Project Management: QAHE Mobile App Development Project Report
VerifiedAdded on 2023/01/13
|25
|4525
|57
Project
AI Summary
This project management report details the development of a mobile application for QAHE recreation, focusing on providing students with a platform to access club and society event information and publicize their own events. The report begins with a project initiation document (PID) outlining the project's objectives, budget, and key stakeholders. It then presents a stakeholder analysis matrix, identifying and evaluating various stakeholders' interests and influence. A work breakdown structure (WBS) is provided to illustrate the hierarchical decomposition of project tasks. The report also includes a Gantt chart for visualizing project timelines and a critical path analysis for identifying critical project activities. Furthermore, the report addresses potential project risks through a risk register, detailing various risks, their probabilities, impacts, and mitigation strategies. The project also covers communication strategies and project management methodologies. The project aims to create a comprehensive plan for the successful development and deployment of the mobile app, ensuring effective project management practices.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

Project
Management
Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Contents
INTRODUCTION...........................................................................................................................1
PROJECT 1......................................................................................................................................1
A) Sample project Initiation document ......................................................................................1
B) Work Breakdown Structure....................................................................................................4
..........................................................................................................................................................7
..........................................................................................................................................................7
PROJECT 2 .....................................................................................................................................7
A) Number of risks .....................................................................................................................7
B) Risk Register..........................................................................................................................7
PROJECT 3 ...................................................................................................................................11
Short report................................................................................................................................11
a) Communication ....................................................................................................................11
b) Methodologies......................................................................................................................11
CONCLUSION..............................................................................................................................12
REFERENCES .............................................................................................................................14
.......................................................................................................................................................14
.......................................................................................................................................................14
INTRODUCTION...........................................................................................................................1
PROJECT 1......................................................................................................................................1
A) Sample project Initiation document ......................................................................................1
B) Work Breakdown Structure....................................................................................................4
..........................................................................................................................................................7
..........................................................................................................................................................7
PROJECT 2 .....................................................................................................................................7
A) Number of risks .....................................................................................................................7
B) Risk Register..........................................................................................................................7
PROJECT 3 ...................................................................................................................................11
Short report................................................................................................................................11
a) Communication ....................................................................................................................11
b) Methodologies......................................................................................................................11
CONCLUSION..............................................................................................................................12
REFERENCES .............................................................................................................................14
.......................................................................................................................................................14
.......................................................................................................................................................14


INTRODUCTION
Project management introduces as an effective practices of initiating, planning, doing,
controlling and ending the work of a team to accomplish specific objectives and meet particular
success criteria at the specified time period. This project is based on the case scenario 2 which is
mainly related with the recreation of mobile phone app (Al-Hunaiyyan, Alhajri and Al-Sharhan,
2016). This app will give day by day details of QAHE clubs and societies’ events, links to
contact details and the freedom for students to publicise their own events. This project is based
on different tasks which includes PID and stakeholder analysis, WBS, risk register and Short
report. These are main aspects which will be beneficial for project manager in completion of
each activities of project in systematic manner.
PROJECT 1
A) Sample project Initiation document
Project Initiation document is important document that defines the project management,
scope and overall success criteria that the project team can go back to during the project. This
project is based on recreating of mobile phone app that helps QAHE clubs and societies by
connecting number of students to publishes their own events. Project initiation is a document that
includes useful information regarding the various attributes that turn to support project manager
in completion of project successfully (Palos-Sanchez, Saura and Debasa, 2018).
Attributes Description
Title of project The development of a new QAHE Recreation
mobile phone app.
Estimated Budget £200k
How might you break down this number into
key categories?
Direct expenses
Material
Labour
Indirect expenses
Administrative
Supervisory
1
Project management introduces as an effective practices of initiating, planning, doing,
controlling and ending the work of a team to accomplish specific objectives and meet particular
success criteria at the specified time period. This project is based on the case scenario 2 which is
mainly related with the recreation of mobile phone app (Al-Hunaiyyan, Alhajri and Al-Sharhan,
2016). This app will give day by day details of QAHE clubs and societies’ events, links to
contact details and the freedom for students to publicise their own events. This project is based
on different tasks which includes PID and stakeholder analysis, WBS, risk register and Short
report. These are main aspects which will be beneficial for project manager in completion of
each activities of project in systematic manner.
PROJECT 1
A) Sample project Initiation document
Project Initiation document is important document that defines the project management,
scope and overall success criteria that the project team can go back to during the project. This
project is based on recreating of mobile phone app that helps QAHE clubs and societies by
connecting number of students to publishes their own events. Project initiation is a document that
includes useful information regarding the various attributes that turn to support project manager
in completion of project successfully (Palos-Sanchez, Saura and Debasa, 2018).
Attributes Description
Title of project The development of a new QAHE Recreation
mobile phone app.
Estimated Budget £200k
How might you break down this number into
key categories?
Direct expenses
Material
Labour
Indirect expenses
Administrative
Supervisory
1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Start date January 22, 2020
Finish date March 22, 2020
Project Sponsor QAHE
Project Manager ABC
Main objectives Main objective of developing a new QAHE
Recreation mobile phone app is to help
students by providing them a platform to
interact with people organising social events.
Project staff In order to complete this project, there is need
of some members which are human resource
manager, marketing manager, finance manager
and project manager. These are main staff that
plays an important role in developing a new
QAHE Recreation mobile phone app.
Approach There are basically three approaches that will
be require by project manager in development
of new QAHE Recreation mobile phone app
which are Native, Hybrid and Mobile app (Ma,
Lam and Leung, 2018).
Native
Quick response time with Zero network
Makes the most of smartphone features.
Development and maintenance cost is
slow.
Hybrid
Development and maintenance cost is
moderate.
Large portion of the app codes can be
re-used.
2
Finish date March 22, 2020
Project Sponsor QAHE
Project Manager ABC
Main objectives Main objective of developing a new QAHE
Recreation mobile phone app is to help
students by providing them a platform to
interact with people organising social events.
Project staff In order to complete this project, there is need
of some members which are human resource
manager, marketing manager, finance manager
and project manager. These are main staff that
plays an important role in developing a new
QAHE Recreation mobile phone app.
Approach There are basically three approaches that will
be require by project manager in development
of new QAHE Recreation mobile phone app
which are Native, Hybrid and Mobile app (Ma,
Lam and Leung, 2018).
Native
Quick response time with Zero network
Makes the most of smartphone features.
Development and maintenance cost is
slow.
Hybrid
Development and maintenance cost is
moderate.
Large portion of the app codes can be
re-used.
2

