This report is a comprehensive analysis of a Project Management Capstone project, focusing on the integration of theoretical knowledge and practical application. The report begins with an executive summary and table of contents, followed by an introduction outlining the objectives. The core of the report details the application of project management principles, lessons learned from previous studies, and the use of PMI guidelines, WBS, and Gantt charts. It also explores the concepts of integrated project management, change management, and stakeholder management. The report then bridges the gap between theory and practice, using the Salt River Coal Project as a case study. The student highlights the importance of linking theoretical concepts with practical implementation. Finally, the report concludes with a discussion on the capstone project's impact and future implications for project management skills. The report also highlights the application of stakeholder management, project planning, quality management, resource management, risk analysis, and project leadership. The student also covers topics like project procurement, sustainability, and organizational behavior within the context of project management.
Document Page
Running head: PROJECT MANAGEMENT CAPSTONE
PROJECT MANAGEMENT CAPSTONE
Name of Student:
Name of Class:
Author note:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT MANAGEMENT CAPSTONE
Executive Summary:
The report aims to understand the way previous studies helped to gain knowledge about
project management and it also describes how to implement the knowledge in the practical
field of project management. There are certain advantages of this study which helped during
the performance of the Capstone project. The theoretical knowledge and practical skills play
an important role to perform a better project through the Capstone project. After the
performance of the Capstone project helped to enhance the skills further. This theoretical skill
and practical performance practice will also help to perform better in the future with more
managing capacity. The report concluded that it will help to understand a bridge between the
previous study and the capstone project. Also, the way it will help in the future.
Document Page
2PROJECT MANAGEMENT CAPSTONE
Table of Contents
A. Introduction........................................................................................................................3
B. Project management application and lessons learned 3
C. Bridging theory and practice..............................................................................................7
D. Capstone Project.................................................................................................................8
E. Conclusion..........................................................................................................................9
Document Page
3PROJECT MANAGEMENT CAPSTONE
A. Introduction
B. The paper aims to understand how the previous study helped in the application of
project management and the lessons that are learned from the last survey. The
experiences that are determined from the previous study are related to the current
Capstone project. A bridge is created between the theoretical knowledge and practical
knowledge which is learned from previous research and the new Capstone project
(Ren & Jia, 2017). It is also determined in the paper that how this study will help in
the future for managing various projects. All the project managing techniques that are
learned from previous studies are explained in the paper. After the explanation of the
lessons that are discovered, a brief idea is given how to relate both of the reviews and
make a bridge among theory and effective practice.
C. A. Project management application and lessons learned
D. It is learned about the idea of project management. In the principles of project
management, certain things are learned. The PMI guidelines are also determined from
here. The lessons that are learned are on managing the process of the project, the
principles of project management. The tools, techniques and process groups are also
learned from the project. It can also be learned about the importance of project
management for an organization (Wu & Hyatt, 2016). The study also helped in
understanding the knowledge of PMBOK. It can also be learned about the process
groups and their role, impact, and relevance in the field of project management. It also
gives a good idea about the techniques to succeed in a project. It is also learned the
way to do WBS and to make a Gantt chart.
E. In the case of integrated project management, certain things are learned. It helped to
understand the changes in the project and the changes in project management. It helps
to understand the applications of the process of change management and also helps to
understand the framework of the process of change management. It also evaluates all
the requirements that are changed in the case of the project that is selected. The study
helps to apply all the concepts in change management. This is the concept that helps
in developing the change of management planning and the change of the management
process that is recommended by PMI. The study also helps to understand the concept
of management for the stakeholders and the process for stakeholder management. The
study also develops a management plan for the development of practical stakeholders.
It also incorporates the benefits in case of the concept of realization besides it includes
the framework in case of the chosen project. This helps to communicate the benefits
of the project towards the critical project for the stakeholders.
