This project management report for the SIM335 Managing Projects module details the key characteristics of projects, scope statements, work breakdown structures (WBS), Gantt charts, budget generation approaches, and risk management strategies. It includes a full project Gantt chart with a critical path analysis and outlines various responses to project risks. The report also addresses quality methods for ensuring successful project completion. Furthermore, it presents a case study involving the merger acquisition of ABC, PLC, and DEF Ltd, utilizing agile development methodology with specific sprints for initialization, structuring merged principles, inventory development, planning, and execution. The report covers project scope, milestone lists, project schedules, resource management plans, and cost budgets, concluding with a risk management plan to facilitate a successful merger. Desklib provides access to similar solved assignments and past papers for students.

Running head: PROJECT MANAGEMENT REPORT
Faculty of Business and Law
Module: SIM335 Managing Projects
Assignment Code: SIM335
Student Name:
Student ID:
Faculty of Business and Law
Module: SIM335 Managing Projects
Assignment Code: SIM335
Student Name:
Student ID:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT MANAGEMENT REPORT
Table of Contents
Task 1...............................................................................................................................................2
Task 2...............................................................................................................................................7
Introduction and Background......................................................................................................7
1. Project Management Approach...............................................................................................7
2. Project Scope...........................................................................................................................8
3. Milestone List..........................................................................................................................8
4. Project Schedule and Work Breakdown Structure..................................................................9
5. Project Lifecycle....................................................................................................................13
6. Project Deliverables...............................................................................................................14
7. Resource Management Plan..................................................................................................14
8. Cost Budget...........................................................................................................................16
9. Risk Management Plan..........................................................................................................17
Conclusion.................................................................................................................................17
Bibliography..................................................................................................................................19
Table of Contents
Task 1...............................................................................................................................................2
Task 2...............................................................................................................................................7
Introduction and Background......................................................................................................7
1. Project Management Approach...............................................................................................7
2. Project Scope...........................................................................................................................8
3. Milestone List..........................................................................................................................8
4. Project Schedule and Work Breakdown Structure..................................................................9
5. Project Lifecycle....................................................................................................................13
6. Project Deliverables...............................................................................................................14
7. Resource Management Plan..................................................................................................14
8. Cost Budget...........................................................................................................................16
9. Risk Management Plan..........................................................................................................17
Conclusion.................................................................................................................................17
Bibliography..................................................................................................................................19

2PROJECT MANAGEMENT REPORT
Task 1
1) Define the key characteristics of any project.
The key characteristics of the project include the factors that are supportive for the
implication of the effective system development operations. The key characteristic factors for the
project are,
Exclusive requirements: The requirements of the project are exclusive and it is
completely different for each of the project. It is possible that the some of the project activities
might be same with other projects. However, most of the requirements are unique for each of the
projects.
Client Based: The project activities are aligned with the demands of the project client and
it is possible that the project can utilize the alignment of the specific requirements of the client.
The client’s final approval is required for the successful completion of the project. Hence,
aligning the project based on client’s demand is the primary requirement for the project.
Profit Dependent: The value of the project activities are aligned with value based
outcomes in terms of profit acquisition. The integration alignment of project activities would
align with the deployment of the effective profit generation for the project investors.
2) What is the Scope Statement for a project? What role does the Work Breakdown Structure
(WBS) have in such a statement?
The specific and detailed description of the project deliverables is pointed out in the short
scope statement for ensuring that the project objectives are explained clearly. The consideration
of the activities would support the simplification of the activities that are capable of integrating
Task 1
1) Define the key characteristics of any project.
The key characteristics of the project include the factors that are supportive for the
implication of the effective system development operations. The key characteristic factors for the
project are,
Exclusive requirements: The requirements of the project are exclusive and it is
completely different for each of the project. It is possible that the some of the project activities
might be same with other projects. However, most of the requirements are unique for each of the
projects.
Client Based: The project activities are aligned with the demands of the project client and
it is possible that the project can utilize the alignment of the specific requirements of the client.
The client’s final approval is required for the successful completion of the project. Hence,
aligning the project based on client’s demand is the primary requirement for the project.
Profit Dependent: The value of the project activities are aligned with value based
outcomes in terms of profit acquisition. The integration alignment of project activities would
align with the deployment of the effective profit generation for the project investors.
