Project Progress Report: Analysis of Apple's I-phone X Launch Event

Verified

Added on  2020/05/28

|24
|4444
|420
Project
AI Summary
This Project Progress Report provides a detailed analysis of the Apple I-phone X launch event, covering various aspects of project management. The report begins with a discussion of different project life cycles, recommending an iterative approach suitable for the event's short duration. It then outlines a recommended project structure and a project control system, emphasizing project evaluation and monitoring. The report identifies four key determinants of project success: scope, time, cost, and quality. Risk management's purpose is also discussed. Task 2 provides a comprehensive overview of the I-phone X launch event, including the company background, event information, and a detailed project scope statement with objectives, scope, time, cost, and quality considerations. The report includes a priority matrix, WBS diagram, and work packages to illustrate the project's structure. Cost estimation and a time-phased budget are also included. The report concludes with a bibliography of cited sources.
Document Page
Running head: PROJECT PROGRESS REPORT
Project Progress Report
Name of the Student:
Student ID:
Name of the University:
Author’s note:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT PROGRESS REPORT
Table of Contents
Task 1...............................................................................................................................................4
1) Discussion of types of Project Life Cycle...............................................................................4
2) Recommended Project Structure.............................................................................................4
3) Project Control System............................................................................................................5
4) 4 determinants of Project Success...........................................................................................6
5) Purpose of Risk Management in Project Management...........................................................6
6) Question number 6..................................................................................................................8
Task 2...............................................................................................................................................9
1) Introduction.............................................................................................................................9
1.1 Company Background (APPLE).......................................................................................9
1.2 Event information..............................................................................................................9
2) Project Scope Statement........................................................................................................10
2.1 Objective..........................................................................................................................10
2.2 Scope................................................................................................................................11
2.3 Time.................................................................................................................................11
2.4 Cost..................................................................................................................................11
2.5 Quality.............................................................................................................................11
2.6 Review.............................................................................................................................12
3) Priority Matrix.......................................................................................................................12
Document Page
2PROJECT PROGRESS REPORT
3.1 Priority Table...................................................................................................................12
3.2 Justification......................................................................................................................12
4) WBS......................................................................................................................................13
4.1 WBS Diagram......................................................................................................................13
4.2 Work Packages................................................................................................................14
5) Cost Estimation.....................................................................................................................19
5.1 Estimation Table..............................................................................................................19
5.2 Time-phased budget.........................................................................................................20
6) Conclusion.............................................................................................................................20
Bibliography..............................................................................................................................21
Document Page
3PROJECT PROGRESS REPORT
Task 1
1) Discussion of types of Project Life Cycle
The four types of project life cycles that has been prominently being used in today’s
world are Linear, Iterative, Adaptive, and Extreme project life cycles (Matejka and Tomek,
2017). These life cycles have been explained below,
Linear Project Life Cycle: The linear is the traditional and simple project management
approach that deals with the analysis and logic of five process composition of project life cycle.
The project life cycle comprises of scope, plan, launch, monitor and control, and closeout.
Iterative Project Life Cycle: The iterative project life cycle is based on the agile project
management approach. The system delivers solution with all of the iterations and it forms the
development of the improved functions and operations.
Adaptive Project Life Cycle: The adaptive project life cycle is implied for the formation
of the APM approach with minimal information and missing functional aspect. The process is
very helpful for software development projects and construction projects.
Extreme Project Life Cycle: The approach is helpful for the development of the
research projects. The project involves the heavy client information and the process goals for the
development of the solutions for the high risk and change type projects.
2) Recommended Project Structure
The iterative project life cycle structure should be followed as it would allow the
manufacturing company for the development of the improvements while carrying out the trade
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT PROGRESS REPORT
show event (Garcia et al., 2017). Since the project planning is of short duration, the project
managers would require some improved actions while the project is ongoing and this project life
cycle would allow the users for the function.
