Project Management Leadership and Skills: House Renovation Project

Verified

Added on  2023/01/13

|16
|3900
|26
Project
AI Summary
This report details the project management of a house renovation in the UK. It begins with a network diagram and a discussion of the critical path method, highlighting its advantages in task scheduling and resource allocation. The report then addresses a constraint of two workers within six weeks, demonstrating its infeasibility based on the project's activity durations. A comprehensive risk analysis is presented, identifying potential risks in categories such as health and safety, project-based issues, resource availability, quality, and communication. Each risk is evaluated for probability, consequences, and a proposed treatment strategy. The risk score is then discussed, categorizing risks from very high to low. Furthermore, the report explores leadership and motivation theories, including Maslow's Hierarchy of Needs, Herzberg's Two-factor Theory, and McClelland's Achievement Need Theory, providing examples and concluding with recommendations on how to motivate a hypothetical worker, Kevin, within the project context. The document concludes with a summary of the project's findings and implications.
Document Page
qwertyuiopasdfghjklzxcvbnmqw
ertyuiopasdfghjklzxcvbnmqwert
yuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiop
asdfghjklzxcvbnmqwertyuiopasd
fghjklzxcvbnmqwertyuiopasdfgh
jklzxcvbnmqwertyuiopasdfghjkl
zxcvbnmqwertyuiopasdfghjklzxc
vbnmqwertyuiopasdfghjklzxcvb
nmqwertyuiopasdfghjklzxcvbnm
qwertyuiopasdfghjklzxcvbnmqw
ertyuiopasdfghjklzxcvbnmqwert
yuiopasdfghjklzxcvbnmqwertyui
opasdfghjklzxcvbnmqwertyuiop
asdfghjklzxcvbnmqwertyuiopasd
fghjklzxcvbnmqwertyuiopasdfgh
jklzxcvbnmrtyuiopasdfghjklzxcv
House Renovation
Project Management
4/16/2019
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
House Renovation
Abstract
The report is prepared for the House Renovation project for a large property investor based out of
UK. The report includes the network diagram, critical path, and schedule details along with the
information on risk management and managerial activities for the project. The scheduling of
the tasks becomes easier with the aid of the critical path method. Also, the allocation of the
resources in the project is simplified with the use of the method.
For this project, resource risks are assigned with the score as very high and therefore, it shall
be treated on highest priority. The risks as health & safety and communication risks shall be
handled thereafter followed by quality issues and project-based issues.
The use of communication, training, professional development, and rewards system shall be
done to motivate the resources.
1
Document Page
House Renovation
Table of Contents
Introduction...........................................................................................................................................3
Network Diagram..................................................................................................................................3
Critical Path Discussion.........................................................................................................................3
Discussion of 2 Workers/6 Weeks Constraint.......................................................................................4
Risk Analysis.........................................................................................................................................6
Risk Score Discussion...........................................................................................................................9
Opportunities Discussion.....................................................................................................................11
Review of theory relating to leadership and motivation......................................................................11
Maslow Hierarchy of Needs............................................................................................................11
Herzberg’s Two-factor Theory........................................................................................................12
McClelland Achievement Need Theory...........................................................................................12
Examples.............................................................................................................................................12
Conclusion on ways to motivate Kevin...............................................................................................13
Conclusion...........................................................................................................................................14
References...........................................................................................................................................15
2
Document Page
House Renovation
Introduction
A large property investor in UK wishes to renovate his house. It is desired by the investor to
restrict the costs to minimum value and therefore, only one worker is assigned to a specific
activity at a particular instance. There are numerous tasks that will be involved in the
renovation process. The duration and flow of each of these tasks is provided by the investor.
The report includes the network diagram, critical path, and schedule details along with the
information on risk management and managerial activities for the project.
Network Diagram
Network diagram in a project is a diagram that graphically represents the project tasks and
activities and showcases the connection between these activities. The network diagram for
the house renovation project is depicted in the diagram below.
3
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
House Renovation
Critical Path Discussion
The critical path of the project is shown in the image above.
There are numerous advantages associated with the critical path method. Some of these
advantages are included in the points below.
The project is divided in to a set of components and activities as per the critical path
method. The activities that are listed down are then mapped with the earliest start and
finish dates that may be feasible. The critical path provides the understanding of the
longest duration of an activity and the entire project. It is the maximum duration
feasible without impacting the delivery dates. The information can be useful for the
project managers and leaders to avoid the issues of schedule overrun.
The scheduling of the tasks becomes easier with the aid of the critical path method.
Also, the allocation of the resources in the project is simplified with the use of the
method. The choice of deploying the new resources and the most effective resources
in the project is made clear with the aid of this method. The new resources can be
deployed on the float to avoid any further delays in the project (Lee, 2014).
