This report provides a detailed analysis of the Portsmouth Festival of the Sea 2021 project, focusing on project environment and planning. It begins with an executive summary, followed by an introduction emphasizing sustainability and green environment promotion. The main body of the report covers various objectives, including an overview of the project bid, work breakdown structure analysis, project life cycle model, and schedule of activities with a Gantt chart. It also includes a breakdown of costs, estimation of economic benefits, justification of benefits to local people, and success criteria for the project. The report highlights the importance of environmental and ethical considerations in the bidding process, the role of stakeholders, and the deliverables of the project. The schedule of activities for the two-day festival is also provided. The report concludes with a discussion of the project's success criteria, its measurement, and references.

Project
Environment and
Planning
Environment and
Planning
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

EXECUTIVE SUMMARY
Project refers to some task which is associated with completing the assigned
task in systematic manner. There is requirement of complete and specific information
about project, so activities will be planned and organised accordingly. It is important that
manager have to regular analyse changes so it will be easy for them to understand
actions which has to be taken to over come with issues. In this report, there is
discussion about Portsmouth Festival of the Sea which is an event organised in 2021
from 27th August 2021 to 29th August 2021. the main aim of this project is to determine
ways and techniques through which sustainability and green environment is considered.
Hence there is program organised for the purpose of bid and it is essential to take
actions through which cultural and natural resources does not get farmed.
In this report, there will discussion about understanding and collecting
information about bidding process, work break down structure, project life cycle model,
schedule of activities with the help of Gantt chart, break down of cost, economic
benefits which society will earn, justifications of benefits to local people and lastly
success criteria of completing the project.
Work break down structure assist in completing whole project in small chunks
and dividing activities among individuals. Project life cycle model provides information
about role and importance of stages of project and its impact on completing whole task.
With the help of three point estimation technique, it will be easy for manager to
determine cost and estimated budget. Total budget of the project will be bifurcated into
labour cost, material cot, logistic cost, etc. so it will be easy to maintain budget for whole
project easily.
Project refers to some task which is associated with completing the assigned
task in systematic manner. There is requirement of complete and specific information
about project, so activities will be planned and organised accordingly. It is important that
manager have to regular analyse changes so it will be easy for them to understand
actions which has to be taken to over come with issues. In this report, there is
discussion about Portsmouth Festival of the Sea which is an event organised in 2021
from 27th August 2021 to 29th August 2021. the main aim of this project is to determine
ways and techniques through which sustainability and green environment is considered.
Hence there is program organised for the purpose of bid and it is essential to take
actions through which cultural and natural resources does not get farmed.
In this report, there will discussion about understanding and collecting
information about bidding process, work break down structure, project life cycle model,
schedule of activities with the help of Gantt chart, break down of cost, economic
benefits which society will earn, justifications of benefits to local people and lastly
success criteria of completing the project.
Work break down structure assist in completing whole project in small chunks
and dividing activities among individuals. Project life cycle model provides information
about role and importance of stages of project and its impact on completing whole task.
With the help of three point estimation technique, it will be easy for manager to
determine cost and estimated budget. Total budget of the project will be bifurcated into
labour cost, material cot, logistic cost, etc. so it will be easy to maintain budget for whole
project easily.

