This report provides a comprehensive analysis of a project management scenario involving the organization of an indoor sports event at QAHE University in London. The project aims to enhance the university's market presence and engage students through a QAHE-funded initiative with a budget of £20,000. The report includes a project initiation document outlining objectives, key staff, and approaches, along with a stakeholder analysis identifying key players like university volunteers, trustees, and sponsors. A work breakdown structure (WBS) details the project's tasks, followed by a risk register that identifies and assesses potential risks such as technology disruptions, budget instability, and reputational concerns. The report also discusses relevant project methodologies and offers recommendations for successful project execution. Desklib provides access to similar solved assignments and past papers to assist students in their studies.
Document Page
Business Project
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Contents
INTRODUCTION...........................................................................................................................1
MAIN BODY..................................................................................................................................1
Part 1................................................................................................................................................1
Project Initiation Document.........................................................................................................1
Part 2................................................................................................................................................6
Risk Register................................................................................................................................6
Project Methodologies...............................................................................................................12
Recommendation.......................................................................................................................14
CONCLUSION..............................................................................................................................14
REFERENCES..............................................................................................................................15
Document Page
Document Page
INTRODUCTION
A business project is emphasized as an individual project that is mainly executed to accomplish
business-related objectives (Markovic., Bagherzadeh and Bogers , 2021). It has different actions
which an undertaken for the specific period of time in which several resources are involved.
Better project management refers to different managed risk that can comprise activities through
both starting and end of that project. In this project, some case scenarios are given on which one
of the case scenarios is considered: case study 1. According to a case, being as a project manager
organising a indoor sports event of Olympics in London (Arslan, 2020). The purpose of
conducting this sport event is to help the market through QAHE facilities with a budget of £20k
where students of the university show their participation in this, which allows more funding. The
below report is based on the scenario of providing more space to all students and teachers and
redevelopment of QAHE university campus, London. The report includes risk register,
methodologies, theories and recommendations.
MAIN BODY.
Part 1
Project Initiation Document.
According to the project initiation document is a form of the guide towards a project that is
clearly lying out within better justification towards the project, what the objectives will be and
how the project would be organized. This helps to make ensure that participants or people who
are around must aware of project highlights effectively (Buganova, Luskova and Slepecky,
2021). As QAHE University is organising a small indoor Sport event to help the market and
engage University students. As the event is taking place in the month of between July and
August with a budget of £20k. There are some important events of project initiation document
covers which helps to execute the better project development are:
Time scales The project timeline is predicted to complete within one month
(July to August). This one timeline will follow and attain more
important aspects strictly or resources would make implement to
QAHE’s University sport indoor Olympics project.
Objective or purpose The main objective of this project is to create awareness and
1
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
promote in the market about QAHE’s facilities. And make to
engage University student participation in Sports indoor games in
London .
Key staff The main staff involved in this Sport indoor project are University
students, lectures, Sports volunteers, trustees, Event Sponsor team
etc (Kravchenko and Shevgunov., 2021). These are the essential
staffs who plays an important role in establishing successfully.
Approach The approaches which imply in the project to collect the
information through using the deductive or primary approach to
analyse about project importance, create the valuable or potential
team, searching about best accommodation services for guests
Risk management plan It is the most important part of any project. In business, the risk
management plan is implemented through managers to identify
project risk that arises in a certain period properly.
Stakeholder Analysis:
It is the process is assessing a system and having certain potential changes acquired by
relevant parties. This information is used to allow about the interest of those stakeholders, which
much should address in a better project plan. For the QAHE University project of Sport indoor
event there are some specific main stakeholder who plays a significant role such as University
volunteer, trustees team, Sports coordinator. University Board of director, Government etc.
Stakeholder Matrix
2
Document Page
Figure 1: Stakeholder Matrix, 2020.
Source: https://www.stakeholdermap.com/stakeholder-matrix.html.
High power, Low interest: These stakeholders have high power but show less interest that keeps
them satisfied. For example, the Management team of QAHE’s University has the power to
provide resources in Sport indoor Olympic project to execute in a better manner.
High power, High Interest: They tend to be major stakeholders who have heavingly invested
their contribution in projects. For example: Trustees, Board of directors of QAHE University,
Sponsors are the main stakeholders who contributed their fundings into projects.
Low power, Low interest: According to this factor, stakeholder are the ones who are just
monitored and become more powerful affect the project within futures (Hillson. and Simon,
2020). For example: Receptions, pions and other vounteers etc.
