Project Scope and Time Cost Management: PERT Analysis Reflection

Verified

Added on  2022/09/18

|4
|771
|20
Homework Assignment
AI Summary
This assignment is a reflective journal exploring the Program Evaluation and Review Technique (PERT) analysis, a critical project management tool. The student reflects on a lecture and related readings, highlighting key concepts such as the probability concept in PERT, the three estimates of activity duration (optimistic, most likely, and pessimistic times), and the use of the beta distribution. The journal discusses the advantages of the lecture, such as the opportunity for questions, and evaluates the student's increased understanding of PERT. The student plans to apply PERT in future projects, using it to assess project timelines and manage potential risks. The journal also identifies areas for further learning, such as the availability of tools for calculating the probability of PERT charts and the drawbacks of PERT analysis. The student emphasizes the importance of questioning to clarify concepts and improve project management skills. References to relevant academic sources are included.
Document Page
Running head: PROJECT SCOPE AND TIME COST MANAGEMENT
PROJECT SCOPE AND TIME COST MANAGEMENT
Name of the Student
Name of the University
Author note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT SCOPE AND TIME COST MANAGEMENT
Reflective Journal
Describe
The most important thing that I learned in the week 6 is the PERT analysis. This
lecture provided me a real life concept regarding the PERT analysis. Apart from the notes I
read many journals regarding the PERT analysis (Akpan & Agadaga 2020). I have learned
this topic from a guest lecturer. The most important point that I learned in this PERT analysis
was the probability concept in PERT. It was a most interesting because in PERT, the time
duration of a particular activity is a random variable with a huge amount of variances. I have
learned three estimates of activity’s duration. It helped me gain a vast knowledge regarding
the optimistic duration and pessimistic time of PERT. From this lecture, I came to know
regarding the problem with PERT, estimated project duration and Z value (Ba'Its, Puspita &
Bay 2020). The lecturer pointed out all the topics of the PERT. No students asked the lecturer
for providing a detailed description regarding the PERT analysis.
Interpret
This lecture helps me to increase the strength of using the PERT analysis (Nouban,
Alijl & Tawalbeh 2020). Asking questions and clearing the doubts regarding this topic helps
the lecturer to understand whether a student is getting the topic or not.
Evaluate
Main advantage of this lecture is that the teacher allows us to ask questions regarding
the PERT analysis. It helps me clear many doubts regarding the PERT analysis. Previously, I
thought that PERT analysis was a very difficult topic (Onifade & Oroye 2020). However,
after attending the lectures, I feel that it is not so much difficult. However, we would ask
much questions to the teachers that I expected we should. Knowing the importance of
Document Page
2PROJECT SCOPE AND TIME COST MANAGEMENT
questioning to achieve the object of clarification is important for me to enhance my
confidence in the field of project management.
Plan
I believe that this topic will be very useful for me while conducting a project in near
future. It will give me an edge when I shall work in any real life projects in my professional
career. I shall use the PERT Chart analysis to check whether the project can be finished within
the assigned deadline. It helps me to understand the objective dimensions and any subjective
aspects of this topic. In this PERT Chart analysis, I have learned optimistic duration and
pessimistic time, which I am able to apply in any future projects. However, I am unsure
whether any tool is available for calculating the probability of the PERT chart. I would like to
know more about the implementation of the PERT Chart and drawbacks of the PERT Chart. It
helps me to understand what the disadvantages of PERT Chart are (Akpan & Agadaga 2020).
I find one issue in this PERT Chart that it gives unreliable data for a project for cost or time.
In my practice, I shall use questioning methods for clarifying the objectives of using the
PERT analysis in project management. In my career, I shall raise questions to my own
thoughts regarding the PERT analysis and try to resolve those one.
Document Page
3PROJECT SCOPE AND TIME COST MANAGEMENT
References
Akpan, N.P. & Agadaga, G.O., 2020. Modelling Building Renovation Using PERT. Asian
Research Journal of Mathematics, pp.25-38.
Ba'Its, H.A., Puspita, I.A. & Bay, A.F., 2020. Combination of Program Evaluation and
Review Technique (PERT) and Critical Path Method (CPM) for Project Schedule
Development. International Journal of Integrated Engineering, 12(3), pp.68-75.
Nouban, F., Alijl, N. & Tawalbeh, M., 2020. Integrated earned value analysis and their impact
on project success. International Journal of Advanced Engineering, Sciences and
Applications, 1(1), pp.34-39.
Onifade, M.K. & Oroye, O.A., 2020. Application of Artificial Neural Networks Technique to
Project Management and Control: A Pilot Assessment of Some Firms in Lagos,
Nigeria. algorithms, 2(1), pp.40-46.
chevron_up_icon
1 out of 4
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]