Mobile app
High development speed
Low development and Maintenance
cost
Therefore with the help of above mentioned
approach, QAHE can easily develop mobile
phone app.
Risk There are some risk that may be face by project
manager by developing of mobile phone app.
This includes risk of security breaches, risk of
choosing the wrong development partner etc.
These are major risk that will be faced by
project manager while developing of mobile
phone app (Martinez and Lecomte, 2017).
Quality TQM and JIT is the approach used regarding
maintenance of overall quality. This will not
help to manage the inventory but aid in
optimum utilisation of monetary requirements.
Also, TQM help in integration of all the efforts
that ultimately contributes in production of
qualitative mobile application.
Cost The estimated cost incurred in development of
this application will be around £5000.
Time Total 1 year of time period is required in
effective development of mobile application
along with its testing
References Ma, R., Lam, P. T. and Leung, C. K., 2018.
Potential pitfalls of smart city
development: A study on parking
mobile applications (apps) in Hong
Kong. Telematics and Informatics.
3
High development speed
Low development and Maintenance
cost
Therefore with the help of above mentioned
approach, QAHE can easily develop mobile
phone app.
Risk There are some risk that may be face by project
manager by developing of mobile phone app.
This includes risk of security breaches, risk of
choosing the wrong development partner etc.
These are major risk that will be faced by
project manager while developing of mobile
phone app (Martinez and Lecomte, 2017).
Quality TQM and JIT is the approach used regarding
maintenance of overall quality. This will not
help to manage the inventory but aid in
optimum utilisation of monetary requirements.
Also, TQM help in integration of all the efforts
that ultimately contributes in production of
qualitative mobile application.
Cost The estimated cost incurred in development of
this application will be around £5000.
Time Total 1 year of time period is required in
effective development of mobile application
along with its testing
References Ma, R., Lam, P. T. and Leung, C. K., 2018.
Potential pitfalls of smart city
development: A study on parking
mobile applications (apps) in Hong
Kong. Telematics and Informatics.
3

35(6). pp.1580-1592.
Martinez, M. and Lecomte, S., 2017, May.
Towards the quality improvement of
cross-platform mobile applications.
In 2017 IEEE/ACM 4th International
Conference on Mobile Software
Engineering and Systems
(MOBILESoft) (pp. 184-188). IEEE.
Palos-Sanchez, P. R., Saura, J. R. and Debasa,
F., 2018. The influence of social
networks on the development of
recruitment actions that favor user
interface design and conversions in
mobile applications powered by
linked data. Mobile Information
Systems, 2018.
4
Martinez, M. and Lecomte, S., 2017, May.
Towards the quality improvement of
cross-platform mobile applications.
In 2017 IEEE/ACM 4th International
Conference on Mobile Software
Engineering and Systems
(MOBILESoft) (pp. 184-188). IEEE.
Palos-Sanchez, P. R., Saura, J. R. and Debasa,
F., 2018. The influence of social
networks on the development of
recruitment actions that favor user
interface design and conversions in
mobile applications powered by
linked data. Mobile Information
Systems, 2018.
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Stakeholder Analysis Matrix
This introduces as a process of distinguishing these people before the starting of project
and grouping them with their levels of interest, participations and influence in the project. Along
with this, there are different number of stakeholders that plays essential role in developing
project successfully (Barnett and et. al., 2019). There are some internal and external stakeholders
that will be require in accomplishment of objective or development of QAHE Recreation mobile
phone app.
5
This introduces as a process of distinguishing these people before the starting of project
and grouping them with their levels of interest, participations and influence in the project. Along
with this, there are different number of stakeholders that plays essential role in developing
project successfully (Barnett and et. al., 2019). There are some internal and external stakeholders
that will be require in accomplishment of objective or development of QAHE Recreation mobile
phone app.
5