F. The early study also helps to perform the planning of the project and budgeting of the
plan (Arashpour et al., 2015). This helps to identify the expectations of the clients and
to manage the expectations of the client. It helps to apply various methods in a case to
obtain the requirements of a project that are undertaken from the needs of the
business. It also helps to plan the scope management for a project. It helps in
constructing the structure for a work breakdown. It helps to make a relationship
between the operation, organization and the project strategy. This study also plays a
vital role in the case of the project manager of an organization and also helps to
deliver the values of a project in an organization (Cabral et al., 2017). The definition
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT MANAGEMENT CAPSTONE
and management of project scope can be understood. It helps in identifying the factors
which influence the planning for quality management. The study also applies a
planning tool for quality management. It also involves planning tools quality
management and the techniques for the same. The study also helps to identify all the
components for Project management quality (Cicero, 2019). In this study, various
standards are applied to multiple regulations are also used. Various factors are
identified in a case to influence the planning of resource management. Various
techniques of resource management are applied to the project in the study. The study
also evaluates the way resource management will affect the risk of the project and the
scheduling of the project. Various tools are identified and multiple techniques are
defined for managing the project resource.
G. The study also helps in the execution of the project and to control the project. The
study draw tools and a technique to source the data of the plan (Cober et al., 2015). It
also develops various processes and measures to manage the change, quality, and
scope for the projects that are complex globally. The study also helps to analyze the
risks of the project and also helps in developing the number of strategies that will
manage all the risks for ensuring the outcomes of the project manager that is expected
(Delgado et al., 2015). The study also helps to reflect the project leadership and the
communication skills help to increase the outcome of the project for executing the
plan, control the project and to close all the phases of that project.
H. The study also helps to contract and to procure the project. It helps to learn how to
plan for multiple purchases and even plans for acquisitions. It requests for various
type of proposals, helps in selecting vendors, helps to contract the administration and
to close the contract. It also helps to understand the main issues which have wither
short contracts or more extended contracts. This study also contributes to examine
bidding, management process of order and tendering (Gautier & Van Vuuren, 2017).
It helps in commercial implications and also related legal consequences. This study
also helps to manage the relationship among the seller and the buyer helps to assess
the performance of the vendor, control the change of the contract.
I. The study helps in creating sustainability in the portfolio of the project and in
managing the program of the project. It helps to learn the way to assess and also to
evaluate the performance in case of multiple projects. It also helps in applying the
range of tools and the techniques while the portfolio of the project is managed along
with the involvement of sustainability in the project management (Healey, 2018). It
teaches to maintain three fundamental objectives of project management including
social equity, economic efficiency and the performance of the environment. The study
also evaluates the strategic value of the project and the management of the project
portfolio. The study also pays particular attention to the impact of social equity, the
life cycle of the project management and the change of the organization.
J. The study also plays a role in the behavior of the organization and to manage the
people of the organization (Hoppe, 2017). The study helps to examine the way to
support the team members and to motivate the team members so that they can perform
with their best ability, helps to produce good quality results and that too within less
amount of time and by limiting the cost. It also helps to manage the behavioral impact
of an individual or a group in the organization (Hurst & Nespoli, 2016). It also helps
to learn all the ways that will support the design of the project which will help in
meeting the goals of the organization. The study will also help to engage and build the
capital of the organization. The study also helps to assess the communication
management as a tool that manages the internal relationship and the external
relationship for the stakeholders, customers, partners, and the vendors.
Document Page
5PROJECT MANAGEMENT CAPSTONE
K. The study also helped in integrating the infrastructure of project management. The
study examines the way the projects of infrastructure will interact along with the
environment and the society (Janicki, Fischetti & Burns, 2016). It also involves
various challenges that are complex that include the management of public
infrastructure of the 21st century which are investigated by multiple factors including
the financial sustainability, impact of the environment and the approach of the
command which are to be explored.
L. B. Bridging theory and practice
M. The project was done by Landless which is known as the Salt River Coal Project
bridges the theory and practice. As the Capstone course teaches to maintain a link
between the theory and practical implementation, the project successfully fulfills the
same. When somebody builds something that is designed by himself it is not sure that
the application will completely stand up or not. So it is always necessary to link the
theory with the practical application. This is the reason the course teaches still to
bridge theory and practice (Lee, Wick & Figueroa 2018). It is not ethical to just make
the design or else to just build the construction. Similarly, in the case of the particular
project, the contractors have successfully created a bridge of theory and practice
which made them eligible to perform the project. As they have gone through the
project course of Capstone, they utilized their previous knowledge including
theoretical knowledge and the practical knowledge after which they went through
various practices that have made them more eligible to perform the project. After their
completion of the project course form Capstone, they became successful to make the
design of their project. After this, they went to several practices which benefitted
them with more practical knowledge. Due to this, the contractors were able to
complete the project with success.