Table of Contents
EXECUTIVE SUMMARY.............................................................................................................2
INTRODUCTION...........................................................................................................................4
MAIN BODY...................................................................................................................................5
Objective 1: Overview of the Project Bid and an outline programme of events for the 2 day
festival....................................................................................................................................5
Objective 2: Work break down structure and its strength and weakness as project planning10
Objective 3: Project life cycle for planning of project and justify its suitability.................14
Objective 4: Schedule of the planning activities..................................................................18
Objective 5: Breakdown of Costs for the budget allocation.................................................22
Objective 6: Estimation of Economic Benefits Arising Out of Portsmouth Sea Festival....24
Objective 7: Information To council about justification for potential sustainable legacies.26
Objective 8: Success criteria for the Project and discuss how these could be measured.....28
CONCLUSION..............................................................................................................................31
REFERENCES..............................................................................................................................32
EXECUTIVE SUMMARY.............................................................................................................2
INTRODUCTION...........................................................................................................................4
MAIN BODY...................................................................................................................................5
Objective 1: Overview of the Project Bid and an outline programme of events for the 2 day
festival....................................................................................................................................5
Objective 2: Work break down structure and its strength and weakness as project planning10
Objective 3: Project life cycle for planning of project and justify its suitability.................14
Objective 4: Schedule of the planning activities..................................................................18
Objective 5: Breakdown of Costs for the budget allocation.................................................22
Objective 6: Estimation of Economic Benefits Arising Out of Portsmouth Sea Festival....24
Objective 7: Information To council about justification for potential sustainable legacies.26
Objective 8: Success criteria for the Project and discuss how these could be measured.....28
CONCLUSION..............................................................................................................................31
REFERENCES..............................................................................................................................32
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

INTRODUCTION
Sustainability refers to the meeting the current needs and demands of the
present without compromising the ability of their future generations in order to meet their
own needs and demands. The concept of sustainability is composed of three pillars
such as social, environmental and economical. With the help of these concepts, it has
been made successful to make improvement in the level of working of different
organisations along with considering the needs and demands of companies as well. The
following assignment will make its focus o the development of different activities which
are needed to be completed at the time of completing a project. With the help of these
activities, it will be made possible to achieve successful completion of the project along
with meeting the goals and objectives of the project also. The main focus of this project
will be made on the sustainability and green environment promotion which is an
important aspect for the safety and security of environment such as preventing it from
polluting and many more aspects as well. At the time of festivals, people make use of
more things that make increment in the level of pollution. The different aspects which
are covered in the assignment will be providing an overview of the Bid Project such as
deliverable, outlining the project along with Work Break Down Structure of the activities
and the key tasks involved. In addition to this, the discussion will be made about the
Project Life Cycle Model for planning the project along with schedule of the planning
activities. Further, the project will also make discussion about breakdown of costs for
the budget allocation upto £2.5 million that could make the effective completion of the
project. Moreover, the assignment will provide an overview of the economic benefits
that will be generated as the income with the conduction of this festival. Lastly, the
project will also provide a justification for the potential legacies arsing out of the festival
along with success criteria for the project which are minimum and discussion of the
measurement of these success criteria as well.
Sustainability refers to the meeting the current needs and demands of the
present without compromising the ability of their future generations in order to meet their
own needs and demands. The concept of sustainability is composed of three pillars
such as social, environmental and economical. With the help of these concepts, it has
been made successful to make improvement in the level of working of different
organisations along with considering the needs and demands of companies as well. The
following assignment will make its focus o the development of different activities which
are needed to be completed at the time of completing a project. With the help of these
activities, it will be made possible to achieve successful completion of the project along
with meeting the goals and objectives of the project also. The main focus of this project
will be made on the sustainability and green environment promotion which is an
important aspect for the safety and security of environment such as preventing it from
polluting and many more aspects as well. At the time of festivals, people make use of
more things that make increment in the level of pollution. The different aspects which
are covered in the assignment will be providing an overview of the Bid Project such as
deliverable, outlining the project along with Work Break Down Structure of the activities
and the key tasks involved. In addition to this, the discussion will be made about the
Project Life Cycle Model for planning the project along with schedule of the planning
activities. Further, the project will also make discussion about breakdown of costs for
the budget allocation upto £2.5 million that could make the effective completion of the
project. Moreover, the assignment will provide an overview of the economic benefits
that will be generated as the income with the conduction of this festival. Lastly, the
project will also provide a justification for the potential legacies arsing out of the festival
along with success criteria for the project which are minimum and discussion of the
measurement of these success criteria as well.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

MAIN BODY
Objective 1: Overview of the Project Bid and an outline programme of events for the 2
day festival
Bid refers to the process in which particular product or service is being priced.
