This report provides a comprehensive overview of project management principles applied to a redevelopment project at QAHE University's London campus. It begins with an introduction to project management and its key components, including project initiation, planning, and control. The report then presents a project initiation document (PID) outlining the project's objectives, budget, and timeline, along with a stakeholder analysis identifying key stakeholders and their influence. It also includes a work breakdown structure (WBS) that breaks down the project into manageable tasks, a Gantt chart for visual scheduling, and a critical path analysis to identify the shortest project duration. Furthermore, the report addresses project risks through a risk register, detailing potential risks and mitigation strategies. Finally, the report covers communication theories and methodologies relevant to project execution, offering insights into effective project management practices. The document is contributed by a student to be published on the website Desklib. Desklib is a platform which provides all the necessary AI based study tools for students.
Document Page
Project Management
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
Introduction......................................................................................................................................1
Project 1...........................................................................................................................................1
Project initiation document and stakeholder analysis.................................................................1
Stakeholder Analysis...................................................................................................................2
Project 2...........................................................................................................................................3
Risk Register...............................................................................................................................3
Project 3...........................................................................................................................................6
I. Theories for communication process.......................................................................................6
ii. Critique of methodologies.......................................................................................................9
Conclusion.....................................................................................................................................12
References......................................................................................................................................13
Document Page
Introduction
Project management is defined as a practice for initiation, formulation of plans,
controlling as well as closing of work of team for attaining peculiar goals at stipulated time
frame. Basically, it is application of tools, skills, techniques and knowledge related with project
activities for meeting project requirements (Braglia and Frosolini, 2014). It comprises of reasons
behind why project is important a by capturing its requirements, formulation of budget and
carrying out interaction with stakeholders. This report is based on QAHE who want to improve
space which is being provided to business students, for this redevelopment and refurbishment has
to be carried out in London campus. It is important for facilities management department to
ensure that teaching is disrupted during this entire process. The report comprises of PID (project
initiation document) along with budget, timescale, stakeholder analysis and work breakdown
structure. In addition to this, it involves risk register and report involves structured interaction
along with methodology that is being for execution of project case study.
Project 1
Project initiation document and stakeholder analysis.
The crucial element in project management that furnish base for business project is
referred to as project initiation document (PID). Furthermore, it acts as a reference point which is
being utilised for attainment of project that involves crucial details (Bucero and Englund, 2015).
It has been shown beneath with respect to when project was initiated and when it will be
completed. The PID plan with respect to QAHE have been illustrated below:
Title of project Launching of an event
Estimated budget The Facility Management Department of QAHE has
furnished a budget of £ 100.000 for delivering this project.
Project involves refurbishment and redevelopment within
London Campus of QAHE.
Break down of money Raw material - £40
Human Resources - £30
Other entities - £30
1
Document Page
Start date 2nd February, 2020
Finish date 6th August, 2020
Project Sponsor Director of QAHE University
Project manager
Main objectives (short list of
key business related with why
project is being undertaken)
To provide the appropriate space to business students
by which they can be comfortable within the
classroom.
Acquire the charts and other equipments through
which students can be provided with appropriate
resources through which there learning can be
enhanced.
Overall suggested approach
(some essential points in
description of how objectives
can be attained)
Appropriate strategies must be utilised by which
overall objectives can be attained as well as studies of
students also do not get impacted by this.
Any major risks, time, cost,
quality and impact on project
There is a probability that studies of students may be
disrupted when this project is being carried out. Time
required for its completion will be six months and cost
required for this is £ 100.000. The time is apt for delivering
quality standards which will lay down affirmative influence
on the project.
Key Constraints The major constraints associated with QAHE
University includes: scope, cost, quality and time.
Customer Satisfaction also acts as one of the major
aspect while delivering services within the market.
Key project Team members Head of Facility Management Department
Project Manager
Team Leader
2
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Team members
Reference(s)
Stakeholder Analysis
There exist different stakeholders within firm, they are: director, suppliers, members and
various others (Burke, 2013). From these stakeholders some acts as crucial asset for firm and
must be maintained by them in an efficacious as well as relevant manner. The stakeholder
analysis of QAHE have been provided below:
Stakeholder Analysis Matrix
Stakehold
er Name
Contact
Person
Impact Influence What is
important
to
stakehold
ers?
How they
will
contribut
e within
project?
How they
can block
project?
Strategy
for
managem
ent of
Stakehold
ers
Supplier Joseph
Smith
joseph@q
ahe.com
High Broad They will
provide
University
with raw
material
like
bricks,
cement
etc.
through
which
process of
redevelop
ment can
be carried
out.
Suppliers
are
interested
to have
They will
provide
appropriat
e
resources
to QAHE
University
that will
enable
them to
render
their
services in
affirmativ
It will be
difficult to
start work
if raw
material is
not
available
on time.
Agreement
can be
made with
suppliers.
3
Document Page
profit. e manner.
Donors David
david@qa
he.com
High High They are
interested
within this
as this will
enable
them to
acquire
more
number of
students
within
class.
Donors
have
invested
financially
within the
project.
They will
not block
the project
as they
will be
having
profit from
this.
