QA Higher Education London Lunch Event Planning Report
VerifiedAdded on  2023/01/18
|19
|3978
|73
Report
AI Summary
This report details a lunch event plan for QA Higher Education (QAHE) in London, focusing on publicizing the refurbishment of computing labs and teaching rooms. It begins with a Project Initiation Document (PID) outlining budgetary information, timescales, objectives, and an approach using the Waterfall Model. Key staff roles and stakeholder analysis are also included. The report continues with a Work Breakdown Structure (WBS) and Gantt chart illustrating project activities and timelines. A comprehensive Risk Register is then presented, identifying potential risks, severity levels, and mitigation strategies. Finally, a short report is provided that highlights the need for quality leadership and discusses project methodologies. The report covers various aspects of event planning and project management to ensure a successful launch event.

LUNCH EVENT
PLAN
PLAN
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION...........................................................................................................................1
TASK 1............................................................................................................................................1
Sample Project Initiation Document (PID).................................................................................1
TASK 2............................................................................................................................................4
Work Breakdown Structure.........................................................................................................4
TASK 3............................................................................................................................................7
Risk Register...............................................................................................................................7
TASK 4..........................................................................................................................................11
Short report................................................................................................................................12
CONCLUSION..............................................................................................................................15
REFERENCES..............................................................................................................................16
INTRODUCTION...........................................................................................................................1
TASK 1............................................................................................................................................1
Sample Project Initiation Document (PID).................................................................................1
TASK 2............................................................................................................................................4
Work Breakdown Structure.........................................................................................................4
TASK 3............................................................................................................................................7
Risk Register...............................................................................................................................7
TASK 4..........................................................................................................................................11
Short report................................................................................................................................12
CONCLUSION..............................................................................................................................15
REFERENCES..............................................................................................................................16

INTRODUCTION
Event planning refers to all the activities, procedure and practices that are required to
plan, manage and execute an effective event for a specific purpose. It is a highly crucial activity
which applies the techniques and methods of project management and ensure a sequential
development of the event, along with all the resources and techniques that would be facilitating
the scope of the project in an effective and essential manner (Müller, 2015). The report below is
based on the case study of QA Higher Education (QAHE), which has recently finished
refurbishment of the of the computing labs, as well as teaching rooms in London. The
assignment hence covers a Lunch Event Planning to publicise the overall refurbishment and
effective learning environment. It includes a detailed Project Initiation Document and an
effective Work Breakdown Structure (WBS). In addition to this, the report is inclusive of risk
register containing each and every probable risk which is associated with the project. Moreover,
a short report is also developed within the assignment, that explains need of quality leadership
and analysis and critique of several project methodologies.
TASK 1
Sample Project Initiation Document (PID)
Budgetary Information
It is highly essential activity which is related towards enhanced and appropriate
segregation of financial resources onto different activities (Hamzeh, Zankoul and Rouhana,
2015). The lunch event for QA Higher Education (QAHE) has a budget of £50,000. Hence, this
budget is appropriately showcased below:
ACTIVITIES SUB-ACTIVITIES SUB-ACTIVITIES
AMOUNT AMOUNT (£)
Catering
Starters 2500
Drinks 3000
Main Course 3500
Dessert 1000 10000
1
Event planning refers to all the activities, procedure and practices that are required to
plan, manage and execute an effective event for a specific purpose. It is a highly crucial activity
which applies the techniques and methods of project management and ensure a sequential
development of the event, along with all the resources and techniques that would be facilitating
the scope of the project in an effective and essential manner (Müller, 2015). The report below is
based on the case study of QA Higher Education (QAHE), which has recently finished
refurbishment of the of the computing labs, as well as teaching rooms in London. The
assignment hence covers a Lunch Event Planning to publicise the overall refurbishment and
effective learning environment. It includes a detailed Project Initiation Document and an
effective Work Breakdown Structure (WBS). In addition to this, the report is inclusive of risk
register containing each and every probable risk which is associated with the project. Moreover,
a short report is also developed within the assignment, that explains need of quality leadership
and analysis and critique of several project methodologies.
