Project Management Assignment: Victoria Construction Pty Ltd Project
VerifiedAdded on  2020/03/28
|24
|2591
|319
Project
AI Summary
This project management assignment focuses on Victoria Construction Pty Ltd, presenting a detailed project schedule analysis. The solution includes two project schedules, represented through Gantt charts, Work Breakdown Structures (WBS), and Activity-on-Node (AON) network diagrams. Task A covers the development of the project schedule, including timelines, durations, dependencies, and resource allocation. Task B involves a modified project schedule, analyzing critical paths and resource constraints. The student addresses questions about project completion time, critical tasks, and the impact of holidays. Task C presents project management blogs, evaluated for a PowerPoint presentation. The assignment offers insights into project initiation, planning, execution, and closure, demonstrating the application of project management principles. The document also includes various figures illustrating the project's timeline and structure.

Running head: PROJECT MANAGEMENT
Project Management: Victoria Construction Pty Ltd.
Name of the student:
Name of the university:
Project Management: Victoria Construction Pty Ltd.
Name of the student:
Name of the university:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT MANAGEMENT
Table of Contents
Task A..................................................................................................................................2
Development of project schedule (ProjectSchedulePartA1.mpp)...................................2
Task B................................................................................................................................12
Development of project schedule (ProjectSchedulePartA2.mpp).................................12
Task C- Presenting Project Management Blogs................................................................22
Bibliography......................................................................................................................23
Table of Contents
Task A..................................................................................................................................2
Development of project schedule (ProjectSchedulePartA1.mpp)...................................2
Task B................................................................................................................................12
Development of project schedule (ProjectSchedulePartA2.mpp).................................12
Task C- Presenting Project Management Blogs................................................................22
Bibliography......................................................................................................................23

2PROJECT MANAGEMENT
Task A
Development of project schedule (ProjectSchedulePartA1.mpp)
Task
Mode
WB
S Task Name Durati
on Start Finish Predecess
ors
Resource
Names
Cost
Variance
Auto
Schedul
ed
0
Timeframe
for
Victoria
Constructi
on Pty Ltd
27
days?
Mon
9/25/1
7
Tue
10/31/
17
$35,520.
00
Auto
Schedul
ed
1 Project
initiation 5 days
Mon
9/25/1
7
Fri
9/29/1
7
$6,160.0
0
Auto
Schedule
d
1.1
Environ
mental
monitoring
1 day
Mon
9/25/1
7
Mon
9/25/1
7
software
analyst or
designer
$720.00
Auto
Schedule
d
1.2
Analysi
s for
requirement
s
2 days
Mon
9/25/1
7
Tue
9/26/1
7
Environmen
tal
analyst ,Soft
ware
engineer
$2,720.0
0
Auto
Schedul
ed
1.3 Hardw
are 4 days
Tue
9/26/1
7
Fri
9/29/1
7
2 $2,720.0
0
Auto
Schedule
d
2 Milestone
1:
Completio
0 days Fri
9/29/1
Fri
9/29/1
7 software
analyst or
$0.00
Task A
Development of project schedule (ProjectSchedulePartA1.mpp)
Task
Mode
WB
S Task Name Durati
on Start Finish Predecess
ors
Resource
Names
Cost
Variance
Auto
Schedul
ed
0
Timeframe
for
Victoria
Constructi
on Pty Ltd
27
days?
Mon
9/25/1
7
Tue
10/31/
17
$35,520.