3) Project Control System
The project control system is implied for the development of the activities for controlling
the activities of the project (Willems and Vanhoucke 2015). The implementation of the
operations would allow the formation of the improved activities. The control strategies are
implied for forming the activities and development of the operations. The control system
comprises of developing the improved actions for the organization. The control system is formed
for ensuring that the activities of the project are aligned properly.
Project Evaluation: The project evaluation is formed for the development of the
improved activities and alignment of the project (Zarza et al., 2014). The organizations have
some specific goals and objectives that must be achieved in due course of the project operations.
The development of the project activities can be achieved by the analysing the activities and
modifying the project activities in a specific way.
Monitoring and Control: The monitoring and control is implied for forming the
development of the activities and alignment of the improved processes (Willems and Vanhoucke
2015). The monitoring is done for checking whether the project is done carefully and the
systematic development of the project integration is carried on successfully.
Document Page
5PROJECT PROGRESS REPORT
4) 4 determinants of Project Success
Scope: The scope plays a major role in the integration of the activities of the organization
for achieving appropriate results (Bingham and Gibson Jr, 2016). The project would be formed
by analysing the basic requirements of the project and the systematic and confine development of
the project operations. The management of the project functions is based on the scope
development and alignment.
Time: Time plays a crucial factor for the verification of the project success and the
project is always confided with some time factor. The project is scheduled for a certain amount
of time and the criteria for the project success are that the activities of the project is completed in
the estimated time duration.
Cost: The overall cost of the project is budgeted and the resources are aligned in that way
only. Hence the management of the project activities would require the formation of the budget
and aligning all the specific resources in that budget only.
Quality: Quality is another major factor that had caused the deployment of the improved
activities and the project is bounded to outcome some specific results. The client has set some
specific expectation from the project and the quality of the outcome is dependent on the client’s
requirement.
5) Purpose of Risk Management in Project Management
Risk Management is the process of managing the risk factors in a project so that the
overall impact of the risk is minimized or reduced to zero (Kirkham et al., 2014). The projects
Document Page
6PROJECT PROGRESS REPORT
consist of a number of activities and hence there are probabilities that the project might face
issues in compliance to all the activities. The purposes of risk management are,
Analysis of the factors of the risk for the project
Development of plan of activities for overcoming the issues of risk
Successful implication of the project activities so that the proper project outcome
is achieved
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT PROGRESS REPORT
6) Question number 6
i. Project Network Diagram is implied so that the project is aligned and specific project path can be recognized. The project network diagram is helpful for forming the proper project activity
alignment.
ii.
Figure 1: Activity on Node diagram
iii. The project would exhaust a total of 29 days for completion.
iv.
ID Task
Mode
WBS Task Name Duration Start Finish WBS
Predecessors
0 0 Preparation of Graduation Ceremony26 days Mon 1/15/18 Mon 2/19/18
1 A Initial Discussion 3 days Mon 1/15/18 Wed 1/17/18
2 B Food Planning 4 days Thu 1/18/18 Tue 1/23/18 A
3 C Entertainment Planning 5 days Thu 1/18/18 Wed 1/24/18 A
4 D Drinks Planning 2 days Thu 1/18/18 Fri 1/19/18 A
5 E Committee Approval 5 days Thu 1/25/18 Wed 1/31/18 B,C,D
6 F Student Invitation 8 days Thu 2/1/18 Mon 2/12/18 E
7 G Faculty Invitation 5 days Thu 2/1/18 Wed 2/7/18 E
8 H Furniture Arrangement 3 days Thu 2/1/18 Mon 2/5/18 E
9 I Decorate Hall 6 days Thu 2/1/18 Thu 2/8/18 E
10 J Committee Final Approval 5 days Tue 2/13/18 Mon 2/19/18 F,G,H,I
S T M F T S W S T M F T S W S T
Jan 14, '18 Jan 28, '18 Feb 11, '18 Feb 25, '18 Mar 11, '18
Figure 2: Gantt chart
Document Page
8PROJECT PROGRESS REPORT
Task 2
1) Introduction
1.1 Company Background (APPLE)
Apple is a leading brand of mobile phone that comprises of the development of the
activities and alignment of the improved processes (Business, 2018). The mobile phone company
has formed the development of the most supplementary development of the mobile experience.
