Creation of a Comprehensive Project Management System Solution

Verified

Added on  2022/12/19

|6
|758
|43
Project
AI Summary
This project presents the development of a comprehensive project management system, addressing both functional and non-functional requirements. The system facilitates user registration with project details, allows for adding and managing new projects, and integrates constraint measurement. It supports overlay applications and mobile network support. The non-functional requirements focus on user interface, maintainability, and organized record-keeping. The system includes features for daily effort tracking across different project phases such as designing, coding, and testing, with secure data storage. Users can enter effort details, select dates, and view expended hours. The assignment covers project planning including estimating completion, cost, and effort, utilizing techniques like algorithmic cost modeling and experiential models. The project also explores project management phases (Planning, Organizing, Monitoring, and Adjusting) and emphasizes the importance of understanding project requirements and defining measurable goals.
Document Page
Running head: CREATION OF PROJECT MANAGEMENT SYSTEM
Creation of project management system
Enter: Name of the Student
Enter: Name of the University
Author note
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1DEVELOPMENT OF PROJECT MANAGEMENT SYSTEM
Table of Contents
Project Requirements.......................................................................................................................2
Project Effort Monitoring and Tracking..........................................................................................3
Reference.........................................................................................................................................4
Document Page
2DEVELOPMENT OF PROJECT MANAGEMENT SYSTEM
Comprehensive Plan
Project Requirements
The non-functional and functional requirements of the new software which can be
accessed and modified by the users as described as below:
Functional Requirements: The new software will wait for data to be accessible from
administrators. Each of the users must be signing up the software with personal details
such as name, role in the projects and experience of working in similar projects and
contact details. New projects can be added or dropped within a project or project
extension can be managed using the new software [4]. Measuring of the constraints will
be an integrated part of the new system. The new software will be supporting the overlay
applications and mobile network support as well. Thus, the entire process of a project can
be managed using the new software.
Non-functional requirements: The non-functional requirements includes the products
requirements which are aligned with the project requirements, it will also consider the
user interface of the new system and the human factors. The user of this new system must
have all the basic idea about the functionality of the new system so that the efficiency of
the software is maintained [3]. Tracking of the project records and updating will be done
in an organized manner by this new software as well. The new system will not have any
compatibility or maintainability issue which can affect the project. Thus, all the quality
attributes of the project will be considered by this new system.
Document Page
3DEVELOPMENT OF PROJECT MANAGEMENT SYSTEM
Project Effort Monitoring and Tracking
Monitoring of each level of the project can be done using the new project management
system. The new system will have a separate section which will allow the users to enter details
on a daily basis such as designing, coding, project management and testing [5]. All the details of
the data will be stored securely in the databases. The data entry steps of the new feature of the
project management system are listed below:
Enter project name.
View earlier entered requirements.
Proceed or back to the project name.
Select current date.
Enter the effort in the number of person per hour.
Select department of the concerned person.
Save data
Add/ edit data.
All these data can be stored and managed both at a daily basis and in a monthly basis.
Tracking each of the activities of the project team can be done using the new software. The new
system will also have an option which will be allowing the users to view the total expended
hours in each phase of the project [2]. The below diagram can be very much important to
understand the feature of the new system [5]. Dates can be selected and details can be manually
added in the new software based on the availability of the resources.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4DEVELOPMENT OF PROJECT MANAGEMENT SYSTEM
Figure 1: Requirement of the new feature of the project management system
(Source: Laporte and Chevalier 2017)
Reference
[1] C.Y. Laporte, and F. Chevalier. An innovative approach to the development of project
management processes for small-scale projects in a large engineering company. In Project
Management: Concepts, Methodologies, Tools, and Applications (pp. 882-919). IGI Global,
2016
[2] H. Kerzner, and H.R. Kerzner. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons, 2017
[3] H.A. Hornstein. The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2), pp.291-
298, 2015
[4] J. Batselier, and M. Vanhoucke. Project regularity: Development and evaluation of a new
project characteristic. Journal of systems science and systems engineering, 26(1), pp.100-120,
2017
Document Page
5DEVELOPMENT OF PROJECT MANAGEMENT SYSTEM
[5] J. Binder. Global project management: communication, collaboration and management across
borders. Routledge, 2016