PPMP20008: Analysing Lessons Learnt in Project Planning & Execution
VerifiedAdded on 2023/04/26
|7
|1577
|164
Report
AI Summary
This report reflects on the lessons learnt from the PPMP20008 course, focusing on project planning and initiation. It details the planned versus actual approaches to gathering and documenting lessons, highlighting challenges faced with team communication, application of Microsoft Project, and implementation of collected data. The author identifies three key lessons: the importance of team communication, the need for sufficient time to understand project management tools, and the difficulty in applying theoretical knowledge in real-world scenarios. For each lesson, an improvement strategy is proposed, along with methods to measure its effectiveness, reasons for its achievability, its relevance to the lesson, and a timeline for implementation. The report concludes by emphasizing the importance of proper project definition, resource identification, cost analysis, and the use of mitigation strategies to overcome challenges. References to relevant literature are included to support the analysis and proposed strategies.

TERM 2 ASS_3
LESSONS LEARNT
Name: Insert full name
Student Number Insert student number
Campus: Insert campus or distance
Tutor: Insert tutor name
Tutorial number: Insert the tutorial number
LESSONS LEARNT
Name: Insert full name
Student Number Insert student number
Campus: Insert campus or distance
Tutor: Insert tutor name
Tutorial number: Insert the tutorial number
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Notes to the Author
[This document is a template. It has been tailored to suit the assessment. All fields within the template
should be completed as per the project scenario provided.
 Blue italicized text provides an explanation of what should be included for each section. Remove all
blue text prior to submission. If there are two or more options for you to decide between, revert
the option you are keeping to black and remove the other.
[This document is a template. It has been tailored to suit the assessment. All fields within the template
should be completed as per the project scenario provided.
 Blue italicized text provides an explanation of what should be included for each section. Remove all
blue text prior to submission. If there are two or more options for you to decide between, revert
the option you are keeping to black and remove the other.

1. INTRODUCTION
In order to complete this specific course study I have chosen PMP20008 course. This will help to
meet all the requirements related to project planning and initiation. According to my
observation this project will help me in addressing all the requirements related to the project.
This will help me to address the benefits and challenges that are going to be faced while
implementing this project. I have explained the way in which the sources and information’s are
collected in this paper. Apart from this paper I have also addressed the way in which the
situation forced me to work on that specific situation. In this paper I have included all the
existing challenges and strategies that will help in improving the situation.
2A. LESSONS LEARNT: FRAMEWORK
2.1 How I planned to gather and document lessons learnt
When I planned to
identify and collect
lessons learnt
Who I planned to involve
in the process of
gathering lessons
How I planned to
document lessons
While working with this
course I have identified
that it is important to have
a proper planning for the
project. So that the project
can be completed as per
the requirements.
In order to have a proper
analysis over the data it is
important to gather
documents from proper
data. However this
becomes important for
people to gather
information that will help in
further supervising the
process.
The documents specified
will help in capturing data
and allows us to utilize the
lessons learnt from the
report. However it
becomes important to
review the documented
data properly so that it can
be applied at the time of
project development
process.
2B. LESSONS LEARNT: FRAMEWORK (CON’T)
2.2 What actually happened?
When I identified and
collected lessons learnt
Who I involved in the
process of gathering
lessons
How I documented
lessons
While by the end of course
I learnt that the data
collected is very much
crucial for the project
development. Apart from
this it is important to
identify the collected data.
It is important to analyse all
the collected data properly
so that proper supervision
can be done at the time of
implementation of the
project.
It is important to capture all
the data and store them for
the purpose of future
dissemination and
development.
In order to complete this specific course study I have chosen PMP20008 course. This will help to
meet all the requirements related to project planning and initiation. According to my
observation this project will help me in addressing all the requirements related to the project.
This will help me to address the benefits and challenges that are going to be faced while
implementing this project. I have explained the way in which the sources and information’s are
collected in this paper. Apart from this paper I have also addressed the way in which the
situation forced me to work on that specific situation. In this paper I have included all the
existing challenges and strategies that will help in improving the situation.
2A. LESSONS LEARNT: FRAMEWORK
2.1 How I planned to gather and document lessons learnt
When I planned to
identify and collect
lessons learnt
Who I planned to involve
in the process of
gathering lessons
How I planned to
document lessons
While working with this
course I have identified
that it is important to have
a proper planning for the
project. So that the project
can be completed as per
the requirements.
In order to have a proper
analysis over the data it is
important to gather
documents from proper
data. However this
becomes important for
people to gather
information that will help in
further supervising the
process.
The documents specified
will help in capturing data
and allows us to utilize the
lessons learnt from the
report. However it
becomes important to
review the documented
data properly so that it can
be applied at the time of
project development
process.
2B. LESSONS LEARNT: FRAMEWORK (CON’T)
2.2 What actually happened?
When I identified and
collected lessons learnt
Who I involved in the
process of gathering
lessons
How I documented
lessons
While by the end of course
I learnt that the data
collected is very much
crucial for the project
development. Apart from
this it is important to
identify the collected data.
It is important to analyse all
the collected data properly
so that proper supervision
can be done at the time of
implementation of the
project.
It is important to capture all
the data and store them for
the purpose of future
dissemination and
development.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

