This report provides a detailed analysis of project selection methods, using Uber as a case study. The report begins with an introduction to Uber and its business model, highlighting its use of technology and constant need for innovation. It then delves into various project selection methods, focusing on the Benefit Measurement Method (BMM) and its components: Internal Rate of Return (IRR), Payback Period, and Net Present Value (NPV). The report compares and contrasts these methods, explaining their applicability to Uber's projects, particularly the development of a new driver interface. The discussion extends to the initial process group, referencing the PMBOK guide to illustrate how project managers can apply these tools and strategies. The report emphasizes the importance of stakeholder involvement, including project managers, technical teams, and legal teams, and outlines essential project documents such as technical and financial plans. Finally, the report concludes by summarizing the benefits of the chosen project selection method for Uber and its potential impact on the company's competitiveness and the enhancement of driver experience.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

Running head: PROJECT SELECTION METHODS BASED ON UBER CASE STUDY
Project Selection Methods based on Uber Case Study
Name of the Student
Student ID
Lecturer
Subject
Date
Author’s note
Project Selection Methods based on Uber Case Study
Name of the Student
Student ID
Lecturer
Subject
Date
Author’s note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

1PROJECT SELECTION METHODS BASED ON UBER CASE STUDY
Table of Contents
1. Introduction..................................................................................................................................2
2. Discussion....................................................................................................................................2
2.1 Project Selection Methods.....................................................................................................2
2.2 Comparison between the Various Approaches of Project Management...............................3
2.3 Initial Process Group.............................................................................................................4
3. Conclusion...................................................................................................................................6
References........................................................................................................................................7
Table of Contents
1. Introduction..................................................................................................................................2
2. Discussion....................................................................................................................................2
2.1 Project Selection Methods.....................................................................................................2
2.2 Comparison between the Various Approaches of Project Management...............................3
2.3 Initial Process Group.............................................................................................................4
3. Conclusion...................................................................................................................................6
References........................................................................................................................................7

2PROJECT SELECTION METHODS BASED ON UBER CASE STUDY
1. Introduction
Uber is regarded as the largest online taxi provider in the world, which offer their various
facilities by enhancing their mobile application day by day. As per an estimation, it has been
found that more than 3 million of Uber drivers log in to the application and thus spend 8.5
million hours within the application. Uber provides a vast range of services for the purpose of
meeting the expectations of their customers (Cramer & Krueger, 2016). The largest ride hailing
company mostly contracts different taxi service providers on a contractual basis. These workers
are then engaged into a labour force with the help of an efficient software.
This report further puts emphasis over a certain project selection method and thus
implementing a new form of user interface within their business structure. This would mostly be
helpful for supporting customers and their partnered drivers to enhance the business structure of
the organisation.
2. Discussion
2.1 Project Selection Methods
Despite a high level of competition, the company is always planning to introduce new
kind of services before the customers in order to meet their expectations and thus constantly
move forward. Technology has always been the major support and is extensively used by the
application in order to improve their services (Grønbæk et al., 2017). The new form of business
strategy would be extremely important in the competitive marketplace.
The project is thus based on understanding about the needs of the company and thus
decide on the best possible measure that needs to be taken in order to enhance the scenario of the
business. The application of Uber is considered to be the workplace for the drivers and thus each
1. Introduction
Uber is regarded as the largest online taxi provider in the world, which offer their various
facilities by enhancing their mobile application day by day. As per an estimation, it has been
found that more than 3 million of Uber drivers log in to the application and thus spend 8.5
million hours within the application. Uber provides a vast range of services for the purpose of
meeting the expectations of their customers (Cramer & Krueger, 2016). The largest ride hailing
company mostly contracts different taxi service providers on a contractual basis. These workers
are then engaged into a labour force with the help of an efficient software.
This report further puts emphasis over a certain project selection method and thus
implementing a new form of user interface within their business structure. This would mostly be
helpful for supporting customers and their partnered drivers to enhance the business structure of
the organisation.