Stakeholde
r
Name/Auth
ority
(Category
of
stakeholder
)
Contact
Person
Phone,
Email,
Website,
Address
Impact
How much
does the
project
impact
them?
(Low,
Medium,
High)
Influen
ce
How
much
influenc
e do
they
have
over the
project?
(Low,
Medium
, High)
What is
important to
the
stakeholder?
How
could
the
stakehol
der
contrib
ute to
the
project?
How could
the
stakeholder
block the
project?
Strategy
for
engaging
the
stakeholde
r
Project
managem
ent team
- High High They are
key
stakeholder
within an
organisatio
n that have
prime role
in
successfully
developmen
t of mobile
phone app.
By
managi
ng
each
activiti
es on
time.
Making
complaint
s
Using
communi
cation
strategies
Students - High Mediu
m
These are
main
stakeholder
as in
respect to
them to get
benefit of
mobile
application.
They have
more
interest in
developmen
t of a new
QAHE
Recreation
mobile
phone app.
Providi
ng
their
opinio
n about
the
new
project
.
Going on
strike
Conferen
ce and
seminars
Governm
ent
- Low Low This are
main
stakeholder
that have
important
Providi
ng
sufficie
nt
amount
Bann the
project
Develop
ment of
rules and
regulatio
ns
6
r
Name/Auth
ority
(Category
of
stakeholder
)
Contact
Person
Phone,
Email,
Website,
Address
Impact
How much
does the
project
impact
them?
(Low,
Medium,
High)
Influen
ce
How
much
influenc
e do
they
have
over the
project?
(Low,
Medium
, High)
What is
important to
the
stakeholder?
How
could
the
stakehol
der
contrib
ute to
the
project?
How could
the
stakeholder
block the
project?
Strategy
for
engaging
the
stakeholde
r
Project
managem
ent team
- High High They are
key
stakeholder
within an
organisatio
n that have
prime role
in
successfully
developmen
t of mobile
phone app.
By
managi
ng
each
activiti
es on
time.
Making
complaint
s
Using
communi
cation
strategies
Students - High Mediu
m
These are
main
stakeholder
as in
respect to
them to get
benefit of
mobile
application.
They have
more
interest in
developmen
t of a new
QAHE
Recreation
mobile
phone app.
Providi
ng
their
opinio
n about
the
new
project
.
Going on
strike
Conferen
ce and
seminars
Governm
ent
- Low Low This are
main
stakeholder
that have
important
Providi
ng
sufficie
nt
amount
Bann the
project
Develop
ment of
rules and
regulatio
ns
6

Stakeholde
r
Name/Auth
ority
(Category
of
stakeholder
)
Contact
Person
Phone,
Email,
Website,
Address
Impact
How much
does the
project
impact
them?
(Low,
Medium,
High)
Influen
ce
How
much
influenc
e do
they
have
over the
project?
(Low,
Medium
, High)
What is
important to
the
stakeholder?
How
could
the
stakehol
der
contrib
ute to
the
project?
How could
the
stakeholder
block the
project?
Strategy
for
engaging
the
stakeholde
r
role to
ascertain
the
educational
quality
available to
students for
finding of
future of
nation.
of
capital
for
launchi
ng
mobile
phone
applica
tion.
College
managem
ent
- High Mediu
m
These
stakeholder
want to
develop
QAHE
Recreation
mobile
phone app
in order to
attain
objectives
(Chali,
Yonah and
Kalegele,
2018).
Manag
ing
each
activiti
es that
are
needed
in
comple
tion of
project
Develop
ment of
seminars
Other
Institutio
ns
- Low Mediu
m
They are
another
main
stakeholder
that want to
understand
regarding
the
enhanceme
nts along
Providi
ng
their
suggest
ions
about
success
fully
launchi
ng
Refuse to
coordinate
Conducti
ng of
meeting
7
r
Name/Auth
ority
(Category
of
stakeholder
)
Contact
Person
Phone,
Email,
Website,
Address
Impact
How much
does the
project
impact
them?
(Low,
Medium,
High)
Influen
ce
How
much
influenc
e do
they
have
over the
project?
(Low,
Medium
, High)
What is
important to
the
stakeholder?
How
could
the
stakehol
der
contrib
ute to
the
project?
How could
the
stakeholder
block the
project?
Strategy
for
engaging
the
stakeholde
r
role to
ascertain
the
educational
quality
available to
students for
finding of
future of
nation.
of
capital
for
launchi
ng
mobile
phone
applica
tion.
College
managem
ent
- High Mediu
m
These
stakeholder
want to
develop
QAHE
Recreation
mobile
phone app
in order to
attain
objectives
(Chali,
Yonah and
Kalegele,
2018).
Manag
ing
each
activiti
es that
are
needed
in
comple
tion of
project
Develop
ment of
seminars
Other
Institutio
ns
- Low Mediu
m
They are
another
main
stakeholder
that want to
understand
regarding
the
enhanceme
nts along
Providi
ng
their
suggest
ions
about
success
fully
launchi
ng
Refuse to
coordinate
Conducti
ng of
meeting
7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Stakeholde
r
Name/Auth
ority
(Category
of
stakeholder
)
Contact
Person
Phone,
Email,
Website,
Address
Impact
How much
does the
project
impact
them?
(Low,
Medium,
High)
Influen
ce
How
much
influenc
e do
they
have
over the
project?
(Low,
Medium
, High)
What is
important to
the
stakeholder?
How
could
the
stakehol
der
contrib
ute to
the
project?
How could
the
stakeholder
block the
project?
Strategy
for
engaging
the
stakeholde
r
with bring
modificatio
ns in their
own
facilities.
project
.
General
Public
These have
interest in
regard to
gaining
accurate
knowledge
regarding
developmen
ts in
educational
system.
8
r
Name/Auth
ority
(Category
of
stakeholder
)
Contact
Person
Phone,
Email,
Website,
Address
Impact
How much
does the
project
impact
them?
(Low,
Medium,
High)
Influen
ce
How
much
influenc
e do
they
have
over the
project?
(Low,
Medium
, High)
What is
important to
the
stakeholder?
How
could
the
stakehol
der
contrib
ute to
the
project?
How could
the
stakeholder
block the
project?
Strategy
for
engaging
the
stakeholde
r
with bring
modificatio
ns in their
own
facilities.
project
.
General
Public
These have
interest in
regard to
gaining
accurate
knowledge
regarding
developmen
ts in
educational
system.
8

