This report outlines the QA Higher Education's campus renovation project, focusing on the London and Birmingham campuses. The project aims to modernize computer labs and teaching rooms with the latest technology. The report includes a project initiation document (PID) detailing the project's timescale, budget, stakeholders, and approach. A risk register identifies potential risks and contingency actions. The project plan incorporates a Gantt chart with dependencies and milestones. The report also evaluates the project's risk management plans and the application of the PRINCE2 methodology, highlighting both its strengths and weaknesses. Key aspects covered are stakeholder management, financial risks, technical challenges, and environmental considerations, providing a comprehensive overview of the project's planning and execution.
Document Page
Project Management
QAB020N503S
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Contents
Introduction:....................................................................................................................................4
1 Sample Project Initiation Document (PID)...................................................................................5
2 Risk Register.................................................................................................................................7
2.1 Project Plan..........................................................................................................................11
3.....................................................................................................................................................16
3.1 Importance of Risk Management:.......................................................................................16
3.2 PRINCE2 and Methodology:...............................................................................................17
Conclusion:....................................................................................................................................18
Reference:......................................................................................................................................19
Document Page
Table of Figure:
Figure 1: Cash flow in the project.................................................................................................12
Figure 2: Task cost Variance.........................................................................................................12
Figure 3: Resource cost Variance..................................................................................................13
Figure 4: Cost status of the project................................................................................................13
Figure 5: Cost Details of the project..............................................................................................13
Figure 6: Project Grant chat...........................................................................................................14
Figure 7: Project task.....................................................................................................................15
Document Page
Introduction:
The QA Higher Education (QAHE) based in London is planning to renovate the computer labs
and teaching rooms as well as for Birmingham campus too. The aim of campus is to provide the
latest technology to the students with including new hardware, software and the network
infrastructure. To complete this project report, the first part will include the information like
timescale, budgetary information, stakeholders and the approach of the project. The second part
will contain the risk register which includes the documented risk with contingency actions and
also includes Gantt chart with dependencies, milestones and summary task. The final part will
contain the short report of quality risk management plans. It will also contain the negative
experience of PRINCE2 methodology and also include the strength and weakness of the project.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1 Sample Project Initiation Document (PID)
“QA Higher Education” project designed for London Campus that is offered the excellent
learning environments and provide the latest technology to support higher and modern education
system. Here I have worked as project manager for the QA Higher Education. QA Higher
Education started on 1st March 2018 and Finished on 2nd July 2018. The project will be
completed in 18 weeks.
QA Higher Education estimated budget is $44,560.00. QA Higher Education sponsored by
Managing Director who managed the Budget allocation and project planned for the project. He is
also taken major decision for the project, Project Manager, and team and also Ratifies the
decisions which taken by team or project manager for the project. Risk Management, issue
Management, and Resource Management for the QA Higher Education project managed by the
Project sponsored. Managing Director as a project sponsored defined the scope of QA Higher
Education (Crawford and Brett 2001).
As Project Manager, I have managed the project time, scope, and budget. I designed QA Higher
Education project plan. Project Manager managed project resource such project team, Technical
manager, and project resources. I have resolved resource issue, review issue, and team issue. The
policy of project is defined by the project manager (Munns, and Bjeirmi, 1996).
The objective of QAHE project:
QA Higher Education is a project which is designed for London campus. It needs full
refurbishment teaching rooms and computing labs with modern technology that provide an
excellent learning environment for the teaching and studies. QAHE project needs a computer
hardware and software infrastructure, network infrastructure need for the communication,
sharing the files, documents, and study materials. They also want to improve IT support desk so
need a local IT support representative that placed forever in the London Campus. Furniture and
peripherals device need for the classroom and computer lab.
The approach of QAHE project:
As Project Manager, I have defined the project approach for the QAHE project. As a project
manager, I have set a meeting the client and get all requirement which needs for the project.
Then, I have made the planning for the project according to the client need and organization
resources. After that, the team selected which is a need for the completion. There are designed
the computer systems according to the user need and connected with WAN network. Project
Manager Analysis the project and defined the project resource, cost, stakeholder and their role,
and early phase issued.
