Redevelopment Project: Wolfron City Tourism Procurement & Strategies
VerifiedAdded on 2023/06/13
|18
|5712
|373
Project
AI Summary
This report provides a comprehensive analysis of a tourism development project for Wolfron City, which aims to boost its tourism sector with a £1 billion redevelopment project. The report begins by defining project management and its key components, emphasizing the importance of planning, work breakdown structure, scheduling, and monitoring. It then delves into procurement alternatives for the project, focusing on infrastructure improvements, transportation upgrades, water supply development, and telecommunications enhancements. The work breakdown structure (WBS) is presented, outlining the various stages of house construction for Wolfron City, including design, earthworks, foundation, and superstructure. The cost breakdown structure (CBS) categorizes project costs into fixed and variable expenses, providing a detailed breakdown of labor, materials, site overhead, and home office overhead. Furthermore, a network diagram is developed to illustrate the sequence of project activities, and project management and tracking plans are outlined to ensure timely delivery. Finally, the report includes a plan for analyzing potential delays, ensuring proactive management of project risks. Desklib offers a platform for students to access similar solved assignments and past papers for their studies.

Portfolio Project
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION...........................................................................................................................3
Procurement alternative to be used..................................................................................................3
Work Breakdown Structure.............................................................................................................5
Cost Breakdown Structure...............................................................................................................7
Develop a Network Diagram.........................................................................................................10
Project Management and Tracking Plans for Delivery..................................................................12
Plan for Analysing Delays.............................................................................................................14
CONCLUSION..............................................................................................................................16
REFERENCES..............................................................................................................................17
INTRODUCTION...........................................................................................................................3
Procurement alternative to be used..................................................................................................3
Work Breakdown Structure.............................................................................................................5
Cost Breakdown Structure...............................................................................................................7
Develop a Network Diagram.........................................................................................................10
Project Management and Tracking Plans for Delivery..................................................................12
Plan for Analysing Delays.............................................................................................................14
CONCLUSION..............................................................................................................................16
REFERENCES..............................................................................................................................17

INTRODUCTION
Project management can be defined as the process of planning, control as well as
coordination of a project from its initiation to completion (Abate, Bonafini and Ferrari, 2022).
The primary aim of project management is to ensure that the client's requirements are met and
that the project is completed on time within the budget without any compromise on the quality
standards. There are different components of project management such as planning, developing a
work breakdown structure, scheduling as well as monitoring and control. The project manager is
responsible for overlooking the different project activities as well as ensuring that the team
members are aware of their respective roles as well as responsibilities. The respective report is
based on Wolfron City that has an approximate population of 1 million. The goal of the city is to
boost its tourism sector for which £1billion is available for the redevelopment project. The report
will provide recommendations as well as procurement alternatives will be provided. Apart from
this, the report will also include a work breakdown structure, a cost breakdown structure as well
as a network diagram to facilitate a better understanding.
Procurement alternative to be used
Procurement can be defined as the process that involves each and every activity that is
involved in obtaining the goods as well as services that are needed to support the daily operations
or carry out a project in a smooth manner. The different activities that are included in
procurement are sourcing, negotiating terms, purchasing items, receiving as well as inspecting
the goods and lastly maintaining the records of all these steps in the process. In context of the
respective project, the Wolfron City wants to boost its tourism sector and in order to do so, the
city has planned to expand as well as upgrade the overall infrastructure of the city, provision for
extra housing as well as leisure facilities along with other needs (Chaudhury, Alam and Dooty,
2022). It can be stated that the procurement for this project would require various activities to
ensure that the project is undertaken in a smooth manner. The different activities can include
planning about what changes have to be made to the existing infrastructure. Once this is done,
the next step would be to develop a list of the different raw materials that will be required to
undertake the project effectively. In order to improve the infrastructure, the existing
transportation will be improved and also, water supplies across the city will also be developed.
This is important because it will ensure that adequate facilities are available to the tourists and
Project management can be defined as the process of planning, control as well as
coordination of a project from its initiation to completion (Abate, Bonafini and Ferrari, 2022).
