Project Management Methodologies Learning Portfolio - Course Name
VerifiedAdded on 2021/05/31
|7
|2949
|15
Project
AI Summary
This learning portfolio explores various project management methodologies, offering a detailed overview of OPM, PRINCE2, and PMBOK. The assignment delves into the student's personal learning experiences and outcomes from the course, drawing from readings such as Besner and Hobbs (2012) and PMI's materials on implementing organizational project management. The portfolio highlights the importance of organizational culture, strategic alignment, and the implementation process, including key partners and the role of project boards. The student reflects on the practical application of these methodologies, emphasizing the significance of continuous change and experiential learning in achieving successful project outcomes. The assignment also covers the key expectations at each stage of implementing OPM and why consistent change is an essential part of actualizing OPM.

PROJECT MANAGEMENT METHODOLOGIES
LEARNING PORTFOLIO
NAME
COURSE
DATE
LEARNING PORTFOLIO
NAME
COURSE
DATE
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Topic and
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
I was acquainted with the
verifiable points of view on
venture administration and got a
comprehension of best practices
in overseeing ventures.
Acclimated with the idea of
authoritative undertaking
administration and the basic
achievement factors with regards
to OPM. I came to figure out how
to evaluate whether an
association is prepared to execute
OPM and how to continue to
actualize OPM inside an
association. The course unit was
edifying in that I got new points
of view on the ideas of venture
administration with regards to an
association. The association of
the course was great and
consistent, beginning with the
fundamentals and after that step
by step going into the intricate
parts of OPM and how to
actualize it. The lesson designs
and how the lessons were sorted
out was likewise great as they
empowered me comprehend what
I should know toward the finish
of the course unit. Every lesson
had quite recently enough
substance to learn and
comprehend and toward the
finish of every lesson, I believed I
had discovered some new
information
The course unit has given me an
absolutely new way to deal with the
idea of task administration as to an
association. I comprehend the idea of
authoritative culture and structure; in
any case, in the setting pf venture
administration, I have taken in an
essential lesson on how associations
can be progressed toward becoming
undertaking focused, with the end goal
that their way of life and even
association depends on the idea of task
administration. Such firms are better
set to meet their goals and turn out to
be more aggressive (Kinicki and
Williams, 2008)Earlier on, I
envisioned that undertaking
administration standards are just
connected in ventures in the
conventional sense, for example, an
engineer needs to assemble a house:
the task is then overseen and executed
utilizing venture administration
standards, beginning with arranging
and building up a task plan.
Notwithstanding, with regards to the
course, I have come to find out about
how associations can receive venture
administration models and standards
by they way they work. Aside from an
association embracing venture
administration standards, this course
lesson has presented me to how
precisely this happens, and what it
implies. In embracing OPM,
associations essentially deal with their
projects, tasks, and portfolios in
arrangement with the key objectives
Perusing Besner
and Hobbs (2012)
- Contextualized
Project
Management
Practice: A Cluster
Analysis of
Practices and Best
Practices, I have
come to
comprehend that
the idea of OPM
must go further
and consider the
business,
authoritative
setting, and land
area; that OPM
has a development
display that shows
how well a firm
has 'developed' its
OPM
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
I was acquainted with the
verifiable points of view on
venture administration and got a
comprehension of best practices
in overseeing ventures.
Acclimated with the idea of
authoritative undertaking
administration and the basic
achievement factors with regards
to OPM. I came to figure out how
to evaluate whether an
association is prepared to execute
OPM and how to continue to
actualize OPM inside an
association. The course unit was
edifying in that I got new points
of view on the ideas of venture
administration with regards to an
association. The association of
the course was great and
consistent, beginning with the
fundamentals and after that step
by step going into the intricate
parts of OPM and how to
actualize it. The lesson designs
and how the lessons were sorted
out was likewise great as they
empowered me comprehend what
I should know toward the finish
of the course unit. Every lesson
had quite recently enough
substance to learn and
comprehend and toward the
finish of every lesson, I believed I
had discovered some new
information
The course unit has given me an
absolutely new way to deal with the
idea of task administration as to an
association. I comprehend the idea of
authoritative culture and structure; in
any case, in the setting pf venture
administration, I have taken in an
essential lesson on how associations
can be progressed toward becoming
undertaking focused, with the end goal
that their way of life and even
association depends on the idea of task
administration. Such firms are better
set to meet their goals and turn out to
be more aggressive (Kinicki and
Williams, 2008)Earlier on, I
envisioned that undertaking
administration standards are just
connected in ventures in the
conventional sense, for example, an
engineer needs to assemble a house:
the task is then overseen and executed
utilizing venture administration
standards, beginning with arranging
and building up a task plan.
Notwithstanding, with regards to the
course, I have come to find out about
how associations can receive venture
administration models and standards
by they way they work. Aside from an
association embracing venture
administration standards, this course
lesson has presented me to how
precisely this happens, and what it
implies. In embracing OPM,
associations essentially deal with their
projects, tasks, and portfolios in
arrangement with the key objectives
Perusing Besner
and Hobbs (2012)
- Contextualized
Project
Management
Practice: A Cluster
Analysis of
Practices and Best
Practices, I have
come to
comprehend that
the idea of OPM
must go further
and consider the
business,
authoritative
setting, and land
area; that OPM
has a development
display that shows
how well a firm
has 'developed' its
OPM

Topic and
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
of the association ((Milosevic,
Annaboon, and Patanakul, 2013),
which conveys me to my other key
lesson: that an association that has
received the OPM show is considered
so just when its vital objectives are
lined up with OPM standards and
methodologies (Mossalam and Arafa,
2017). I have gone to the
understanding that OPM is another
and dynamic administration circle
where the dynamic structures inside
an association are enunciated as
means by which corporate destinations
are executed through ventures so as to
amplify esteem, as Williams (2011)
implies. Further, I have turned out to
be acquainted with the duality of OPM
in to the extent associations are
concerned; that OPM is an auxiliary
worldview and also a training where
authoritative culture and practices take
after a venture situated approach. The
other lesson is that OM incorporates
ability, and will enable an association
to comprehend its targets better, assess
its imperatives, and build up an
arrangement of activity, in view of
OPM, that amplifies esteem,
disregarding requirements and
impediments
Once more, the course lessons for
week six are all around organized
and introduced, with brief
portrayal on what one will realize
and the normal capabilities
toward the finish of the learning.
The way the course is exhibited is
efficient and dynamic, beginning
Having examined the week six course
material, one thing that has struck me
is the manner by which interrelated
certain angles and ideas are, for
example, the ideas of lean and OPM; I
had already envisioned that they were
discrete and non-related standards,
accepting that standards, for example,
Perusing PMI's
part three on
Implementing
Organizational
PM has given me
more data and
thoughts on the
how and why of
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
of the association ((Milosevic,
Annaboon, and Patanakul, 2013),
which conveys me to my other key
lesson: that an association that has
received the OPM show is considered
so just when its vital objectives are
lined up with OPM standards and
methodologies (Mossalam and Arafa,
2017). I have gone to the
understanding that OPM is another
and dynamic administration circle
where the dynamic structures inside
an association are enunciated as
means by which corporate destinations
are executed through ventures so as to
amplify esteem, as Williams (2011)
implies. Further, I have turned out to
be acquainted with the duality of OPM
in to the extent associations are
concerned; that OPM is an auxiliary
worldview and also a training where
authoritative culture and practices take
after a venture situated approach. The
other lesson is that OM incorporates
ability, and will enable an association
to comprehend its targets better, assess
its imperatives, and build up an
arrangement of activity, in view of
OPM, that amplifies esteem,
disregarding requirements and
impediments
Once more, the course lessons for
week six are all around organized
and introduced, with brief
portrayal on what one will realize
and the normal capabilities
toward the finish of the learning.
The way the course is exhibited is
efficient and dynamic, beginning
Having examined the week six course
material, one thing that has struck me
is the manner by which interrelated
certain angles and ideas are, for
example, the ideas of lean and OPM; I
had already envisioned that they were
discrete and non-related standards,
accepting that standards, for example,
Perusing PMI's
part three on
Implementing
Organizational
PM has given me
more data and
thoughts on the
how and why of
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Topic and
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
with brief focuses and step by
step forming into point by point
ideas that are straightforward and
perhaps apply in a genuine
circumstance. After week five, I
however I had a considerable
measure of information on OPM,
until the point that I got to the
week six course materials that
were illuminating and intriguing.
