Fundamentals of Project Management Report: AF PLC Case Study, BT7073

Verified

Added on  2023/01/07

|24
|5223
|82
Report
AI Summary
This report presents an in-depth analysis of the AF PLC case study within the context of project management fundamentals. The report is divided into two main parts: Part A focuses on the practical application of project management tools and techniques, including the importance of the iron triangle (scope, time, cost, and quality) in defining project objectives and their interrelations. It also includes the formulation of a risk register, network diagrams, Gantt charts, budget preparation, and earned value analysis to assess project progress and make recommendations. Part B is a reflective essay that discusses the challenges and issues encountered during the project. The report covers various aspects of project planning, execution, and control, providing a comprehensive overview of the project's lifecycle and offering insights into effective project management practices. The report also includes an executive summary, introduction, conclusion, and references to provide a complete and well-structured analysis of the project.
Document Page
Fundamentals of Project
Management
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
EXECUTIVE SUMMARY.............................................................................................................3
PART A: AF PLC Case study.........................................................................................................4
Project definition/Parameters and Risks..........................................................................................4
A) Importance of different iron triangle parameters to set overall project objectives and its
inter-relation with each other......................................................................................................4
B) Formulation of the AF PLC risk register...............................................................................6
2. Cost and planning......................................................................................................................11
A) Creation of network diagram that demonstrate critical path and planned duration of project
...................................................................................................................................................11
B) Preparation of Gantt chart....................................................................................................12
.......................................................................................................................................................13
........................................................................................................................................................14
C) Detailing of overall project budget along with projected net profit.....................................15
3. Progress managing and spending...............................................................................................16
A) Use of Gantt chart for determine of planned progress about each task...............................16
B) To enter actual progress value for progress from revised table and producing of a revised
Gantt Chart to complete project with completion date ............................................................17
4. Earned Value Analysis and Acceleration .................................................................................18
A) Creation for earned value analysis table that show ACWP, BCWS and BCWP values for
each project task........................................................................................................................18
B) Creation of project completion date for entire project using estimate at completion
(schedule) method that derived from Earned Value Analysis..................................................19
C) Recommendation for the option should be accept or declined............................................20
PART B: Reflective Essay ............................................................................................................21
CONCLUSION .............................................................................................................................22
REFERENCES..............................................................................................................................23
Document Page
EXECUTIVE SUMMARY
AF Plc is selected in the report and they undertake the railway project from one of the
clients and the time period to complete project is one year. One of the major consideration of
effective project management relates with the support of technology for completion of work in
an organised manner. The existing project report is based on two part that are project A and
project B. This all activities are covered under different aspect that undertakes network diagram,
risk register and Gantt chart. Moreover, the part B undertakes the reflection which consist of
various issue that relates with completion of project.
Document Page
INTRODUCTION
The term project management refers to the policy and practices that are designed by
organisation for accomplishing all goals and objectives within minimum period of time. The
process of project management support organisation to work with leading performance by
completing all task and activities in an organised manner. This is more essential for organisation
to complete their work according to project as it helps to accomplish target in an effective
manner. With the fundamentals of project management that consists of planning, monitoring,
implementation and controlling of project with formative method. The existing report is divided
among two different sections that involve Part A and Part B (Mazzetto, 2018). The part A
consists about the importance of iron triangle which is used to manage project objectives. Risk
register creator which is organised and manage by AF while construction of project, formulation
of network diagram and its critical path which provide overall duration of project. In addition to
this Gantt chart, net profit and project budget will also undertake different task and
recommendation. In the last, Part B is based on reflective essay that undertake issue and
challenges that are considerate among the process with undertaking transparent personal
development goals.