2. Discussion
2.1 Project Selection Methods
Despite a high level of competition, the company is always planning to introduce new
kind of services before the customers in order to meet their expectations and thus constantly
move forward. Technology has always been the major support and is extensively used by the
application in order to improve their services (Grønbæk et al., 2017). The new form of business
strategy would be extremely important in the competitive marketplace.
The project is thus based on understanding about the needs of the company and thus
decide on the best possible measure that needs to be taken in order to enhance the scenario of the
business. The application of Uber is considered to be the workplace for the drivers and thus each

3PROJECT SELECTION METHODS BASED ON UBER CASE STUDY
of the beneficial methods that would be undertaken within the project would be helpful for
enhancing the application for the betterment of the drivers. This project is thus based on building
of an entirely new form of interface that would suit the needs of drivers (Hermann, Pentek &
Otto 2016). The entire project is commercially based. The company has understood the needs for
the development of an entirely new project and thus have decided to build an entirely new
application with the help of a best form of project selection method.
2.2 Comparison between the Various Approaches of Project Management
Based on the given project designed for Uber, the Benefit Measurement Method (BMM)
could be applicable for the project. The primary models and methods that are used within this
method are – Internal Rate of Return (IRR), Payback Period and Net Present Value (NPV).
In this form of economic model based on IRR, the company should be able to calculate
the rate of interest at which the total inflow of cash would occur within the project development
phase. The total cash inflow that would be made within the project should be equal to the
outflow of cash from the project (Bora, 2015). From the discussed model, it could be further
outlined that higher the value of IRR, there would be more flow of profits incurred after the
design of the project.
In the discussion over the Payback Period based economic model, it could be discussed
that the time period would be required to be calculated for based on the made investment made
during the designing of the project. The concerned project would require a certain time period
during which the investments made would help in gaining some benefits for the company (Deng
et al., 2014). This would mean that after a certain time period, the project would help in returning
profits for the organisation.
of the beneficial methods that would be undertaken within the project would be helpful for
enhancing the application for the betterment of the drivers. This project is thus based on building
of an entirely new form of interface that would suit the needs of drivers (Hermann, Pentek &
Otto 2016). The entire project is commercially based. The company has understood the needs for
the development of an entirely new project and thus have decided to build an entirely new
application with the help of a best form of project selection method.
2.2 Comparison between the Various Approaches of Project Management
Based on the given project designed for Uber, the Benefit Measurement Method (BMM)
could be applicable for the project. The primary models and methods that are used within this
method are – Internal Rate of Return (IRR), Payback Period and Net Present Value (NPV).
In this form of economic model based on IRR, the company should be able to calculate
the rate of interest at which the total inflow of cash would occur within the project development
phase. The total cash inflow that would be made within the project should be equal to the
outflow of cash from the project (Bora, 2015). From the discussed model, it could be further
outlined that higher the value of IRR, there would be more flow of profits incurred after the
design of the project.
In the discussion over the Payback Period based economic model, it could be discussed
that the time period would be required to be calculated for based on the made investment made
during the designing of the project. The concerned project would require a certain time period
during which the investments made would help in gaining some benefits for the company (Deng
et al., 2014). This would mean that after a certain time period, the project would help in returning
profits for the organisation.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

4PROJECT SELECTION METHODS BASED ON UBER CASE STUDY
The last economic model that would be considered for the project is the Net Present
Value (NPV). Based on considering this model, the NPV for a certain project would be
calculated by deducting the cost that would be incurred for a project. The NPV that would be
calculated within a project would be calculated over multiple time periods (Thamhain, 2014).
This would entirely be based on the present costs or investments that would be made for the
project. If the calculated NPV is positive, it would indicate that the selected project is positive.