TASK 1
Sample Project Initiation Document (PID)
Budgetary Information
It is highly essential activity which is related towards enhanced and appropriate
segregation of financial resources onto different activities (Hamzeh, Zankoul and Rouhana,
2015). The lunch event for QA Higher Education (QAHE) has a budget of £50,000. Hence, this
budget is appropriately showcased below:
ACTIVITIES SUB-ACTIVITIES SUB-ACTIVITIES
AMOUNT AMOUNT (£)
Catering
Starters 2500
Drinks 3000
Main Course 3500
Dessert 1000 10000
1
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Human Resource
Event Planners 20000
Decorators 10000
Waiters 5000
Cleaners 5000
Technicians 10000 40000
TOTAL 50000
However, the above budget is required to be segregated as per the activities which are
mentioned below:ï‚· Catering: These activities are related to the development and provision of food and
beverages within the overall event (Ickman and et. al., 2016). As per the cost, overall
£10,000 have been initiated for the overall catering activities. It includes 5 starters, which
overall would be costing £2,500. Moreover 6 types of drinks on a cost of £500 would
require a budget of £3,000. Similarly 7 types of dishes would be costing £3,500 each and
4 types of desserts would be generating the cost of £1,000.
ï‚· Human Resources: In relation to the human resources, 4 event planners have been hired
on a cost of £5,000 each, that would be generating the cost of £20,000. Moreover, 4
decorators and 4 technicians have been hired to ensure the set up and decoration of the
overall event on the rate of £2,500 each individual, generating a collective cost of
£10,000 each. Lastly, 10 waiters and cleaners at a cost of £500 have been hired which
enhances the cost by £5,000 each.
Hence, the above was a detailed segregation of £50,000 which was the budget of the
Lunch Event.
Timescales
It is again essential for the event to divide the overall activity on a set timescale to ensure
a probable time of the overall completion of all the stages of project management. Hence, for the
Lunch Event of QA Higher Education (QAHE), the timescale is mentioned below:
ACTIVITIES TIMESCALE
2
Event Planners 20000
Decorators 10000
Waiters 5000
Cleaners 5000
Technicians 10000 40000
TOTAL 50000
However, the above budget is required to be segregated as per the activities which are
mentioned below:ï‚· Catering: These activities are related to the development and provision of food and
beverages within the overall event (Ickman and et. al., 2016). As per the cost, overall
£10,000 have been initiated for the overall catering activities. It includes 5 starters, which
overall would be costing £2,500. Moreover 6 types of drinks on a cost of £500 would
require a budget of £3,000. Similarly 7 types of dishes would be costing £3,500 each and
4 types of desserts would be generating the cost of £1,000.
ï‚· Human Resources: In relation to the human resources, 4 event planners have been hired
on a cost of £5,000 each, that would be generating the cost of £20,000. Moreover, 4
decorators and 4 technicians have been hired to ensure the set up and decoration of the
overall event on the rate of £2,500 each individual, generating a collective cost of
£10,000 each. Lastly, 10 waiters and cleaners at a cost of £500 have been hired which
enhances the cost by £5,000 each.
Hence, the above was a detailed segregation of £50,000 which was the budget of the
Lunch Event.
Timescales
It is again essential for the event to divide the overall activity on a set timescale to ensure
a probable time of the overall completion of all the stages of project management. Hence, for the
Lunch Event of QA Higher Education (QAHE), the timescale is mentioned below:
ACTIVITIES TIMESCALE
2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Project Initiation (Investors, Suppliers, Event
Contraction) 2 Months
Project Planning (Planning of Resources,
Techniques, Activities, Guests) 2 Months
Project Execution (Development of Event,
Allocation of Resources, Testing) 1.5 Months
Project Closure (Monitoring Effectiveness,
Modifications in Delivering) 2 Weeks
Objectives
Every event has several objectives which are required to be analysed to ensure
development of the event for achievement of these objectives (Enck, 2015). Some of these
objectives are very much explained below:
ï‚· With the event, the firm is planning to acquire new students and enhance the scope of
education of their students.ï‚· Another objective from the overall event would be to encourage better practices and high
technological advancements for other schools within the city.