00
Auto
Schedul
ed
1 Project
initiation 5 days
Mon
9/25/1
7
Fri
9/29/1
7
$6,160.0
0
Auto
Schedule
d
1.1
Environ
mental
monitoring
1 day
Mon
9/25/1
7
Mon
9/25/1
7
software
analyst or
designer
$720.00
Auto
Schedule
d
1.2
Analysi
s for
requirement
s
2 days
Mon
9/25/1
7
Tue
9/26/1
7
Environmen
tal
analyst ,Soft
ware
engineer
$2,720.0
0
Auto
Schedul
ed
1.3 Hardw
are 4 days
Tue
9/26/1
7
Fri
9/29/1
7
2 $2,720.0
0
Auto
Schedule
d
2 Milestone
1:
Completio
0 days Fri
9/29/1
Fri
9/29/1
7 software
analyst or
$0.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROJECT MANAGEMENT
n of project
initiation
phase
7 7 designer
Auto
Schedul
ed
3 Project
planning
17
days
Mon
10/2/1
7
Tue
10/24/
17
$7,440.0
0
Auto
Schedule
d
3.1 Softwar
e 1 day
Mon
10/2/1
7
Mon
10/2/1
7
8
software
analyst or
designer,
Software
engineer
$1,360.0
0
Auto
Schedule
d
3.2
Require
ment of
data
1 day
Tue
10/3/1
7
Tue
10/3/1
7
10 Software
engineer $640.00
Auto
Schedule
d
3.3
Milesto
ne 2:
Completio
n
ofhardwar
e and
software
requireme
nt planning
1 day
Wed
10/4/1
7
Wed
10/4/1
7
11 Electronic
engineer $640.00
Auto
Schedul
ed
3.4
Softwar
e required
for the
tablet
4 days
Wed
10/4/1
7
Mon
10/9/1
7
$2,720.0
0
Auto 3.5 The 1 day Tue Tue 10,17,16 Electronic $1,360.0
n of project
initiation
phase
7 7 designer
Auto
Schedul
ed
3 Project
planning
17
days
Mon
10/2/1
7
Tue
10/24/
17
$7,440.0
0
Auto
Schedule
d
3.1 Softwar
e 1 day
Mon
10/2/1
7
Mon
10/2/1
7
8
software
analyst or
designer,
Software
engineer
$1,360.0
0
Auto
Schedule
d
3.2
Require
ment of
data
1 day
Tue
10/3/1
7
Tue
10/3/1
7
10 Software
engineer $640.00
Auto
Schedule
d
3.3
Milesto
ne 2:
Completio
n
ofhardwar
e and
software
requireme
nt planning
1 day
Wed
10/4/1
7
Wed
10/4/1
7
11 Electronic
engineer $640.00
Auto
Schedul
ed
3.4
Softwar
e required
for the
tablet
4 days
Wed
10/4/1
7
Mon
10/9/1
7
$2,720.0
0
Auto 3.5 The 1 day Tue Tue 10,17,16 Electronic $1,360.0
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT MANAGEMENT
Schedule
d
tablet server
requirement
10/10/
17
10/10/
17
engineer ,En
vironemntal
analyst
0
Auto
Schedule
d
3.6
Develop
ing server
user
interface
1 day
Tue
10/24/
17
Tue
10/24/
17
22,27 Environemn
tal analyst $720.00
Auto
Schedule
d
4
Milestone
3:
Completio
n of project
planning
phase
0 days
Tue
10/10/
17
Tue
10/10/
17
18 Electronic
engineer $0.00
Auto
Schedul
ed
5 Project
execution
24
days?
Mon
9/25/1
7
Thu
10/26/
17
$19,760.
00
Auto
Schedule
d
5.1
Review
and
approval of
the software
based
requirement
s
1 day
Wed
10/11/
17
Wed
10/11/
17
20
software
analyst or
designer
$720.00
Auto
Schedul
ed
5.2
Require
ment for
reporting
3 days
Thu
10/12/
17
Mon
10/16/
17
$2,720.0
0
Auto
Schedule
5.2. For 1 day Thu
10/12/
Thu
10/12/
22 software
analyst or
$1,360.0
Schedule
d
tablet server
requirement
10/10/
17
10/10/
17
engineer ,En
vironemntal
analyst
0
Auto
Schedule
d
3.6
Develop
ing server
user
interface
1 day
Tue
10/24/
17
Tue
10/24/
17
22,27 Environemn
tal analyst $720.00
Auto
Schedule
d
4
Milestone
3:
Completio
n of project
planning
phase
0 days
Tue
10/10/
17
Tue
10/10/
17
18 Electronic
engineer $0.00
Auto
Schedul
ed
5 Project
execution
24
days?
Mon
9/25/1
7
Thu
10/26/
17
$19,760.