I acclimated encourage with the
techniques for actualizing OPM
and the significance of doing
examinations and valuating the
possibility of rolling out
improvements, previously
proposing a business case. I
likewise acquainted with the key
expectations at each phase of
executing the OPM and why
consistent change is an essential
part of actualizing OPM (Hashim,
2011). I have taken in the two
primary procedures to overseeing
ventures; that is PMBOK and
PRINCE 2 and their disparities
and similitudes and
circumstances where each is ideal
lean were more pertinent to
assembling forms. Be that as it may,
from the week six lessons, I have
figured out how the different ideas
join, and that executing OPM requires
constant change keeping in mind the
end goal to accomplish the coveted
destinations (Silvius and Karayaz,
2017). I had envisioned that
undertaking administration was a
general structure; this present weeks'
lessons have acclimated me with the
idea of PRINCE 2 and PMBOK as the
two head ways to deal with overseeing
ventures. Further, I have
comprehended the structure of
PRINCE 2 of every a vastly improved
way; I now have a superior
comprehension of its structure and
process, and additionally components,
despite the fact that I would wish to
take in more about PRINCE 2 on the
grounds that the little I have found out
about it influences me to trust it is
exceptionally reasonable for the usage
of OPM. I have likewise taken in the
key partners required in actualizing
OPM, and the general structure of a
task group that would effectively
execute OPM. Further, I have
comprehended what a task board does
(its part) and why it is essential for the
fruitful execution of OPM.
Experiential learning is likewise an
exceedingly viable technique to
comprehend and disguise ideas, as per
Kolb (2015).
actualizing OPM
('Project
Management
Institute', 2014).
I observed the course content
again to be all around organized
The lessons from week seven are a
change and development of what I had
Perusing PMI's
part three on
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
with brief focuses and step by
step forming into point by point
ideas that are straightforward and
perhaps apply in a genuine
circumstance. After week five, I
however I had a considerable
measure of information on OPM,
until the point that I got to the
week six course materials that
were illuminating and intriguing.
I acclimated encourage with the
techniques for actualizing OPM
and the significance of doing
examinations and valuating the
possibility of rolling out
improvements, previously
proposing a business case. I
likewise acquainted with the key
expectations at each phase of
executing the OPM and why
consistent change is an essential
part of actualizing OPM (Hashim,
2011). I have taken in the two
primary procedures to overseeing
ventures; that is PMBOK and
PRINCE 2 and their disparities
and similitudes and
circumstances where each is ideal
lean were more pertinent to
assembling forms. Be that as it may,
from the week six lessons, I have
figured out how the different ideas
join, and that executing OPM requires
constant change keeping in mind the
end goal to accomplish the coveted
destinations (Silvius and Karayaz,
2017). I had envisioned that
undertaking administration was a
general structure; this present weeks'
lessons have acclimated me with the
idea of PRINCE 2 and PMBOK as the
two head ways to deal with overseeing
ventures. Further, I have
comprehended the structure of
PRINCE 2 of every a vastly improved
way; I now have a superior
comprehension of its structure and
process, and additionally components,
despite the fact that I would wish to
take in more about PRINCE 2 on the
grounds that the little I have found out
about it influences me to trust it is
exceptionally reasonable for the usage
of OPM. I have likewise taken in the
key partners required in actualizing
OPM, and the general structure of a
task group that would effectively
execute OPM. Further, I have
comprehended what a task board does
(its part) and why it is essential for the
fruitful execution of OPM.
Experiential learning is likewise an
exceedingly viable technique to
comprehend and disguise ideas, as per
Kolb (2015).
actualizing OPM
('Project
Management
Institute', 2014).
I observed the course content
again to be all around organized
The lessons from week seven are a
change and development of what I had
Perusing PMI's
part three on
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Topic and
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
and composed, with the principle
focuses and expected adapting
obviously expressed for the entire
course unit before beginning
learning. This was essential in
helping recognize what I
expected to realize; giving
students a brief on what they
ought to realize is a novel way
getting ready understudies for
viable learning. It is much the
same as a learning blue print.