B) Work Breakdown Structure
Work breakdown structure introduces as a deliverable-oriented hierarchical
decomposition of the work. It is an effective framework that helps project manager to allot roles
and responsibilities to the number of stakeholders according to their experience and performance
(Flora, 2018). There are different number of tasks. All these are completed in the situation of
attaining targets. Planning is completed when able to ascertain the resources. Production is
completed when able to lunch the application.
9
Work breakdown structure introduces as a deliverable-oriented hierarchical
decomposition of the work. It is an effective framework that helps project manager to allot roles
and responsibilities to the number of stakeholders according to their experience and performance
(Flora, 2018). There are different number of tasks. All these are completed in the situation of
attaining targets. Planning is completed when able to ascertain the resources. Production is
completed when able to lunch the application.
9

10
llustration 1: Work-break down structure
llustration 1: Work-break down structure
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Gantt Chart
This introduces as an graphical presentation tool which help project manager in
identification of starting and ending time of project completion (Kim, 2018). In this chart,
number of activities have been developed which turn to support investigator in attainment of
project objective within a given time period. idea generation, development of project objective,
identification of key stakeholders, development of strategy, user-experience design, user
interface design, design to development handoff, high-level technical design, development and
literation, extended review, deployment, monitoring, further literation and improvement and
development of mobile phone app.
Illustration 2: Gantt chart
11
This introduces as an graphical presentation tool which help project manager in
identification of starting and ending time of project completion (Kim, 2018). In this chart,
number of activities have been developed which turn to support investigator in attainment of
project objective within a given time period. idea generation, development of project objective,
identification of key stakeholders, development of strategy, user-experience design, user
interface design, design to development handoff, high-level technical design, development and
literation, extended review, deployment, monitoring, further literation and improvement and
development of mobile phone app.
Illustration 2: Gantt chart
11

12

13
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

14

15

Critical Path: It is a network diagram that depicts the path which a project manager is
needed to follow regarding the successful and timely completion of project on time. This depicts
the different paths associated with the project along with the number of days needed for their
individual completion. It is the duty of the project manager is to select the largest path and
complete the one in timely manner. This will aid in overall completion of project on time.
Illustration 3: Critical Path
PROJECT 2
A) Number of risks
There are number of risk involved in development of mobile phone app for providing
opportunities to the student to publish their own event. This risks are communication risk, market
risk, resources risk, financial risk, managerial risk, technical risk, external risk, performance risk,
time and customer related risk (Pandey, Litoriya and Pandey, 2018). These are main risks that
have direct impact on project manager while completion of project in systematic and effective
manner. In order to deal with these risk, project manager wants to prepare risk register which
will be determined as below:
B) Risk Register
In the overall risk management plan, risk register forms a very significant part as it contains
all the risks that are associated with the project, identification of which helps manager in
managing the risk in an appropriate way. It contains prioritized ranking of crucial risks for
project. Risk register includes risk, probability of occurring that risk, impact of the risk, their
priority and the response plans which helps in mitigating the risk in an effective and efficient
way. This risk register can lead the project manager directly to handling of risk. In the risk
management plan, risk register helps in determining the risks and which supports proper analysis
and monitoring of project.
Risk management plan is wide in nature and includes the activities which are required to
be adhere whole one year. The role of risk register in this is main as this will aid in determining
16
needed to follow regarding the successful and timely completion of project on time. This depicts
the different paths associated with the project along with the number of days needed for their
individual completion. It is the duty of the project manager is to select the largest path and
complete the one in timely manner. This will aid in overall completion of project on time.
Illustration 3: Critical Path
PROJECT 2
A) Number of risks
There are number of risk involved in development of mobile phone app for providing
opportunities to the student to publish their own event. This risks are communication risk, market
risk, resources risk, financial risk, managerial risk, technical risk, external risk, performance risk,
time and customer related risk (Pandey, Litoriya and Pandey, 2018). These are main risks that
have direct impact on project manager while completion of project in systematic and effective
manner. In order to deal with these risk, project manager wants to prepare risk register which
will be determined as below:
B) Risk Register
In the overall risk management plan, risk register forms a very significant part as it contains
all the risks that are associated with the project, identification of which helps manager in
managing the risk in an appropriate way. It contains prioritized ranking of crucial risks for
project. Risk register includes risk, probability of occurring that risk, impact of the risk, their
priority and the response plans which helps in mitigating the risk in an effective and efficient
way. This risk register can lead the project manager directly to handling of risk. In the risk
management plan, risk register helps in determining the risks and which supports proper analysis
and monitoring of project.
Risk management plan is wide in nature and includes the activities which are required to
be adhere whole one year. The role of risk register in this is main as this will aid in determining
16
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

