to conduct a successful project.
7
You're viewing a preview
Unlock full access by subscribing today!

8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

REFERANCES
Books and Journal
Burke, R., 2013. Project management: planning and control techniques. New Jersey,
USA, 26.
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project
management. Project Management Institute.
Hwang, B.G. and Ng, W.J., 2013. Project management knowledge and skills for green
construction: Overcoming challenges. International Journal of Project
Management. 31(2). pp.272-284.
Meredith, J.R., Mantel Jr, S.J. and Shafer, S.M., 2017. Project management: a
managerial approach. John Wiley & Sons.
Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking
project management performance and project success. International journal of
project management. 32(2). pp.202-217.
Morris, P., 2013. Reconstructing project management reprised: A knowledge
perspective. Project Management Journal. 44(5). pp.6-23.
Ofori, D.F., 2013. Project management practices and critical success factors–a
developing country perspective.
Pemsel, S. and Wiewiora, A., 2013. Project management office a knowledge broker in
project-based organisations. International journal of project management. 31(1).
pp.31-42.
Pinto, J.K., 2014. Project management, governance, and the normalization of
deviance. International Journal of Project Management. 32(3). pp.376-387.
Sánchez, M.A., 2015. Integrating sustainability issues into project management. Journal
of Cleaner Production. 96. pp.319-330.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Too, E.G. and Weaver, P., 2014. The management of project management: A
conceptual framework for project governance. International Journal of Project
Management. 32(8). pp.1382-1394.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
9
Books and Journal
Burke, R., 2013. Project management: planning and control techniques. New Jersey,
USA, 26.
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project
management. Project Management Institute.
Hwang, B.G. and Ng, W.J., 2013. Project management knowledge and skills for green
construction: Overcoming challenges. International Journal of Project
Management. 31(2). pp.272-284.
Meredith, J.R., Mantel Jr, S.J. and Shafer, S.M., 2017. Project management: a
managerial approach. John Wiley & Sons.
Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking
project management performance and project success. International journal of
project management. 32(2). pp.202-217.
Morris, P., 2013. Reconstructing project management reprised: A knowledge
perspective. Project Management Journal. 44(5). pp.6-23.
Ofori, D.F., 2013. Project management practices and critical success factors–a
developing country perspective.
Pemsel, S. and Wiewiora, A., 2013. Project management office a knowledge broker in
project-based organisations. International journal of project management. 31(1).
pp.31-42.
Pinto, J.K., 2014. Project management, governance, and the normalization of
deviance. International Journal of Project Management. 32(3). pp.376-387.
Sánchez, M.A., 2015. Integrating sustainability issues into project management. Journal
of Cleaner Production. 96. pp.319-330.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Too, E.G. and Weaver, P., 2014. The management of project management: A
conceptual framework for project governance. International Journal of Project
Management. 32(8). pp.1382-1394.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
9

10
You're viewing a preview
Unlock full access by subscribing today!
1 out of 12
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.