Assessment 2 – Project Selection Methods and Initial Documents
1
1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
Introduction......................................................................................................................................3
Essay................................................................................................................................................4
Conclusion.......................................................................................................................................7
References........................................................................................................................................8
2
Introduction......................................................................................................................................3
Essay................................................................................................................................................4
Conclusion.......................................................................................................................................7
References........................................................................................................................................8
2

Introduction
The project management is the process of initiating; planning, executing, control, as well as the
closing of the work done by a team in order, achieve the specific objectives within the specified
time period. The main challenge within the project management is to accomplish the project
goals within given constraint. This essay is prepared in order to examine different project
selection methods which can be applied appropriately in the Uber’s project. The processes of
conducting these methods will also be discussed in such a report. There is also considered the
guide of PMBOK in order to describe the initial process group of a project and the important
documents which are generally created as the input for the new project. There has been taken the
example of Uber’s new app development project as a case study and the project management
methodologies are used in order to analyze such a project.
3
The project management is the process of initiating; planning, executing, control, as well as the
closing of the work done by a team in order, achieve the specific objectives within the specified
time period. The main challenge within the project management is to accomplish the project
goals within given constraint. This essay is prepared in order to examine different project
selection methods which can be applied appropriately in the Uber’s project. The processes of
conducting these methods will also be discussed in such a report. There is also considered the
guide of PMBOK in order to describe the initial process group of a project and the important
documents which are generally created as the input for the new project. There has been taken the
example of Uber’s new app development project as a case study and the project management
methodologies are used in order to analyze such a project.
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Essay
The Uber is considered as the most important test case for the gig economy. This is one of the
best Taxi Services apps which are providing the best services to their riders and customers. A
user-friendly experience is being provided to the customers booking their cabs or ordering for the
food delivery. There has been identified the requirement of adopting the new app which can be
useful for the drivers and providing them the feasibility at the workplace. The Uber app is
considered as the workplace for the drivers. Uber is now looking forward to finishing touches on
the from- scratch rebuild of the driver app. This is a very important project for the company.
The project selection methods are a very important concept which helps the organizations to
make the decisions regarding selecting the projects out of the alternative projects. As a project
manager, there is always needed to make decisions regarding which project must be
implemented. As a team, there is a requirement of analyzing all the factors contributing towards
the project such as customer requirements, objectives of the organization, budget as well as the
scheduling. The most valuable asset of any business is its time. The profitability of a business
depends on the effective use of the time and it also requires not involving in such projects which
are taking a lot of time and they relatively produce the lesser amount of value from such project.
The bad choice of the project can lead to the failure of the project as well as the business. It is
very necessary to make use of the evaluation approaches that can be useful in identifying the
value of the projects.
One of these models is the mathematical model which is also called as the constrained
optimization. This method involves the measurement and calculation of different mathematical
factors. The technical definition provided for such a mathematical model is to solve the problems
which seek to maximize or minimize the real functions by systematically selecting the values of
the integer variables from the allowed set. This method also grants permission to determine the
best elements of some objective function and different type of the domain.
The second model is the benefit measurements which enables the organization to effectively
make a comparison of the benefits as well as the values of one project to the other project. This
4
The Uber is considered as the most important test case for the gig economy. This is one of the
best Taxi Services apps which are providing the best services to their riders and customers. A
user-friendly experience is being provided to the customers booking their cabs or ordering for the
food delivery. There has been identified the requirement of adopting the new app which can be
useful for the drivers and providing them the feasibility at the workplace. The Uber app is
considered as the workplace for the drivers. Uber is now looking forward to finishing touches on
the from- scratch rebuild of the driver app. This is a very important project for the company.
The project selection methods are a very important concept which helps the organizations to
make the decisions regarding selecting the projects out of the alternative projects. As a project
manager, there is always needed to make decisions regarding which project must be
implemented. As a team, there is a requirement of analyzing all the factors contributing towards
the project such as customer requirements, objectives of the organization, budget as well as the
scheduling. The most valuable asset of any business is its time. The profitability of a business
depends on the effective use of the time and it also requires not involving in such projects which
are taking a lot of time and they relatively produce the lesser amount of value from such project.
The bad choice of the project can lead to the failure of the project as well as the business. It is
very necessary to make use of the evaluation approaches that can be useful in identifying the
value of the projects.
One of these models is the mathematical model which is also called as the constrained
optimization. This method involves the measurement and calculation of different mathematical
factors. The technical definition provided for such a mathematical model is to solve the problems
which seek to maximize or minimize the real functions by systematically selecting the values of
the integer variables from the allowed set. This method also grants permission to determine the
best elements of some objective function and different type of the domain.
The second model is the benefit measurements which enables the organization to effectively
make a comparison of the benefits as well as the values of one project to the other project. This
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