Risk of QAHE project:
Document Page
QAHE project has a security issue in the WAN network connection. Privacy of data is a major
risk. A third party or hacker may attack the network and steal the data. Project cost may be
increased due to the resource.
Key Staff of QAHE project:
QA Higher Education project key staff is Managing Director who is spooned project so he takes
the decision and approved the budget, time, and scope. He is responsible for the project success
and success. Second key staff is a project manager who is making the planned for the project,
communicate with the client, controlled the project activity and team of QAHE project. Interior
Decorator and Software Engineer are also key staff because they decided the classroom and
computer Interior and established a secure infrastructure of the computer system.
Stakeholder of QAHE project:
A stakeholder is a collection of a person which takes the major decision in the organization that
affects organization activities. Here, I have defined the stakeholder of the QAHE project.
Project sponsored: He described the project cost and take the decision for the project.
Project Manager: He managed the project resource, scope, and team and made planned
for the project.
Architect: he designed the classroom and computer lab environment and solved their
project in the QAHE project.
Contractor: He finalized the project contractor.
Interior Decorator: He designed the Interior for the project.
Software Engineer: He installed all software which needs for the project and testing the
software.
Hardware engineer: He installed all hardware which needs for the project and testing the
Hardware.
IT Support Engineer: He provides the support for the communication support and defined
the environmental goals.
Document Page
2 Risk Register
Severity prior to
mitigation
Severity after
mitigation
Financial Likeli
hood
Impa
ct
Rati
ng
Mitigati
on
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
Plans
Statu
s
Own
er
F
1
Start-
up
costs
and
invest
ments
might
prove
too
steep
to
endure
3
Possi
ble
4
Signi
ficant
4
Med
ium
High
Good
estimati
on and
modelli
ng of
financia
l flows
to
inform
investm
ent
decision
,
expectat
ions and
actions
tbc
Adopt
an
evolvin
g model
2
Unlik
ely
3
Mode
rate
2
Low
Med
ium
Switch
to
phased
implem
entation
Acti
ons
com
plete
-
moni
tor
Proje
ct
Team
Operation
al
Likeli
hood
Impa
ct
Rati
ng
Mitigati
on
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
Plane
Statu
s
Own
er
O
1
Some
influen
tial
stakeh
olders
might
consid
er this
is not
an
approp
4
likely
4
signif
icant
4
medi
um-
high
PR/
comms
strategy
Compre
hensive
stakehol
der
manage
ment
board
support
4
likely
3
mode
rate
3
medi
um
Chief
executiv
e
prepare
d to act
1 to 1
Acti
ons
in
progr
ess
Proje
ct
team
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
riate
initiati
ve and
therefo
re do
not
adequa
tely
engage
with it
Effectiv
e
commu
nication
with all
stakehol
ders
Demons
trate the
potentia
l
benefits
to the
stakehol
ders
Reputatio
nal
Likeli
hood
Impa
ct
Rati
ng
Mitigati
ons
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
plans
Statu
s
Own
er
R
1
A bad
result
might
dent
our
reputat
ion
and/or
cause
contagi
on for
other
busines
s lines
3
possi
ble
4
signif
icant
4
medi
um-
high
Quality
processe
s,
standard
s,
reviews,
controls,
Essentia
l to have
an
experien
ced
engage
ment
manager
PR/
comms
continge
ncy
plannin
g
3
Possi
ble
4
Signi
ficant
4
Med
ium-
High
Distanc
e new
venture
from the
robust
main
business
For
boar
d
appr
oval
Steeri
ng
com
mitte
e
Technical Likeli
hood
Impa
ct
Rati
ng
Mitigati
ons
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
plans
Statu
s
Own
er
T
1
Less
knowle
3
possi
4
signif
4
medi
Provide
technica
2
unlik
4
signif
4
medi
staff
trained
Acti
ons
Engi
neer
Document Page
dge of
technic
al
terms
might
fail the
project
ble icant um-
high
l
tanning
to staff
member
s
Technic
al
regardin
g
software
and
hardwar
e
ely icant um-
high
and the
project
does not
fail due
to a
technica
l issue
in
progr
ess
Schedule Likeli
hood
impa
ct
Rati
ng
Mitigati
on
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