There are some individuals who are involved in this process but they have complete
information about all the characteristics. There is requirement of complete information
because among all the bidders the one who bids lowest will allotted with the project. In
this report, there will consideration of bidding process for Portsmouth Festival of the Sea
2021 and project team is hired by Council of Portsmouth City. There will organisation of
festival which is also known as floating festival because this is organised in sea. The
main aim of this bid or the main component which has to be considered by bidders is to
understand and determine the best ways through which individuals are considered and
evaluated is to take acre of environmental and ethical considerations. There will use of
complete and specific information through which they can determine best way which will
be considered. It is important and relevant for people to understand the ways through
which environment can be cured.
Portsmouth Festival of the Sea 2021 will be organised for two days, hence
bidders have to determine best ways through which they can maintain decorum and
take care of environmental prospects. With change in operations, it is important for
people to communicate. This festival is organised at very large scale, hence there are
possibilities that environment might gets affected. There are many people who are
coming from outside, hence it is important for council to take acre of their demand and
create awareness about social and environmental factors. When there is change in
activities performed at festival, then it will be easy for people to understand the
importance of changes. There is complete and specific information among people
regarding understanding and determining best ways to conserve nature and make it
less costlier for everyone. So there are many bidders which are involved to grab this
opportunity and make event best. For this festival, there are many stakeholders such as
local people, government, political parties of other countries, local vendors, etc.
because they also get affected with this event whether positively or negatively. For
instance: if nature is not considered, then in long term local people will suffer and this
Objective 1: Overview of the Project Bid and an outline programme of events for the 2
day festival
Bid refers to the process in which particular product or service is being priced.
There are some individuals who are involved in this process but they have complete
information about all the characteristics. There is requirement of complete information
because among all the bidders the one who bids lowest will allotted with the project. In
this report, there will consideration of bidding process for Portsmouth Festival of the Sea
2021 and project team is hired by Council of Portsmouth City. There will organisation of
festival which is also known as floating festival because this is organised in sea. The
main aim of this bid or the main component which has to be considered by bidders is to
understand and determine the best ways through which individuals are considered and
evaluated is to take acre of environmental and ethical considerations. There will use of
complete and specific information through which they can determine best way which will
be considered. It is important and relevant for people to understand the ways through
which environment can be cured.
Portsmouth Festival of the Sea 2021 will be organised for two days, hence
bidders have to determine best ways through which they can maintain decorum and
take care of environmental prospects. With change in operations, it is important for
people to communicate. This festival is organised at very large scale, hence there are
possibilities that environment might gets affected. There are many people who are
coming from outside, hence it is important for council to take acre of their demand and
create awareness about social and environmental factors. When there is change in
activities performed at festival, then it will be easy for people to understand the
importance of changes. There is complete and specific information among people
regarding understanding and determining best ways to conserve nature and make it
less costlier for everyone. So there are many bidders which are involved to grab this
opportunity and make event best. For this festival, there are many stakeholders such as
local people, government, political parties of other countries, local vendors, etc.
because they also get affected with this event whether positively or negatively. For
instance: if nature is not considered, then in long term local people will suffer and this

impacts their health as well. If nature and environmental prospects are not considered,
then at Portsmouth Sea can not organise this festival ion long run.
Project deliverable refers to some tangible or intangible components which will
arise with conducting project properly. There is some information which is
communicated to stakeholders regarding getting after completing the project. There are
some deliverables which stakeholders of the Portsmouth Festival of the Sea 2021 will
get are-
There will job opportunities to local people regarding near by Portsmouth sea
because they are not the one who makes changes properly and perform
operations with change in business activities. There is use of solar energy,
natural resources are optimally used through which activities are performed
properly and cost of availing services will also low because main theme of
festival is “Sustainability” and “Green Environment”.
There will allotment of some space or canopies to local people where they can
sell their items such as artisans, painters and other handicraft work. With change
in operations, it will be easy for association to determine and understand policies
properly.
The main component with this project is that all the task are properly organised
and there will no confusion among individuals when they are availing services
from here. There is change in operations because natural and cultural prospects
are at priority. So with this event, there will nil issue to natural resources.
There will allotment of time schedule through Gantt chart, hence it will be easy
for people to know what activity will be done and at what time. There will use of
complete and specific information with local individuals of Portsmouth sea
because they are allotted with task for making this event of festival success.
