Developing an Arm Robot: A Project Management Implementation

Verified

Added on  2023/04/20

|6
|357
|340
Project
AI Summary
This document presents a project focused on the development of an arm robot, employing project management methodologies. It includes a project charter outlining the project's description, goals, team members, milestones, risks, and constraints. The work breakdown structure (WBS) details the researching phase, project proposal, software and hardware development, implementation phase, and report generation. Key activities include defining the project scope, creating programs on Arduino, designing a Gantt chart, and troubleshooting. The hardware aspect covers materials, equipment, circuit design, and body construction. The implementation phase involves integrating unit modules, documenting hardware and software, and thorough testing. A Gantt chart is provided to visualize the project timeline and task dependencies, offering a structured approach to managing the project from initiation to completion. Desklib provides students access to similar solved assignments and past papers.
Document Page
Running head: PROJECT MANAGEMENT
Project Management
Name of Student-
Name of University-
Author’s Note-
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT MANAGEMENT
Project Charter:
Project Charter
Project Name Developing an Arm Robot
Project Description
The Development of an arm robot.
Project Manager [Please Fill] Date
Approved
[Please Fill]
Project Sponsor [Please Fill] Signature [Please Fill]
Project Case Expected Goals/Deliverables
The project deals with developing a robot with the
help of project management. There are many
activities that are to be carried out for developing
the project.
1. Researching Phase
2. Project proposal
3. Software
4. Hardware
5. Implementation Phase
6. Generating Reports
Team Members Milestones
Target dates
Name Role 1/07/19 Finalizing Requirements
[Please Fill] Project Manager 12/07/19 Project Approval
[Please Fill] Team Leader 27/09/19 Testing the Program for practical
Document Page
2PROJECT MANAGEMENT
use
[Please Fill] Programmer 8/11/19 Troubleshooting the circuit
[Please Fill] System Developer
[Please Fill] System Analyst
[Please Fill] Software Engineer
Risks and Constraints
Safety of the labors are to be included
in the project.
Late delivery of the materials should
be mitigated by mitigating the transportation
risk.
Technical risk should be considered
that includes working of all the equipment
properly.
Designing risk
The cost and the schedule of the
project should be maintained for designing the
robots.
Document Page
3PROJECT MANAGEMENT
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT MANAGEMENT
Work Breakdown Structure:
Developing an arm robot
Researching Phase
Project Similarity
Materials Types
Equipments Needed
Software needed
Finalyzing
Requirements
Project proposal
Defining project
scope
Design gantt chart
Design WBS
Project Approval
Software
Creating Program on
Arduino
Troubleshooting the
Program
Testing the Program
for practical use
Hardware
Gathering Materials
Hand Gripper,
Arduino, and Servo
Designing Cuircuit
Simulation circuit
Building the circuit
Testing the Circuit
Troubleshooting the
circuit
Body designing
Designing the Body
Building the Body
Implementation phase
Integrating Unit
Modules
Integrating Program
Modules
Generating Reports
Documenting the
Hardware Design
Documenting the
programs
Document hardware
Document software
Project Checklist
Document Page
5PROJECT MANAGEMENT
Gantt chart: