Project Scope and Cost Management: Case Studies and Analysis
VerifiedAdded on 2025/04/08
|21
|762
|110
AI Summary
Desklib provides past papers and solved assignments for students. This report analyzes project scope and cost management.

Project Scope and
Cost Management
Cost Management
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
• Introduction
• Project Management Scope
• Cost management
• Case Studies
• Q & A
• Conclusion
• References
• Introduction
• Project Management Scope
• Cost management
• Case Studies
• Q & A
• Conclusion
• References

INTRODUCTION
• Project scope management and cost management.
• Three case studies are been highlighted in context of
which project scope management and cost management
strategies are been discussed.
• Project scope management is about defining, validating
and completing of a project.
• Cost management is determining the budget of the entire
project and the cost of maintenance after the completion
of the project.
• Project scope management and cost management.
• Three case studies are been highlighted in context of
which project scope management and cost management
strategies are been discussed.
• Project scope management is about defining, validating
and completing of a project.
• Cost management is determining the budget of the entire
project and the cost of maintenance after the completion
of the project.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Project management Scope
• Plan Development: Defining,
Validating and controlling of the
plan.
• Understanding Client
requirement: Managing and
documenting stakeholder’s needs.
• The scope of the project is
developed for identifying the
scopes that help in the timely
delivery of the project.
• Plan Development: Defining,
Validating and controlling of the
plan.
• Understanding Client
requirement: Managing and
documenting stakeholder’s needs.
• The scope of the project is
developed for identifying the
scopes that help in the timely
delivery of the project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Cost Management

Case study 1:
Case Outline
• Designing an air conditioning unit for a three-story building.
• Two proposals were given by the contractor; the client went for the
proposal with least expensive upfront cost not considering the maintenance
cost throughout life.
• Within intervals of 12 months, the units went into maintenance for 3 times
for pipe rupturing that cost $30,000
• On argument with the client, as the client refused to pay the amount saying
it was a designing fault, the contractor had to bear the cost of repairing.
Case Outline
• Designing an air conditioning unit for a three-story building.
• Two proposals were given by the contractor; the client went for the
proposal with least expensive upfront cost not considering the maintenance
cost throughout life.
• Within intervals of 12 months, the units went into maintenance for 3 times
for pipe rupturing that cost $30,000
• On argument with the client, as the client refused to pay the amount saying
it was a designing fault, the contractor had to bear the cost of repairing.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Cost challenges
• Cost accounting, not analysis: Analysis of the situations that might
be arising considering the maintenance cost.
• Forecasting and budgeting
• Progress report from different subcontractors
• Alignment of the data
• Effort and time with reporting
• Reporting timely and accurately
• Scenario analysis better best planning
• Cost accounting, not analysis: Analysis of the situations that might
be arising considering the maintenance cost.
• Forecasting and budgeting
• Progress report from different subcontractors
• Alignment of the data
• Effort and time with reporting
• Reporting timely and accurately
• Scenario analysis better best planning
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Quality challenges and
project risk
1. Defining the goals poorly.
2. Creep Scope.
3. Improper communication.
4. The solution with less cost expensive:
• Cost of up-front.
• Maintenance cost.
• Repair cost.
project risk
1. Defining the goals poorly.
2. Creep Scope.
3. Improper communication.
4. The solution with less cost expensive:
• Cost of up-front.
• Maintenance cost.
• Repair cost.

Q & A
• 1. What were the challenges regarding the cost?
• Ans: Total cost including the maintenance cost, repairing cost, and the
cost of the life cycle of the air-conditioning.
• 2. What did the total repairing cost?
• Ans: The cost of repairing the air condition was $10,000 every time.
• 3. What was the problem that creates the issue between the client and
the contractor?
• Ans: The poor communication and the documentation between them
lead to the problem.
• 1. What were the challenges regarding the cost?
• Ans: Total cost including the maintenance cost, repairing cost, and the
cost of the life cycle of the air-conditioning.
• 2. What did the total repairing cost?
• Ans: The cost of repairing the air condition was $10,000 every time.
• 3. What was the problem that creates the issue between the client and
the contractor?
• Ans: The poor communication and the documentation between them
lead to the problem.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

CASE STUDY 2:
SYDNEY OPERA HOUSE
SYDNEY OPERA HOUSE
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Project scope
• Building the Opera house In Sydney.
• There were no limit to the cost.
• No limit of the time.
• There was three stages including
- Podium: Stage 1
- Outer Shells: Stage 2
- Windows and interior: stage 3.
• Building the Opera house In Sydney.
• There were no limit to the cost.
• No limit of the time.
• There was three stages including
- Podium: Stage 1
- Outer Shells: Stage 2
- Windows and interior: stage 3.

Cost Management Challenges
• Controlling and Managing the overall change in project
• Inaccuracies Reporting
• Inefficient Systems and also the processes.
• Calculating the progress with accurate methods.
• Controlling and Managing the overall change in project
• Inaccuracies Reporting
• Inefficient Systems and also the processes.
• Calculating the progress with accurate methods.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 21
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.