This case study examines the project management aspects of upgrading the management information system (MIS) at a Starbucks store in Chermside, Queensland, Australia. The project aims to enhance service quality, reduce operational errors, and improve customer satisfaction. The analysis covers the organizational context, current IT infrastructure, and the project's potential impact on society and organizational success, including a SWOT analysis. It justifies the selection of a predictive methodology for project execution and evaluates relevant tools and software applications. The report details the project scope, features, limitations, charter, schedule, and budget, concluding with a performance analysis of the project's potential benefits and challenges in the competitive Australian market. Desklib is your go-to resource for accessing similar case studies and project management solutions.

Running Head: PROJECT MANAGEMENT
Project Management: Management Information System of Starbucks
Name of the Student
Name of the University
Project Management: Management Information System of Starbucks
Name of the Student
Name of the University
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT MANAGEMENT
Executive Summary
Starbucks is a multinational coffeehouse chain that is massively popular among the fans
throughout the world. The selected project is the development and upgrade of management
information system for Starbucks Chermside. The project is mainly designed to upgrade the
information system and make significant changes in the management process so as to attract
more customers and compete against the main competitors in the country.
Executive Summary
Starbucks is a multinational coffeehouse chain that is massively popular among the fans
throughout the world. The selected project is the development and upgrade of management
information system for Starbucks Chermside. The project is mainly designed to upgrade the
information system and make significant changes in the management process so as to attract
more customers and compete against the main competitors in the country.

2PROJECT MANAGEMENT
Table of Contents
Introduction......................................................................................................................................3
Analysis of Selected Project Case and Organizational Context......................................................4
Evaluation of Current State of Organization’s IS/IT Technology...................................................5
Impact of Project on Society and Organizational Success..............................................................6
Analysis of Processes and Methods to Select the Project................................................................8
Justification for Methodology Selected for Project Execution........................................................8
Evaluation of Tools or Software Applications................................................................................9
Alignment with Strategic Goals of the Organization....................................................................10
Project Scope and Features............................................................................................................13
Project Scope Statement............................................................................................................13
Project Features.........................................................................................................................13
Project Limitations.....................................................................................................................13
Issues Related to Scope Changes...............................................................................................13
Project Charter...........................................................................................................................14
Project Schedule............................................................................................................................16
Project Budget...............................................................................................................................20
Performance Analysis of the Project.............................................................................................24
Conclusion.....................................................................................................................................27
References......................................................................................................................................28
Table of Contents
Introduction......................................................................................................................................3
Analysis of Selected Project Case and Organizational Context......................................................4
Evaluation of Current State of Organization’s IS/IT Technology...................................................5
Impact of Project on Society and Organizational Success..............................................................6
Analysis of Processes and Methods to Select the Project................................................................8
Justification for Methodology Selected for Project Execution........................................................8
Evaluation of Tools or Software Applications................................................................................9
Alignment with Strategic Goals of the Organization....................................................................10
Project Scope and Features............................................................................................................13
Project Scope Statement............................................................................................................13
Project Features.........................................................................................................................13
Project Limitations.....................................................................................................................13
Issues Related to Scope Changes...............................................................................................13
Project Charter...........................................................................................................................14
Project Schedule............................................................................................................................16
Project Budget...............................................................................................................................20
Performance Analysis of the Project.............................................................................................24
Conclusion.....................................................................................................................................27
References......................................................................................................................................28
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROJECT MANAGEMENT
Introduction
The study for this report involves the case study of deployment of management
information system in Starbucks Chermside., Queensland, Australia. Starbucks is one of the most
popular coffeehouse chains around the world that entered the Australian market only a decade
ago. Before venturing into the Australian market, the company has gained massive popularity
around the world and has tried to replicate the success in Australia as well (Li, 2018). However,
in current times, development and deployment of suitable information system is essential for any
business organisation. Similarly, Starbucks has deployed a management information that
includes four main components – transaction processing system, supply chain management
system, decision support system and customer relationship management system. The same
information system model was deployed in Australia when business was initiated in the country.