00
Auto
Schedule
d
5.1
Review
and
approval of
the software
based
requirement
s
1 day
Wed
10/11/
17
Wed
10/11/
17
20
software
analyst or
designer
$720.00
Auto
Schedul
ed
5.2
Require
ment for
reporting
3 days
Thu
10/12/
17
Mon
10/16/
17
$2,720.0
0
Auto
Schedule
5.2. For 1 day Thu
10/12/
Thu
10/12/
22 software
analyst or
$1,360.0

5PROJECT MANAGEMENT
d 1 report A 17 17
designer,
Software
engineer
0
Auto
Schedule
d
5.2.
2
For
report B 1 day
Fri
10/13/
17
Fri
10/13/
17
24 Software
engineer $640.00
Auto
Schedule
d
5.2.
3
For
report C 1 day
Mon
10/16/
17
Mon
10/16/
17
25,34
software
analyst or
designer
$720.00
Auto
Schedul
ed
5.3 Softwar
e design
5
days?
Tue
10/17/
17
Mon
10/23/
17
Electronic
engineer
$6,640.0
0
Auto
Schedule
d
5.3.
1
Tablet
server
interface
1 day
Tue
10/17/
17
Tue
10/17/
17
26
software
analyst or
designer
$720.00
Auto
Schedule
d
5.3.
2 1 day?
Wed
10/18/
17
Wed
10/18/
17
28 $0.00
Auto
Schedule
d
5.3.
3
User
server
interface
1 day
Wed
10/18/
17
Wed
10/18/
17
28
software
analyst or
designer
$720.00
Auto
Schedule
d
5.3.
4
Devel
opment of
data layer
1 day
Thu
10/19/
17
Thu
10/19/
17
28,30
Electronic
engineer ,So
ftware
engineer
$1,280.0
0
Auto 5.3. Milest 1 day Fri Fri 31 $0.00
d 1 report A 17 17
designer,
Software
engineer
0
Auto
Schedule
d
5.2.
2
For
report B 1 day
Fri
10/13/
17
Fri
10/13/
17
24 Software
engineer $640.00
Auto
Schedule
d
5.2.
3
For
report C 1 day
Mon
10/16/
17
Mon
10/16/
17
25,34
software
analyst or
designer
$720.00
Auto
Schedul
ed
5.3 Softwar
e design
5
days?
Tue
10/17/
17
Mon
10/23/
17
Electronic
engineer
$6,640.0
0
Auto
Schedule
d
5.3.
1
Tablet
server
interface
1 day
Tue
10/17/
17
Tue
10/17/
17
26
software
analyst or
designer
$720.00
Auto
Schedule
d
5.3.
2 1 day?
Wed
10/18/
17
Wed
10/18/
17
28 $0.00
Auto
Schedule
d
5.3.
3
User
server
interface
1 day
Wed
10/18/
17
Wed
10/18/
17
28
software
analyst or
designer
$720.00
Auto
Schedule
d
5.3.
4
Devel
opment of
data layer
1 day
Thu
10/19/
17
Thu
10/19/
17
28,30
Electronic
engineer ,So
ftware
engineer
$1,280.0
0
Auto 5.3. Milest 1 day Fri Fri 31 $0.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6PROJECT MANAGEMENT
Schedule
d 5
one 4:
Design
approval
completion
10/20/
17
10/20/
17
Auto
Schedule
d
5.3.
6
Revie
w and
approval of
the software
design
details
1 day
Mon
10/23/
17
Mon
10/23/
17
32
software
analyst or
designer
$720.00
Auto
Schedul
ed
5.4
Softwar
e
developme
nt and
testing
6 days
Mon
9/25/1
7
Mon
10/2/1
7
$2,800.0
0
Auto
Schedule
d
5.4.
1
User
interface
developmen
t
1 day
Thu
9/28/1
7
Thu
9/28/1
7
5
software
analyst or
designer
$720.00
Auto
Schedule
d
5.4.
2
Data
layer
developmen
t
1 day
Fri
9/29/1
7
Fri
9/29/1
7
35
software
analyst or
designer
$720.00
Auto
Schedule
d
5.4.
