This project delves into various aspects of civil engineering project management, encompassing project scheduling, material management, and labor allocation. It includes a project schedule with a critical path, a labor schedule detailing shifts and costs, and a material schedule. The assignment also presents a case study analyzing cost overruns and underestimated expenses, along with a call forwarding sheet and detailed ordering processes. Furthermore, it outlines the wall framing, external cladding, and window installation processes, providing insights into each step, including material selection, application methods, and safety considerations. The document also includes a discussion of the windows installation process, detailing different framing systems and their respective installation steps.