From the unit, I took in another
idea that is a headway of lessons
learned in week six: there is a
characterized procedure by which
OPM is executed inside an
association to guarantee
achievement. I additionally took
in the different models and
structures of task administration,
including CMBoK, the Lewin-
Feeezing similarity, the Kotter
Eight Step process, Prosci,
APMG (How to oversee change),
and obviously the means and
procedures associated with
PRINCE 2.
realized in week six, in spite of the
fact that there are likewise special and
new substance that I have learned. In
the earlier week, I took in the
requirement for adjusting OPM to key
objectives; in week seven, I have
discovered that fruitful OPM usage
requires different empowering factors
that incorporate administration, the
OPM procedure utilized, competency
administration, and obviously, key
arrangement. Further, I have seen
precisely what vital arrangement is
and how to accomplish it utilizing a
reasonable contextual analysis. The
utilization of a going with contextual
investigation has empowered handle
the idea extremely well and
subsequently, I can apply it in any
hierarchical circumstance. I have
taken in the general procedure
associated with executing OPM inside
an association, beginning with
revelation and examination, building
up a guide for usage, and after that
actualizing OPM: I would now be able
to apply this way to deal with execute
OPM, as I have additionally found out
about the yields of the procedure and
framework. From the week lessons, I
have learned and comprehended the
helpful exercises in creating OPM, as
frequently, there is center around
exercises that are not valuable. So I
have additionally figured out how
OPM joins lean and proficiency ideas
to guarantee an association is better
ready to meet its targets utilizing
OPM. Further, the part of coordinated
Implementing
Organizational
PM has given me
more data and
thoughts on the
how and why of
actualizing OPM
('Project
Management
Institute', 2014).
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
and composed, with the principle
focuses and expected adapting
obviously expressed for the entire
course unit before beginning
learning. This was essential in
helping recognize what I
expected to realize; giving
students a brief on what they
ought to realize is a novel way
getting ready understudies for
viable learning. It is much the
same as a learning blue print.
From the unit, I took in another
idea that is a headway of lessons
learned in week six: there is a
characterized procedure by which
OPM is executed inside an
association to guarantee
achievement. I additionally took
in the different models and
structures of task administration,
including CMBoK, the Lewin-
Feeezing similarity, the Kotter
Eight Step process, Prosci,
APMG (How to oversee change),
and obviously the means and
procedures associated with
PRINCE 2.
realized in week six, in spite of the
fact that there are likewise special and
new substance that I have learned. In
the earlier week, I took in the
requirement for adjusting OPM to key
objectives; in week seven, I have
discovered that fruitful OPM usage
requires different empowering factors
that incorporate administration, the
OPM procedure utilized, competency
administration, and obviously, key
arrangement. Further, I have seen
precisely what vital arrangement is
and how to accomplish it utilizing a
reasonable contextual analysis. The
utilization of a going with contextual
investigation has empowered handle
the idea extremely well and
subsequently, I can apply it in any
hierarchical circumstance. I have
taken in the general procedure
associated with executing OPM inside
an association, beginning with
revelation and examination, building
up a guide for usage, and after that
actualizing OPM: I would now be able
to apply this way to deal with execute
OPM, as I have additionally found out
about the yields of the procedure and
framework. From the week lessons, I
have learned and comprehended the
helpful exercises in creating OPM, as
frequently, there is center around
exercises that are not valuable. So I
have additionally figured out how
OPM joins lean and proficiency ideas
to guarantee an association is better
ready to meet its targets utilizing
OPM. Further, the part of coordinated
Implementing
Organizational
PM has given me
more data and
thoughts on the
how and why of
actualizing OPM
('Project
Management
Institute', 2014).

Topic and
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
change administration has been made
obvious to me and how to consolidate
it into OPM. Vitally, I have taken in
the PRINCE 2 process and the means
included; I had quite recently
observed the idea yet never extremely
saw how and where it can
The course material was again
intelligently sorted out, beginning
with straightforward ideas and
logically moving to the more
perplexing parts of OPM and
venture administration systems. I
have acclimated how venture
administration philosophy is
connected in a down to earth
setting, and the key advances and
components, including the
essential sources of info, their
related exercises, the yields, and
results. I have likewise
acclimated myself with the WBS
and its basic significance in
fruitful task administration.