2) What is the Scope Statement for a project? What role does the Work Breakdown Structure
(WBS) have in such a statement?
The specific and detailed description of the project deliverables is pointed out in the short
scope statement for ensuring that the project objectives are explained clearly. The consideration
of the activities would support the simplification of the activities that are capable of integrating
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROJECT MANAGEMENT REPORT
the project objectives. The scope statement would help in understanding the success criteria for
the project.
Work breakdown structure is the listing of the works required in the project for
developing the project activities. The project activities can be summarized into some specific
class or work package that would be required for the completion of the project. The work
packages would combine for listing the alignment of the specific work development for the
project and it is termed as work breakdown structure. The work breakdown structure of the
project would support the completion of the project activities. The specific objectives of the
project would combine with the alignment of the work packages developed.
3) Using the information below, plot out a full project Gantt chart and identify the critical path.
How many days does it take to complete the project?
The project Gantt chart is given below,
ID Task
Mode
Task Name Duration Start Finish Predecessors
0 Project Summary19 days Mon 7/9/18 Thu 8/2/18
1 a 5 days Mon 7/9/18 Fri 7/13/18
2 b 4 days Mon 7/16/18 Thu 7/19/18 1
3 c 2 days Fri 7/20/18 Mon 7/23/18 2
4 d 3 days Fri 7/20/18 Tue 7/24/18 2
5 e 5 days Tue 7/24/18 Mon 7/30/18 3
6 f 7 days Wed 7/25/18 Thu 8/2/18 4
T M F T S W S T M
Jul 1, '18 Jul 15, '18 Jul 29, '18
The critical tasks of the project are abdf and it is shown below,
the project objectives. The scope statement would help in understanding the success criteria for
the project.
Work breakdown structure is the listing of the works required in the project for
developing the project activities. The project activities can be summarized into some specific
class or work package that would be required for the completion of the project. The work
packages would combine for listing the alignment of the specific work development for the
project and it is termed as work breakdown structure. The work breakdown structure of the
project would support the completion of the project activities. The specific objectives of the
project would combine with the alignment of the work packages developed.
3) Using the information below, plot out a full project Gantt chart and identify the critical path.
How many days does it take to complete the project?
The project Gantt chart is given below,
ID Task
Mode
Task Name Duration Start Finish Predecessors
0 Project Summary19 days Mon 7/9/18 Thu 8/2/18
1 a 5 days Mon 7/9/18 Fri 7/13/18
2 b 4 days Mon 7/16/18 Thu 7/19/18 1
3 c 2 days Fri 7/20/18 Mon 7/23/18 2
4 d 3 days Fri 7/20/18 Tue 7/24/18 2
5 e 5 days Tue 7/24/18 Mon 7/30/18 3
6 f 7 days Wed 7/25/18 Thu 8/2/18 4
T M F T S W S T M
Jul 1, '18 Jul 15, '18 Jul 29, '18
The critical tasks of the project are abdf and it is shown below,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT MANAGEMENT REPORT
ID Task
Mode
Task Name Duration Start Finish Predecessors
0 Project Summary19 days Mon 7/9/18 Thu 8/2/18
1 a 5 days Mon 7/9/18 Fri 7/13/18
2 b 4 days Mon 7/16/18 Thu 7/19/18 1
3 c 2 days Fri 7/20/18 Mon 7/23/18 2
4 d 3 days Fri 7/20/18 Tue 7/24/18 2
5 e 5 days Tue 7/24/18 Mon 7/30/18 3
6 f 7 days Wed 7/25/18 Thu 8/2/18 4
T M F T S W S T M
Jul 1, '18 Jul 15, '18 Jul 29, '18
The project would exhaust a sum total of 19 days for the completion of the project. The
project duration summary is given below,
Task Duration
a 5
b 4
d 3
f 7
Tota
l
19
4) What approaches exist to generate a budget for a specific project budget?
