Project Management Report: QAHE Redevelopment and Refurbishment

Verified

Added on  2022/11/24

|7
|1022
|457
Report
AI Summary
This report provides a comprehensive overview of project management strategies applied to the redevelopment of QAHE's teaching spaces. It begins with an introduction to project management principles and then delves into the specifics of the QAHE project, including the project initiation document which outlines the aims, budget, and key staff involved. The report details the allocated budget, timescale, and required staff for the project, followed by an analysis of the project's objectives and approach. A stakeholder analysis is presented, identifying the interests of various stakeholders in the project. The work breakdown structure (WBS) is discussed as a tool for managing the project into smaller components. The report concludes with a critical path analysis (CPA) and network diagrams to evaluate the project's timescale and dependencies. The report highlights how project management techniques can be implemented to ensure the successful redevelopment and refurbishment of teaching spaces for QAHE's business students.
Document Page
management (2)
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
TABLE OF CONTENT
INTRODUCTION.......................................................................................................................................3
MAIN BODY..............................................................................................................................................3
Project initiation document......................................................................................................................3
WORK BREAKDOWN STRUCTURE..................................................................................................5
CONCLUSION...........................................................................................................................................8
REFERENCE..............................................................................................................................................8
Document Page
INTRODUCTION
Project management is mainly a method which helps how to lead the work and also to
manage a proper methods through which goals and objectives can be achieved and proper targets
can be framed out in and constant manner (Bjorvatn, and Wald, 2018). It is mainly a process and
an application to which proper skills, knowledge and the methods can be applied for the specific
areas of work. This report will cover objective of approach and its various key staff and the
budget that is being allocated for the case scenario.
MAIN BODY
Project initiation document
This is mainly a method through which a proper record can be maintained out in order to
capture all the important relevant information and implementation of a project in the plan can be
framed out through it as it provides out the aims and the plans through which the manner can be
implemented in order to meet the requirements of the project. As for QAHE they tried to manage
the refurbishment and the redevelopment in London for the better seating and teaching space
they can thereby implement out a proper planning in which all the important projects can be
aligned out with an expanded planning and its aims.
Budget
Items Amount (£) in Thousands
Equipments 25
Graphics 15
Hiring and expenses of staff 25
Other expenses 35
TOTAL 100
Timescale
This is a project in order to redevelop all the important areas and the space for the
business students and the timescale required for it is 22 June 2021- 26 August 2021
Document Page
Key staff required: There will be required approximately 20 staff members to maintain the work
in a proper manner (Sanchez, and et. al., 2019).
Objectives of project
To make a proper project for the redevelopment of spaces.
To implicate a proper provisional budget for the project that is being processed for
QAHE (Galli, 2018).
To manage proper work regarding to die project development and strategy for QAHE.
Approach
It is mainly the implementations of all the stages and the management of the project in a
better way so as to enhance the success for the project and also to lead out the better manner by
executing, initiating, monitoring and controlling with the close access of all the working
scenarios. As in this case scenario QAHE thereby trying to maintain a proper budget through
which it will help out to maintain an approach in which they can implement out a proper better
teaching space And will also help out to improve the spaces available for all the business
students.
Key Staff
Teachers team
Other work staff
Project manager
Stakeholder Analysis
For QAHE redevelopment of teaching areas and advances the most essential parts for this
project is mainly in order to communicate and maintain the project in a better way (Machuca-
Villegas, and et. al., 2018), The stakeholders are being required for communicating the details of
the project which is being given below:
Stakeholder Interest in project
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Teachers High interest
Staff members Moderate interest
Students High interest
Government Less interest
Trustees of campus High interest
Directors High interest
Dean High interest
Investors Moderate interest
Societies and clubs of campus High interest
Suppliers and other personnel Low interest
WORK BREAKDOWN STRUCTURE
Work breakdown structure is mainly helps to manage the project and also all the system
through which the delivery of the oriented programs can be maintained in smaller areas and
components. It covers out and organise important teamwork within manageable areas and
sections. As in this case scenario it will help out to analyse all the improvements that are being
needed and the implementation of budget with the technical aspects and the timescale that is
being required for the making of program.
Critical path analysis
CPA is mainly a technique which helps out to manage the project and also to mapping of
all the task that are being needed for completing the project it also to identify all the amount end
Document Page
of the time that is being necessary and needed for the dependencies of the project as for all this
redevelopment of the teaching area for the business students CPA will be evaluated by
measuring the timescale (Layton and et.al., 2020).
Figure 1: Network diagram
Figure 2: EST, LST, EFT and LST
CONCLUSION
It is concluded from the above report that project management helps out to implement the
strategies for the project. Stakeholder analysis helps out to analyse the power and the interest of
the stakeholders. WBS is implementation of structure for the implementation of project
management.
Document Page
REFERENCE
Bjorvatn, T. and Wald, A., 2018. Project complexity and team-level absorptive capacity as
drivers of project management performance. International Journal of Project
Management, 36(6), pp.876-888.
Galli, B.J., 2018. Risks related to lean six sigma deployment and sustainment risks: How project
management can help. International Journal of Service Science, Management,
Engineering, and Technology (IJSSMET), 9(3), pp.82-105.
Sanchez, and et. al., 2019. A Step for Improving the Transition Between Traditional Project
Management to Agile Project Management Using a Project Management Maturity
Model. The Journal of Modern Project Management, 7(1).
Machuca-Villegas, and et. al., 2018, October. Gamification for improving software project
management processes: A systematic literature review. In International Conference on
Software Process Improvement (pp. 41-54). Springer, Cham.
Layton and et.al., 2020. Agile project management for dummies. John Wiley & Sons.