Further, I have figured out how to
create function bundles and the
WBS lexicon and why it is
critical. I have acclimated again
with the helpful exercises for
creating and executing OPM and
the product advancement life
cycle (SDLC).
I have figured out how to comprehend
the WBS idea, and chaperon
instruments for overseeing ventures,
including the Work bundles, and the
WBS lexicon and why they are
imperative in an undertaking,
including executing OPM. I had felt
that creating objectives for a venture,
deciding how to attempt the task, and
undertaking and checking on the
venture were adequate in executing an
undertaking. Notwithstanding, the
week eight course materials have
shown me that there is a deliberate
procedure to attempt a task, for
example, when creating programming,
with exercises and steps that must be
taken after to the end (SDLC). I have
additionally known how the essential
undertaking administration forms
apply when one is utilizing the SDLC
way to deal with run and deal with a
task (Brewer, 2018). The down to
earth aggregate work gave me
encourage functional experience and
an essence of exactly how the venture
administration procedure and
standards ought to be connected when
undertaking a task. I believe I am a
greatly improved and learned
understudy f proj3ct administration; I
comprehend the ideas, philosophies,
Perusing PMI's
Implementing
Organizational
PM Chapter 5 has
additionally given
me new and point
by point
viewpoints and the
method of
reasoning in the
execution of OPM
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
change administration has been made
obvious to me and how to consolidate
it into OPM. Vitally, I have taken in
the PRINCE 2 process and the means
included; I had quite recently
observed the idea yet never extremely
saw how and where it can
The course material was again
intelligently sorted out, beginning
with straightforward ideas and
logically moving to the more
perplexing parts of OPM and
venture administration systems. I
have acclimated how venture
administration philosophy is
connected in a down to earth
setting, and the key advances and
components, including the
essential sources of info, their
related exercises, the yields, and
results. I have likewise
acclimated myself with the WBS
and its basic significance in
fruitful task administration.
Further, I have figured out how to
create function bundles and the
WBS lexicon and why it is
critical. I have acclimated again
with the helpful exercises for
creating and executing OPM and
the product advancement life
cycle (SDLC).
I have figured out how to comprehend
the WBS idea, and chaperon
instruments for overseeing ventures,
including the Work bundles, and the
WBS lexicon and why they are
imperative in an undertaking,
including executing OPM. I had felt
that creating objectives for a venture,
deciding how to attempt the task, and
undertaking and checking on the
venture were adequate in executing an
undertaking. Notwithstanding, the
week eight course materials have
shown me that there is a deliberate
procedure to attempt a task, for
example, when creating programming,
with exercises and steps that must be
taken after to the end (SDLC). I have
additionally known how the essential
undertaking administration forms
apply when one is utilizing the SDLC
way to deal with run and deal with a
task (Brewer, 2018). The down to
earth aggregate work gave me
encourage functional experience and
an essence of exactly how the venture
administration procedure and
standards ought to be connected when
undertaking a task. I believe I am a
greatly improved and learned
understudy f proj3ct administration; I
comprehend the ideas, philosophies,
Perusing PMI's
Implementing
Organizational
PM Chapter 5 has
additionally given
me new and point
by point
viewpoints and the
method of
reasoning in the
execution of OPM
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Topic and
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
why they are imperative for OPM, and
utilizing the SDLC in attempted tasks.
Further, I comprehend the way toward
building up a coveted state through
endeavor a hole examination;
preceding the week, I however targets
are simply arbitrarily created: in this
weeks course, I have discovered that
there is an orderly manner by which to
create venture destinations and
execute an undertaking to accomplish
those goals, utilizing organized
apparatuses and task administration
philosophies
reading
samples.
Your personal learning
outcomes from this course.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
why they are imperative for OPM, and
utilizing the SDLC in attempted tasks.
Further, I comprehend the way toward
building up a coveted state through
endeavor a hole examination;
preceding the week, I however targets
are simply arbitrarily created: in this
weeks course, I have discovered that
there is an orderly manner by which to
create venture destinations and
execute an undertaking to accomplish
those goals, utilizing organized
apparatuses and task administration
philosophies
1 out of 7
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.