The project budget estimation can be achieved using the bottom up approach as it would
involve the consideration of the effective documentation forming the alignment of the effective
process integration. The budget for the project would be developed using the following steps,
Step 1 Calculating the direct cost labour for the project
Step 2 Cost of materials is evaluated and estimated for the project
Step 3 Cost Expense for the transportation is evaluated for the completion of the project
Step 4 Salaries of human resources that would be involved in the project would be calculated
ID Task
Mode
Task Name Duration Start Finish Predecessors
0 Project Summary19 days Mon 7/9/18 Thu 8/2/18
1 a 5 days Mon 7/9/18 Fri 7/13/18
2 b 4 days Mon 7/16/18 Thu 7/19/18 1
3 c 2 days Fri 7/20/18 Mon 7/23/18 2
4 d 3 days Fri 7/20/18 Tue 7/24/18 2
5 e 5 days Tue 7/24/18 Mon 7/30/18 3
6 f 7 days Wed 7/25/18 Thu 8/2/18 4
T M F T S W S T M
Jul 1, '18 Jul 15, '18 Jul 29, '18
The project would exhaust a sum total of 19 days for the completion of the project. The
project duration summary is given below,
Task Duration
a 5
b 4
d 3
f 7
Tota
l
19
4) What approaches exist to generate a budget for a specific project budget?
The project budget estimation can be achieved using the bottom up approach as it would
involve the consideration of the effective documentation forming the alignment of the effective
process integration. The budget for the project would be developed using the following steps,
Step 1 Calculating the direct cost labour for the project
Step 2 Cost of materials is evaluated and estimated for the project
Step 3 Cost Expense for the transportation is evaluated for the completion of the project
Step 4 Salaries of human resources that would be involved in the project would be calculated

5PROJECT MANAGEMENT REPORT
Step 5 Cost expended on the equipments and the software would be considered
Step 6 All cost would be summed for calculating the total expenses of the project
Step 7 An infringement of +10% would be added for developing the total budget for the
project
5) How can project risk arise? Outline the various responses to risk that may be taken within
project management.
The project risk can result in forming the alignment of the major issues that would result
in forming the problems for the project execution. The implication of the risk analysis would
help in sorting out the major problems that the project might face due to the execution of the
project activities. The project risk analysis would include the process of identifying the risk,
evaluate its impact areas, and develop mitigation strategies for the execution of the project
successfully.
Causes of risk Risk response plan
Risk factors can be accidental or deliberate
depending upon the causes of the risk. The
various causes of the risk include lack of
documentation, absence of the resources, lack of
proper documentation, unskilled workers, and
communication noises, inaccurate estimation,
and poor development.
The response plan for the risk factors would include
the development of the risk mitigation planning and it
is started with the identification of the risk factors.
The impact analysis for the risk would be done for
understanding the root causes for the project. The
mitigation strategies would be developed for dealing
with the issues of the risk factors.
Step 5 Cost expended on the equipments and the software would be considered
Step 6 All cost would be summed for calculating the total expenses of the project
Step 7 An infringement of +10% would be added for developing the total budget for the
project
5) How can project risk arise? Outline the various responses to risk that may be taken within
project management.
The project risk can result in forming the alignment of the major issues that would result
in forming the problems for the project execution. The implication of the risk analysis would
help in sorting out the major problems that the project might face due to the execution of the
project activities. The project risk analysis would include the process of identifying the risk,
evaluate its impact areas, and develop mitigation strategies for the execution of the project
successfully.
Causes of risk Risk response plan
Risk factors can be accidental or deliberate
depending upon the causes of the risk. The
various causes of the risk include lack of
documentation, absence of the resources, lack of
proper documentation, unskilled workers, and
communication noises, inaccurate estimation,
and poor development.
The response plan for the risk factors would include
the development of the risk mitigation planning and it
is started with the identification of the risk factors.
The impact analysis for the risk would be done for
understanding the root causes for the project. The
mitigation strategies would be developed for dealing
with the issues of the risk factors.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6PROJECT MANAGEMENT REPORT
6) What quality methods (project evaluation, monitoring and control) would you introduce to
ensure a project is completed successfully?
The project evaluation, monitoring and control would be deployed in the project for
easing the processes of the improved communication and deployment. The following methods
would be deployed in the project for ensuring the completion of the project,
Project Evaluation is developed for keeping whether the activities of the project would be
completed in the estimated time and budget. The analysis of the project activities would support
the implication of the proper documentation and the completion of the project
Monitoring and Control is deployed for making the required modification in the
completion of the effective project execution and deployment. The controlling of the project
activities would align with the successive formation of the operations.
6) What quality methods (project evaluation, monitoring and control) would you introduce to
ensure a project is completed successfully?
