Project Selection Methods and Initial Documents Report
VerifiedAdded on 2022/11/14
|10
|1897
|251
Report
AI Summary
This report, prepared for PROJ6000 Principles of Project Management, delves into project selection methods and initial documents, focusing on the context of Uber's driver app. It explores the importance of appropriate project selection, emphasizing its role in organizational efficiency and alignment with goals. The report compares various project management approaches, including Waterfall, Scrum, and Agile methodologies, ultimately advocating for the Agile methodology due to its flexibility and adaptability. It also highlights the significance of project management tools, such as Gantt charts and network diagrams, and underscores the necessity of risk assessment in project development. The analysis concludes by summarizing the benefits of the selected project, particularly in enhancing Uber's services and improving driver efficiency, which in turn, aims to improve the market position of the organization.

Running head: Principle of Project Management
PRINCIPLE OF PROJECT MANAGEMENT
Name of the Student
Name of the University
Author Note:
PRINCIPLE OF PROJECT MANAGEMENT
Name of the Student
Name of the University
Author Note:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1Project Management
Table of Contents
Introduction:...............................................................................................................................1
Discussion:.................................................................................................................................1
Project Management Approaches:.........................................................................................3
Waterfall Model:................................................................................................................3
Scrum Model-.....................................................................................................................4
Agile Method-....................................................................................................................4
Project Management Tool:.....................................................................................................5
Gantt Chart-........................................................................................................................5
Network Diagram-.............................................................................................................5
Scheduling-........................................................................................................................5
Risk Assessment:...................................................................................................................5
Conclusion:................................................................................................................................6
Table of Contents
Introduction:...............................................................................................................................1
Discussion:.................................................................................................................................1
Project Management Approaches:.........................................................................................3
Waterfall Model:................................................................................................................3
Scrum Model-.....................................................................................................................4
Agile Method-....................................................................................................................4
Project Management Tool:.....................................................................................................5
Gantt Chart-........................................................................................................................5
Network Diagram-.............................................................................................................5
Scheduling-........................................................................................................................5
Risk Assessment:...................................................................................................................5
Conclusion:................................................................................................................................6

2Project Management
Introduction:
The primary objective of this paper is to elaborate the project selection process as well
as this paper will also consist a detail elaboration related to the initial processes of the
mentioned project. In order to initiate any project it is very important to select an appropriate
project selection method which will provide effectiveness in the development of the project.
Followed by this aspect it will also explain about the importance of an appropriate project
management process in project development process. Along with that it will also describe
why the selected project is appropriate for the mentioned case scenario by comparing it with
other processes. Apart from describing the project selection process and the management
process it will also consist an assessment of the risk related to the mentioned project. Lastly,
it will conclude by providing a brief discussion based on the essentiality of this above
elaboration.
Discussion:
According to the project management book of knowledge it has been noticed that there is
a significant role of selecting an appropriate project plan for any development as an
appropriate as well as effective project plan helps the developer to understand the future
scope of the approached project as well as it is effective of organize the work process.
Followed by this in order to specify the investment which is required for the developing the
mentioned project is also very essential which can be addressed by an appropriate project
management plan. It has also mentioned that while selecting any project there are several
aspects present which needs to be accounted. According to the case scenario it has been
noticed that the objective of the approached project is to deliver such application to their
drivers which holds the capability to guide the customers as well as the drivers. Analysing the
Introduction:
The primary objective of this paper is to elaborate the project selection process as well
as this paper will also consist a detail elaboration related to the initial processes of the
mentioned project. In order to initiate any project it is very important to select an appropriate
project selection method which will provide effectiveness in the development of the project.
Followed by this aspect it will also explain about the importance of an appropriate project
management process in project development process. Along with that it will also describe
why the selected project is appropriate for the mentioned case scenario by comparing it with
other processes. Apart from describing the project selection process and the management
process it will also consist an assessment of the risk related to the mentioned project. Lastly,
it will conclude by providing a brief discussion based on the essentiality of this above
elaboration.
Discussion:
According to the project management book of knowledge it has been noticed that there is
a significant role of selecting an appropriate project plan for any development as an
appropriate as well as effective project plan helps the developer to understand the future
scope of the approached project as well as it is effective of organize the work process.