various level of risks occurred on different time periods. The risk register not only contains the
information about risks but also have information related to the nature of risk, preventive
measure and level of impact. All these information in relation to the different time periods is
gathered and used integrally in preparation of risk management plan. This will be considered as
the main plan that will be followed by all personnels till the performance of project. The impact
of this will be ascertained in the manner of positive control over various project associated risks
along attainment of desired targets.
If project management plan is not formulated on the basis of risk register then final
actions will not be formulated. This hinders the capacity of different personnels associated with
project in performance of their functions properly with integration of other departments
objective. Finally, this will resultants into non completion of project on time or as per the
desirable standards.
This clearly depicts the importance of risk management plan over risk registers. The
different number of benefits will be gathered through formulation of risk management plan
includes completion of project on time, aligned departmental activities, desirable outcomes,
optimum utilisation of resources, qualitative in nature etc.
The limitations attached with risk register that prepared by considering different levels
and time period by different department of their own. This will help in removal of the risks
associated with their own activities. The non integration between the different risks hinders the
capacity to analyse the impact of one over the cations of other along with preventive measure for
same. So, after preparation of the risk register that particular departments and associated
personnels are not able to attained the desirable results due to the impact of others. This limits
the imaginary power of each and every department related to completion of project activities
along with providence of support each other in attainment of overall objectives.
PROJECT 3
Short report
a) Communication
Proper communication between the project manager and their team is important in
developing of mobile phone application successful. Linear Model of Communication is more
effective and useful for project manager to communicate each information about the
17
information about risks but also have information related to the nature of risk, preventive
measure and level of impact. All these information in relation to the different time periods is
gathered and used integrally in preparation of risk management plan. This will be considered as
the main plan that will be followed by all personnels till the performance of project. The impact
of this will be ascertained in the manner of positive control over various project associated risks
along attainment of desired targets.
If project management plan is not formulated on the basis of risk register then final
actions will not be formulated. This hinders the capacity of different personnels associated with
project in performance of their functions properly with integration of other departments
objective. Finally, this will resultants into non completion of project on time or as per the
desirable standards.
This clearly depicts the importance of risk management plan over risk registers. The
different number of benefits will be gathered through formulation of risk management plan
includes completion of project on time, aligned departmental activities, desirable outcomes,
optimum utilisation of resources, qualitative in nature etc.
The limitations attached with risk register that prepared by considering different levels
and time period by different department of their own. This will help in removal of the risks
associated with their own activities. The non integration between the different risks hinders the
capacity to analyse the impact of one over the cations of other along with preventive measure for
same. So, after preparation of the risk register that particular departments and associated
personnels are not able to attained the desirable results due to the impact of others. This limits
the imaginary power of each and every department related to completion of project activities
along with providence of support each other in attainment of overall objectives.
PROJECT 3
Short report
a) Communication
Proper communication between the project manager and their team is important in
developing of mobile phone application successful. Linear Model of Communication is more
effective and useful for project manager to communicate each information about the
17

development of mobile phone application. This model of communication explains the one-way
communication process where project manager provide information to their staff members.
Along with this, effective commination depends on non-verbal and verbal body language that
communicate an information while depending on cues for feedback. There are different
importance of communication model including, receiving information, change in situation etc.
Therefore communication is more important in successfully developing of mobile phone
application (Villamil, Guarda and Quina, 2018).
Effective communication is very important in an organisation as it helps in conveying all
the informations in clear and transparent way. This helps in ensuring that work is performed in
an effective manner. Apart from this, it is very crucial for effective attainment of goals and
objectives of a particular project. Structured communication between manager of project and
team members helps in ensuring that all the goals associated with project are clear and all the
members of team are working towards attainment of that common goals. In context of QAHE
Recreation mobile phone application project, structured communication helps project manager in
two ways. Firstly, it enables manager to organise and remember ideas and secondly, it makes it
easy for listener to stay focused and follow. It also helps in negotiation and can foster good
relationship with team members which in turn enhance their efficiency and morale that leads the
project of QAHE towards success. Apart from this, effective and structured communication also
increase the overall productivity of work and develop better understanding among project
manager and team members. For the project manager, effective communication makes it easy for
them to understand the skills and talents possess by their employees and provide them with clear
directions which are best suited to their job. Thus, maximising the entire turnaround time of
QAHE Recreation mobile phone application project. For ensuring effective and structured
communication of project manager with team members, there are some communication theories
which can be apply by project administrator. The communication theories that helps in ensuring
structured and effective communication between team members and project manager are
mentioned below:
Communication Accommodation Theory:
Communication Accommodation is defined as the theory of communication which
focuses on the adjustments that individuals made at the time of communicating with others. This
theory was developed by Howard Giles who stated that when individuals try to minimise or
18
communication process where project manager provide information to their staff members.
Along with this, effective commination depends on non-verbal and verbal body language that
communicate an information while depending on cues for feedback. There are different
importance of communication model including, receiving information, change in situation etc.
Therefore communication is more important in successfully developing of mobile phone
application (Villamil, Guarda and Quina, 2018).
Effective communication is very important in an organisation as it helps in conveying all
the informations in clear and transparent way. This helps in ensuring that work is performed in
an effective manner. Apart from this, it is very crucial for effective attainment of goals and
objectives of a particular project. Structured communication between manager of project and
team members helps in ensuring that all the goals associated with project are clear and all the
members of team are working towards attainment of that common goals. In context of QAHE
Recreation mobile phone application project, structured communication helps project manager in
two ways. Firstly, it enables manager to organise and remember ideas and secondly, it makes it
easy for listener to stay focused and follow. It also helps in negotiation and can foster good
relationship with team members which in turn enhance their efficiency and morale that leads the
project of QAHE towards success. Apart from this, effective and structured communication also
increase the overall productivity of work and develop better understanding among project
manager and team members. For the project manager, effective communication makes it easy for
them to understand the skills and talents possess by their employees and provide them with clear
directions which are best suited to their job. Thus, maximising the entire turnaround time of
QAHE Recreation mobile phone application project. For ensuring effective and structured
communication of project manager with team members, there are some communication theories
which can be apply by project administrator. The communication theories that helps in ensuring
structured and effective communication between team members and project manager are
mentioned below:
Communication Accommodation Theory:
Communication Accommodation is defined as the theory of communication which
focuses on the adjustments that individuals made at the time of communicating with others. This
theory was developed by Howard Giles who stated that when individuals try to minimise or
18