According to me it is
important to use proper
guidelines at the time of
implementation.
3.1 LESSON 1
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
I faced problems due to my
team members. They had
communication gap and
that led to barrier while
development of the project.
However it became very
much difficult for me to
handle the situation. This
made me feel angry.
After analysing the
situation I have understood
this that proper
communication among the
group members are
important.
3.2 LESSON 1: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
The
improvement
strategy plan is
continuous in
nature and gets
executed with
time.
PMI helps in
understanding
whether the
strategy is
working or not.
This strategy
will help me in
supervising the
project and fir
better
development of
the skills.
Improvement
plan will help in
reducing the
challenges
faced at the
time of project
development.
The strategy
will be
implemented by
(15/02/19)
4.1 LESSON 2
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
important to use proper
guidelines at the time of
implementation.
3.1 LESSON 1
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
I faced problems due to my
team members. They had
communication gap and
that led to barrier while
development of the project.
However it became very
much difficult for me to
handle the situation. This
made me feel angry.
After analysing the
situation I have understood
this that proper
communication among the
group members are
important.
3.2 LESSON 1: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
The
improvement
strategy plan is
continuous in
nature and gets
executed with
time.
PMI helps in
understanding
whether the
strategy is
working or not.
This strategy
will help me in
supervising the
project and fir
better
development of
the skills.
Improvement
plan will help in
reducing the
challenges
faced at the
time of project
development.
The strategy
will be
implemented by
(15/02/19)
4.1 LESSON 2
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

At the time of project
development I realized that
there was not sufficient
ideas that will help in the
application of Microsoft
project. However it is
important to implement the
project progress
specifically with the use of
MS project.
While handling this
situation I got extremely
frustrated as there was not
enough time for
understanding the detailed
application regarding the
MS project.
From this lesson I have
learnt that time is important
factor for determining all
the subjects related to MS
project.
4.2 LESSON 2: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
In order to
handle this
situation it
becomes
important to
implement
SWOT analysis
that will help to
determine the
strength,
weakness,
threats and
opportunities.
In order to
identify the
condition of
strategy it
becomes
important to
use
performance
matrix. This will
help to improve
the strategy.
This strategy
can be
achieved
efficiently as
there is no
need of huge
resources and
proper
evaluation can
be
implemented
on time.
With the proper
working of this
strategy it will
become easy to
minimize the
challenges
faced at
development
phase.
The time
estimated for
the
development of
this course is
from (17-2-19
till 23-2-19)
5.1 LESSON 3
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
Once the data are
collected and gathered
from the resources it
becomes important to
apply this at the time of
project planning phase.
However I faced many
At that time I felt very
angry as I was not able to
handle the situation
properly and there was not
sufficient team members.
However after analysing
the situation, I learnt that
the lessons learnt was
difficult to implement in the
real life.
development I realized that
there was not sufficient
ideas that will help in the
application of Microsoft
project. However it is
important to implement the
project progress
specifically with the use of
MS project.
While handling this
situation I got extremely
frustrated as there was not
enough time for
understanding the detailed
application regarding the
MS project.
From this lesson I have
learnt that time is important
factor for determining all
the subjects related to MS
project.
4.2 LESSON 2: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
In order to
handle this
situation it
becomes
important to
implement
SWOT analysis
that will help to
determine the
strength,
weakness,
threats and
opportunities.
In order to
identify the
condition of
strategy it
becomes
important to
use
performance
matrix. This will
help to improve
the strategy.
This strategy
can be
achieved
efficiently as
there is no
need of huge
resources and
proper
evaluation can
be
implemented
on time.
With the proper
working of this
strategy it will
become easy to
minimize the
challenges
faced at
development
phase.
The time
estimated for
the
development of
this course is
from (17-2-19
till 23-2-19)
5.1 LESSON 3
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the
situation
Once the data are
collected and gathered
from the resources it
becomes important to
apply this at the time of
project planning phase.
However I faced many
At that time I felt very
angry as I was not able to
handle the situation
properly and there was not
sufficient team members.
However after analysing
the situation, I learnt that
the lessons learnt was
difficult to implement in the
real life.