3
Field
testing 1 day
Mon
10/2/1
7
Mon
10/2/1
7
4
software
analyst or
designer
$720.00
Auto
Schedule
5.4. Applic
ation layer
1 day Mon
9/25/1
Mon
9/25/1
Software $640.00
Schedule
d 5
one 4:
Design
approval
completion
10/20/
17
10/20/
17
Auto
Schedule
d
5.3.
6
Revie
w and
approval of
the software
design
details
1 day
Mon
10/23/
17
Mon
10/23/
17
32
software
analyst or
designer
$720.00
Auto
Schedul
ed
5.4
Softwar
e
developme
nt and
testing
6 days
Mon
9/25/1
7
Mon
10/2/1
7
$2,800.0
0
Auto
Schedule
d
5.4.
1
User
interface
developmen
t
1 day
Thu
9/28/1
7
Thu
9/28/1
7
5
software
analyst or
designer
$720.00
Auto
Schedule
d
5.4.
2
Data
layer
developmen
t
1 day
Fri
9/29/1
7
Fri
9/29/1
7
35
software
analyst or
designer
$720.00
Auto
Schedule
d
5.4.
3
Field
testing 1 day
Mon
10/2/1
7
Mon
10/2/1
7
4
software
analyst or
designer
$720.00
Auto
Schedule
5.4. Applic
ation layer
1 day Mon
9/25/1
Mon
9/25/1
Software $640.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT MANAGEMENT
d 4 improveme
nt 7 7 engineer
Auto
Schedul
ed
5.5 Testing
the tablet 5 days
Mon
10/16/
17
Fri
10/20/
17
$4,160.0
0
Auto
Schedule
d
5.5.
1
Server
tablet
interface
testing
1 day
Mon
10/16/
17
Mon
10/16/
17
38,25
software
analyst or
designer
$720.00
Auto
Schedule
d
5.5.
2
Softw
are
installation
1 day
Tue
10/17/
17
Tue
10/17/
17
40
software
analyst or
designer
$720.00
Auto
Schedule
d
5.5.
3
Syste
m testing 1 day
Wed
10/18/
17
Wed
10/18/
17
41
software
analyst or
designer
$720.00
Auto
Schedule
d
5.5.
4
Milest
one 5:
Completio
n of field
testing
1 day
Thu
10/19/
17
Thu
10/19/
17
42 Software
engineer $640.00
Auto
Schedule
d
5.5.
5
Softw
are server
developmen
t
1 day
Fri
10/20/
17
Fri
10/20/
17
43
software
analyst or
designer,
Software
engineer
$1,360.0
0
Auto
Schedul
5.6 Hardw
are
4 days Mon
10/23/
Thu
10/26/
$2,720.0
d 4 improveme
nt 7 7 engineer
Auto
Schedul
ed
5.5 Testing
the tablet 5 days
Mon
10/16/
17
Fri
10/20/
17
$4,160.0
0
Auto
Schedule
d
5.5.
1
Server
tablet
interface
testing
1 day
Mon
10/16/
17
Mon
10/16/
17
38,25
software
analyst or
designer
$720.00
Auto
Schedule
d
5.5.
2
Softw
are
installation
1 day
Tue
10/17/
17
Tue
10/17/
17
40
software
analyst or
designer
$720.00
Auto
Schedule
d
5.5.
3
Syste
m testing 1 day
Wed
10/18/
17
Wed
10/18/
17
41
software
analyst or
designer
$720.00
Auto
Schedule
d
5.5.
4
Milest
one 5:
Completio
n of field
testing
1 day
Thu
10/19/
17
Thu
10/19/
17
42 Software
engineer $640.00
Auto
Schedule
d
5.5.
5
Softw
are server
developmen
t
1 day
Fri
10/20/
17
Fri
10/20/
17
43
software
analyst or
designer,
Software
engineer
$1,360.0
0
Auto
Schedul
5.6 Hardw
are
4 days Mon
10/23/
Thu
10/26/
$2,720.0

8PROJECT MANAGEMENT
ed
requireme
nt: Data
entry tablet
17 17 0
Auto
Schedule
d
5.6.
1
Report
testing 1 day
Mon
10/23/
17
Mon
10/23/
17
44 Electronic
engineer $640.00
Auto
Schedule
d
5.6.