This project will be completed within specified time and attaining aim because all
the project activities are planned and organised properly for understanding and creating
awareness among people. In order to maintain sustaining and using concept of green
environment, it is essential that local people of Portsmouth Sea must have awareness
about it. They must prefer to use environment savy items through which it will be easy
then at Portsmouth Sea can not organise this festival ion long run.
Project deliverable refers to some tangible or intangible components which will
arise with conducting project properly. There is some information which is
communicated to stakeholders regarding getting after completing the project. There are
some deliverables which stakeholders of the Portsmouth Festival of the Sea 2021 will
get are-
There will job opportunities to local people regarding near by Portsmouth sea
because they are not the one who makes changes properly and perform
operations with change in business activities. There is use of solar energy,
natural resources are optimally used through which activities are performed
properly and cost of availing services will also low because main theme of
festival is “Sustainability” and “Green Environment”.
There will allotment of some space or canopies to local people where they can
sell their items such as artisans, painters and other handicraft work. With change
in operations, it will be easy for association to determine and understand policies
properly.
The main component with this project is that all the task are properly organised
and there will no confusion among individuals when they are availing services
from here. There is change in operations because natural and cultural prospects
are at priority. So with this event, there will nil issue to natural resources.
There will allotment of time schedule through Gantt chart, hence it will be easy
for people to know what activity will be done and at what time. There will use of
complete and specific information with local individuals of Portsmouth sea
because they are allotted with task for making this event of festival success.
This project will be completed within specified time and attaining aim because all
the project activities are planned and organised properly for understanding and creating
awareness among people. In order to maintain sustaining and using concept of green
environment, it is essential that local people of Portsmouth Sea must have awareness
about it. They must prefer to use environment savy items through which it will be easy
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

for them to communicate with other people. There is requirement of change in business
activities with which people came to know about ways to deal with it.
In order to complete this project with positive note, project manager have to take
care of some points and make proper schedule of conducting activities. There are bright
possibilities to get this bid because all the information are collected initially and it will be
easy for manager to communicate because they have justification for their points. For
instance: in order to maintain sustainability, managers will prefer to use cloth bags, use
of mud cups, etc. with which they can easily understand and determine ways to deal
with it. While presenting contract, audience will have queries which will be rectified with
understanding and determining changes properly. This makes proper completion of task
and making operations for betterment.
There is specific schedule for completing this two day event. This schedule will
be communicated to participants, so they will plan their routine accordingly. At this
event, there are many activities for people such as kids zone, dancing, music concert,
food and eatables, games zone, drink counter and many other shows (Enjoy all the
perks of a festival by the sea, 2019). So this will be centre of attending for many people.
As per discussion, this event will organise for two days i.e. 27th August 2021 to 29th
August 2021.
Date Time Activity
27th August 2021 8: 00 AM to 10: 00 AM Cultural proper and
inaugural function.
27th August 2021 10: 00 AM to 11: 00 AM Breakfast at hotels
27th August 2021 11: 45 AM to 1:00 PM Theatre view for movie
27th August 2021 1: 00 PM to 2: 00 PM Lunch
27th August 2021 3: 00 to 5: 00 PM Visit to Clarence Pier
27th August 2021 6: 00 PM to 8: 00 PM Enjoying at Blue Reef
Aquarium
27th August 2021 9: 00 PM to 2: 00 AM Visit to pubs and enjoyment
of night life with dining
activities with which people came to know about ways to deal with it.
In order to complete this project with positive note, project manager have to take
care of some points and make proper schedule of conducting activities. There are bright
possibilities to get this bid because all the information are collected initially and it will be
easy for manager to communicate because they have justification for their points. For
instance: in order to maintain sustainability, managers will prefer to use cloth bags, use
of mud cups, etc. with which they can easily understand and determine ways to deal
with it. While presenting contract, audience will have queries which will be rectified with
understanding and determining changes properly. This makes proper completion of task
and making operations for betterment.
There is specific schedule for completing this two day event. This schedule will
be communicated to participants, so they will plan their routine accordingly. At this
event, there are many activities for people such as kids zone, dancing, music concert,
food and eatables, games zone, drink counter and many other shows (Enjoy all the
perks of a festival by the sea, 2019). So this will be centre of attending for many people.