The primary aim of project management is to ensure that the client's requirements are met and
that the project is completed on time within the budget without any compromise on the quality
standards. There are different components of project management such as planning, developing a
work breakdown structure, scheduling as well as monitoring and control. The project manager is
responsible for overlooking the different project activities as well as ensuring that the team
members are aware of their respective roles as well as responsibilities. The respective report is
based on Wolfron City that has an approximate population of 1 million. The goal of the city is to
boost its tourism sector for which £1billion is available for the redevelopment project. The report
will provide recommendations as well as procurement alternatives will be provided. Apart from
this, the report will also include a work breakdown structure, a cost breakdown structure as well
as a network diagram to facilitate a better understanding.
Procurement alternative to be used
Procurement can be defined as the process that involves each and every activity that is
involved in obtaining the goods as well as services that are needed to support the daily operations
or carry out a project in a smooth manner. The different activities that are included in
procurement are sourcing, negotiating terms, purchasing items, receiving as well as inspecting
the goods and lastly maintaining the records of all these steps in the process. In context of the
respective project, the Wolfron City wants to boost its tourism sector and in order to do so, the
city has planned to expand as well as upgrade the overall infrastructure of the city, provision for
extra housing as well as leisure facilities along with other needs (Chaudhury, Alam and Dooty,
2022). It can be stated that the procurement for this project would require various activities to
ensure that the project is undertaken in a smooth manner. The different activities can include
planning about what changes have to be made to the existing infrastructure. Once this is done,
the next step would be to develop a list of the different raw materials that will be required to
undertake the project effectively. In order to improve the infrastructure, the existing
transportation will be improved and also, water supplies across the city will also be developed.
This is important because it will ensure that adequate facilities are available to the tourists and
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

that they are able to enjoy their stay within the city. Apart from this, telecommunications will
also be improved and in order to introduce these changes, various raw materials will be required
such as water pipes, new transports will be introduced. This will be done mainly to improve the
infrastructure for the tourists. It will also be ensured that appropriate planning is done to check
the amount of funding that will be required for each of these projects. It is important to
understand that planning helps in ensuring that the appropriate resources are available and that
the project is conducted in an effective manner (Bouchard, Fritz and Sjöberg, 2022). An
infrastructure development plan will also be undertaken to make sure that the overall activities as
well as their costs can be analysed and kept a track of. Enough transportation facilities as well as
means should be made available to the tourists to make sure that they are able to explore the
different parts of the city in an effective manner.
Appropriately designed as well as adequate provision for housing will also be made
available for the tourists. The reason behind this is that the tourists will have proper as well as
adequate facilities during their stay. This is an important factor that will ensure that the overall
project is conducted in an effective manner and that the tourists get a positive impression of the
city as well as its infrastructure. Tourists place a great importance on the overall infrastructure as
well as the facilities within the city they visit. It is important to make sure that these procurement
activities are taken into account and that the goals as well as objectives are achieved. This is
because it helps in ensuring that the tourists are able to have a good time as well as enjoy their
trip and stay. Water as well as other basic facilities should be taken care of as well as made
available so that there is an increase in the tourism of the place (Tenera and Varajão, 2022).
There will be guaranteed that appropriate planning is done to check the amount of funding that
will be required for each of these projects. It is important to realize that planning helps in
ensuring that the appropriate resources are available and that the project is conducted in an
effective manner. An infrastructure development plan will also be undertaken to make sure that
the human activity as well as their costs can be analysed and kept a track of (Beljan, Dolinar and
Hodges, 2022). The housing provisions that will be made available for the tourists will include
resorts, hotels as well as home stays. This will ensure that there are adequate housing facilities
for the tourists so that they are able to explore the place in a much more efficient manner. It is
important to take these procurement activities into account to make sure that the overall
experience of the tourists is effective and they would want to visit the city again.
also be improved and in order to introduce these changes, various raw materials will be required
such as water pipes, new transports will be introduced. This will be done mainly to improve the
infrastructure for the tourists. It will also be ensured that appropriate planning is done to check
the amount of funding that will be required for each of these projects. It is important to
understand that planning helps in ensuring that the appropriate resources are available and that
the project is conducted in an effective manner (Bouchard, Fritz and Sjöberg, 2022). An
infrastructure development plan will also be undertaken to make sure that the overall activities as
well as their costs can be analysed and kept a track of. Enough transportation facilities as well as
means should be made available to the tourists to make sure that they are able to explore the
different parts of the city in an effective manner.