method can be incorporated when there is a need to ensure that the integrated project maintains a
clear focus on benefits realization.
The project selecting method includes the scoring which involves making the list of the
objectives which are important for the company with reference to the projects that are
undertaken. If there is a requirement of making the decisions regarding the project on a regular
basis then there is a need for developing and using the template score sheet. There will be scored
the project against the key needs of the company including the time constraints, opportunity cost,
IRR as well as the resource availability (Karaman & Kurt, 2015).
Opportunity cost is another method used for the selection of the projects. It is unwise to use such
projects whether internal or external, which require a higher amount of the resources than the
benefits they bring. If any internal project is making a reduction in the ability to serve the clients
in a better way and if the external project is demanding a higher amount of resources then it is
not considered good to select such projects for the business. It is necessary that the benefits
arising out of the project must be higher than the opportunity costs associated with such projects.
The next method to be discussed regarding the project selection method is the Six Sigma
Methodology. This methodology is generally used by businesses to enhance the effectiveness
and efficiency of the businesses. This method is helpful in making a reduction in the wastage and
makes improvements within the services offered by the business. This is one of the best methods
used by the businesses for the selection of the projects. It makes a detailed analysis of each and
every aspect of the business and identifies the shortcomings. After that, the solutions are created
for such deficiencies. The main objective of the management is considered as deriving the
maximum benefits from the less work. The Six Sigma project may be considered as a good
project to be implemented during the slow times in order to identify the problems within the
business practices (Brioso, 2015).
For the given project of Uber, there is a need for making the analysis on the maximum benefits
arising from such a project and the expenses covered in such a project. The comparison is
required to be made so that the better project can be selected for the business.
5
clear focus on benefits realization.
The project selecting method includes the scoring which involves making the list of the
objectives which are important for the company with reference to the projects that are
undertaken. If there is a requirement of making the decisions regarding the project on a regular
basis then there is a need for developing and using the template score sheet. There will be scored
the project against the key needs of the company including the time constraints, opportunity cost,
IRR as well as the resource availability (Karaman & Kurt, 2015).
Opportunity cost is another method used for the selection of the projects. It is unwise to use such
projects whether internal or external, which require a higher amount of the resources than the
benefits they bring. If any internal project is making a reduction in the ability to serve the clients
in a better way and if the external project is demanding a higher amount of resources then it is
not considered good to select such projects for the business. It is necessary that the benefits
arising out of the project must be higher than the opportunity costs associated with such projects.
The next method to be discussed regarding the project selection method is the Six Sigma
Methodology. This methodology is generally used by businesses to enhance the effectiveness
and efficiency of the businesses. This method is helpful in making a reduction in the wastage and
makes improvements within the services offered by the business. This is one of the best methods
used by the businesses for the selection of the projects. It makes a detailed analysis of each and
every aspect of the business and identifies the shortcomings. After that, the solutions are created
for such deficiencies. The main objective of the management is considered as deriving the
maximum benefits from the less work. The Six Sigma project may be considered as a good
project to be implemented during the slow times in order to identify the problems within the
business practices (Brioso, 2015).
For the given project of Uber, there is a need for making the analysis on the maximum benefits
arising from such a project and the expenses covered in such a project. The comparison is
required to be made so that the better project can be selected for the business.
5

The PMBOK is the set of standard terminologies as well as the guidelines for the management of
the projects. This is considered an an entire collection of the best practices, processes, guidelines
as well as the terminologies which are accepted as the standards for the project management
industry. There are developed five project management process groups (Chaves, et. al., 2016).
The very first Project Management Process Group is project initiation. It this first process the
project is created as well as defined to the extent to which there is a requirement of beginning the
project. In this step of project management, the setup of the project is made and then it is ensured
that performing the organization is clear about the priorities as well as of purposes surrounding
the project. There are several kinds of issues associated with such project such as stakeholder’s
issues as well as the funding issues (Ma, et. al., 2018). There are two documents prepared in this
stage of project management. These initial documents are projected charter as well as the
stakeholder register. The project charter is considered as the document which defines as well as
authorizes the project. This paper outlines the vision of the organization for such a project as
well as the business project for it. There are several aspects that are covered in the project
charter. These are scope statement, milestones, funding amount, business case, funding status as
well as the success criteria. A general scope statement of the project identifies the vision for the
project which is required to be accomplished by the project team. A final scope statement is
generally finalized by the project manager in the planning phase of the project management.
Milestones are similar to the deliverables. They are required to be identified within a charter but
this is not considered as a role of the project charter to list all the milestones. Further, the
business case is also presented in the project charter which is helpful is having a description on
why the organization is undertaking such project and how can it be useful for the organization
(Nasir, et. al., 2015).
There is also a need for identifying the stakeholders of the project. These are the people who are
associated with such a project. There is a requirement of maintaining a stakeholder's register. The
wrong identification of the stakeholders can cause the failure of the project hence it is a very
important document for any project. All the important requirements are required to be mentioned
in such stakeholders register such as the name of stakeholders, their role, status as well as the
benefits arising from the project. All these stakeholders are required to be identified and then
6
the projects. This is considered an an entire collection of the best practices, processes, guidelines
as well as the terminologies which are accepted as the standards for the project management
industry. There are developed five project management process groups (Chaves, et. al., 2016).
The very first Project Management Process Group is project initiation. It this first process the
project is created as well as defined to the extent to which there is a requirement of beginning the
project. In this step of project management, the setup of the project is made and then it is ensured
that performing the organization is clear about the priorities as well as of purposes surrounding
the project. There are several kinds of issues associated with such project such as stakeholder’s
issues as well as the funding issues (Ma, et. al., 2018). There are two documents prepared in this
stage of project management. These initial documents are projected charter as well as the
stakeholder register. The project charter is considered as the document which defines as well as
authorizes the project. This paper outlines the vision of the organization for such a project as
well as the business project for it. There are several aspects that are covered in the project
charter. These are scope statement, milestones, funding amount, business case, funding status as
well as the success criteria. A general scope statement of the project identifies the vision for the
project which is required to be accomplished by the project team. A final scope statement is
generally finalized by the project manager in the planning phase of the project management.
Milestones are similar to the deliverables. They are required to be identified within a charter but
this is not considered as a role of the project charter to list all the milestones. Further, the
business case is also presented in the project charter which is helpful is having a description on
why the organization is undertaking such project and how can it be useful for the organization
(Nasir, et. al., 2015).
There is also a need for identifying the stakeholders of the project. These are the people who are
associated with such a project. There is a requirement of maintaining a stakeholder's register. The
wrong identification of the stakeholders can cause the failure of the project hence it is a very
important document for any project. All the important requirements are required to be mentioned
in such stakeholders register such as the name of stakeholders, their role, status as well as the
benefits arising from the project. All these stakeholders are required to be identified and then
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