As per discussion, this event will organise for two days i.e. 27th August 2021 to 29th
August 2021.
Date Time Activity
27th August 2021 8: 00 AM to 10: 00 AM Cultural proper and
inaugural function.
27th August 2021 10: 00 AM to 11: 00 AM Breakfast at hotels
27th August 2021 11: 45 AM to 1:00 PM Theatre view for movie
27th August 2021 1: 00 PM to 2: 00 PM Lunch
27th August 2021 3: 00 to 5: 00 PM Visit to Clarence Pier
27th August 2021 6: 00 PM to 8: 00 PM Enjoying at Blue Reef
Aquarium
27th August 2021 9: 00 PM to 2: 00 AM Visit to pubs and enjoyment
of night life with dining
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

facility
28th August 2021 9:00 AM to 11:00 AM Portsmouth Pyramids
Centre
28th August 2021 11:00 AM to 12: 45 PM Time for bunch at
Mozzarella Joe's
28th August 2021 1: 00 PM to 3: 00 PM Deep Blue for relaxing
28th August 2021 3: 30 PM to 5:30 PM Brewers Fayre for food and
drinks
28th August 2021 6: 00 PM to 8: 30 PM Hovertravel for boat trip
which is very interesting and
joyful
28th August 2021 10: 00 PM to 3: 00 AM Closure ceremony with DJ,
live music concerts, games,
drinks, etc. with dinner and
drinks so individual of every
age group can enjoy.
With the help of this activity, there will ease in understanding and determining
what is the schedule and activities are planned for festival. In this schedule most of the
activities are covered for kids as well as youngsters. So there is nil possibilities of being
bored or making any other option for utilising time. There will proper pick and drop
facility for people from their hotel to respective place. There will guide in each bus, so it
will be easy for people to know about other factors as well and its importance. But with
these activities, main and important factor which will be considered is Sustainability and
green concept. There will dining out to local restaurants, so they will came to know
about local culture of Portsmouth Sea and near by areas. This not only improves image
of this place but there will more growth and job opportunities for local people. Hence this
not only benefits economic condition of country but of local people as well. When people
are getting opportunities, then they will prefer to take interest in these activities. This will
28th August 2021 9:00 AM to 11:00 AM Portsmouth Pyramids
Centre
28th August 2021 11:00 AM to 12: 45 PM Time for bunch at
Mozzarella Joe's
28th August 2021 1: 00 PM to 3: 00 PM Deep Blue for relaxing
28th August 2021 3: 30 PM to 5:30 PM Brewers Fayre for food and
drinks
28th August 2021 6: 00 PM to 8: 30 PM Hovertravel for boat trip
which is very interesting and
joyful
28th August 2021 10: 00 PM to 3: 00 AM Closure ceremony with DJ,
live music concerts, games,
drinks, etc. with dinner and
drinks so individual of every
age group can enjoy.
With the help of this activity, there will ease in understanding and determining
what is the schedule and activities are planned for festival. In this schedule most of the
activities are covered for kids as well as youngsters. So there is nil possibilities of being
bored or making any other option for utilising time. There will proper pick and drop
facility for people from their hotel to respective place. There will guide in each bus, so it
will be easy for people to know about other factors as well and its importance. But with
these activities, main and important factor which will be considered is Sustainability and
green concept. There will dining out to local restaurants, so they will came to know
about local culture of Portsmouth Sea and near by areas. This not only improves image
of this place but there will more growth and job opportunities for local people. Hence this
not only benefits economic condition of country but of local people as well. When people
are getting opportunities, then they will prefer to take interest in these activities. This will

benefits local people and they will ready to take care of nature and cost of products will
also low with these components. It is essential for people to determine ways through
which they can maintain sustainability which is the main and core theme of conducting
festivals at Portsmouth. Tin this event of festival for two days, there will use of local
transportation, so some individuals are pre- booked for these two days, so this makes
ease in maintaining sustainability because visitors will take to destinations in electronic
vehicles which are beneficial for environment.