Approach
For a project or event, it is highly essential for the organisation to adopt a specific
approach which is associated with development and execution of the overall project. Hence, for
the Lunch Event,Waterfall Model is being used in order completion of the overall project.
Hence, this model is showcased below:ï‚· Requirements: This stage within the whole project is related to determining the
deliverables, resources, methods and techniques that would be required for the project.ï‚· Design: In this step, the organisation would be planning the whole design of the event,
which would include identifying the display, catering, decoration, timing and so forth.ï‚· Implementation: This undertakes the overall development of the project, for instance,
hiring event planners and caterers, developing the infrastructure, inviting guests,
implementing sound and light systems and so forth.
3
Contraction) 2 Months
Project Planning (Planning of Resources,
Techniques, Activities, Guests) 2 Months
Project Execution (Development of Event,
Allocation of Resources, Testing) 1.5 Months
Project Closure (Monitoring Effectiveness,
Modifications in Delivering) 2 Weeks
Objectives
Every event has several objectives which are required to be analysed to ensure
development of the event for achievement of these objectives (Enck, 2015). Some of these
objectives are very much explained below:
ï‚· With the event, the firm is planning to acquire new students and enhance the scope of
education of their students.ï‚· Another objective from the overall event would be to encourage better practices and high
technological advancements for other schools within the city.
Approach
For a project or event, it is highly essential for the organisation to adopt a specific
approach which is associated with development and execution of the overall project. Hence, for
the Lunch Event,Waterfall Model is being used in order completion of the overall project.
Hence, this model is showcased below:ï‚· Requirements: This stage within the whole project is related to determining the
deliverables, resources, methods and techniques that would be required for the project.ï‚· Design: In this step, the organisation would be planning the whole design of the event,
which would include identifying the display, catering, decoration, timing and so forth.ï‚· Implementation: This undertakes the overall development of the project, for instance,
hiring event planners and caterers, developing the infrastructure, inviting guests,
implementing sound and light systems and so forth.
3

ï‚· Verification and Maintenance: This would reflect the last 2 weeks of the whole event,
which would be undertaking the overall management of the event, its testing,
modifications as per the results and so forth (Broudehoux and Sánchez, 2015).
Key Staff
There are several key personnels that are associated with the project, which are
mentioned below:ï‚· Event Manager: This individual would be undertaking the overall management of the
Lunch Event which would include the resource hiring and allotment, setting up objectives
and timescales, monitoring and so forth.ï‚· Marketing Manager: They are responsible towards marketing the event within the
masses to enhance the scope of its occupancy.ï‚· Catering Manager: The food and beverages would be managed by this individual in an
appropriate manner throughout the event, as per the guests.ï‚· Project Team: This is related to the whole team which comes under these managers
above and are responsible to report these individuals and abide by the set plan to ensure
development of the event in an effective manner.
Stakeholder Analysis
There are several stakeholders which are required to be analysed in order to fulfil their
interests within the overall event. Some of these stakeholders are mentioned below:ï‚· College Management: One of the most prominent stakeholders of the project would be
college management, who would be interested in getting more students to acquire their
facilities and hence, enhance the scope of their provision of services.ï‚· Students: These require high end facilities and career development opportunities and
hence, the event must address the benefits which the college would be providing these
students with.
ï‚· Parents: Parents require a safe, progressive and supportive environment for their students
to complete their higher education. Hence, the event must be organised in a way where it
is highly effective in communicating the same to the parents (Müller, 2015).
4
which would be undertaking the overall management of the event, its testing,
modifications as per the results and so forth (Broudehoux and Sánchez, 2015).