plans
Statu
s
Own
er
S
1
An
uncerta
in
schedu
le
delay
the
project
4
likely
3
mode
rate
4
medi
um-
high
Fix a
permane
nt
schedul
e for
member
s
3
possi
ble
3
mode
rate
3
medi
um
Project
complet
ed on
time and
save
cost and
effort
For
boar
d
appr
oval
Proje
ct
team
Client Likeli
hood
Impa
ct
Rati
ng
Mitigati
on
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
plans
Statu
s
Own
er
C
1
Client
respon
sibility
make
the
project
more
popula
r
3
possi
ble
4
signif
icant
4
medi
um-
high
Make
proper
commu
nication
with the
client
3
possi
ble
4
signif
icant
4
medi
um-
high
The
project
will be
more
popular
For
boar
d
appr
oval
Proje
ct
team
Weather Likeli
hood
Impa
ct
Rati
ng
Mitigati
on
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
plans
Statu
s
Own
er
W
1
Weath
er can
affect
some
4
likely
3
mode
rate
4
medi
um-
high
Make
proper
construc
tion
3
possi
ble
3
mode
rate
3
medi
um-
high
Make
proper
building
Acti
ons
In
proc
Proje
ct
team
Document Page
type of
project
accordin
g to
weather
ess
Political Likeli
hood
Impa
ct
Rati
ng
Mitigati
on
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
plan
Statu
s
Own
er
P
1
Politic
al
related
project
success
rate is
high
3
possi
ble
4
signif
icant
3
medi
um
Make
political
connecti
on
2
unlik
ely
3
mode
rate
2
low
medi
um
Make
commu
nicant
with
political
leader
Acti
ons
in
progr
ess
Proje
ct
team
Environm
ent
Likeli
hood
Impa
ct
Rati
ng
Mitigati
on
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
plan
Statu
s
Own
er
E
1
Create
good
enviro
nment
3
possi
ble
4
signif
icant
4
medi
um
high
Project
complet
e
successf
ully
with
good
team
work
3
possi
ble
4
signif
icant
4
medi
um
high
Make
proper
commu
nicant
Acti
on
com
plete
Proje
ct
team
People Likeli
hood
Impa
ct
Rati
ng
Mitigati
on
Likeli
hood
Impa
ct
Rati
ng
Conting
ency
plan
Statu
s
Own
er
P
1
People
affect
the
project
success
rate
3
possi
ble
4
signif
icant
3
medi
um
high
Project
make
popular
3
possi
ble
4
signif
icant
3
medi
um
high
Proper
commu
nication
In
progr
ess
Proje
ct
team
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
2.1 Project Plan
QA Higher Education project is managed by the project manager. The project works started
during the summer breaks which is done in the Easter time. As a project manager, I have
designed the project plan for the QA Higher Education. It completed in the 18 weeks with the
nine phases which are described below:
Planning and Preparation is the first phase that completed in 8 days. It managed by
Architect, and project manager.
The second phase is a developed phase that completed in 2 days. It developed by the
project manager.
Access the environment phase completed in 13 days which controlled by IT support
Engineers, Architect, and project manager.
Four phases are Risk management which managed by IT support Engineers, hardware
engineer, Contractor, and project manager. Risk management phase completed in 14
days.
Collection of client requirement is the fifth phase that completed in 16 days. It controlled
hardware engineer and interior decorator.
Classroom construction phase completed in 14 days. Project sixth phase managed by
hardware engineer, and IT support engineer.
The seventh phase is computer lab construction which completed in 20 days. It managed
by hardware engineer and IT support engineer.
The testing phase is the eight phases that completed in 27 days. In this phase, hardware
engineer and IT support engineer tested the hardware and software.
The implementation phase is the last phase of the project that completed in 10 days by the
IT support engineer.
QA Higher Education project cost is $44,560.00. Project Manager hired in $30.00 per hour. The
architect hired in $20.00 per hour. The contractor hired in $25.00 per hour. Interior Decorator
hired in $25.00 per hour. Software Engineer hired in $30.00 per hour. Hardware engineer is hired
in $30.00 per hour. IT support Engineer hired at $25.00 per hour. QA Higher Education project
set the milestone after completed the one phase of the project (Katcherovski, 2012).
Document Page
Figure 1: Cash flow in the project
Figure 2: Task cost Variance