Followed by this in order to specify the investment which is required for the developing the
mentioned project is also very essential which can be addressed by an appropriate project
management plan. It has also mentioned that while selecting any project there are several
aspects present which needs to be accounted. According to the case scenario it has been
noticed that the objective of the approached project is to deliver such application to their
drivers which holds the capability to guide the customers as well as the drivers. Analysing the
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3Project Management
purpose of the approached project it can be stated that the approached plan holds the
responsibility to reduce the cost of the company by maximize the utilization of time.
Followed by the mentioned case scenario crucial aspects are mentioned below which needs to
be accounted while selecting any project:
At first it is very important to understand the essentiality of the approached project,
how the approached project is beneficial for the targeted organization?
If it can maximize the utilization of all the available resources?
If the project can address the customer as well as other stakeholders expectation?
If it can help the organization to enhance their market position, market share and
profit?
It it can engage new customers?
What are the possible risk present in the approached project?
If the project is relevant to the company or not?
How this will improve the current status of the organization?
Considering the above mentioned aspect it has been determined that the approached
project holds a significant role in enhancing the services of Uber. The approached project is
highly effective for the customers as well as for the drivers as it helps the driers to select the
nearest passenger which will reduce the possibility of latency thus, it will maximize the
utilization of time.
Project Management Approaches:
Followed by selecting the effective project for the mentioned case scenario it is also
very essential to choose appropriate project management plan for the selected project. There
are several project management approach which includes the Waterfall model, Scrum Model,
Critical Path Method as well as the Agile Method. In order to select effective project
purpose of the approached project it can be stated that the approached plan holds the
responsibility to reduce the cost of the company by maximize the utilization of time.
Followed by the mentioned case scenario crucial aspects are mentioned below which needs to
be accounted while selecting any project:
At first it is very important to understand the essentiality of the approached project,
how the approached project is beneficial for the targeted organization?
If it can maximize the utilization of all the available resources?
If the project can address the customer as well as other stakeholders expectation?
If it can help the organization to enhance their market position, market share and
profit?
It it can engage new customers?
What are the possible risk present in the approached project?
If the project is relevant to the company or not?
How this will improve the current status of the organization?
Considering the above mentioned aspect it has been determined that the approached
project holds a significant role in enhancing the services of Uber. The approached project is
highly effective for the customers as well as for the drivers as it helps the driers to select the
nearest passenger which will reduce the possibility of latency thus, it will maximize the
utilization of time.
Project Management Approaches:
Followed by selecting the effective project for the mentioned case scenario it is also
very essential to choose appropriate project management plan for the selected project. There
are several project management approach which includes the Waterfall model, Scrum Model,
Critical Path Method as well as the Agile Method. In order to select effective project
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4Project Management
management approaches a detail elaboration of the comparison between the project
management approaches are mentioned below:
Waterfall Model:
This is one of the effective project management process as well as this is one of the
oldest project management methodologies. This method followed a specific sequence as this
method is highly strict about the pre-selected requirements. In order to apply this
methodology in order to develop the approached project it is very essential to have a clear as
well as effective plan since, no back tracking is possible in this project development
methodology. This method consist many steps which are described below:
Identifying the requirements.
Analysing the approached plan.
Design the approached project.
Implementing the project.
Testing of the implemented project.
If it passes then deployment of the implemented project.
Maintenance of the deployed product.
However, this process is one of the oldest project management method it also holds
significant limitation which affects the project development process. Those limitation
includes the risk related to the application of this method as there is no such way for back
tracking in this method which may lead to a huge blunder. Along with that in this method is
highly restricted to the predefined plan as no change will be accounted at the middle of the
process.
management approaches a detail elaboration of the comparison between the project
management approaches are mentioned below:
Waterfall Model:
This is one of the effective project management process as well as this is one of the
oldest project management methodologies. This method followed a specific sequence as this
method is highly strict about the pre-selected requirements. In order to apply this
methodology in order to develop the approached project it is very essential to have a clear as
well as effective plan since, no back tracking is possible in this project development
methodology. This method consist many steps which are described below:
Identifying the requirements.
Analysing the approached plan.
Design the approached project.
Implementing the project.
Testing of the implemented project.
If it passes then deployment of the implemented project.
Maintenance of the deployed product.