Key Staff
There are several key personnels that are associated with the project, which are
mentioned below:ï‚· Event Manager: This individual would be undertaking the overall management of the
Lunch Event which would include the resource hiring and allotment, setting up objectives
and timescales, monitoring and so forth.ï‚· Marketing Manager: They are responsible towards marketing the event within the
masses to enhance the scope of its occupancy.ï‚· Catering Manager: The food and beverages would be managed by this individual in an
appropriate manner throughout the event, as per the guests.ï‚· Project Team: This is related to the whole team which comes under these managers
above and are responsible to report these individuals and abide by the set plan to ensure
development of the event in an effective manner.
Stakeholder Analysis
There are several stakeholders which are required to be analysed in order to fulfil their
interests within the overall event. Some of these stakeholders are mentioned below:ï‚· College Management: One of the most prominent stakeholders of the project would be
college management, who would be interested in getting more students to acquire their
facilities and hence, enhance the scope of their provision of services.ï‚· Students: These require high end facilities and career development opportunities and
hence, the event must address the benefits which the college would be providing these
students with.
ï‚· Parents: Parents require a safe, progressive and supportive environment for their students
to complete their higher education. Hence, the event must be organised in a way where it
is highly effective in communicating the same to the parents (Müller, 2015).
4
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

TASK 2
Work Breakdown Structure
This structure is used for the business process modelling and covers the various phases
such as launch, design, modelling, developing, execution and implementation in order to monitor
and realise the value of the work (Te Phan, and et. al., 2015). It includes dividing the work or
planning it according to the convenient. It is a deliverable oriented grouping of project elements
which helps in organising and defining the total space of the project. It is a decomposed process
which is used in order to divide and broken down the various activities, tasks and work packages
as it helps in developing the efficiency in work and can easily identified and managed. QA
higher education is planning a launch event for its classes and promote its teaching methods and
computing labs. In the launch event, they promote it through ensuring that their students and
staff all have excellent learning environment and use latest technology in order to support their
studies and teaching. Moreover, critical path analysis helps in scheduling the project activities
and specify the effective tools in order to manage events. In addition to this, it helps in
identifying the crucial paths and activities which can become barrier in the success of an event
(Oliver, 2017). Below is the Work Breakdown Structure and Gantt Chart of the activities of the
event.
5
Work Breakdown Structure
This structure is used for the business process modelling and covers the various phases
such as launch, design, modelling, developing, execution and implementation in order to monitor
and realise the value of the work (Te Phan, and et. al., 2015). It includes dividing the work or
planning it according to the convenient. It is a deliverable oriented grouping of project elements
which helps in organising and defining the total space of the project. It is a decomposed process
which is used in order to divide and broken down the various activities, tasks and work packages
as it helps in developing the efficiency in work and can easily identified and managed. QA
higher education is planning a launch event for its classes and promote its teaching methods and
computing labs. In the launch event, they promote it through ensuring that their students and
staff all have excellent learning environment and use latest technology in order to support their
studies and teaching. Moreover, critical path analysis helps in scheduling the project activities
and specify the effective tools in order to manage events. In addition to this, it helps in
identifying the crucial paths and activities which can become barrier in the success of an event
(Oliver, 2017). Below is the Work Breakdown Structure and Gantt Chart of the activities of the
event.
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Illustration 1: Gantt Chart
6
6

Illustration 2: Gantt Chart
Illustration 3: Gantt Chart
TASK 3
Risk Register
It is a tool or technique which is used in order to documenting risk in order to manage it.
It is important because it is useful in assessing the risk before planning an event and also helps in
identifying the logged on register and actions which need to be taken in order to overcome and
7
Illustration 3: Gantt Chart
TASK 3
Risk Register
It is a tool or technique which is used in order to documenting risk in order to manage it.
It is important because it is useful in assessing the risk before planning an event and also helps in
identifying the logged on register and actions which need to be taken in order to overcome and
7
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

respond the risk. It is also useful in order to identify the potential of risk in an event and what are
the compliances and measures are taken in order to overcome it. For this, it is important to
identify the risk, its nature, level of risk and the mitigation measures at the place to respond it.