The project is divided in a series of components with the aid of the critical path
method. The development of these activities and short-term goals make it easier to
keep a track of the progress. Also, the additional resources and the associated time
lags can be identified with the help of this method. The overall management of the
project becomes simplified for the leaders involved.
The scheduling of the project is effectively done along with the allocation of adequate
resources to the project tasks and activities. Therefore, the costs of the project are also
4
Document Page
House Renovation
easily managed. The avoidance of over-spending the costs is achieved (Moghayedi,
2016).
Discussion of 2 Workers/6 Weeks Constraint
There are certain constraints that have been applied in the project. These include the two
workers and six weeks constraint. The schedule that has been developed as per these
constraints and the flow provided is as included in the table below. With the design of this
schedule, over-allocation of the resources was witnessed for the tasks 1.3, 1.4, 1.7, and 1.11.
The resources are available for 5 days in a week and only one worker could be assigned to an
activity.
WBS Task Name Duration Start Finish Predecessors Resource
Names
1 House Renovation 32 days Tue 16-
04-19
Wed 29-
05-19
1.1 Substantial repairs
to the roof 8 days Tue 16-
04-19
Thu 25-
04-19 Worker 1
1.2 Internal structural
work 4 days Fri 26-
04-19
Wed 01-
05-19 2 Worker 2
1.3 Electrical work 7 days Thu 02-
05-19
Fri 10-
05-19 3 Worker 1
1.4 Plumbing 6 days Thu 02-
05-19
Thu 09-
05-19 3 Worker 2
1.5 Installing a new
kitchen 3 days Thu 16-
05-19
Mon 20-
05-19 9 Worker 1
1.6 Installing a new
bathroom 4 days Thu 16-
05-19
Tue 21-
05-19 9 Worker 2
1.7 Garden 5 days Thu 02-
05-19
Wed 08-
05-19 3 Worker 1
1.8 Plastering 4 days Fri 10-
05-19
Wed 15-
05-19 5 Worker2
1.9 Internal decoration 5 days Wed 22- Tue 28- 7 Worker 1
5
Document Page
House Renovation
05-19 05-19
1.10 Fitting carpets 1 day Wed 29-
05-19
Wed 29-
05-19 10 Worker 2
1.11 Outside paintwork 5 days Thu 02-
05-19
Wed 08-
05-19 3 Worker 2
Over-allocation of the resources shall not be present in the project. In this case, there is only
one worker available for one job and therefore, the over-allocation is not feasible. With
adjusting the resources and the project activities, the minimum duration achieved is 37 days.
This does not meet the constraint of six weeks duration for the project. Therefore, the
constraint of 2 workers/six weeks is not feasible for the project as per the duration assigned
for each of the project activities involved.
WBS Task Name Duration Start Finish Predecessors Resource
Names
1 House Renovation 37 days Tue 16-
04-19
Wed 05-
06-19
1.1 Substantial repairs to
the roof 8 days Tue 16-
04-19
Thu 25-
04-19 Worker 1
1.2 Internal structural
work 4 days Fri 26-
04-19
Wed 01-
05-19 2 Worker 2
1.3 Electrical work 7 days Thu 02-
05-19
Fri 10-05-
19 3 Worker 1
1.4 Plumbing 6 days Thu 02-
05-19
Thu 09-
05-19 3 Worker 2
1.5 Installing a new
kitchen 3 days Thu 16-
05-19
Mon 20-
05-19 9 Worker 1
1.6 Installing a new
bathroom 4 days Thu 16-
05-19
Tue 21-
05-19 9 Worker 2
1.7 Garden 5 days Wed 29-
05-19
Tue 04-
06-19 10 Worker 1
1.8 Plastering 4 days Fri 10- Wed 15- 5 Worker2
6
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
House Renovation
05-19 05-19
1.9 Internal decoration 5 days Wed 22-
05-19
Tue 28-
05-19 7 Worker 1
1.10 Fitting carpets 1 day Wed 29-
05-19
Wed 29-
05-19 10 Worker 2
1.11 Outside paintwork 5 days Thu 30-
05-19
Wed 05-
06-19 11 Worker 2
Risk Analysis
Risk
ID
Category Description Probability Consequences Treatment/Response
1 Health &
Safety
The project is a
construction project
that includes the
renovation of the
house. It will require
several tools and
equipment to carry
out the project
activities. The on-site
conditions may not
be safe and there may
be health & safety
issues that may
emerge for the
workers
(Burtonshaw-Gunn,
2015).
The
probability
level
detected
and
assessed for
the risk is
moderate.
The resulting
consequences
of the risk
will be severe
and will be
negative in
nature.
The response
strategy for the
treatment of this
risk shall be risk
avoidance. There
must be WHS
regulations
published and
complied with and
the reviews shall be
conducted to make
sure that safe
conditions are
developed.