2.3 Initial Process Group
With the development of the application project, it would be considered that the existing
application would be completely revamped and a new setup would be made. A knowledge over
the PMBOK guide would be able to help the project manager and the entire team to design the
application with a better form of approach (A guide to the project management body of
knowledge, 2017). The various techniques and strategies that are undertaken by the company by
following the PMBOK guide would be helpful for guiding the entire project.
The business of Uber should consider the Payback Period for calculating the amount of
gain that would be incurred for the project. With the implementation of this model within the
business structure, the company would be gain an idea about the number of time periods that
would be required for a project (Dutra et al., 2014). This would help in gaining an idea about the
amount of benefits incurred over making investments within a project. After the design of the
new interface for the driver application, it would be necessary for the company to discuss about
the benefits that would be incurred after the project (Ruparathna, Hewage & Sadiq, 2017).
Hence, with the implementation of the Payback Period model for the project, the company would
be able to calculate the amount of revenue generated after the project has made some
contribution of profits.
The last economic model that would be considered for the project is the Net Present
Value (NPV). Based on considering this model, the NPV for a certain project would be
calculated by deducting the cost that would be incurred for a project. The NPV that would be
calculated within a project would be calculated over multiple time periods (Thamhain, 2014).
This would entirely be based on the present costs or investments that would be made for the
project. If the calculated NPV is positive, it would indicate that the selected project is positive.
2.3 Initial Process Group
With the development of the application project, it would be considered that the existing
application would be completely revamped and a new setup would be made. A knowledge over
the PMBOK guide would be able to help the project manager and the entire team to design the
application with a better form of approach (A guide to the project management body of
knowledge, 2017). The various techniques and strategies that are undertaken by the company by
following the PMBOK guide would be helpful for guiding the entire project.
The business of Uber should consider the Payback Period for calculating the amount of
gain that would be incurred for the project. With the implementation of this model within the
business structure, the company would be gain an idea about the number of time periods that
would be required for a project (Dutra et al., 2014). This would help in gaining an idea about the
amount of benefits incurred over making investments within a project. After the design of the
new interface for the driver application, it would be necessary for the company to discuss about
the benefits that would be incurred after the project (Ruparathna, Hewage & Sadiq, 2017).
Hence, with the implementation of the Payback Period model for the project, the company would
be able to calculate the amount of revenue generated after the project has made some
contribution of profits.

5PROJECT SELECTION METHODS BASED ON UBER CASE STUDY
The stakeholder team who would be involved within the project would comprise of the
best and world class group of technicians and decision makers. This would include the lead
project designers, technical development team, testing and quality analyst team and the
automobile engineering team (Blomberg et al., 2017). The project manager would however
spearhead the entire progress and development of the project. A proper guidance would need to
be sought in order to understand the core idea of the project and thus take proper steps in order to
plan the project. The proper documents that would be needed for the project include a technical
project plan, a financial plan that would sort the entire financial aspects that would be required
during the project, an approval plan that would be highly needed for ensuring that each of the
members are on board and willing to start with the development of the project (Stanton et al.,
2017). Before the initiation over the works on the project, the legal team at Uber should
undertake several legal steps in order to ensure that there would be no legal action after the
development of the interface of the application has been done (Nguyen, Reiter & Rigo, 2014). A
proper legal document would also ensure that there would not arise any situations of problem
after the commercial launch of the application in the overseas market.