Starbucks Chermside was first set up in 2004 and the information system development project
was initiated in 2005. However, it was a basic information system and currently, this existing
information system does not meet the needs of current day business amidst the market
competition and rapid evolution of technology. The proposed project for Starbucks Chermside
will be initiated this year (2019) and is expected to finish within next year.
The purpose of this report is to analyze the project case and determine the benefits or
shortfalls faced by Starbucks regarding the deployment and utilization of information system.
The main reason behind choosing this case study is that it is one of best examples of the effects
of lack of sufficient information system and how a well developed information system has the
potential to change the performance of a company.
Introduction
The study for this report involves the case study of deployment of management
information system in Starbucks Chermside., Queensland, Australia. Starbucks is one of the most
popular coffeehouse chains around the world that entered the Australian market only a decade
ago. Before venturing into the Australian market, the company has gained massive popularity
around the world and has tried to replicate the success in Australia as well (Li, 2018). However,
in current times, development and deployment of suitable information system is essential for any
business organisation. Similarly, Starbucks has deployed a management information that
includes four main components – transaction processing system, supply chain management
system, decision support system and customer relationship management system. The same
information system model was deployed in Australia when business was initiated in the country.
Starbucks Chermside was first set up in 2004 and the information system development project
was initiated in 2005. However, it was a basic information system and currently, this existing
information system does not meet the needs of current day business amidst the market
competition and rapid evolution of technology. The proposed project for Starbucks Chermside
will be initiated this year (2019) and is expected to finish within next year.
The purpose of this report is to analyze the project case and determine the benefits or
shortfalls faced by Starbucks regarding the deployment and utilization of information system.
The main reason behind choosing this case study is that it is one of best examples of the effects
of lack of sufficient information system and how a well developed information system has the
potential to change the performance of a company.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT MANAGEMENT
Analysis of Selected Project Case and Organizational Context
Starbucks is a multinational coffeehouse chain that is massively popular among the fans
throughout the world. Initially, the company was dependant on the development of branding and
quality of products but after its international growth, the company relies on very high brand
value, premium products and pricing as well as the support of management information system
that allows the central management of the company to control all the branches throughout the
world through one common system architecture (Martínez-Torres, Rodriguez-Piñero & Toral,
2015). However, in spite of the rapid international growth of the company, it could not grow as
expected in Australia. While there are many non-technical factors behind it, there are also several
technical shortfalls that resulted in lack of control of the business in the country. In the selected
store of Chermside, Queensland, Starbucks did not assign sufficient information system support
for the business and as a result, the business performance has faltered. This is mainly due to the
fact that the operations were slow, error prone and ineffective and as a result, the customer and
operations management failed in the Starbucks store. The organisational context based on the
project is explained below.
Size – The project will be launched first in the Chermside store only and depending on
the success of the project, further projects will be executed in other Starbucks stores in Australia.
Budget – The decided budget for the project is $250,000 and efforts will be made to
complete the project within this budget limit only.
Problem Statement – The main problem is that, due to lack of a proper information
system, the operations are slow at the store resulting in various errors during order and bill
Analysis of Selected Project Case and Organizational Context
Starbucks is a multinational coffeehouse chain that is massively popular among the fans
throughout the world. Initially, the company was dependant on the development of branding and
quality of products but after its international growth, the company relies on very high brand
value, premium products and pricing as well as the support of management information system
that allows the central management of the company to control all the branches throughout the
world through one common system architecture (Martínez-Torres, Rodriguez-Piñero & Toral,
2015). However, in spite of the rapid international growth of the company, it could not grow as
expected in Australia. While there are many non-technical factors behind it, there are also several
technical shortfalls that resulted in lack of control of the business in the country. In the selected
store of Chermside, Queensland, Starbucks did not assign sufficient information system support
for the business and as a result, the business performance has faltered. This is mainly due to the
fact that the operations were slow, error prone and ineffective and as a result, the customer and
operations management failed in the Starbucks store. The organisational context based on the
project is explained below.
Size – The project will be launched first in the Chermside store only and depending on
the success of the project, further projects will be executed in other Starbucks stores in Australia.
Budget – The decided budget for the project is $250,000 and efforts will be made to
complete the project within this budget limit only.