N. Salt River coal project included the following elements during the time of
implementation, firstly they have identified the problems and mentioned the problems
which helped them to increase the awareness in case of the issue and also convinced
to the non-believers that there are actual problems. Secondly, they have made an
action plan where the actions are selected by them to all the stakeholders which
include policymakers, professional organizations, purchasers and others. They have
also appointed a leader for opinion purposes who have supported the program.
Thirdly they have also defined the objectives which are realistic, limit and clear in
order. Fourthly they have reached the consensus among their team members during
the action and their way to achieve the objectives. After this, they have implemented
the program with an approach of multifaceted. Due to this the bulldozer effect is also
avoided that has evoked the resistance (Matveeva & Kholodova, 2018). This is the
method which helped in a case to enhance the awareness and the behavior to that of
the problem which is noticed. After this, the result is also monitored. This is the phase
that is done with the measurement of the rate of compliance along with the local
recommendations. After this, they have followed the frequency of occurrence by
preventing the event. The feedback is also very important all-time though if the
objectives are not achieved.
O. Education is the key which helps to increase the awareness of the problems and also it
provides enough knowledge to counter the issues. The contractors of the Landless
were highly trained and besides having practical experience and practices they also
have theoretical knowledge, which helped them to combat any problem they have
faced during the time of the project. Due to performing the project of Capstone, they
gained more knowledge and practical experience. This is the reason they have ensured
Document Page
6PROJECT MANAGEMENT CAPSTONE
the bridge between the theory and practice in case of the project performed by the
contractors of Capstone named Salt River Coal Project.
P. The bridge between the theory practices is vital, it keeps the balance of the project
properly if there is a gap in between the theory and practice of the project, the safety
of the project decreases and it may lead to significant risk in the project.
Q.
R. C. Capstone Project
S. The project helped to increase the knowledge of the modular construction of the
person. The person has learned the way to implement modular construction (Sarang-
Sieminski & Christianson, 2016). It can be seen that modular construction has
particular beneficiaries as this is effective from cost, it is a fast process and this helps
to create a more efficient development. The knowledge of this construction helps to
speed up the production, helps to perform installations on off-site. It helps in using
eco-friendly materials and this has minimal impacts on the business (Sit haram, 2018).
The practice of this type of construction increases sustainability makes fire resistance,
has good structure and better flexibility.
T. Wood modular construction is a part of modular construction which enhance the
modular construction to a greater extent. Concrete and steel modular construction is
another type of development where the materials used are from recycled materials,
thus this improves the flexibility of the building (Taborda, Liu & Crawford, 2017). It
also follows the BAPO methodology where the Business – Architecture – Process –
Organisation develops a conceptual layout.
U. D. Conclusion
V. The paper concludes that the previous study learned and the capstone project together
will cause a significant impact on managing various projects in the future. As the
earlier studies that are done give proper knowledge about project management. This
knowledge already helps to know multiple concepts of project management (Venom
et al., 2015). This study includes the principles of managing of project, helps to
integrate the project management, planning of project and budgeting of project,
execution of the project and control of the project, also helps to learn contracts and
procurement of project management, also increases the sustainability of the portfolio
of the project and managing the program, also helps to maintain the organizational
behaviour and manage people, besides it also helps to integrate the infrastructure of
the project management. This is the theoretical studies that are learned from the
previous reviews about project management (Vincent, 2018). Later the Capstone
project that is done helps to perform sure practical tasks beside of having theoretical
knowledge, the performing of the possible functions increases the ability of the
person, which not only helps the person to perform a better project also it helped the
person to have a better knowledge to perform best in the future.
W.
Reference:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT MANAGEMENT CAPSTONE
Arashpour, M., Sagoo, A., Wingrove, D., Maqsood, T., & Wakefield, R. (2015). Single
capstone or multiple cornerstones? A distributed model of capstone subjects in
construction education. In ISEC-8: Implementing Innovative Ideas in Structural
Engineering and Project Management (pp. 1-6). ISEC Press.