also low with these components. It is essential for people to determine ways through
which they can maintain sustainability which is the main and core theme of conducting
festivals at Portsmouth. Tin this event of festival for two days, there will use of local
transportation, so some individuals are pre- booked for these two days, so this makes
ease in maintaining sustainability because visitors will take to destinations in electronic
vehicles which are beneficial for environment.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Objective 2: Work break down structure and its strength and weakness as project
planning
Work break down structure refers to the technique of project management
because this is the way through which complex project activities will be diverted into
smalls chunks. It will be easy for project manager to determine and understand ways to
complete the task (Jeong and et. al., 2015). Managing and organising project for festival
is not easy task because the main objective of this project is to maintain sustainability
and promotion of green environment,. It is important for project manager to understand
and determine what activities have to be conducted and make changes in better and
effective manner. There is completion of information with project manager, so it will be
easy for them to understand and determine changes properly.
Work break down structure is the diagram of activities in hierarchy manner as
activities are communicated properly and understanding is done about it. There are
many activities which has to be planned by project manager such as financial activities,
collecting and communicating with local people, etc. so this is not possible when it is
divided in small hunks. Hence there is discussion among people to understand what
has to be done to achieve targets. With change in activities, it will be easy for people to
determine and understand changes properly.
For understanding and determining activities there are two phases of conducting
operations i.e. conception and definition phase (Jupp, 2017).
Conception phase: in this there is study of information with which individuals are
able to redetermine and understand information properly. There is use of complete
information about economic study which is getting with completing the task, financing
and supporting management team. There is discussion about completing task with use
of monetary terms and understanding changes properly. In this stage, there will
discussion about understanding and determining roles and responsibilities among
people. It is not possible for people to determine and understand roles until it is divided.
There is requirement of proper communication and transport facility for employees as
well, so they complete task with specific and appropriate manner. In order to determine
and evaluate changes properly, there will study of complete and specific information in
this stage of activities.
planning
Work break down structure refers to the technique of project management
because this is the way through which complex project activities will be diverted into
smalls chunks. It will be easy for project manager to determine and understand ways to
complete the task (Jeong and et. al., 2015). Managing and organising project for festival
is not easy task because the main objective of this project is to maintain sustainability
and promotion of green environment,. It is important for project manager to understand
and determine what activities have to be conducted and make changes in better and
effective manner. There is completion of information with project manager, so it will be
easy for them to understand and determine changes properly.
Work break down structure is the diagram of activities in hierarchy manner as
activities are communicated properly and understanding is done about it. There are
many activities which has to be planned by project manager such as financial activities,
collecting and communicating with local people, etc. so this is not possible when it is
divided in small hunks. Hence there is discussion among people to understand what
has to be done to achieve targets. With change in activities, it will be easy for people to
determine and understand changes properly.
For understanding and determining activities there are two phases of conducting
operations i.e. conception and definition phase (Jupp, 2017).
Conception phase: in this there is study of information with which individuals are
able to redetermine and understand information properly. There is use of complete
information about economic study which is getting with completing the task, financing
and supporting management team. There is discussion about completing task with use
of monetary terms and understanding changes properly. In this stage, there will
discussion about understanding and determining roles and responsibilities among
people. It is not possible for people to determine and understand roles until it is divided.
There is requirement of proper communication and transport facility for employees as
well, so they complete task with specific and appropriate manner. In order to determine
and evaluate changes properly, there will study of complete and specific information in
this stage of activities.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Economic study will be conducted for marketing processes, measuring
techniques for performance and quality aspects, estimation of cost, capital generating
sources, etc. which are important for making an event successful and collecting
information from them. Financing options are selected from owners, bankers, investors,
brokers, etc. SO when they people invest in government project, then it will be easy for
project manger to determine the changes properly and communicate them about
importance of this project. Lastly, there will planning for determining how to schedule
activities and determine best ways to understand and evaluate changes. This is the best
way through which operations are conducted in synchronise manner and determine
requirements about human capital (Kaiser, El Arbi and Ahlemann, 2015).