The knowledge and consideration of the PMBOK guidelines would help the entire project
team to implement the technical knowledge over the domain. The use of exclusive project
management techniques would be able to guide the project management team for implementing
the necessary changes during development of the project. The development team would be
highly involved in planning, designing a wireframe of the entire interface that would be user-
friendly. The PMBOK standards would be able to define several new ways and useful strategies
that would be able to facilitate the drivers in completing their rides with the esteemed customers
within the company. Each of the strategies defined during the development of the interface
The stakeholder team who would be involved within the project would comprise of the
best and world class group of technicians and decision makers. This would include the lead
project designers, technical development team, testing and quality analyst team and the
automobile engineering team (Blomberg et al., 2017). The project manager would however
spearhead the entire progress and development of the project. A proper guidance would need to
be sought in order to understand the core idea of the project and thus take proper steps in order to
plan the project. The proper documents that would be needed for the project include a technical
project plan, a financial plan that would sort the entire financial aspects that would be required
during the project, an approval plan that would be highly needed for ensuring that each of the
members are on board and willing to start with the development of the project (Stanton et al.,
2017). Before the initiation over the works on the project, the legal team at Uber should
undertake several legal steps in order to ensure that there would be no legal action after the
development of the interface of the application has been done (Nguyen, Reiter & Rigo, 2014). A
proper legal document would also ensure that there would not arise any situations of problem
after the commercial launch of the application in the overseas market.
The knowledge and consideration of the PMBOK guidelines would help the entire project
team to implement the technical knowledge over the domain. The use of exclusive project
management techniques would be able to guide the project management team for implementing
the necessary changes during development of the project. The development team would be
highly involved in planning, designing a wireframe of the entire interface that would be user-
friendly. The PMBOK standards would be able to define several new ways and useful strategies
that would be able to facilitate the drivers in completing their rides with the esteemed customers
within the company. Each of the strategies defined during the development of the interface

6PROJECT SELECTION METHODS BASED ON UBER CASE STUDY
should have a future planning to improve the experience of the drivers and also enhance the
business efficiency.
3. Conclusion
Based on discussing about the various aspects of the report, it could be concluded that
with the development of the project based on the new interface, it would be extremely beneficial
for the company to stay ahead in the highly competitive market. The new venture of the
company is based on planning of a new interface for the drivers and thus enhance their
experience during the ride. This report thus puts focuses over the project selection methods that
could be used within the development of the discussed project. The project management method
that has been applied during the development of the project is based on Payback Period method.
The implementation of this method would mostly benefit Uber as they would be able to calculate
the amount of benefits incurred after the implementation of the new project.
The report also discusses about the ways in which the project management body involved
with the design aspects of the project would be able to cover the entire aspects of the project. The
team of project management involved with the design of the project would cover the financial,
technical and legal aspects that are involved within the project. Selection of the payback period
method would be helpful for the company to deliver the best kind of quality output to the
company and also ensure the net profits that would be incurred for the project in the future.
should have a future planning to improve the experience of the drivers and also enhance the
business efficiency.
3. Conclusion
Based on discussing about the various aspects of the report, it could be concluded that
with the development of the project based on the new interface, it would be extremely beneficial
for the company to stay ahead in the highly competitive market. The new venture of the
company is based on planning of a new interface for the drivers and thus enhance their
experience during the ride. This report thus puts focuses over the project selection methods that
could be used within the development of the discussed project. The project management method
that has been applied during the development of the project is based on Payback Period method.
The implementation of this method would mostly benefit Uber as they would be able to calculate
the amount of benefits incurred after the implementation of the new project.
The report also discusses about the ways in which the project management body involved
with the design aspects of the project would be able to cover the entire aspects of the project. The
team of project management involved with the design of the project would cover the financial,
technical and legal aspects that are involved within the project. Selection of the payback period
method would be helpful for the company to deliver the best kind of quality output to the
company and also ensure the net profits that would be incurred for the project in the future.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT SELECTION METHODS BASED ON UBER CASE STUDY
References
Blomberg, J., Giacomi, J., Mosher, A., & Swenton-Wall, P. (2017). Ethnographic field methods
and their relation to design. In Participatory Design (pp. 123-155). CRC Press.
Bora, B. (2015). Comparison between net present value and internal rate of return. International
Journal of Research in Finance and Marketing, 5(12), 61-71.
Cramer, J., & Krueger, A. B. (2016). Disruptive change in the taxi business: The case of
Uber. American Economic Review, 106(5), 177-82.
Deng, Q., Zhang, L., Cui, Q., & Jiang, X. (2014). A simulation-based decision model for
designing contract period in building energy performance contracting. Building and
environment, 71, 71-80.