The Apple products have always been helpful for the designing of the product in a more specific
and improved methods. The company has been formed for the modification of the changing
application design and the extension of the business capabilities. Apple has developed over the
years and it has become simple for the users. The increase of the number of the functions has
provided ease of the development model. According to iPhone X (2018), the reformation of the
facial recognition into face ID is the most exclusive feature of the I-phone X developed by Apple
Inc.
1.2 Event information
The event of I-phone X event launch is implied for the development of the program with
the help of the program development. The analysis of the program management has employed
the successful implication of the project based on the event management. The event would
comprise of the specific activities and processes for the development of the improved functional
development. The program event consists of five phases namely initiation, invitation, promotion,
and marketing, site selection and development, one day event, and project closure. The initiation
consists of the activities of requirement analysis, initial documentation, charter development,
Document Page
9PROJECT PROGRESS REPORT
submission of documents, and sign off. The invitation, promotion, and marketing consists of the
activities of making guests list, sending invitations and e-vites, contacting advertisement
company, banners and flyers are made, television and internet ads are run, and marketing of the
event. The site selection and development consists of the activities of appropriate venue is
selected, venue set up, stage is developed, sounds, lights, and cameras are installed, decoration
theme is set up, and program is rehearsed. The one day event consists of the activities of
welcoming of the guests, brief intro speech, explanation of mission, vision, and value statement
of the company, customer's expectation from the company, showcase of the model (Iphone X),
and description of phone's technology. The project closure consists of the activities of
development of final documents, submission of documents, sign off, and project is closed.
2) Project Scope Statement
The project scope plays a major role in the integration of the activities of the organization
for achieving appropriate results (Bingham and Gibson Jr, 2016). The project would be formed
by analysing the basic requirements of the project and the systematic and confine development of
the project operations. The scope statement is implied for successful development of the
improvement process.
2.1 Objective
The project objectives are aligned for the modification of the event program and
development of the activities of program management. The objectives of the project of I-phone
X launch event are,
Development of plan for the event of I-phone X launch
Successful completion of the project in the expected time and budget
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10PROJECT PROGRESS REPORT
Maintenance of the project activities for launch of the mobile phone
2.2 Scope
The project of I-phone X launch event is developed for ensuring that the project would be
carried on for the modification of the improved processes and activities (Collins, Parrish and
Gibson Jr, 2017). The project has the scope of holding the one day event for successful launch of
the I-phone X. The integration of the project plan is formed for the modification of the integrated
activities.
2.3 Time
The project of I-phone X launch event program would comprise of 29 days of project
activities that includes documentation, marketing, promotion, invitation, site development, venue
decoration, sounds, cameras, and lights installation, and successful completion of the event.
2.4 Cost
The project has an estimated project budget of $ 20,000.00 and all the project resources
would be managed in that estimated budget.
2.5 Quality
The project of I-phone X launch event is formed by the management of the program
event management and the quality of the event is formed when the activities would involve the
deployment would be successful completed.
Document Page
11PROJECT PROGRESS REPORT
2.6 Review
The review of the project of I-phone X launch event is carried on by the deployment of
the improved successful methods and the development of the integration methods. The review of
the project is aligned to the management of the successful project integration and management.
3) Priority Matrix
Priority Matrix is aligned with the development of the improved project scenario and it
analyses the project in terms of the factors of cost, time, and performance (Kirkham et al., 2014).
The complete project can be altered and bounded by these factors and the project managers
would have to follow the project priority table so that he/she can develop the improved project
plan.
3.1 Priority Table
The priority table for the project of I-phone X launch event is given below,
Time Performance Cost
Constrain
Enhance
Accept
3.2 Justification
The project of I-phone X launch event have the time as constrain factor, performance as
enhance factor, and cost as accept factor. The complete project is developed for holding one day
event of I-phone X launch. The time for the execution of the project is limited and constrain to 1
day. Hence, in the prioritization table the time factor has been marked as a constrain factor.