The project evaluation, monitoring and control would be deployed in the project for
easing the processes of the improved communication and deployment. The following methods
would be deployed in the project for ensuring the completion of the project,
Project Evaluation is developed for keeping whether the activities of the project would be
completed in the estimated time and budget. The analysis of the project activities would support
the implication of the proper documentation and the completion of the project
Monitoring and Control is deployed for making the required modification in the
completion of the effective project execution and deployment. The controlling of the project
activities would align with the successive formation of the operations.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT MANAGEMENT REPORT
Task 2
Introduction and Background
The report would be developed for the analysis of the activities and aligning the
utilization of the operations for supporting the implication of the improved functional
development. The project report would be deployed for easing the processes of forming the
utilization of the project management principles. The effective use of the project management
principles would be helpful for easing the merger of ABC, PLC, and DEF Ltd. The report would
involve the utilization of the techniques of project lifecycle analysis, project management,
planning, cost management, quality management, resource management, scope management, and
controlling for the merger of the three organizations.
The project is merger acquisition based for the development of the effective support to
the utilization of the improved communication and development. The project is titled Merger
Acquisition Project for ABC, PLC, and DEF Ltd. The completion of the project would support
the utilization of the improved activities. The alignment would be helpful for the execution of the
improved communication and implication of the project management concepts for the project.
The completion of the merger would help the three organizations for supporting and developing
their specific factors for including the saint factors that would support the merger of the two
companies.
1. Project Management Approach
The project of Merger Acquisition Project for ABC, PLC, and DEF Ltd has been
completed using the agile development methodology and hence specific sprints are included in
Task 2
Introduction and Background
The report would be developed for the analysis of the activities and aligning the
utilization of the operations for supporting the implication of the improved functional
development. The project report would be deployed for easing the processes of forming the
utilization of the project management principles. The effective use of the project management
principles would be helpful for easing the merger of ABC, PLC, and DEF Ltd. The report would
involve the utilization of the techniques of project lifecycle analysis, project management,
planning, cost management, quality management, resource management, scope management, and
controlling for the merger of the three organizations.
The project is merger acquisition based for the development of the effective support to
the utilization of the improved communication and development. The project is titled Merger
Acquisition Project for ABC, PLC, and DEF Ltd. The completion of the project would support
the utilization of the improved activities. The alignment would be helpful for the execution of the
improved communication and implication of the project management concepts for the project.
The completion of the merger would help the three organizations for supporting and developing
their specific factors for including the saint factors that would support the merger of the two
companies.
1. Project Management Approach
The project of Merger Acquisition Project for ABC, PLC, and DEF Ltd has been
completed using the agile development methodology and hence specific sprints are included in

8PROJECT MANAGEMENT REPORT
project. Each of the sprints would comprise of developing the project activities while supporting
the inclusion of a specific deliverable and a milestone for the project. The five sprints of the
project are initialization, structuring the merged principles, inventory development, planning, and
execution of activities. The use of the agile methodology would help in easing the project
execution and the development of the effective implication development.
2. Project Scope
The project of Merger Acquisition Project for ABC, PLC, and DEF Ltd is a merger
acquisition project and it involves the following points,
Formation of the structure supporting the operations of the three organizations in
an integrated organizational structure
Forming the inventory that would support the information processing for the
organizations
Developing communication process, integration plan, and initiating the staff
retention activities
3. Milestone List
The project of Merger Acquisition Project for ABC, PLC, and DEF Ltd has been
completed using the agile development methodology and hence specific sprints are included in
project. Each of the sprints would comprise of developing the project activities while supporting
the inclusion of a specific deliverable and a milestone for the project. The milestones represent
the various initial and end points of a sprint for the project. The following are the milestones of
the project,
project. Each of the sprints would comprise of developing the project activities while supporting
the inclusion of a specific deliverable and a milestone for the project. The five sprints of the
project are initialization, structuring the merged principles, inventory development, planning, and
execution of activities. The use of the agile methodology would help in easing the project
execution and the development of the effective implication development.