emphasize the behaviour then able to communicate in best possible manner. The power of
having such behaviour is further known as controlling of social differences between the
interactant. This also includes the process of accommodating communication activities to attain
approval on same along with creation of positive image in front of interactant. The impact of
environment is also huge over the ability of communication and information they want to
transfer or deliver.
The accommodation aspect mentioned in this theory is of two types. It is must to
understand because both will help in development of the ability to communicate with each other
in effective manner along with determination of positive results. The detailed information in
relation to both along with their role in communication betterment is presented below:
Convergence: This is the process which includes the adoption of the characteristics of
another person in relation to communication. The main purpose behind the adoption of
this option is to is to eliminate social differences. This will works as providence of an
opportunity in determination of the norms followed by other in process of communication
and grab the same meaning as they want to deliver. The benefit of this is determined in
the way of improvement in characteristics and creation of better relation.
Divergence: This is totally different from the above one and major focus is provided over
creating the difference with other persons. The difference is also known as social
difference and non verbal differences. This is the approach that does not have appropriate
features in relation to the improvement of communication but having their own benefit of
clarity.
This is one of the best approach in respect to apply over the project of mobile application
development in appropriate manner. This will provides an opportunity to communicate as per the
situation present during the performance of work. The aspect of convergence provides an
opportunity to adapt the norms in relation to those have by others and improve communication.
This will have benefit in performance of overall work in qualitative manner. Also, the benefit
will be ascertained in the form of trust and support of others in performance of functions with the
support of each other. Effective team is developed during the performance of project that help in
accomplishment of individual and overall organisational targets. Also, having the option
regarding the adoption of divergence approach where each and every one is able has to perform
functions on the basis of the one who provide instructions. This develops the appropriate culture
19
having such behaviour is further known as controlling of social differences between the
interactant. This also includes the process of accommodating communication activities to attain
approval on same along with creation of positive image in front of interactant. The impact of
environment is also huge over the ability of communication and information they want to
transfer or deliver.
The accommodation aspect mentioned in this theory is of two types. It is must to
understand because both will help in development of the ability to communicate with each other
in effective manner along with determination of positive results. The detailed information in
relation to both along with their role in communication betterment is presented below:
Convergence: This is the process which includes the adoption of the characteristics of
another person in relation to communication. The main purpose behind the adoption of
this option is to is to eliminate social differences. This will works as providence of an
opportunity in determination of the norms followed by other in process of communication
and grab the same meaning as they want to deliver. The benefit of this is determined in
the way of improvement in characteristics and creation of better relation.
Divergence: This is totally different from the above one and major focus is provided over
creating the difference with other persons. The difference is also known as social
difference and non verbal differences. This is the approach that does not have appropriate
features in relation to the improvement of communication but having their own benefit of
clarity.
This is one of the best approach in respect to apply over the project of mobile application
development in appropriate manner. This will provides an opportunity to communicate as per the
situation present during the performance of work. The aspect of convergence provides an
opportunity to adapt the norms in relation to those have by others and improve communication.
This will have benefit in performance of overall work in qualitative manner. Also, the benefit
will be ascertained in the form of trust and support of others in performance of functions with the
support of each other. Effective team is developed during the performance of project that help in
accomplishment of individual and overall organisational targets. Also, having the option
regarding the adoption of divergence approach where each and every one is able has to perform
functions on the basis of the one who provide instructions. This develops the appropriate culture
19
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