PART A: AF PLC Case study
Project definition/Parameters and Risks
A) Importance of different iron triangle parameters to set overall project objectives and its inter-
relation with each other
The project manager perform different task and activities that helps in managing all the
relative aspect of project in order to complete task within a controlled manner. Project manager
utilise iron triangle because it is a vital concept and it assist different activities which is required
to perform in the future. Along with this iron triangle consist of different parameters that are
scope, quality, time and cost. This also leads project manager to gather and collect all
information as well as knowledge that helps in completion of activities according to decided time
limit (Poston and Richardson, 2019). This is also important for project manager to analyse and
understand all task because it ensure that all activities are processed accurately because it helps
in completion of activities according to decided strategy and policy. Project management and its
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
activities are also followed by all departments and manager of Automation future. This is
followed by manager by undertaking all in-depth analysis information because it helps to
interpret all data due to which it is easy to interlink with each other. Some aspects are defined as
below:
Cost- The cost aspect provide the in-depth knowledge about the related amount that is
used for measuring projected cost. This results all essential aspects of cost which is related with
complete of project is undertaken to prepare the budget and it also assign all activities through
which rate of deliverables and their probability is maintained to complete the project according
to decided activities. Fixed and variable both aspects of cost are undertaken by organisation for
evaluating the total cost of project (Zhou and et. al., 2018). This also results that all resources are
arranged by management of Automation future to complete their project with right rate of
occurrence. Along with this different prospect that are related with raw-materials, workforce,
technical equipments etc. are also collected by management to complete the project in a perfect
manner. It also helps in completion of project in decided budget or cost.
Time- The time aspect relates with the instance which helps to complete project in an
affordable manner by coordinating among all activities of project. In order to manage the project
time allotment is an essential attributes that helps for measuring all activities time period. So
with estimating time of all project actions. This is easy for the project manager to complete their
work done with the support of management and its limitations and it is used to complete project
activities according to decided time period. Automation future is responsible for making aspects
of project that support business action of organisation to work and perform their function in a
smooth manner. The responsibility of project manager relates with managing task with project
management tool such as Gantt chart and network diagram that is used to analyse and complete
all activities within right time period and it also ensure that organisation task are completed in a
perfect manner.
Scope- This is related with the deliverables which is linked with efforts of organisation
and it helps in completion of project properly. Scope parameters of the iron triangle provide
certain knowledge about effectiveness of project and it is also used by management to design
project and objectives in an effective manner (Heigermoser and et. al., 2019). Automation future
work with the aim of engaging technical engineering in automation plan. Along with this project
manager also perform their role for identifying selective aspects which helps to complete project
Document Page
with decided budget and time in order to take first mover advantage for accomplish of
organisation opportunity.
Quality- The term quality parameters is based on the impact of certainty for delivering
the overall process of project. In the end, there are different project activities is included by the
management and all of them are focused towards finishing the project with evolving good quality
of project. According to the case of Automation future it is analysed that all challenges are
overlooked and it is also resolved within minimum time. It helps organisation for achieving more
profits of business by completing all task in a quality manner.
With the above analysis it is also accomplish that most of the constraints are parallel and
linked with each other (Hopkin, 2018). This is useful for management to deliver better
possibilities of the project with inter-acting by all projects. In the case, if project parameters are
not managed properly than it is complex to manage and operate project in an efficient manner.
B) Formulation of the AF PLC risk register
The risk register with the determinant are always important for business and it helps for
identifying attributes and nature of project activities. This is also critical or important for
Automation future plc it is linked with analysis and measuring of factors that aids results to make
desirable changes and modifications among project that is related with requirements of project.
In the present scenario, respective organisation is performing their work at wider platform. It also
leads management to face different risk aspects. So to measure all risk aspects organisation risk
is measured in fulfil and completion of project with company objectives. There are different risk
register which is associated with project risk and it is explain as follow:
Risk name Reason behind the
risk
Risk that occur in
future
Impact of risk on
project activities
Preventive
measure to
control risk
Insufficient
funds
The risk level on
project activities
relates with funding
level. It also not done
with effectiveness of
market (Too and
The possibility
for risk in future
is high.
There is higher
impact on the
concept of
operation and
functions of
organisation. This
Strategy which is
used to minimise
the fund relates
with different
sources.
Moreover, with
Document Page
Weaver, 2014). In
context of this
research activities and
availability about
resources is not
managed which
creates less alignment
of activities.
also depend on
availability of
funds.
support of
strategy all funds
are managed in
controlled and
appropriate
manner.
Lack of raw-
materials
It is occurred
according to the
uncertain information
which is constrained
while working with
project. There are
different task need to
be consider because
there are different
reason raise that
occur certain amount
of contracts in
marketplace.
Probability to
face risk aspect is
high.
Their is huge
level of impact is
demonstrate on
the project
because without
the accessibility
of materials it is
complex to
complete work in
possible manner.