Hence, in the context of QA higher education the assessment for their risk is mentioned as
below:
RISK SEVERITY RESPONSIBILITY MITIGATION AND
CONTINGENCY
ACTIONS
SCORES
(Out of 10)
Loss of
reputation
HIGH Event Manager This risk is associated
with the loss of
reputation which
directly influences the
event company in order
to prevent from this, the
event manager should
ensure about the
services and facilities
which is provided to
attendees and also
follow ethical conduct
to prevent from facing
any kind of legal action.
9
Natural
disaster
HIGH Insurance
Department
This risk is associated
with the natural
calamities which
happen because of any
changes in nature and
no one is responsible for
it but for this insurance
department is payable
8
8
the compliances and measures are taken in order to overcome it. For this, it is important to
identify the risk, its nature, level of risk and the mitigation measures at the place to respond it.
Hence, in the context of QA higher education the assessment for their risk is mentioned as
below:
RISK SEVERITY RESPONSIBILITY MITIGATION AND
CONTINGENCY
ACTIONS
SCORES
(Out of 10)
Loss of
reputation
HIGH Event Manager This risk is associated
with the loss of
reputation which
directly influences the
event company in order
to prevent from this, the
event manager should
ensure about the
services and facilities
which is provided to
attendees and also
follow ethical conduct
to prevent from facing
any kind of legal action.
9
Natural
disaster
HIGH Insurance
Department
This risk is associated
with the natural
calamities which
happen because of any
changes in nature and
no one is responsible for
it but for this insurance
department is payable
8
8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

for all the losses as the
insurance is done for the
loss of an event. In
order to prevent from it
event can be held in the
halls or any indoor
place.
Last minute
cancellations
HIGH Marketing Manager It is associated with the
last minute
cancellations which is
done by the attendees
because of the lack of
promotion and in order
to prevent from this it is
the duty of the
marketing manager to
promote and advertise
its event in order to
gather more public.
9
Threat from
fire and short
circuit
HIGH Technical
Department
This risk is concerned
with the threat which
can cause because of the
carelessness of the
technical department
which can become
threat on the life of
attendees. In order to
prevent from this,
technicians should
double check the setting
7
9
insurance is done for the
loss of an event. In
order to prevent from it
event can be held in the
halls or any indoor
place.
Last minute
cancellations
HIGH Marketing Manager It is associated with the
last minute
cancellations which is
done by the attendees
because of the lack of
promotion and in order
to prevent from this it is
the duty of the
marketing manager to
promote and advertise
its event in order to
gather more public.
9
Threat from
fire and short
circuit
HIGH Technical
Department
This risk is concerned
with the threat which
can cause because of the
carelessness of the
technical department
which can become
threat on the life of
attendees. In order to
prevent from this,
technicians should
double check the setting
7
9

and also set fire alarms
to get alert.
Food hygiene MEDIUM Catering Manager This risk is associated
with food hygiene and
to prevent from this it
is the duty of the
catering manager to
adopt proper hygiene
factors such as use of
gloves while making
food, clean utensils and
many more.
6
Loss of
equipment
MEDIUM Technical
Department
This risk include
breakdown of stage,
sound and videos issues
and in order to prevent
from this they also have
backup plan and double
check the proper
settings before the
commencing the event.
4
Shortage of
finance
MEDIUM Finance Manager It is associated with
shortage of finance as it
can be face by any event
and for this the finance
manager should have
reserves and surplus at
the time emergency in
finance (Cagliano,
Grimaldi and Rafele,
5
10
to get alert.
Food hygiene MEDIUM Catering Manager This risk is associated
with food hygiene and
to prevent from this it
is the duty of the
catering manager to
adopt proper hygiene
factors such as use of
gloves while making
food, clean utensils and
many more.
6
Loss of
equipment
MEDIUM Technical
Department
This risk include
breakdown of stage,
sound and videos issues
and in order to prevent
from this they also have
backup plan and double
check the proper
settings before the
commencing the event.
4
Shortage of
finance
MEDIUM Finance Manager It is associated with
shortage of finance as it
can be face by any event
and for this the finance
manager should have
reserves and surplus at
the time emergency in
finance (Cagliano,
Grimaldi and Rafele,
5
10
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 19
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.