Definition phase- In this phase, there will complete study of feasibility and
functional functional of complete project. Apart from this, there will study of site
development and lastly approval processes. With completing of task,it is essential for
people to understand and determine their roles, which is possible through approval of
new project is possible. When there is change in operations of association, then
activities will be done for completing it but there is requirement of approval from some
institutes such as local vendors, local communities, etc. with which it will be easy for
project manager to distribute activities. When changes are required ion operations, then
work break down structure assist in determining where to take corrective actions. There
will study of complete and specific information through feasibility study such as finance,
industry, market, product, etc. This is the actual executive phase because activities are
performed and planned properly through which actions are conducted.
For conducting and planning operations for Portsmouth Sea festival in 2021, is
wide task and there are some informations which has to be delivered to local people as
well because this event with motto of sustainability and green environment will not be
possible if not conducted properly. In this study, there will collecting information about
feasibility study because this is the best way through which material, financial
resources, cost estimation for completing the project can be determined. In feasibility
study, there will study of completing information through which they can understand and
determine changes properly. For planning and conducting Portsmouth Sea festival,
there is requirement of planning for sites such as restaurants where visitors will go,
techniques for performance and quality aspects, estimation of cost, capital generating
sources, etc. which are important for making an event successful and collecting
information from them. Financing options are selected from owners, bankers, investors,
brokers, etc. SO when they people invest in government project, then it will be easy for
project manger to determine the changes properly and communicate them about
importance of this project. Lastly, there will planning for determining how to schedule
activities and determine best ways to understand and evaluate changes. This is the best
way through which operations are conducted in synchronise manner and determine
requirements about human capital (Kaiser, El Arbi and Ahlemann, 2015).
Definition phase- In this phase, there will complete study of feasibility and
functional functional of complete project. Apart from this, there will study of site
development and lastly approval processes. With completing of task,it is essential for
people to understand and determine their roles, which is possible through approval of
new project is possible. When there is change in operations of association, then
activities will be done for completing it but there is requirement of approval from some
institutes such as local vendors, local communities, etc. with which it will be easy for
project manager to distribute activities. When changes are required ion operations, then
work break down structure assist in determining where to take corrective actions. There
will study of complete and specific information through feasibility study such as finance,
industry, market, product, etc. This is the actual executive phase because activities are
performed and planned properly through which actions are conducted.
For conducting and planning operations for Portsmouth Sea festival in 2021, is
wide task and there are some informations which has to be delivered to local people as
well because this event with motto of sustainability and green environment will not be
possible if not conducted properly. In this study, there will collecting information about
feasibility study because this is the best way through which material, financial
resources, cost estimation for completing the project can be determined. In feasibility
study, there will study of completing information through which they can understand and
determine changes properly. For planning and conducting Portsmouth Sea festival,
there is requirement of planning for sites such as restaurants where visitors will go,

accommodation services, space near by Portsmouth sea for setting canopy. There will
completion of information about resources which are required and understanding and
determining changes properly. Lastly, there will be taking of approval because this is the
best way through which activities of festival does not get interrupted. There will approval
from owner, government, etc. regarding conducting activities of green environment and
sustainability (Kerzner, 2017).
(Source: Work Break Down Structure, 2019)
Advantages of work break down structure is that operations are properly
planned and there is less possibilities of wastage of resources. With change in project
activities because of external sources, it is important for people to determine and
understand changes properly. As planning and conducting project activities, is not easy
task because of complex procedure, so it will be easy to complete whole task with work
break done structure.
Illustration 1: Work Break Down Structure
completion of information about resources which are required and understanding and
determining changes properly. Lastly, there will be taking of approval because this is the
best way through which activities of festival does not get interrupted. There will approval
from owner, government, etc. regarding conducting activities of green environment and
sustainability (Kerzner, 2017).
(Source: Work Break Down Structure, 2019)
Advantages of work break down structure is that operations are properly
planned and there is less possibilities of wastage of resources. With change in project
activities because of external sources, it is important for people to determine and
understand changes properly. As planning and conducting project activities, is not easy
task because of complex procedure, so it will be easy to complete whole task with work
break done structure.
Illustration 1: Work Break Down Structure
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 34
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.