In order to reduce
the risk there is
lack of
possibilities is
determined
related with raw-
material. So to
deal with
challenge
enhancement
among
interrelationship
with suppliers is
focused that helps
in managing
better working
possibilities for
organisation
(Joslin and
Müller, 2015).
Neglect to
workforce
One of the vital
reason which is
In context of
neglect about
Their is a medium
impact is
The project
manager maintain
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
related with
occurrence of risk
associate with
neglecting of
employees. Working
gap and incapability
of employee's also
impacts on the
performance of
manager. Along with
this it also raise dis-
satisfaction among
employee's towards
working. This is also
because working
without monetary
amounts generate
complexity for
business.
workforce the
approach for
organisation is
moderate.
analysed on the
working and
completion of
project. It is also
diminished by
analysing skilled
and capable
workforce. This
also managed and
processed by
project manager.
continuous focus
and concern about
the guidelines that
helps to monitor
all different task
in an effective
time manner.
Lack of
communicatio
n
This is occurred by
the risk such as the
inappropriate
coordination between
organisational
activities (Hornstein,
2015). Along with
information which is
transferred are clear
and transparent.
Along with this
another reason
From the
perspective of
future
communication
risk is at
moderate
position.
Their is a medium
level of intensity
exists among the
project
management.
This refers that it
get delay only on
working process
by impacting on
company
performance.
This is essential
for project
manager that they
manage and focus
for arranging an
appropriate level
of
communication.
This leads
organisation to
complete their
work in an
Document Page
associate with diverse
culture and it is
promoted by
business. Further, it is
complex for
employees to work in
collective manner due
to language barrier.
effective manner
by improvising
working ability
and the capacity
to improve
performance and
productiveness of
project.
Technical risk One of the suitable
reason that relates
with occurrence of
technical risk is based
on the issue that are
developed because of
using obsolete
technology. Along
with this
technological
engagement is raised
on constant period.
Along with this it also
provide appropriate
training and the
development to
employees. Further,
repetitive changes
within technical
machinery also used
to improve
productivity and
Technical risk for
organisation is at
medium level.
Organisation
undertakes
medium level of
intensity due to
which
performance rate
and working
speed is also
decrease
(Conforto and et.
al., 2014).
In context of this
risk organisation
require regular
training and
development that
is offered to
employee's. This
also increase
ability of
workforce for
working with new
technology.
Document Page
costing.
Nature or
environment
calamity
One of the reason
behind the occurrence
of risk relates with
misshapenness that
are occurred due to
natural disaster.
Along with this there
is direct impact on
constant supply of
resources (Svejvig
and Andersen, 2015).
This results project
work is stopped.
The risk for
natural calamity
is too low.
It has the lower
impact because
natural calamities
not take place on
repetitive period.
Moreover, no one
is able to control
natural calamity.
Project manager
ensure there are
various aspect
related with
organisation
alternatives.
Performance and
promotion rate
also increase by
attaining natural
calamity.
Workers
strike
The occurrence
behind the
inappropriate
situations is
monitored by
employee's. It is
because of non-
fulfilment about
employees
requirement.
Probability of
employee's strike
is too low.
There is lower
impact monitored
on the
possibilities of
organisation
strike but if occur
than it impact on
overall project.
Project manager
is focused for
satisfying all
employee's and
this also helps
individual for
identifying
different solution
of workforce.
Ineffective
management
of time
The difference in
timescales occur if
organisation working
is not processed
according to accurate
time. This also
There is moderate
level of risk
related
probability exist.
The impact of
time risk directly
relates with
quality of
product. This also
determine work
Project manager
focus on all task,
action and
activities of
project. This leads
organisation to
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
disturb organisation
work. Further, it take
place due to lack
knowledge, funds and
times.
quality of
operational issue
changed at
random basis
(Niazi and et. al.,
2016). It also
increase
expenditure cost
for organisation.
complete their
project on time
basis.
2. Cost and planning
A) Creation of network diagram that demonstrate critical path and planned duration of project
The above stated diagram relates with Automation Future plc and it show different paths
that are basically relates with completion of task with more perfection (Floricel and et. al., 2014).
In the context of simple basis critical path not involves certain path for float but in context of this
project there is no difference between the completion of project with actual time and expected
time.