Low Power, High Interest: In these stakeholders with low power but show their high
contribution to conduct the project effectively. For example, the Olympics project conducted by
QAHE University where students and staff have low power but their creativity shows high
interest.
3
Document Page
Work Breakdown Structure
This structure in a project management is method for completing a complex with better
multi-step project. Further, it breaks the plan of specific projects in a better manner to attain get
accomplish project in effectively manner (Beerbaum., 2021). The purpose of on WBS is to make
large project more manageable. This also enhance to generate efficiency of employee
productivity to attain easier project management. There are 20 items of Work breakdown
structure items about Olympics of Indoor Sports in QAHE University in London project.
4
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
5
Document Page
Part 2.
Risk Register
According to this, it is a document which is used as a risk management tool and to
accomplish regulative compliance within terms of considering all risk which were being better
identified. It is used to examined about high value risk with consideration of project. In context
with better project management with the main purpose is to identify and track all of risk (Poch.,
Miralles and Ramos , 2021). The reason behind this is that implementing any project with the
main expected situation might take place to create both positive and negative impacts. In
accordance with chosen scenario, there are ten risk that are associated with the end with it being
explained below:
Disruption in technology
Having no conyrol in staff priorities.
Interruption in teaching timetables
Instability in budget.
Loss of Support.
Project Manager got sick
Lack of resources.
Unexpected financial losses.
Reputational Risk.
Natural disasters
Description of
risk
Chances of
occurrence of
the risks
Impact Severity Owner Mitigating
action
Disruption in
technology
The Risk
associated
with better
technology is
high because
new tools and
techniques get
Within the
context of
these risk, it
would create a
significant
impact as if
the technology
It has a high
level of
severity is
more
considering
through both
aspects
Technician
Departments.
In the
perspective of
reducing the
risk regarding
technology
where they
should be tired
6
Document Page
not properly
accomplished
on a certain
point in time.
would not
proper then
the objectives
will not be
accomplished.
effectively. before using
them to
accomplish a
new project,
they face the
loss.
Having no
control in
staff priorities
The
probability of
these types of
risk is
moderate
because
QAHE
University
staff are
efficient and
experienced
enough to
handle the
project. As
because has
implemented
then it would
done with
proper
planning
priorities
might changes
at time of risk
may get
The impact of
this is very
low in QAHE
University
project.
The severisty
is low while
evaluating
both
likelihood and
getting impact
effectively.
Project
sponser, the
Management
team of the
event.
To mitigate
such risk
assessment of
all individual
priorties, it
should do
based on the
project that
should be
implemented.
7
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
occurred.
Interruption
in teaching
timetables.
This is high
because of
during the
construction
process, long
period of time
is better
involved.
As the impact
on the project
would be high
because
student can
faces losses if
they do not
study properly
at a similar
period.
In terms of
their ranking it
has high
position of
risk
A Project
manager.
The risk can
be reduced
with the help
of scheduling
proper dates
and time so
everything to
execute the
project
according to
schedule.
Instability in
budget
At the specific
project, there
are lots of
tasks that
require better
budget
planning and it
is having the
involvement
of better
budget.
Through this
risk can easily
mitigate
couldbe high.
If the budget
gets planned
and affected,
then it would
have a high
impact on the
better project
and better
executed
effective
manner.
There is high
Severity
This can
handle by
Financial
Manager
through
maintained
financial
statements
such as cash
flow and
balanace
sheets etc.
According to
this risk, it
needs to
reduce
unwanted
elements such
as expenses
and create a
budget only
the most
essential
things needed
during the
construction
(Tulupov, ,
2020).
Loss of
support
The loss of
support would
As all the
departmental
There is low
level of
Through
conducting
It is can be
reduced by
8
Document Page
be very high
as a
Comparison of
low risk
because in
QAHE
University,
each
department
has been
alloated a
potential team.
Through each
department
can work as
per
accordingly
effectively.
team of
QAHE
University will
work
coordinate to
execute the
project in
successfully
manner. It has
low influence
severity Project
Manager team
attracting were
all teams that
enhance the
useful
effectively.
The project
manager got
sick
During the
process of
project, no one
can claim to
issues as it can
arise at any
point in time.
So the project
manager can
get sick and in
terms of this is
having high
range of
If the manger
or supervisor
gets sick, there
can be a high
range of
complications
for the project
effectively.
By looking
both of the
aspect the
severity is
commence
very high.
Through
project
sponsor.
It can be
reduced
through
enabling with
other
executives
also in
advanced that
if the project
manager gets
sick, other
people tackle
9