However, this process is one of the oldest project management method it also holds
significant limitation which affects the project development process. Those limitation
includes the risk related to the application of this method as there is no such way for back
tracking in this method which may lead to a huge blunder. Along with that in this method is
highly restricted to the predefined plan as no change will be accounted at the middle of the
process.

5Project Management
Scrum Model-
Along with the waterfall method for developing any project it is also an effective
project management model which does not follows any master slave tradition. It takes the
project to the centre and proceed with the development process by involving every team
members of the project development team. Followed by the aspect it has been noticed that
this is also applicable for the mentioned case scenario.
Agile Method-
Along with the above two project development method it is also one of the effective
software project development method. This model is quite opposite of the Waterfall
methodology which is much faster and flexible as compared with other project management
approaches. One of the most significant advantages to apply this method is that it does not
demands any fixed requirements as there is a freedom for the experimenting with the
requirements. Along with that utilization of this method offers lower risk related to the
development of the final product as there is a huge chance for other project management
methods to do not address the desire goal. Along with the advantages it also consists several
limitations related to the fixed plan as in this methodology there is no fixed plan which may
affect the development process while predicting the resources as well as the man power.
Followed by the above mentioned aspect high collaboration of the stakeholders and the
workers effects the development of the approached project.
After considering the above project management plans it has been determined that
Agile methodology is more appropriate for the approached project as this project
management methodology holds the capability to effectively analyse the project scope and
requirement in order to design the approached project.
Scrum Model-
Along with the waterfall method for developing any project it is also an effective
project management model which does not follows any master slave tradition. It takes the
project to the centre and proceed with the development process by involving every team
members of the project development team. Followed by the aspect it has been noticed that
this is also applicable for the mentioned case scenario.
Agile Method-
Along with the above two project development method it is also one of the effective
software project development method. This model is quite opposite of the Waterfall
methodology which is much faster and flexible as compared with other project management
approaches. One of the most significant advantages to apply this method is that it does not
demands any fixed requirements as there is a freedom for the experimenting with the
requirements. Along with that utilization of this method offers lower risk related to the
development of the final product as there is a huge chance for other project management
methods to do not address the desire goal. Along with the advantages it also consists several
limitations related to the fixed plan as in this methodology there is no fixed plan which may
affect the development process while predicting the resources as well as the man power.
Followed by the above mentioned aspect high collaboration of the stakeholders and the
workers effects the development of the approached project.
After considering the above project management plans it has been determined that
Agile methodology is more appropriate for the approached project as this project
management methodology holds the capability to effectively analyse the project scope and
requirement in order to design the approached project.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6Project Management
Project Management Tool:
Followed by the appropriate project management methods it is also essential to
incorporate effective project management tool for developing an approached project. The
most effective project management tools are mentioned below:
Gantt Chart-
This is s type of chart in which the project development processes are scheduled.
Network Diagram-
This diagram represents the working process of the project development as well as
helps to determine the critical path for the mentioned project.
Scheduling-
This tool helps to schedule the process and the progress of the mentioned project by
which the work flow as well as the progress can be controlled.
Risk Assessment:
Followed by the above discussion related to the project management methodology as well
as the project management tool it is also very essential to assess the risk related to the
approached project.
In order to effectively analyse the project risk it is essential to determine the risk
present in every field of the approached project.
Followed by this, collecting feedback from the stakeholders of the project is also
essential to determine the risk present in the approached project.
Considering the determined risk it is essential to suggest effective mitigation problem.
Project Management Tool:
Followed by the appropriate project management methods it is also essential to
incorporate effective project management tool for developing an approached project. The
most effective project management tools are mentioned below:
Gantt Chart-
This is s type of chart in which the project development processes are scheduled.
Network Diagram-
This diagram represents the working process of the project development as well as
helps to determine the critical path for the mentioned project.
Scheduling-
This tool helps to schedule the process and the progress of the mentioned project by
which the work flow as well as the progress can be controlled.
Risk Assessment:
Followed by the above discussion related to the project management methodology as well
as the project management tool it is also very essential to assess the risk related to the
approached project.
In order to effectively analyse the project risk it is essential to determine the risk
present in every field of the approached project.
Followed by this, collecting feedback from the stakeholders of the project is also
essential to determine the risk present in the approached project.