where each and everyone has equal amount of opportunities regarding completion of work on
time.
The assumptions help in guidance within communication accommodation theory
includes:
While communication there will be sameness and deviation in the language and action.
The characteristics that group display are based on our experiences and the
perceptiveness ground that we grew up in.
Norms guide the improvement process which change in the level of propriety.
Need for quality Leadership
In order to develop mobile phone application successfully, there is needs to use effective
approaches of leadership. In the project of college regarding the development of mobile app,
project manager must needed to follow the qualitative leadership. approach The advantage of this
approach is it gives an effective chance to build linnet structure. In nature it is more flexible
along with favourable working environment. In addition, it support all the stakeholders that are
associated with the working of developing mobile phone app to perform the activities in effective
way in attainment of targets in predetermined manner.
b) Methodologies
There are different number of methodologies that can be used for the purpose of carrying on
work over some project. Each kind of methodology has their own different rule regarding
performance within the project (Polhul and Yarovy, 2019). Also, they attached with diversified
number of strengths and weaknesses. It is the duty of project manager is to analyse all and
identify the one which is most suitable in accordance to the nature of project. Some of the
methodologies which are generally used are named as Agile, Waterfall and Prince 2. The
analysis of all along with description of their own strengths and weaknesses is provided below:
Agile: This is an iterative approach that aid in delivering of the project throughout to its
whole life cycle properly. This includes the development of many different kind of iterations in
relation to the completion of whole project. This kind of approach is basically used for the
purpose of developing software's. This is so because this will promotes the option of velocity and
adaptability. This will provides an opportunity regarding adjustment irrespective to adhere linear
path. The main advantage associated with this that providence of benefits through out the process
20
time.
The assumptions help in guidance within communication accommodation theory
includes:
While communication there will be sameness and deviation in the language and action.
The characteristics that group display are based on our experiences and the
perceptiveness ground that we grew up in.
Norms guide the improvement process which change in the level of propriety.
Need for quality Leadership
In order to develop mobile phone application successfully, there is needs to use effective
approaches of leadership. In the project of college regarding the development of mobile app,
project manager must needed to follow the qualitative leadership. approach The advantage of this
approach is it gives an effective chance to build linnet structure. In nature it is more flexible
along with favourable working environment. In addition, it support all the stakeholders that are
associated with the working of developing mobile phone app to perform the activities in effective
way in attainment of targets in predetermined manner.
b) Methodologies
There are different number of methodologies that can be used for the purpose of carrying on
work over some project. Each kind of methodology has their own different rule regarding
performance within the project (Polhul and Yarovy, 2019). Also, they attached with diversified
number of strengths and weaknesses. It is the duty of project manager is to analyse all and
identify the one which is most suitable in accordance to the nature of project. Some of the
methodologies which are generally used are named as Agile, Waterfall and Prince 2. The
analysis of all along with description of their own strengths and weaknesses is provided below:
Agile: This is an iterative approach that aid in delivering of the project throughout to its
whole life cycle properly. This includes the development of many different kind of iterations in
relation to the completion of whole project. This kind of approach is basically used for the
purpose of developing software's. This is so because this will promotes the option of velocity and
adaptability. This will provides an opportunity regarding adjustment irrespective to adhere linear
path. The main advantage associated with this that providence of benefits through out the process
20

instead of attaining at end. The limitation associated with this is about the time consuming
working nature of this methodology that hinder to perform work in fast manner.
Waterfall: This project management approach is different from the above one. This
bifurcate the project into different stages and work is perform for the completion of each stage
step by step. The different number of phases which are included under this methodology includes
determination of requirements, preparation of design, implementation, verification and
maintenance (Pandey, Litoriya and Pandey, 2018). The benefit associated with this technique is
help in removal of issues for formulation of project free from any kind of error. The limitation
associated with this approach is its initial planning which is based upon assumption.
Prince 2: This is one of the structured project management method. This includes the
bifurcation of projects into manageable and controllable stages. This methodology focused over
product based planning approach. This will also provides the level of flexibility to the project.
The main benefit associated with the use of this technique is easy to operate and flexible in
nature. The limitation associated with is about assumption only.
The one best method that will be use in creation of mobile application is Waterfall. This
will provides an opportunity regarding clearance all errors and issues at end level (Radicchi,
2018).
CONCLUSION
From the above mentioned report, it has been concluded that there are different aspects
which are require by project manager in order to complete project in successful manner.
Preparation of Project initiation document has a higher significance as this will support in
coverage of planning in regards to each aspect which are associated with completion of project in
successful manner. These are includes objectives, budget information, stakeholder analysis, key
staff and Timescale. Along with this, there are some methodologies including WBS, Gantt chart
and critical path, these are important for investigator by helping them in completion of project
successfully. Risk assessment plan have been developed which will be beneficial in finding of
risks associated in project along with mitigation measures. This will help project manager by
improving its overall performance.
21
working nature of this methodology that hinder to perform work in fast manner.
Waterfall: This project management approach is different from the above one. This
bifurcate the project into different stages and work is perform for the completion of each stage
step by step. The different number of phases which are included under this methodology includes
determination of requirements, preparation of design, implementation, verification and
maintenance (Pandey, Litoriya and Pandey, 2018). The benefit associated with this technique is
help in removal of issues for formulation of project free from any kind of error. The limitation
associated with this approach is its initial planning which is based upon assumption.
Prince 2: This is one of the structured project management method. This includes the
bifurcation of projects into manageable and controllable stages. This methodology focused over
product based planning approach. This will also provides the level of flexibility to the project.
The main benefit associated with the use of this technique is easy to operate and flexible in
nature. The limitation associated with is about assumption only.
The one best method that will be use in creation of mobile application is Waterfall. This
will provides an opportunity regarding clearance all errors and issues at end level (Radicchi,
2018).
CONCLUSION
From the above mentioned report, it has been concluded that there are different aspects
which are require by project manager in order to complete project in successful manner.
Preparation of Project initiation document has a higher significance as this will support in
coverage of planning in regards to each aspect which are associated with completion of project in
successful manner. These are includes objectives, budget information, stakeholder analysis, key
staff and Timescale. Along with this, there are some methodologies including WBS, Gantt chart
and critical path, these are important for investigator by helping them in completion of project
successfully. Risk assessment plan have been developed which will be beneficial in finding of
risks associated in project along with mitigation measures. This will help project manager by
improving its overall performance.
21