Problem Statement – The main problem is that, due to lack of a proper information
system, the operations are slow at the store resulting in various errors during order and bill

5PROJECT MANAGEMENT
processing and others. Moreover, the staffs are mostly involved in order and bill processing and
as a result, customer service is generally overlooked.
Project Objectives – The main objective of the project is to implement a management
information system at Starbucks Chermside that will enhance the quality of services at the store
as well as solve the errors that have been occurring due to complete manual handling of
operations.
Evaluation of Current State of Organization’s IS/IT Technology
Considering the initial days’ issues and problems, Starbucks Chermside implemented an
IT system that consists of a number of different features aimed towards enhancement of
customer care process, internal operations, business process management and others. This IT set
up is not different from the mainstream and popular Starbucks stores placed at various important
locations around the world (Shirdastian, Laroche & Richard, 2017). The basic features of the IT
system include transaction processing system, supply chain management system and business
analytics system that help to enhance the overall performance and operations. The features of the
current state of organisation’s IT strategy are briefly explained below.
Transaction Processing System – Although cash payments are accepted at the store, the
store promotes the use of cashless payments through credit and debit cards. Online payments can
be recorded effectively with an accounting system and the records can be updated to the cloud
database of the company (Ivanov, Tsipoulanidis & Schönberger, 2017). Without the use of
accounting system, the transaction processing were inefficient and there were many errors in the
records that were partially solved with the new system. However, further development is
processing and others. Moreover, the staffs are mostly involved in order and bill processing and
as a result, customer service is generally overlooked.
Project Objectives – The main objective of the project is to implement a management
information system at Starbucks Chermside that will enhance the quality of services at the store
as well as solve the errors that have been occurring due to complete manual handling of
operations.
Evaluation of Current State of Organization’s IS/IT Technology
Considering the initial days’ issues and problems, Starbucks Chermside implemented an
IT system that consists of a number of different features aimed towards enhancement of
customer care process, internal operations, business process management and others. This IT set
up is not different from the mainstream and popular Starbucks stores placed at various important
locations around the world (Shirdastian, Laroche & Richard, 2017). The basic features of the IT
system include transaction processing system, supply chain management system and business
analytics system that help to enhance the overall performance and operations. The features of the
current state of organisation’s IT strategy are briefly explained below.
Transaction Processing System – Although cash payments are accepted at the store, the
store promotes the use of cashless payments through credit and debit cards. Online payments can
be recorded effectively with an accounting system and the records can be updated to the cloud
database of the company (Ivanov, Tsipoulanidis & Schönberger, 2017). Without the use of
accounting system, the transaction processing were inefficient and there were many errors in the
records that were partially solved with the new system. However, further development is
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6PROJECT MANAGEMENT
necessary that will enable the company to produce 100% error free transaction processing and
records.
Supply Chain Management System – Starbucks always operates through a large supply
chain through which it procures various raw materials like coffee beans, milk and others
(Shirdastian, Laroche & Richard, 2017). For managing all the supply chain processes effectively,
Starbucks Chermside has deployed a supply chain management system that helps the store to
keep track of the supply chain including delivery of materials, pending payments, ordering
materials and many others.
Business Analytics System – Starbucks Chermside has deployed a business analytics
system that helps to forecast the business based on current and past sales (Real & Percell, 2018).
This helps the company to prepare appropriate business and procurement strategy so that
resources are not wasted or spent inappropriately.
Impact of Project on Society and Organizational Success
This project is selected keeping mind the main goal to serve the customers better so that
return again after a visit. Without sufficient quality of service, no customers will be satisfied and
they will not again return to the store. The selected project is the development and upgrade of
management information system for Starbucks Chermside. It is expected that the proposed
project will have a significant impact on the society and organizational success (Ivanov,
Tsipoulanidis & Schönberger, 2017). However, in order to determine the impact of the project, it
is important to determine the internal factors that are analyzed using SWOT technique as
follows.
necessary that will enable the company to produce 100% error free transaction processing and
records.