Cabral, J. A., Benhart, B. L., Metzinger, J. R., Morgan, P. C., & Santon, S. D. (2017).
Curriculum Transformation: Redesigning a Construction Management program to a
Vertically and Horizontally Integrated Curriculum with Authentic Project-Based
Learning.
Cecere, J. J. (2019). Partnering with an Advisory Board.
Cober, R., Tan, E., Slotta, J., So, H. J., & Könings, K. D. (2015). Teachers as participatory
designers: Two case studies with technology-enhanced learning
environments. Instructional Science, 43(2), 203-228.
Delgado, A. J., Wardlow, L., McKnight, K., & O’Malley, K. (2015). Educational technology:
A review of the integration, resources, and effectiveness of technology in K-12
classrooms. Journal of Information Technology Education, 14.
Gautier, P. A., & Van Vuuren, A. (2017). The effect of a land lease on house prices.
Available at SSRN 2975498.
Healey, D. (2018). TESOL technology standards. The TESOL Encyclopedia of English
Language Teaching, 1-6.
Hoppe, M. (2017). Towards Open Theory: How to Bridge the Theoretic Gap Between
Academia and Practice. In After Methods, Västerås, Sverige, 2017.
Document Page
8PROJECT MANAGEMENT CAPSTONE
Hurst, A., & Nespoli, O. G. (2016). Student perceptions of the value of peer and instructor
feedback in capstone design review meetings. In Proceedings of the 2016 Capstone
Conference, Columbus, Ohio.
Janicki, T. N., Fischetti, D., & Burns, A. T. (2016). Incorporating real-world projects and
emerging technologies into one MIS capstone course.
Lee, D., Wick, C., & Figueroa, H. (2018). Applying Scrum Project Management Methods in
Biomedical and Electrical and Computer Engineering Capstone Design Courses.
Matveeva, M., & Kholodova, O. (2018). A comprehensive description of the matter of the
land lease. In MATEC Web of Conferences (Vol. 212, p. 09011). EDP Sciences.
Ren & Jia, (2017. Research on Owner Project Management Maturity Model of Highway
Construction Project. In 2017 5th International Conference on Mechatronics,
Materials, Chemistry and Computer Engineering (ICMMCCE 2017). Atlantis Press.
Sarang-Sieminski, A., & Christianson, R. (2016). Agile/scrum for capstone project
management. In Capstone Design Conference, Columbus, Ohio (pp. 19-47).
Sitharam, T. G. (2018). Sea dike construction challenges in coastal waters for storage of river
floodwaters: a sustainable strategy for water resource development using coastal
reservoirs. Advances in Sustainable Urbanization, 3(1), 1-6.
Taborda, L., Liu, L., & Crawford, L. (2017). Experiential learning in project management
education. In the 28th Annual Conference of the Australasian Association for
Engineering Education (AAEE 2017) (p. 542). Australasian Association for
Engineering Education.
Document Page
9PROJECT MANAGEMENT CAPSTONE
Veum, K. S., Kremer, R. J., Sudduth, K. A., Kitchen, N. R., Lerch, R. N., Baffaut, C., ... &
Sadler, E. J. (2015). Conservation effects on soil quality indicators in the Missouri
Salt River Basin. Journal of Soil and Water Conservation, 70(4), 232-246.
Vincent, D. M. (2018). Post-mortem Molecular Investigation: exploring genetic variation in
CYP2D6 in deceased individuals at Salt River Mortuary (Doctoral dissertation,
University of Cape Town).
Wu & Hyatt, (2016). Integrating Building Information Modeling across an undergraduate
construction management curriculum: Experiential learning through a Tiny House
project. In Proceedings of the Academic Interoperability Coalition: 10th BIM
Academic Symposium, Orlando, Florida (pp. 18-26).
Zhang, J., Xie, H., & Li, H. (2017). Competency-based knowledge integration of BIM
capstone in construction engineering and management education. Int. J. Eng.
Educ, 33, 2020-2032.