REFERENCES
Books and Journals
Al-Hunaiyyan, A., Alhajri, R. A. and Al-Sharhan, S., 2018. Perceptions and challenges of mobile
learning in Kuwait. Journal of King Saud University-Computer and Information
Sciences. 30(2). pp.279-289.
Barnett, S., Avazpour, I., Vasa, R. and Grundy, J., 2019. Supporting multi-view development for
mobile applications. Journal of Computer Languages, 51, pp.88-96.
Chali, F., Yonah, Z. O. and Kalegele, K., 2018. Data exchange architecture for the development
of mobile applications that support eHealth systems interoperability: a case of
Tanzania. International Journal of Advanced Computer Research. 8(34). pp.1-10.
Flora, H. K., 2018. Adopting an agile approach for the development of mobile applications.
Kim, D. K., 2018. Development of Mobile Cloud Applications using UML. International
Journal of Electrical and Computer Engineering. 8(1). p.596.
Pandey, M., Litoriya, R. and Pandey, P., 2018. An ISM approach for modeling the issues and
factors of mobile app development. International Journal of Software Engineering and
Knowledge Engineering. 28(07). pp.937-953.
Pandey, M., Litoriya, R. and Pandey, P., 2018. Mobile APP development based on agility
function. Ingénierie des Systèmes d'Information. 23(6). p.19.
Polhul, T. and Yarovy, A., 2019. Development of a method for fraud detection in heterogeneous
data during installation of mobile applications. Восточно-Европейский журнал
передовых технологий, (1 (2)), pp.65-75.
Radicchi, A., 2018. The use of mobile applications in soundscape research: open questions in
standardization. environment, 5, pp.7-8.
Vaupel, S., Taentzer, G., Gerlach, R. and Guckert, M., 2018. Model-driven development of
mobile applications for Android and iOS supporting role-based app
variability. Software & Systems Modeling. 17(1). pp.35-63.
Villamil, X., Guarda, T. and Quina, G.N., 2018, June. Agile software development for mobile
applications and wireless interaction with hardware development board (Arduino).
In 2018 13th Iberian Conference on Information Systems and Technologies (CISTI) (pp.
1-5). IEEE.
22
Books and Journals
Al-Hunaiyyan, A., Alhajri, R. A. and Al-Sharhan, S., 2018. Perceptions and challenges of mobile
learning in Kuwait. Journal of King Saud University-Computer and Information
Sciences. 30(2). pp.279-289.
Barnett, S., Avazpour, I., Vasa, R. and Grundy, J., 2019. Supporting multi-view development for
mobile applications. Journal of Computer Languages, 51, pp.88-96.
Chali, F., Yonah, Z. O. and Kalegele, K., 2018. Data exchange architecture for the development
of mobile applications that support eHealth systems interoperability: a case of
Tanzania. International Journal of Advanced Computer Research. 8(34). pp.1-10.
Flora, H. K., 2018. Adopting an agile approach for the development of mobile applications.
Kim, D. K., 2018. Development of Mobile Cloud Applications using UML. International
Journal of Electrical and Computer Engineering. 8(1). p.596.
Pandey, M., Litoriya, R. and Pandey, P., 2018. An ISM approach for modeling the issues and
factors of mobile app development. International Journal of Software Engineering and
Knowledge Engineering. 28(07). pp.937-953.
Pandey, M., Litoriya, R. and Pandey, P., 2018. Mobile APP development based on agility
function. Ingénierie des Systèmes d'Information. 23(6). p.19.
Polhul, T. and Yarovy, A., 2019. Development of a method for fraud detection in heterogeneous
data during installation of mobile applications. Восточно-Европейский журнал
передовых технологий, (1 (2)), pp.65-75.
Radicchi, A., 2018. The use of mobile applications in soundscape research: open questions in
standardization. environment, 5, pp.7-8.
Vaupel, S., Taentzer, G., Gerlach, R. and Guckert, M., 2018. Model-driven development of
mobile applications for Android and iOS supporting role-based app
variability. Software & Systems Modeling. 17(1). pp.35-63.
Villamil, X., Guarda, T. and Quina, G.N., 2018, June. Agile software development for mobile
applications and wireless interaction with hardware development board (Arduino).
In 2018 13th Iberian Conference on Information Systems and Technologies (CISTI) (pp.
1-5). IEEE.
22
1 out of 25
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.