2. Project Scope
The project of Merger Acquisition Project for ABC, PLC, and DEF Ltd is a merger
acquisition project and it involves the following points,
Formation of the structure supporting the operations of the three organizations in
an integrated organizational structure
Forming the inventory that would support the information processing for the
organizations
Developing communication process, integration plan, and initiating the staff
retention activities
3. Milestone List
The project of Merger Acquisition Project for ABC, PLC, and DEF Ltd has been
completed using the agile development methodology and hence specific sprints are included in
project. Each of the sprints would comprise of developing the project activities while supporting
the inclusion of a specific deliverable and a milestone for the project. The milestones represent
the various initial and end points of a sprint for the project. The following are the milestones of
the project,
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9PROJECT MANAGEMENT REPORT
WB
S Task Name Duration Start Finish
1 Initialization 11 days Tue 6/12/18 Tue 6/26/18
1.5 Project kick off 0 days Tue 6/26/18 Tue 6/26/18
2 Structuring the merged principles 13 days Wed
6/27/18 Fri 7/13/18
2.5 Structuring completed 0 days Fri 7/13/18 Fri 7/13/18
3 Inventory Development 13 days Mon
7/16/18 Wed 8/1/18
3.5 Inventory Integration 0 days Wed 8/1/18 Wed 8/1/18
4 Planning 20 days Thu 8/2/18 Wed 8/29/18
4.6 Approval of plans 0 days Wed
8/29/18 Wed 8/29/18
5 Execution of Activities 49 days Thu 8/30/18 Tue 11/6/18
5.5 Closure 0 days Tue 11/6/18 Tue 11/6/18
4. Project Schedule and Work Breakdown Structure
The schedule for the project of Merger Acquisition Project for ABC, PLC, and DEF Ltd
is given below,
WBS Task Name Duration Start Finish
0 Merger Acquisition Project for ABC, PLC, and
DEF Ltd. 106 days Tue 6/12/18 Tue 11/6/18
1 Initialization 11 days Tue 6/12/18 Tue 6/26/18
1.1 Requirement Analysis 3 days Tue 6/12/18 Thu 6/14/18
1.2 Development of documents 5 days Fri 6/15/18 Thu 6/21/18
1.3 Defining the objectives 2 days Fri 6/22/18 Mon 6/25/18
WB
S Task Name Duration Start Finish
1 Initialization 11 days Tue 6/12/18 Tue 6/26/18
1.5 Project kick off 0 days Tue 6/26/18 Tue 6/26/18
2 Structuring the merged principles 13 days Wed
6/27/18 Fri 7/13/18
2.5 Structuring completed 0 days Fri 7/13/18 Fri 7/13/18
3 Inventory Development 13 days Mon
7/16/18 Wed 8/1/18
3.5 Inventory Integration 0 days Wed 8/1/18 Wed 8/1/18
4 Planning 20 days Thu 8/2/18 Wed 8/29/18
4.6 Approval of plans 0 days Wed
8/29/18 Wed 8/29/18
5 Execution of Activities 49 days Thu 8/30/18 Tue 11/6/18
5.5 Closure 0 days Tue 11/6/18 Tue 11/6/18
4. Project Schedule and Work Breakdown Structure
The schedule for the project of Merger Acquisition Project for ABC, PLC, and DEF Ltd
is given below,
WBS Task Name Duration Start Finish
0 Merger Acquisition Project for ABC, PLC, and
DEF Ltd. 106 days Tue 6/12/18 Tue 11/6/18
1 Initialization 11 days Tue 6/12/18 Tue 6/26/18
1.1 Requirement Analysis 3 days Tue 6/12/18 Thu 6/14/18
1.2 Development of documents 5 days Fri 6/15/18 Thu 6/21/18
1.3 Defining the objectives 2 days Fri 6/22/18 Mon 6/25/18
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10PROJECT MANAGEMENT REPORT
1.4 Signing off the documents 1 day Tue 6/26/18 Tue 6/26/18
1.5 Project kick off 0 days Tue 6/26/18 Tue 6/26/18
2 Structuring the merged principles 13 days Wed 6/27/18 Fri 7/13/18