Supply Chain Management System – Starbucks always operates through a large supply
chain through which it procures various raw materials like coffee beans, milk and others
(Shirdastian, Laroche & Richard, 2017). For managing all the supply chain processes effectively,
Starbucks Chermside has deployed a supply chain management system that helps the store to
keep track of the supply chain including delivery of materials, pending payments, ordering
materials and many others.
Business Analytics System – Starbucks Chermside has deployed a business analytics
system that helps to forecast the business based on current and past sales (Real & Percell, 2018).
This helps the company to prepare appropriate business and procurement strategy so that
resources are not wasted or spent inappropriately.
Impact of Project on Society and Organizational Success
This project is selected keeping mind the main goal to serve the customers better so that
return again after a visit. Without sufficient quality of service, no customers will be satisfied and
they will not again return to the store. The selected project is the development and upgrade of
management information system for Starbucks Chermside. It is expected that the proposed
project will have a significant impact on the society and organizational success (Ivanov,
Tsipoulanidis & Schönberger, 2017). However, in order to determine the impact of the project, it
is important to determine the internal factors that are analyzed using SWOT technique as
follows.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT MANAGEMENT
Strength Weakness
The main strength of the company is that it has a
very high brand value and it is relatively easy for
the company to attract more customers especially
the tourists and immigrants in the country who are
already fans of the brand. Another major strength is
that due to the international success and size of the
company, sufficient funding can be made available
without any major issue.
The main weakness of the company is that the
coffee products of Starbucks are not among the
favorites of the native Australians. The type of
coffee preferred by the Australians is not available
at Starbucks. Hence, even after upgrading the
information system, success cannot be completely
ensured.
Opportunity Threat
Australia has a huge market and with increasing
number of tourists and immigrants, Starbucks has
the opportunity to start getting hold of the market
given the fact that the customer favorite products
are made available at reasonable costs.
Furthermore, with the upgrade of information
system, the store will be able to handle the
operations more efficiently and can invest more
time and funds on marketing and customer service.
In Australia, there are numerous alternative coffee
product sellers available. They already have strong
hold on the market as they sell the coffee products
preferred by the Australians at much lower prices
than Starbucks. Hence, Starbucks faces strong
competition against these already established
companies.
Based on the study of the SWOT table, it has been found that the main current problem
area is the lack of products preferred by the customers in the region and also high prices of
products compared to other coffee product sellers (Ivanov, Tsipoulanidis & Schönberger, 2017).
As a result, social factor plays a major role in determining the organisational success in
Starbucks Chermside and thus, the information system upgrade should focus on customer care
Strength Weakness
The main strength of the company is that it has a
very high brand value and it is relatively easy for
the company to attract more customers especially
the tourists and immigrants in the country who are
already fans of the brand. Another major strength is
that due to the international success and size of the
company, sufficient funding can be made available
without any major issue.
The main weakness of the company is that the
coffee products of Starbucks are not among the
favorites of the native Australians. The type of
coffee preferred by the Australians is not available
at Starbucks. Hence, even after upgrading the
information system, success cannot be completely
ensured.
Opportunity Threat
Australia has a huge market and with increasing
number of tourists and immigrants, Starbucks has
the opportunity to start getting hold of the market
given the fact that the customer favorite products
are made available at reasonable costs.
Furthermore, with the upgrade of information
system, the store will be able to handle the
operations more efficiently and can invest more
time and funds on marketing and customer service.
In Australia, there are numerous alternative coffee
product sellers available. They already have strong
hold on the market as they sell the coffee products
preferred by the Australians at much lower prices
than Starbucks. Hence, Starbucks faces strong
competition against these already established
companies.
Based on the study of the SWOT table, it has been found that the main current problem
area is the lack of products preferred by the customers in the region and also high prices of
products compared to other coffee product sellers (Ivanov, Tsipoulanidis & Schönberger, 2017).
As a result, social factor plays a major role in determining the organisational success in
Starbucks Chermside and thus, the information system upgrade should focus on customer care

8PROJECT MANAGEMENT
and ensure the customer feedbacks are considered while implementing operational and business
related changes.