Dutra, C. C., Ribeiro, J. L. D., & de Carvalho, M. M. (2014). An economic–probabilistic model
for project selection and prioritization. International Journal of Project
Management, 32(6), 1042-1055.
Grønbæk, K., Grudin, J., Bødker, S., & Bannon, L. (2017). Achieving cooperative system
design: shifting from a product to a process focus. In Participatory Design (pp. 79-97).
CRC Press.
Hermann, M., Pentek, T., & Otto, B. (2016, January). Design principles for industrie 4.0
scenarios. In 2016 49th Hawaii international conference on system sciences (HICSS) (pp.
3928-3937). IEEE.
Nguyen, A. T., Reiter, S., & Rigo, P. (2014). A review on simulation-based optimization
methods applied to building performance analysis. Applied Energy, 113, 1043-1058.
References
Blomberg, J., Giacomi, J., Mosher, A., & Swenton-Wall, P. (2017). Ethnographic field methods
and their relation to design. In Participatory Design (pp. 123-155). CRC Press.
Bora, B. (2015). Comparison between net present value and internal rate of return. International
Journal of Research in Finance and Marketing, 5(12), 61-71.
Cramer, J., & Krueger, A. B. (2016). Disruptive change in the taxi business: The case of
Uber. American Economic Review, 106(5), 177-82.
Deng, Q., Zhang, L., Cui, Q., & Jiang, X. (2014). A simulation-based decision model for
designing contract period in building energy performance contracting. Building and
environment, 71, 71-80.
Dutra, C. C., Ribeiro, J. L. D., & de Carvalho, M. M. (2014). An economic–probabilistic model
for project selection and prioritization. International Journal of Project
Management, 32(6), 1042-1055.
Grønbæk, K., Grudin, J., Bødker, S., & Bannon, L. (2017). Achieving cooperative system
design: shifting from a product to a process focus. In Participatory Design (pp. 79-97).
CRC Press.
Hermann, M., Pentek, T., & Otto, B. (2016, January). Design principles for industrie 4.0
scenarios. In 2016 49th Hawaii international conference on system sciences (HICSS) (pp.
3928-3937). IEEE.
Nguyen, A. T., Reiter, S., & Rigo, P. (2014). A review on simulation-based optimization
methods applied to building performance analysis. Applied Energy, 113, 1043-1058.

8PROJECT SELECTION METHODS BASED ON UBER CASE STUDY
Project Management Institute. (2017). A guide to the project management body of knowledge
(PMBOK guide). Newtown Square, Pa: Project Management Institute.
Ruparathna, R., Hewage, K., & Sadiq, R. (2017). Economic evaluation of building energy
retrofits: A fuzzy based approach. Energy and Buildings, 139, 395-406.
Stanton, N. A., Salmon, P. M., Rafferty, L. A., Walker, G. H., Baber, C., & Jenkins, D. P.
(2017). Human factors methods: a practical guide for engineering and design. CRC
Press.
Thamhain, H. J. (2014). Assessing the effectiveness of quantitative and qualitative methods for
R&D project proposal evaluations. Engineering Management Journal, 26(3), 3-12.
Project Management Institute. (2017). A guide to the project management body of knowledge
(PMBOK guide). Newtown Square, Pa: Project Management Institute.
Ruparathna, R., Hewage, K., & Sadiq, R. (2017). Economic evaluation of building energy
retrofits: A fuzzy based approach. Energy and Buildings, 139, 395-406.
Stanton, N. A., Salmon, P. M., Rafferty, L. A., Walker, G. H., Baber, C., & Jenkins, D. P.
(2017). Human factors methods: a practical guide for engineering and design. CRC
Press.
Thamhain, H. J. (2014). Assessing the effectiveness of quantitative and qualitative methods for
R&D project proposal evaluations. Engineering Management Journal, 26(3), 3-12.
1 out of 9
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.