2.1 Guidelines are developed 3 days Wed 6/27/18 Fri 6/29/18
2.2 Merger Structure is developed 4 days Mon 7/2/18 Thu 7/5/18
2.3 Expanding the culture 3 days Fri 7/6/18 Tue 7/10/18
2.4 Business, Operations, and System analysis 3 days Wed 7/11/18 Fri 7/13/18
2.5 Structuring completed 0 days Fri 7/13/18 Fri 7/13/18
3 Inventory Development 13 days Mon 7/16/18 Wed 8/1/18
3.1 Pre Closure data backup 3 days Mon 7/16/18 Wed 7/18/18
3.2 Strategic meetings 5 days Thu 7/19/18 Wed 7/25/18
3.3 Support Plan development for tactical
problems 2 days Thu 7/26/18 Fri 7/27/18
3.4 Governance and Strategy is integrated 3 days Mon 7/30/18 Wed 8/1/18
3.5 Inventory Integration 0 days Wed 8/1/18 Wed 8/1/18
4 Planning 20 days Thu 8/2/18 Wed 8/29/18
4.1 Activities are listed 2 days Thu 8/2/18 Fri 8/3/18
4.2 Schedule is developed 3 days Mon 8/6/18 Wed 8/8/18
4.3 Complete Plan is developed 7 days Thu 8/9/18 Fri 8/17/18
4.4 Staff Retention plan 4 days Mon 8/20/18 Thu 8/23/18
4.5 Integration Plan 4 days Fri 8/24/18 Wed 8/29/18
4.6 Approval of plans 0 days Wed 8/29/18 Wed 8/29/18
5 Execution of Activities 49 days Thu 8/30/18 Tue 11/6/18
5.1 Planning the implementation 2 days Thu 8/30/18 Fri 8/31/18
1.4 Signing off the documents 1 day Tue 6/26/18 Tue 6/26/18
1.5 Project kick off 0 days Tue 6/26/18 Tue 6/26/18
2 Structuring the merged principles 13 days Wed 6/27/18 Fri 7/13/18
2.1 Guidelines are developed 3 days Wed 6/27/18 Fri 6/29/18
2.2 Merger Structure is developed 4 days Mon 7/2/18 Thu 7/5/18
2.3 Expanding the culture 3 days Fri 7/6/18 Tue 7/10/18
2.4 Business, Operations, and System analysis 3 days Wed 7/11/18 Fri 7/13/18
2.5 Structuring completed 0 days Fri 7/13/18 Fri 7/13/18
3 Inventory Development 13 days Mon 7/16/18 Wed 8/1/18
3.1 Pre Closure data backup 3 days Mon 7/16/18 Wed 7/18/18
3.2 Strategic meetings 5 days Thu 7/19/18 Wed 7/25/18
3.3 Support Plan development for tactical
problems 2 days Thu 7/26/18 Fri 7/27/18
3.4 Governance and Strategy is integrated 3 days Mon 7/30/18 Wed 8/1/18
3.5 Inventory Integration 0 days Wed 8/1/18 Wed 8/1/18
4 Planning 20 days Thu 8/2/18 Wed 8/29/18
4.1 Activities are listed 2 days Thu 8/2/18 Fri 8/3/18
4.2 Schedule is developed 3 days Mon 8/6/18 Wed 8/8/18
4.3 Complete Plan is developed 7 days Thu 8/9/18 Fri 8/17/18
4.4 Staff Retention plan 4 days Mon 8/20/18 Thu 8/23/18
4.5 Integration Plan 4 days Fri 8/24/18 Wed 8/29/18
4.6 Approval of plans 0 days Wed 8/29/18 Wed 8/29/18
5 Execution of Activities 49 days Thu 8/30/18 Tue 11/6/18
5.1 Planning the implementation 2 days Thu 8/30/18 Fri 8/31/18

11PROJECT MANAGEMENT REPORT
5.2 Executing the implementation process 14 days Mon 9/3/18 Thu 9/20/18
5.3 Business, Operations, and System analysis 30 days Fri 9/21/18 Thu 11/1/18
5.4 Documenting the lessons learnt 3 days Fri 11/2/18 Tue 11/6/18
5.5 Closure 0 days Tue 11/6/18 Tue 11/6/18
The following is the Gantt chart for the Merger Acquisition Project for ABC, PLC, and
DEF Ltd project,
5.2 Executing the implementation process 14 days Mon 9/3/18 Thu 9/20/18
5.3 Business, Operations, and System analysis 30 days Fri 9/21/18 Thu 11/1/18
5.4 Documenting the lessons learnt 3 days Fri 11/2/18 Tue 11/6/18
5.5 Closure 0 days Tue 11/6/18 Tue 11/6/18
The following is the Gantt chart for the Merger Acquisition Project for ABC, PLC, and
DEF Ltd project,
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 23
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.