listed in the stakeholder's register. It is one of the most important initiation documents of any
project (Varajão, et. al., 2017).
7
project (Varajão, et. al., 2017).
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Conclusion
It can be concluded from this report that there are several steps associated with the project
management but the initiation process group is one of the most important steps because no
project can be started without this initial step. There were examined several other project
selection methods in order to identify the best method as well as the process for the Uber’s new
project of App development. The report has provided a complete understanding of the initial step
as well as the importance of identifying the stakeholders for any project.
8
It can be concluded from this report that there are several steps associated with the project
management but the initiation process group is one of the most important steps because no
project can be started without this initial step. There were examined several other project
selection methods in order to identify the best method as well as the process for the Uber’s new
project of App development. The report has provided a complete understanding of the initial step
as well as the importance of identifying the stakeholders for any project.
8

References
Brioso, X. (2015). Integrating ISO 21500 guidance on project management, lean
construction, and PMBOK. Procedia Engineering, 123, 76-84.
Chaves, M. S., Araújo, C. D., Teixeira, L., Rosa, D., Júnior, I., & Nogueira, C. (2016). A
new approach to managing Lessons Learned in PMBoK process groups: the Ballistic 2.0
Model. International Journal of Information Systems and Project Management, 4(1), 27-
45.
Karaman, E., & Kurt, M. (2015). Comparison of project management methodologies:
prince 2 versus PMBOK for its projects. International Journal of Applied Sciences and
Engineering Research, 4(4), 572-579.
Ma, Y., Ma, J., Zhang, P., Ma, Y., & Che, C. (2018). Research and Application of
PMBOK (Project Management Body of Knowledge) in the Management of Oil and Gas
Pipeline Projects.
Nasir, M. H. N. M., Sahibuddin, S., Ahmad, R. B., & Fauzi, S. S. B. M. (2015). How the
PMBOK Addresses Critical Success Factors for Software Projects: A Multi-round Delphi
Study. JSW, 10(11), 1283-1300.
Varajão, J., Colomo-Palacios, R., & Silva, H. (2017). ISO 21500: 2012 and PMBoK 5
processes in information systems project management. Computer Standards &
Interfaces, 50, 216-222.
9
Brioso, X. (2015). Integrating ISO 21500 guidance on project management, lean
construction, and PMBOK. Procedia Engineering, 123, 76-84.
Chaves, M. S., Araújo, C. D., Teixeira, L., Rosa, D., Júnior, I., & Nogueira, C. (2016). A
new approach to managing Lessons Learned in PMBoK process groups: the Ballistic 2.0
Model. International Journal of Information Systems and Project Management, 4(1), 27-
45.
Karaman, E., & Kurt, M. (2015). Comparison of project management methodologies:
prince 2 versus PMBOK for its projects. International Journal of Applied Sciences and
Engineering Research, 4(4), 572-579.
Ma, Y., Ma, J., Zhang, P., Ma, Y., & Che, C. (2018). Research and Application of
PMBOK (Project Management Body of Knowledge) in the Management of Oil and Gas
Pipeline Projects.
Nasir, M. H. N. M., Sahibuddin, S., Ahmad, R. B., & Fauzi, S. S. B. M. (2015). How the
PMBOK Addresses Critical Success Factors for Software Projects: A Multi-round Delphi
Study. JSW, 10(11), 1283-1300.
Varajão, J., Colomo-Palacios, R., & Silva, H. (2017). ISO 21500: 2012 and PMBoK 5
processes in information systems project management. Computer Standards &
Interfaces, 50, 216-222.
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 9
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.