Project Management Report: BM522, Camden Sickle Cell and Thalassaemia

Verified

Added on  2022/12/15

|14
|2228
|263
Report
AI Summary
This report presents a project management analysis for a music event organized by the Camden Sickle Cell and Thalassaemia Service Group. It begins with an introduction to project management principles and then delves into the specifics of the project, including the development of a manual network diagram to visualize project activities and critical paths. The report then conducts a stakeholder analysis to identify and categorize key individuals and groups, followed by the creation of a work breakdown structure and organizational structure for the event. A detailed risk analysis identifies and assesses 20 potential risks, along with mitigation strategies. The report also addresses quality expectations, specifications, and acceptance criteria, as well as the appropriate project methodology for the event, concluding with a summary of key findings and recommendations.
Document Page
Project Management
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
INTRODUCTION ..........................................................................................................................3
TASK 1............................................................................................................................................3
Developing network diagram manually......................................................................................3
..........................................................................................................................................................6
TASK 2............................................................................................................................................7
Stakeholder analysis for the project............................................................................................7
Developing numbered Work break down structure and organisational .....................................8
TASK 4..........................................................................................................................................10
Risk analysis for 20 different risks............................................................................................10
TASK 5..........................................................................................................................................12
Quality expectation, quality specification, acceptance criteria and measure to be put for
controlling the event..................................................................................................................12
Task 6.............................................................................................................................................12
Critical analysis of what methodology would be appropriate for the project and why............12
CONCLUSION .............................................................................................................................13
REFERENCES..............................................................................................................................15
Document Page
INTRODUCTION
Project management depict is the effective management and suitable execution of skills
knowledge and tools undertaking the various activities and the that is used to evaluate the
effective management policies so that they can have the effective action plan in order to
complete the various task in order to meet the suitable needs(Lee and Yoon, 2019). It also
involve the effective guidance of the project manger in order to complete all the related task as
per the suitable guidelines in order to achieve success.
This report is based on the music event that is Camden Sickle Cell together doing with
the Thalassaemia service group and also develop the effective plan so that all the work can be
done in an right manner(Jin, Shen and Wang, 2018). This report will cover the network diagram
that is being made on the manual basis and also cover the stake-holder's analysis for analysing
the developing the further plan for this report.
TASK 1
Developing network diagram manually.
A network diagram is the visual representation of the various activities that are being
underline in the specific project. It is the network diagram is kind of project which the company
undertake. An effective network diagram supports the company in accomplishing the task in
attractive and the appropriate manner(Abbasi and Jaafari, 2018). It create the link between the
various activities of the event and the set of activities that the Sickle Cell addition to
Thalassaemia Service Group is considering for its music event.
Document Page
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Document Page
Document Page
The above diagram that is prepared with the help of certain basis:
So as per the illustrated diagram, it can be said that the required time for the completing
the project activity in context of Camden Sickle Cell addition to Thalassaemia Service Group are
orange and blue arrow showing the critical oath and is has been found that the shortest path
which group has taken in their task is 1,2,3,4,5,9,10,21 and 22.
TASK 2
Stakeholder analysis for the project
Stakeholder analysis is process of identifying the people before grouping them on the
basis of their skills, knowledge, interest, influence and participation in the project so that the
desirable results can be involved and communicate each of these stakeholder in the group while
developing the project plan activities. Stakeholder is one that can Camden Sickle Cell in relation
to Thalassaemia Service Group can consider in their planning their project(He and et. al., 2021).
It is important to have the support from that group with the consideration of its stakeholder that
can be done through management of stakeholders. This also ensure the success of this project by
having the direct emphasis on their stakeholders so this analysis helps in understanding the
interest and the power of Camden Sickle Cell addition to Thalassaemia Service Group.
Furthermore, during the evaluation of the stakeholder in the project can Sickle Cell addition to
Thalassaemia Service Group can categories their stakeholder which are investors, the town Hall
committee and the various participants that is discussed as follows:
High power and high interest:
This involves the people who show that an organisation make the efforts to full fill them
and manage the various task in completing the task related to the organisation. Investors are
considered in this stage they are the one who contribute in procuring the funds for the
organisation.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Low power and low interest:
An organisation has classified the group of people under observation as there is more
need of monitoring than giving their more efforts to the company(Severo And et. al., 2020).
Audience are considered in this group as they need of monitoring without wasting their energy
on this group.
High power and low interest:
these are the group of people where the Sickle Cell addition to Thalassaemia Service
Group need to emphasising the people satisfied and the Town committed are considered under
this. However, the interest of this group is less but have to satisfy them. On the basis of the
illustration so that they can have the direct emphasis
Low power and high interest:
An organisation has classified these group under the observation as the people need to
monitor as the people having the high interest in this project due to certain success. Therefore,
