This project management assignment centers around a case study involving American Constructors, Inc. (ACI) and their project at World Outreach Church (WOC). The student, assuming the role of a senior project manager, is tasked with analyzing the project, creating a detailed Work Breakdown Structure (WBS) and project implementation schedule in a Gantt chart format using SmartSheet. The assignment requires the use of PERT calculations for tasks with uncertain completion times. The student also analyzes the project, answers specific questions related to scope, time, budget trade-offs, stakeholder roles, and project challenges. The student provides a RACI chart and references using APA standards. The analysis covers key aspects of project management, including schedule, risk, and quality, and discusses the challenges faced by the project manager in delivering the project successfully. The solution includes a Gantt chart, PERT calculations, a stakeholder analysis, and a discussion of project challenges. The student's analysis focuses on the implications of project delays and the importance of meeting quality standards.
Document Page
Running Head: PM
PM
Name of the Student
Name of the University
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PM
Answer to Q1
Most of the issues that arise in project are related to scope, time and budget and the
project manager has to trade off among these three to maintain a balance within the project. For
instance, in case of deadline issues, the project manager may trade off some additional budget in
order to ensure the project is delivered on time.
Answer to Q2
The main stakeholders in this project and their roles in the project are as follows.
Project Manager Finance Manager Contractor Management
Board
Project Initiation A C I R
Project Planning R R I C
Project
Execution
A C R I
Project Closing R I I I
Answer to Q3
The Gantt chart of the project is shown in the diagram below.
Document Page
2PM
Initial Meeting
Unplanned Meeting
Receiving Close Out Documents
Frame/Hang/Finish drywall task
Millwork
Casework
Installation of Flooring
Paintjob
Applying Protective Coat
Doors / Hardware
Electronic Card Reader
Install Projector Screen
Mechanical, Electrical and Plumbing Works
Drywall in Lobby
Concrete Insert
Climatize and Install Wood Flooring
Public Restrooms
Glass Chandelier's Installation
LED Lighting
Framing/Hanging/Finishing the Drywall
Seats Installation
Seats for Handicapped
Door and Hardware
Concrete Deck
0 5 10 15 20 25 30 35
Series1
The PERT calculations are also shown below.
Activities Duration Pessimistic
Duration
Optimistic
Duraton
Most Likely
Duration
PERT
Initiation 218.5 220.6667
Initial Meeting 0.5 0.5 0.5 0.5 0.5
Unplanned Meeting 2 2 2 2 2
Receiving Close Out Documents 21 30 15 21 21.5
Frame/Hang/Finish drywall task 25 23 21 25 24
Millwork 12 20 10 12 13
Casework 3 5 3 3 3.333333
Installation of Flooring 16 13 10 16 14.5
Paintjob 14 10 10 14 12.66667
Applying Protective Coat 12 15 6 12 11.5
Doors / Hardware 9 15 6 9 9.5
Electronic Card Reader 1 1 1 1 1
Install Projector Screen 1 1 1 1 1
Mechanical, Electrical and 11 10 10 11 10.66667
Document Page
3PM
Plumbing Works
Drywall in Lobby 10 10 10 10 10
Concrete Insert 5 7 3 5 5
Climatize and Install Wood Flooring 30 38 25 30 30.5
Public Restrooms 9 20 7 12 12.5
Glass Chandelier's Installation 5 10 3 5 5.5
LED Lighting 5 5 5 5 5
Framing/Hanging/Finishing the
Drywall
12 12 12 12 12
Seats Installation 15 15 15 15 15
Seats for Handicapped 8 8 8 8 8
Door and Hardware 8 13 6 8 8.5
Concrete Deck 11 20 8 11 12
It can be seen that the total duration from PERT estimation is greater than actually
planned duration. Hence, under current circumstances, the project will not be delivered on time.
Answer to Q4
The most important project management challenges include meeting quality standards if
they are set too high or if there are major risks associated with the project. The project manager
needs to be aware of both the aspects in order ensure successful delivery of the project.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PM
Bibliography
Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Meredith, J. R., Mantel Jr, S. J., & Shafer, S. M. (2017). Project management: a managerial
approach. John Wiley & Sons.