2 Project-based Cost and schedule
will be estimated for
the project in the
initiation phase. The
The
probability
level
detected
The resulting
consequences
of the risk
will be high
The response
strategy for the
treatment of this
risk shall be risk
7
Document Page
House Renovation
costs that are
estimated may
witness certain
variations in the
actual and estimated
values leading to
enhanced cost
variance. Similarly,
the schedule that is
estimated may
witness certain
variations in the
actual and estimated
values leading to
enhanced schedule
variance
and
assessed for
the risk is
low.
and will be
negative in
nature.
avoidance. The use
of cost-benefit
analysis and
bottom-up
estimation shall be
done for the
development of
realistic estimates.
The tracking of
schedule and cost
variance shall be
done through
Earned Value
Analysis.
3 Resources The resources allotted
for the project tasks
may not be available
for work during the
project timeline.
There may also be
reduction in the
estimated
productivity levels
that may be
witnessed.
The
probability
level
detected
and
assessed for
the risk is
high.
The resulting
consequences
of the risk
will be severe
and will be
negative in
nature.
The response
strategy for the
treatment of this
risk shall be risk
avoidance. The
resources shall be
kept motivated at all
times by
implementing the
resource-friendly
policies. There shall
be one-on-one
discussions carried
out to determine the
resource concerns.
4 Quality There will be certain
quality standards and
protocols that will be
The
probability
level
The resulting
consequences
of the risk
The response
strategy for the
treatment of this
8
Document Page
House Renovation
necessary to be
maintained in the
project. However, the
project resources may
not adhere with these
determined standards
(Gravitt, 2013).
detected
and
assessed for
the risk is
low.
will be high
and will be
negative in
nature.
risk shall be risk
avoidance. There
shall be a quality
management plan
developed in the
project initiation
and planning phase.
The review of the
project quality shall
be done as per the
guidelines included
in this plan.
5 Communication The stakeholders and
the project
stakeholders may not
be available for
communication at the
same time leading to
inability to share
information and keep
a track of the
progress.
The
probability
level
detected
and
assessed for
the risk is
moderate.
The resulting
consequences
of the risk
will be high
and will be
negative in
nature.
The response
strategy for the
treatment of this
risk shall be risk
avoidance. There
shall be a
communication
management plan
developed in the
project initiation
and planning phase.
The review and
conduction of the
project
communications
shall be done as per
the guidelines
included in this
plan.
9
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
House Renovation
Risk Score Discussion
Probability Risk Score
Very High High High Very High Very High
High Moderate High High Very High
Moderate Low Moderate High High
Low Low Low Moderate High
Impact Low Moderate High Severe
Risk
ID
Category Description Probability Consequences Score
1 Health &
Safety
The project is a construction project that
includes the renovation of the house. It will
require several tools and equipment to carry
out the project activities. The on-site
conditions may not be safe and there may be
health & safety issues that may emerge for
the workers.
Moderate Severe High
2 Project-based Cost and schedule will be estimated for the
project in the initiation phase. The costs that
are estimated may witness certain variations
in the actual and estimated values leading to
enhanced cost variance. Similarly, the
schedule that is estimated may witness
certain variations in the actual and estimated
values leading to enhanced schedule variance
(Park, Lee and Ahn, 2017)
Low High Moderate
3 Resources The resources allotted for the project tasks
may not be available for work during the
project timeline. There may also be reduction
in the estimated productivity levels that may
be witnessed.
High Severe Very High
4 Quality There will be certain quality standards and
protocols that will be necessary to be
Low High Moderate
10
Document Page
House Renovation
maintained in the project. However, the
project resources may not adhere with these
determined standards.
5 Communication The stakeholders and the project stakeholders
may not be available for communication at
the same time leading to inability to share
information and keep a track of the progress.
Moderate High High
The risk scores are assigned on the basis of the values of probability and consequence levels.
There are four risk scores that may be obtained as low, moderate, high, and very high. The
risk scores as very high shall be given the highest priority followed by the scores as high,
moderate, and low.
For this project, resource risks are assigned with the score as very high and therefore, it shall
be treated on highest priority. The risks as health & safety and communication risks shall be
handled thereafter followed by quality issues and project-based issues.
Opportunities Discussion
There are several opportunities that have been identified with the assessment of the risks
associated with the project.
The communication channels involved in the project shall be effective and enhanced
so that the project communications are streamlined. The use of varied communication
channels as emails, reports, social media, and tele-conferencing can be done so that
the project communications are effective at all times.
The project managers and leaders can conduct the reviews and audits to determine the
compliance levels and the gaps, if any (Hwang & Chua, 2011).
The project quality can be maintained and improved on the basis of the compliance
levels and review results.
The resource engagement levels can be improved through the conduction of one-on-
one discussions with the resources. The resources will feel involved and important in
the project.