Donors
need to
ensure that
there
money is
organised
in relevant
activities
and is not
wasted.
Universit
y Head
Cristene
Carlos
carlos@qa
he.com
High High They have
high
interest in
the
processes
as well as
activities
that are
carried out
as they
will be
able to
deliver
well
qualified
individual
s from
They will
have high
profitabilit
y in terms
of number
of students
and
enhancem
ent within
QAHE
University
recognitio
n.
They
won't
block the
project as
this will
bring in
impelling
goodwill
for
University
.
They need
to monitor
each
activity
which is
being
carried out
so that
desired
project can
be
accomplis
hed on
time and
as per
desired
standards.
4
Document Page
there
university.
(Hällgren,
2012).
Governme
nt John@gov
.in
Moderate Moderate They have
interest as
this will
enable
university
to acquire
more
number of
students as
appropriat
e space
will be
there.
Youth will
have
appropriat
e
knowledge
which will
contribute
within
economy
of country
Governme
nt is in
favour as
maximum
of youth
can have
impelling
knowledge
.
They can
develop
strategies
in favour
of QAHE
University
that will
motivate
them to
render
their
services as
per desired
standards.
Work break down structure: The technique or procedure where the entire project is
broken down into small portions or segments through which tasks can be accomplished in
efficient as well as effectual manner is referred to as work break down structure (Fortune and
et.al., 2011). With respect to refurbishment and redevelopment process of QAHE, it has been
divided into 25 activities, they are clearly stated below within WBS shown below:
Initiation of project: The important aspect which have to be carried out will be
identified to acknowledge what is required.
Establish Objective: Identification as well as establishment of suitable objectives for
QAHE for carrying out refurbishment of their premises.
Notification: Furnish the details related with what is to be done within University along
with benefits laid out by them.
5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Identification of requirements: In this QAHE needs to identify what is being required
by students and their stakeholders.
Market research: Here, QAHE will look for what other Universities are doing within
the city for captivating more number of students.
Selection of suitable ideas: With respect to this, QAHE will select their audiences in an
appropriate and effectual way.
Develop plans of activities: Planning will be carried out which will enable to ensure that
all the operations are carried on time.
Filtering and correlation: Here, essential activities will be identified along with this
they will be prioritised.
Activities needed: All the tasks that have to be carried out must be well formulated so
that stakeholders will be clear about what is being required.
Correlation: There has to be a relation among the entire activities and goal behind doing
this so that they can be conducted in an apt manner.
Design promotional and advertising activities: As they know there potential customers
accordingly promotional and advertisements will be made.
Up date Websites: As per the alterations, which are to be made, website can be updated
so that stakeholders can know what is being done.
Trigger: Here, QAHE needs to initiate as per the plan they have formulated so that
things can be done on time.
Conduct analysis: This will enable them to identify how many students they have
attracted towards their University.
Response selection: Depending on response which is attained management can decide
the ways in which further actions can be taken.
Evaluate Decision: Meetings can be conducted for analysing overall impact of their
decisions made.
Auto response: As per the response attained from meeting further strategies can be
developed.
Demand Forecasting: At this QA Higher Education university conduct forecasting of
demand and need things for conducting event in effective and appropriate manner.
6
Document Page
Data Collection: In this respective University collect data and information which is
required for respective event which is going to organised by respective company.
Evaluate Data: Then they evaluate data so that they do further activities in effective
manner.
Develop Budget: After deciding and evaluating all data and information respective
university prepare budget in effective and efficient manner.
Review actions: The actions that are being conducted can be modified if budget is not
enough for meeting them all.
Set activities accordingly: In this step project manager conduct evaluation and set
activities according to budget in effective and appropriate manner.
Analysis effectiveness: At last project manger of respective company analysis
effectiveness of events through feedback and suggestions.
Feedback: The reviews can be taken to identify influence that will be created through
entire project.
7
Document Page
8
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Gantt Chart: The graphical tool that shows tasks or activities which are carried against
time is referred to as visual presentation or Gantt chart. In this project is broken down as well as
displayed on chart that makes it easy for interpretation as well as understanding. In context of
QAHE, it has been shown below:
9
Document Page
Critical Path: The sequence of steps or stages which are liable for identification of
minimum time that is being required for carrying out project is referred to as critical path.
Basically, through this QAHE will be able to schedule their tasks and ensure that there project is
completed on time (Hanisch and Wald, 2011).
Project 2
Risk Register
The major kind of risks associated with the project that are as follows:
Risk Mitigation
Action
Contingency
Action
Pre action score
(Out of 10, where
10 is high risk and
1 is low)
Post action score
(Out of 10, where
10 is high risk
and 1 is low)
Budget risk In that
organisation plan
approximately
about expenses
of project.
So to eliminate
the respective
kind of risk
organisation
utilize the risk
management and
budget planning
in order to gain
desirable
outcomes
(Kerzner and
Kerzner, 2017).
4 6
Integration
risk
In respective risk
included the
integration of
technologies,
information,
processes. In
So the associated
risk with project
is integration by
using the IT
systems which is
vital piece of
6 4