2
Report
review 1 day
Tue
10/24/
17
Tue
10/24/
17
36,27,46 Environmen
tal analyst $720.00
Auto
Schedule
d
5.6.
3
Modif
ication as
per the
testing
results
1 day
Wed
10/25/
17
Wed
10/25/
17
47 Electronic
engineer $640.00
Auto
Schedule
d
5.6.
4
Appro
val on the
production
1 day
Thu
10/26/
17
Thu
10/26/
17
48
software
analyst or
designer
$720.00
Auto
Schedule
d
6
Milestone
6:
Completio
n of project
execution
phase
0 days
Thu
10/26/
17
Thu
10/26/
17
49
software
analyst or
designer
$0.00
Auto
Schedul
ed
7 Project
closure 3 days
Fri
10/27/
17
Tue
10/31/
17
$2,160.0
0
Auto 7.1 Stakeho 1 day Fri Fri 50 Environmen $720.00
ed
requireme
nt: Data
entry tablet
17 17 0
Auto
Schedule
d
5.6.
1
Report
testing 1 day
Mon
10/23/
17
Mon
10/23/
17
44 Electronic
engineer $640.00
Auto
Schedule
d
5.6.
2
Report
review 1 day
Tue
10/24/
17
Tue
10/24/
17
36,27,46 Environmen
tal analyst $720.00
Auto
Schedule
d
5.6.
3
Modif
ication as
per the
testing
results
1 day
Wed
10/25/
17
Wed
10/25/
17
47 Electronic
engineer $640.00
Auto
Schedule
d
5.6.
4
Appro
val on the
production
1 day
Thu
10/26/
17
Thu
10/26/
17
48
software
analyst or
designer
$720.00
Auto
Schedule
d
6
Milestone
6:
Completio
n of project
execution
phase
0 days
Thu
10/26/
17
Thu
10/26/
17
49
software
analyst or
designer
$0.00
Auto
Schedul
ed
7 Project
closure 3 days
Fri
10/27/
17
Tue
10/31/
17
$2,160.0
0
Auto 7.1 Stakeho 1 day Fri Fri 50 Environmen $720.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9PROJECT MANAGEMENT
Schedule
d lder signoff 10/27/
17
10/27/
17 tal analyst
Auto
Schedule
d
7.2
Final
documentati
on
1 day
Mon
10/30/
17
Mon
10/30/
17
52 Environmen
tal analyst $720.00
Auto
Schedule
d
7.3
Post
project
evaluation
and
maintenanc
e
1 day
Tue
10/31/
17
Tue
10/31/
17
53 Environmen
tal analyst $720.00
Auto
Schedule
d
8
Milestone
7: project
closure
completion
0 days
Tue
10/31/
17
Tue
10/31/
17
54 Electronic
engineer $0.00
Schedule
d lder signoff 10/27/
17
10/27/
17 tal analyst
Auto
Schedule
d
7.2
Final
documentati
on
1 day
Mon
10/30/
17
Mon
10/30/
17
52 Environmen
tal analyst $720.00
Auto
Schedule
d
7.3
Post
project
evaluation
and
maintenanc
e
1 day
Tue
10/31/
17
Tue
10/31/
17
53 Environmen
tal analyst $720.00
Auto
Schedule
d
8
Milestone
7: project
closure
completion
0 days
Tue
10/31/
17
Tue
10/31/
17
54 Electronic
engineer $0.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10PROJECT MANAGEMENT
Figure 1: Gantt chart for Victoria Construction Pty., Ltd.
(Source: Created by author)
Figure 1: Gantt chart for Victoria Construction Pty., Ltd.
(Source: Created by author)

11PROJECT MANAGEMENT
Figure 2: WBS for Victoria Construction Pty., Ltd
(Source: created by author)
Figure 3: AIB network diagram for Victoria Construction Pty., Ltd
(Source: Created by author)
Figure 2: WBS for Victoria Construction Pty., Ltd
(Source: created by author)
Figure 3: AIB network diagram for Victoria Construction Pty., Ltd
(Source: Created by author)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 24
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.