difficulties at the time of
execution as the team
members were not
supportive.
5.2 LESSON 3: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy
works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
In order to
improve the
condition it is
important to
involve proper
communication
strategies that
will help in
engaging the
team members in
an effective way.
Proper analysis
of the situation
will help in
measuring the
strategies.
The proper
strategy will help
in requiring
additional cost.
The strategy
adopted is
relevant to
lesson 1 and will
help in
mitigation of
difficult
situations.
This strategy
includes proper
reviewing of the
data and
providing training
towards the staff
that will help in
proper working.
6. CONCLUSION
Thus from the above lessons learnt it can be said that proper project definition is needed to be
done for addressing all the requirements. This includes proper identification of the resources,
analysing the exact cost included on the development of the project and the functional and non-
functional requirements. Proper analysis will help in implementing the project successfully. Each
situation associated with the project needs to be analysed properly. Proper mitigation strategy will
help to overcome the difficult situation. However PPMP20008 course is not sufficient for making a
project successfully, therefore proper lessons will help in completion of each phase quickly.
execution as the team
members were not
supportive.
5.2 LESSON 3: IMPROVEMENT STRATEGY
1.
Improvement
strategy
2. How to
measure if the
strategy
works
3. Why the
strategy is
achievable
4. Relevance
of strategy to
address the
lesson
5. When the
strategy will
be
implemented
In order to
improve the
condition it is
important to
involve proper
communication
strategies that
will help in
engaging the
team members in
an effective way.
Proper analysis
of the situation
will help in
measuring the
strategies.
The proper
strategy will help
in requiring
additional cost.
The strategy
adopted is
relevant to
lesson 1 and will
help in
mitigation of
difficult
situations.
This strategy
includes proper
reviewing of the
data and
providing training
towards the staff
that will help in
proper working.
6. CONCLUSION
Thus from the above lessons learnt it can be said that proper project definition is needed to be
done for addressing all the requirements. This includes proper identification of the resources,
analysing the exact cost included on the development of the project and the functional and non-
functional requirements. Proper analysis will help in implementing the project successfully. Each
situation associated with the project needs to be analysed properly. Proper mitigation strategy will
help to overcome the difficult situation. However PPMP20008 course is not sufficient for making a
project successfully, therefore proper lessons will help in completion of each phase quickly.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

7. REFERENCES
Binder, J. (2016). Global project management: communication, collaboration and management
across borders. Routledge.
Hornstein, H.A., 2015. The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2),
pp.291-298.
Hwang, B.G. and Ng, W.J., 2013. Project management knowledge and skills for green construction:
Overcoming challenges. International Journal of Project Management, 31(2), pp.272-284.
Joslin, R. and Müller, R., 2015. Relationships between a project management methodology and
project success in different project governance contexts. International Journal of Project
Management, 33(6), pp.1377-1392.
Joslin, R., & Müller, R. (2015). Relationships between a project management methodology and
project success in different project governance contexts. International Journal of Project
Management, 33(6), 1377-1392.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and technology.
Routledge.
Binder, J. (2016). Global project management: communication, collaboration and management
across borders. Routledge.
Hornstein, H.A., 2015. The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2),
pp.291-298.
Hwang, B.G. and Ng, W.J., 2013. Project management knowledge and skills for green construction:
Overcoming challenges. International Journal of Project Management, 31(2), pp.272-284.
Joslin, R. and Müller, R., 2015. Relationships between a project management methodology and
project success in different project governance contexts. International Journal of Project
Management, 33(6), pp.1377-1392.
Joslin, R., & Müller, R. (2015). Relationships between a project management methodology and
project success in different project governance contexts. International Journal of Project
Management, 33(6), 1377-1392.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and technology.
Routledge.
1 out of 7
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.