Analysis of Processes and Methods to Select the Project
There are several processes and methods that are generally utilized to select the project
for an organisation. The selection process is mainly based on the needs or requirements of the
organisation and the selection criteria include operations, customer service, external operations,
marketing, cost benefit and others. In order to select the project, the organisation needs to
prioritize the requirement before proceeding with the same (Dorn, Messner & Wänke, 2016). For
this particular case, the main priority of Starbucks is to enhance the state of the internal
operations in order to provide smooth and efficient service to the customers in order to increase
the customer base and get hold of the market against the rival competitors. Starbucks Chermside
also has the target to enhance the customer base by focusing on the customer requirements and
feedbacks and in order to establish the same, the company has focused on upgrading the
management information system (Harrington, Ottenbacher & Fauser, 2017). This project was
chosen considering all the benefits that can be provided by the management information system
towards the business operations as well as customer service. Hence, this project was selected that
would strengthen the IT system of the company and would enable them to focus more on
customer and service development department.
Justification for Methodology Selected for Project Execution
For the proposed project, there are different systems development methodologies that can
be considered. However, not all methodologies can be used as they may not be effective for the
and ensure the customer feedbacks are considered while implementing operational and business
related changes.
Analysis of Processes and Methods to Select the Project
There are several processes and methods that are generally utilized to select the project
for an organisation. The selection process is mainly based on the needs or requirements of the
organisation and the selection criteria include operations, customer service, external operations,
marketing, cost benefit and others. In order to select the project, the organisation needs to
prioritize the requirement before proceeding with the same (Dorn, Messner & Wänke, 2016). For
this particular case, the main priority of Starbucks is to enhance the state of the internal
operations in order to provide smooth and efficient service to the customers in order to increase
the customer base and get hold of the market against the rival competitors. Starbucks Chermside
also has the target to enhance the customer base by focusing on the customer requirements and
feedbacks and in order to establish the same, the company has focused on upgrading the
management information system (Harrington, Ottenbacher & Fauser, 2017). This project was
chosen considering all the benefits that can be provided by the management information system
towards the business operations as well as customer service. Hence, this project was selected that
would strengthen the IT system of the company and would enable them to focus more on
customer and service development department.
Justification for Methodology Selected for Project Execution
For the proposed project, there are different systems development methodologies that can
be considered. However, not all methodologies can be used as they may not be effective for the
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9PROJECT MANAGEMENT
purpose of the project. Two possible methodologies that can be used in this project are agile and
predictive methodologies. Agile methodology involves iterations throughout the course of
project in order to get the best quality outcome constantly changing the outcomes of each
iteration (Schlagwein et al. 2017). As a result, although the final solution is the best possible, this
methodology does not have any proper roadmap or plan and it also takes a long time to complete
the project. On the other hand, in predictive methodology, a detailed project plan is created along
with the project roadmap based on which, the project development life cycle is executed. For this
project, Starbucks Chermside needs to choose predictive methodology as it follows a planned
path. Starbucks already has an existing information system and has specific plans for system
upgradation and hence, iterative development is not suitable for the project.
This IT project is selected solely based on the improvement requirements for the store.
As per the analysis, the store requires urgent attention towards the operations that are currently
done manually and as a result, various errors are generated (Dong & Netten, 2017). Hence, even
after providing high quality products to the customers, the company cannot emphasize on
customer service as the staffs are involved in managing the system operations.
Evaluation of Tools or Software Applications
Starbucks already uses a wide variety of tools and software applications from a large
number of different vendors. Each vendor provides a specific software solution to the company
stores. For instance, HighRadius is a vendor that provides SaaS (software as a service) solution
to Starbucks whereas Affirma Consulting provides business intelligence and analytics service to
Starbucks (Ghaffari & Aubert, 2016). However, not all these vendors are applicable for
Starbucks Chermside as there is only limited software application in the store. The plan of this
purpose of the project. Two possible methodologies that can be used in this project are agile and
predictive methodologies. Agile methodology involves iterations throughout the course of
project in order to get the best quality outcome constantly changing the outcomes of each
iteration (Schlagwein et al. 2017). As a result, although the final solution is the best possible, this
methodology does not have any proper roadmap or plan and it also takes a long time to complete
the project. On the other hand, in predictive methodology, a detailed project plan is created along
with the project roadmap based on which, the project development life cycle is executed. For this
project, Starbucks Chermside needs to choose predictive methodology as it follows a planned
path. Starbucks already has an existing information system and has specific plans for system
upgradation and hence, iterative development is not suitable for the project.
This IT project is selected solely based on the improvement requirements for the store.
As per the analysis, the store requires urgent attention towards the operations that are currently
done manually and as a result, various errors are generated (Dong & Netten, 2017). Hence, even
after providing high quality products to the customers, the company cannot emphasize on
customer service as the staffs are involved in managing the system operations.
Evaluation of Tools or Software Applications
Starbucks already uses a wide variety of tools and software applications from a large
number of different vendors. Each vendor provides a specific software solution to the company
stores. For instance, HighRadius is a vendor that provides SaaS (software as a service) solution
to Starbucks whereas Affirma Consulting provides business intelligence and analytics service to
Starbucks (Ghaffari & Aubert, 2016). However, not all these vendors are applicable for
Starbucks Chermside as there is only limited software application in the store. The plan of this
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10PROJECT MANAGEMENT
store is to upgrade the information system and then launch the mobile app for the Australian
users who can order coffee through the app. This software tool will be very effective in
developing convenience for the customers who will then be attracted to purchase products from
Starbucks (Dong & Netten, 2017). In addition, the use of various software services provided by
the different vendors will allow Starbucks Chermside to develop and upgrade their existing
information system and will add a different dimension to the store. The upgradation of the
information system at the store will also allow the store to advance much further than the nearest
rival organisations in terms of operations, service quality and efficiency. After the
implementation of the software tools, if the store can develop a strong customer base in the area,
it can then start of build up and go far ahead in terms of market competition.
Alignment with Strategic Goals of the Organization
The strategic goal of the organisation is to provide premium quality product and services
to the customers within a high quality environment regardless of the price of products.
According to the general opinion of the Australian customers, the prices of the Starbucks
products are too high compared to other coffee shops in Australia. In order to justify high prices,
Starbucks needs to provide equivalent or better services to the customers so that the customers
return to the store and choose Starbucks over other coffee shops (Chae, Koh & Park, 2018). The
strategic implementation of the project for aligning with the existing business operations of the
company can be done based on any of the following use cases, each of which has its own
benefits to the operations.
store is to upgrade the information system and then launch the mobile app for the Australian
users who can order coffee through the app. This software tool will be very effective in
developing convenience for the customers who will then be attracted to purchase products from
Starbucks (Dong & Netten, 2017). In addition, the use of various software services provided by
the different vendors will allow Starbucks Chermside to develop and upgrade their existing
information system and will add a different dimension to the store. The upgradation of the
information system at the store will also allow the store to advance much further than the nearest
rival organisations in terms of operations, service quality and efficiency. After the
implementation of the software tools, if the store can develop a strong customer base in the area,
it can then start of build up and go far ahead in terms of market competition.
Alignment with Strategic Goals of the Organization
The strategic goal of the organisation is to provide premium quality product and services
to the customers within a high quality environment regardless of the price of products.
According to the general opinion of the Australian customers, the prices of the Starbucks
products are too high compared to other coffee shops in Australia. In order to justify high prices,
Starbucks needs to provide equivalent or better services to the customers so that the customers
return to the store and choose Starbucks over other coffee shops (Chae, Koh & Park, 2018). The
strategic implementation of the project for aligning with the existing business operations of the
company can be done based on any of the following use cases, each of which has its own
benefits to the operations.

11PROJECT MANAGEMENT
Figure 1: The Basic Use Case of Current Operations
(Source: Dzone.com, 2019)
Figure 2: “Divide and Conquer” Strategic Policy with a Single IT System
(Source: Dzone.com, 2019)
Figure 1: The Basic Use Case of Current Operations
(Source: Dzone.com, 2019)
Figure 2: “Divide and Conquer” Strategic Policy with a Single IT System
(Source: Dzone.com, 2019)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 31
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.