Project Management Assignment 3: Beachside Cottage Renovation Project

Verified

Added on  2025/04/28

|10
|1104
|142
AI Summary
Desklib provides past papers and solved assignments for students. This project report details a beachside cottage renovation.
Document Page
MNG00785-2019-1 PROJECT
MANAGEMENT - ASSIGNMENT -3
STUDENT ID-
STUDENT NAME-
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Contents
Introduction......................................................................................................................................3
The situation of Project Description................................................................................................4
Project situation Description........................................................................................................4
Protocol project for the theory of integration..................................................................................5
Experiences of Project Working:.................................................................................................5
Project structure for the logical Essay.............................................................................................6
Experienced and Learned Activity..............................................................................................6
Conclusion.......................................................................................................................................8
References........................................................................................................................................9
Document Page
Introduction
The subject of the management of the project is introducing through the working experience of
the management of the project market. The introduction of the project business tool like
management budget, project system work brake protocol, and application of AoN and
identification function of the stakeholder increase the project experienced and get the more
learned activity. The structure of the management is capable to understand the project design for
the user requirement. Term of project experienced is defining the different type of project task.
The entire learned task is performed in the project working activity.
Document Page
The situation of Project Description
In this object capture the working situation for the project design. On behalf of the project,
activity introduces the different type of management of project activity situation. Project
condition is depending on the structure of the project tool. The basic aim of the project
description situation is to find out the experienced design protocol for the project parameter.
Project situation Description
(1) Communication of Project: In this term capture the communication plan for the repair work
of the project. Matrix of communication project locates the stakeholder protocol information for
the management of the project. Identification of the stakeholder represents the management of
project design during the working experienced (pp. 501-504).
Structure of
Stakeholder
Application of the
Working method
Term of Project
identity
Design of Project
application
Working condition of the
project
Project Document
justification and
Decision of project
making report
Inspection work Improve the quality of
the project
Market stakeholder
information
Project renovation work
application
Design of project
protocol
Gain the goal for
business structure
(2) WBS Structure: This system is monitoring each and every activity which is followed for the
renovation work. Analysis of the project construction planning, cost simulation of renovation
work and find the working activity for the management of the project (pp. 295-306).
Project WBS Panel Situation of Project
Find the project complete
work
In this application, plan to manage the complete working information
regarding the inspection, repair work with the use of the stakeholder.
Activity of project Find the working application for the product stakeholder, Locate the working
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
skills for the business protocol
operation of working In this application justify the complete renovation work for inspection duty for
the beachside cottage.
A protocol of Budget: This subject is defining the basic working condition of the project cost.
Simulation of the budget is the term in which define the baseline of the management of the
project. In this subject on behalf of activity performance determine the cost application for the
project. For the repairing work mange, the $ 20000 for all the perform activity (pp. 342- 344).
Protocol project for the theory of integration
This key analyses the time function of the project activity. This term is introduced through the
quality application of the management of the project. During the renovation work find out the
complete learned activity integration for manage the project design (pp. 300- 303).
Experiences of Project Working:
This term is introduced through the basic concept of the management of project working
situations. All the project operation which is following on the renovation application provides the
new experiences for the market review (pp. 510-513).
Experiences of
working
Session of a Project application
Protocol of risk Manage the complete risk structure for the project design. The object
of the risk application is determining the concept of risk design.
Manage the
communication
Increase communication for better quality function
Stakeholder gathering Gain the information of the stakeholder for the renovation work
Stakeholder information Complete justification of stakeholder for project interface design
A tool of business working Gain the information of market business application
Protocol of project Justify the information of the project for the purpose of user requirement.
Document Page
Document Page
Contribution of Project business situation
In this structure determine the situation of the project contribution for the market review. The
situation of the business plan is locating the performed activity of the project.
(1) Working of management: For the renovation work management team find out the condition
of the project stakeholder. The key to the management stakeholder identifies the complete
requirement of the project segment (pp. 410-413).
Protocol of working Activity of Project
Scope of the project Inspection the project site and deal to stakeholder for repair work
Description of working Generate the new design protocol structure and identify the material
structure
Budget of Project Manage the renovation budget for complete project work
Quality of project High product quality and reduce the risk assessment function
Communication of stakeholder for repair work: For the repair work justify the concept of the
stakeholder. The communication is the application determines the design of management of
project function.
Project structure for the logical Essay
The logical essay is introduced through the structure of the working environment in the
renovation work protocol. In this function capture the learned activity for the project assessment.
Experienced and Learned Activity
During this function manage the complete plan activity of the project which is followed on the
management of the project.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Plan for Project Renovation
Project
Stakeholder
Project
Communication plan
Activity of Project
Inspection of Project E-mail Site renovation and repair work
Plan for recovery Internet Behalf of user need to justify the project
Tool for Renovation Blog Tool requirement for the business protocol
Protocol of working Blog Stakeholder presence make the work
Justification of
Project
videoconferencing Justify the market requirement and generate the
product
Closure of Project: In this term find out the assurance activity for the project application. The
renovation work is depending on the project closure of the user demand (pp. 280-85).
Project Function Deliverables Activity with assurance Roles or activity and function
of Responsibility Experienced
Application of project Project Plan Generation of risk
A report seeking for project Function of quality Result parameter of renovation
work
Outputs Result for project Life structure for project model workplace condition
Benefits of Business Research of market Satisfaction of user
Document Page
Conclusion
This report justifies the need for the management of project function. In this subject on behalf of
activity performance determine the cost application for the project. WBS system is monitoring
each and every activity which is followed for the renovation work.
Document Page
References
Kloppenborg, TJ 2015, Contemporary project management, 3 edn, Cengage Learning, Stamford,
CT.
Kloppenborg, TJ, Anantatmula, V & Wells, KN 2018, Contemporary Project Management, 4
edn, Cengage Learning, Boston, MA, USA.