Stable facts must be provided to them which gratifies their interest at the similar time more than
essential energy.
Developing numbered Work break down structure and organisational
Work breakdown structure is the project management process in which the project
breakdown into a smaller component, a work breakdown is the method to divide the large project
to get the things in an effective and efficient manner. The main aim of WBS is to manage the
large project in an appropriate manner(Rumeser and Emsley, 2018). The consideration of
adopting this system is to structure music event which the Camden Sickle Cell addition to
Thalassaemia Service Group is yo make the make the best use of various resources so that they
can get the better results in the organisation. Work breakdown structure foe the music event in
order to raise funds for the society is discussed below:
Document Page
Illustration 1: Self-made, 2021
The organisational structure is the blueprint for operating the organisation function and
key activities that are performed in the business in order to achieve the objectivity of the
business. For a musical event company like Sickle Cell addition to Thalassaemia Service Group,
(Zwikael, Chih and Meredith, 2018). The functional organisation structure will be best suit in
which the employees will able to work in an appropriate manner and group as per the various
function in the specific department so the organisation structure for the music event is explained
as follows:
Document Page
TASK 4
Risk analysis for 20 different risks
No. Risk Effect Possibilit
y
Mitigation
1 Power let-down Low High It is necessary to arrange the
generator or the inventor in order to
meet the adverse impact of the power
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
fluctuation.
2 Improbability Moderat
e
Low An organiser have to make the
certain predication on the basis of
future uncertainty and develop the
effective action-plan to meet them.
3 Adverse effect upon
environment
Low Moderate Focusing on environmental care and
the security.
4 Pulling-out by sponsor Moderat
e
Low They must frame the various
strategies in order to get the interest of
the sponsor.
5 Bad time management Low Moderate In order to compete the certain task,
it is important to do the scheduling of
all the activities.
6 Inadequate
management of event
High Low Give the emphasis on meeting the
requirement of the events.
7 Safety and security Low High Comforting the security and the safety
during the event.
8 Social-problems High Low Have some belief on the targeted
audience.
9 Shortage of medical
assistance
Low Moderate Get the suitable medical organisation
to support the employees.
10 Risk of fire Moderat
e
High Need to make the arrangement for the
controlling the fire.
11 Loss of status and
image
High Low It is important to perform the various
task in methodical way.
12 Safety of staff High Moderate To take the safety measure for the
staff.
13 Loss of equipment Moderat
e
Low Ensure the p[roper management of the
equipments.
14 Financial loss Low Low To have the advance preparation of
Document Page
the required funds.
15 Permission from the
local authorities
Low High To take all the necessary permission
from the local bodies.
16 Small space Moderat
e
High On the basis of the gathering choose
the best location.
17 Hygiene of food High Moderate Install the sanitisation booths.
18 Deficiency of staff
members
Low High Hire the required number of
employees.
19 Inadequate parking
provisions
Moderat
e
Low Make the provision for parking and
arrange the attender.
20 Weather High Moderate Do the weather forcasting.
TASK 5
Quality expectation, quality specification, acceptance criteria and measure to be put for
controlling the event.
Quality expectations is the process which shows the quality that the individual or the
group of people is expecting but the quality of the project is something that is initially decided in
the starting of the project and in context of Sickle Cell addition to Thalassaemia Service Group,
the quality of the project is expected to high and the event company is planning to be the best
event company that perform the music event for the betterment of the society. In order to collect
the funds as the quality is expected to be high in casting crew and the collection from the
photographing catering of the quality food and also emphasis on taking the various consideration
doe to the risk of COVID-19(Rodríguez-Rivero and et. al., 2020).
In order to get the quality in the event the organiser is taking the feedback of their clients
in order to understand the problem easily and get the full control over the large market.
Task 6
Critical analysis of what methodology would be appropriate for the project and why
Project methodology is the set of essential of the guiding principles and the processes for
managing the project, so there is the need of choosing the right product methodology by which
the effective decision can be taken by the project manager. In context of Sickle Cell addition to
Document Page
Thalassaemia Service Group, they are planing to perform the critical part methodology that will
best suits in as it helps in examine the deadline of the project so that all the task can be
performed within the set time frame. This method save the time of the manager to complete the
various task that is associated with the easy completing of the music events.
CONCLUSION
It s conclude from the above report that, the project has been carried out in which the task
in which the business is using the application and the principles in order to compete the project.
Moreover, the manager of the event also take the major decision and use the various method for
the project. Addition to this, stakeholder analysis also conducted that support in examine the
interest and the power of the individual in the project. There are various factors that is associated
and to eliminate this, the manager have t render the training and development sessions.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
REFERENCES
Books and Journals
Rodríguez-Rivero, R and et. al., 2020. Applying the strategic prospective approach to project
management in a development project in Colombia. International Journal of Project
Management, 38(8), pp.534-547.
Zwikael, O., Chih, Y.Y. and Meredith, J.R., 2018. Project benefit management: Setting effective
target benefits. International Journal of Project Management, 36(4), pp.650-658.
Rumeser, D. and Emsley, M., 2018. A systematic review of project management serious games:
Identifying gaps, trends, and directions for future research. The Journal of Modern
Project Management, 6(1).
Severo, E.A. And et. al., 2020. Project management and innovation practices: backgrounds of the
sustainable competitive advantage in Southern Brazil enterprises. Production Planning
& Control, 31(15), pp.1276-1290.
He, T. and et. al., 2021. QUALIFLEX method for evaluating human factors in construction
project management with Pythagorean 2-tuple linguistic information. Journal of
Intelligent & Fuzzy Systems, (Preprint), pp.1-12.
Abbasi, A. and Jaafari, A., 2018. Evolution of project management as a scientific discipline.
Data and Information Management, 2(2), pp.91-102.
Lee, E. and Yoon, Y.I., 2019, May. Project management model based on consistency strategy for
blockchain platform. In 2019 IEEE 17th International Conference on Software
Engineering Research, Management and Applications (SERA) (pp. 38-44). IEEE.
Jin, H., Shen, L. and Wang, Z., 2018. Mapping the influence of project management on project
cost. KSCE Journal of Civil Engineering, 22(9), pp.3183-3195.