Considering the determined risk it is essential to suggest effective mitigation problem.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7Project Management
Conclusion:
After the completion of the paper it can be concluded that this paper has effectively
discussed about the aspects of project management book of knowledge related to the project
development strategy and process. Followed by this in order to select the most appropriate
project for the selected organization the paper had effectively mentioned the significant
aspects which needs to be considered while selecting a project for the betterment of the
selected organization. Along with the selection of the project it has also elaborated the
possible project management methods from which the Agile methodology has been selected
to develop the approached project. Along with selecting the appropriate project management
methodology it has successfully elaborated the effective project management tools in order to
provide efficiency in the project development process. Lastly, it has effectively elaborated
how the risk assessment should be done in order to enhance the effectiveness of the
approached project. Thus, it can be stated in order to incorporate the approached project for
Uber there is a huge scope for enhancing the market position of the mentioned organization.
Followed by this it has been also observed that due to the incorporation of the new
application it will be very helpful for the uber drivers to provide their services to the
customers by selecting the nearest passenger which will help the driver to maximize the
utilization of their time which will surely help them to gain more profit and the passengers
will get more facilities from the organization as well.
Conclusion:
After the completion of the paper it can be concluded that this paper has effectively
discussed about the aspects of project management book of knowledge related to the project
development strategy and process. Followed by this in order to select the most appropriate
project for the selected organization the paper had effectively mentioned the significant
aspects which needs to be considered while selecting a project for the betterment of the
selected organization. Along with the selection of the project it has also elaborated the
possible project management methods from which the Agile methodology has been selected
to develop the approached project. Along with selecting the appropriate project management
methodology it has successfully elaborated the effective project management tools in order to
provide efficiency in the project development process. Lastly, it has effectively elaborated
how the risk assessment should be done in order to enhance the effectiveness of the
approached project. Thus, it can be stated in order to incorporate the approached project for
Uber there is a huge scope for enhancing the market position of the mentioned organization.
Followed by this it has been also observed that due to the incorporation of the new
application it will be very helpful for the uber drivers to provide their services to the
customers by selecting the nearest passenger which will help the driver to maximize the
utilization of their time which will surely help them to gain more profit and the passengers
will get more facilities from the organization as well.

8Project Management
Bibliography:
Boushaala, A. (2014). An approach for project scheduling using PERT/CPM and Petri Nets
(PNs) Tools. Industrial engineering and operations management, 5(85), 939-947.
Burke, R. (2013). Project management: planning and control techniques. New Jersey,
USA, 26.
Chaves, M. S., Araújo, C. D., Teixeira, L., Rosa, D., Júnior, I., & Nogueira, C. (2016). A new
approach to managing Lessons Learned in PMBoK process groups: the Ballistic 2.0
Model. International journal of information systems and project management, 4(1),
27-45.
Gabrel, V., Murat, C., & Thiele, A. (2014). Recent advances in robust optimization: An
overview. European journal of operational research, 235(3), 471-483.
Gantt, H. (2015). Gantt chart.
Project Management Institute. (2013). A guide to the project management body of knowledge
(PMBOK guide) (5th ed.). Newtown Square, PA: PMI.
Project Management Institute. (2017). A guide to the project management body of knowledge
(PMBOK guide) (6th ed.). Newtown Square, PA: PMI.
Bibliography:
Boushaala, A. (2014). An approach for project scheduling using PERT/CPM and Petri Nets
(PNs) Tools. Industrial engineering and operations management, 5(85), 939-947.
Burke, R. (2013). Project management: planning and control techniques. New Jersey,
USA, 26.
Chaves, M. S., Araújo, C. D., Teixeira, L., Rosa, D., Júnior, I., & Nogueira, C. (2016). A new
approach to managing Lessons Learned in PMBoK process groups: the Ballistic 2.0
Model. International journal of information systems and project management, 4(1),
27-45.
Gabrel, V., Murat, C., & Thiele, A. (2014). Recent advances in robust optimization: An
overview. European journal of operational research, 235(3), 471-483.
Gantt, H. (2015). Gantt chart.
Project Management Institute. (2013). A guide to the project management body of knowledge
(PMBOK guide) (5th ed.). Newtown Square, PA: PMI.
Project Management Institute. (2017). A guide to the project management body of knowledge
(PMBOK guide) (6th ed.). Newtown Square, PA: PMI.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9Project Management
1 out of 10
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.