Appropriately designed as well as adequate provision for housing will also be made
available for the tourists. The reason behind this is that the tourists will have proper as well as
adequate facilities during their stay. This is an important factor that will ensure that the overall
project is conducted in an effective manner and that the tourists get a positive impression of the
city as well as its infrastructure. Tourists place a great importance on the overall infrastructure as
well as the facilities within the city they visit. It is important to make sure that these procurement
activities are taken into account and that the goals as well as objectives are achieved. This is
because it helps in ensuring that the tourists are able to have a good time as well as enjoy their
trip and stay. Water as well as other basic facilities should be taken care of as well as made
available so that there is an increase in the tourism of the place (Tenera and Varajão, 2022).
There will be guaranteed that appropriate planning is done to check the amount of funding that
will be required for each of these projects. It is important to realize that planning helps in
ensuring that the appropriate resources are available and that the project is conducted in an
effective manner. An infrastructure development plan will also be undertaken to make sure that
the human activity as well as their costs can be analysed and kept a track of (Beljan, Dolinar and
Hodges, 2022). The housing provisions that will be made available for the tourists will include
resorts, hotels as well as home stays. This will ensure that there are adequate housing facilities
for the tourists so that they are able to explore the place in a much more efficient manner. It is
important to take these procurement activities into account to make sure that the overall
experience of the tourists is effective and they would want to visit the city again.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Work Breakdown Structure
A work breakdown structure (WBS) is a standard in project planning and information systems
that divide a venture into a network of outcomes and activities. It's a straightforward, logical
approach to arranging and comprehending their scope statement into less, smaller portions.
Fundamentally, employing a work breakdown structure includes searching at each work from the
top to bottom and narrow it down into the subparts that will bring to the finish line (Commerford,
Hatfield and Houston, 2018). It's a useful tool for defining a thorough expense or time estimation
as well as providing recommendations for timetable management and monitoring.
A work breakdown structure (WBS) is a standard in project planning and information systems
that divide a venture into a network of outcomes and activities. It's a straightforward, logical
approach to arranging and comprehending their scope statement into less, smaller portions.
Fundamentally, employing a work breakdown structure includes searching at each work from the
top to bottom and narrow it down into the subparts that will bring to the finish line (Commerford,
Hatfield and Houston, 2018). It's a useful tool for defining a thorough expense or time estimation
as well as providing recommendations for timetable management and monitoring.

Fig 1: Work Break Down Structure. Source: self
This structure set as per the case study in which develop Wolfron city house for people. For this
require to divide work into different categories like design and procurement, earthwork,
foundation, ground floor, walls and many others. These are also categories into various activities
in order to complete work in structured manner.
A family tree chat-like visual depiction of the construction WBS is produced by project leaders.
A 3-bedroom house has been chosen for Wolfron City House as one of the project's five stages.
House Construction 3
Bedroom
Primarily Final phaseUtilitiesSuper StructureStructure
Design and
procurement
Dewatering
and pilling
Ground
investigation
Excavation
Levelling
Excavation
Pour
Concrete
Concrete
Pile Cap
FoundationEarthworks
Ground
Floor
Slab
Brick
Wall
Wall Roofing Plumbing Electric Heating Door Windows
Inspection
Cavity
Walls
UPVC
Building
Finishes
Hand
over
Roof
Column
Set
plumbing
fixture
Rough in
Plumbing
Hardware
HVAC
equipment
Install and
terminate
Test and
clean
Wood
Door
Insulation
UPVC
Window
Wallpapers
Floor
Tiles
Paint
walls
Inspection
Demobilize
Equipment
Cleaning
Gutter
Decking
Roof
TilesVenting
Wall
level 2
Wall
level 1
This structure set as per the case study in which develop Wolfron city house for people. For this
require to divide work into different categories like design and procurement, earthwork,
foundation, ground floor, walls and many others. These are also categories into various activities
in order to complete work in structured manner.
A family tree chat-like visual depiction of the construction WBS is produced by project leaders.
A 3-bedroom house has been chosen for Wolfron City House as one of the project's five stages.
House Construction 3
Bedroom
Primarily Final phaseUtilitiesSuper StructureStructure
Design and
procurement
Dewatering
and pilling
Ground
investigation
Excavation
Levelling
Excavation
Pour
Concrete
Concrete
Pile Cap
FoundationEarthworks
Ground
Floor
Slab
Brick
Wall
Wall Roofing Plumbing Electric Heating Door Windows
Inspection
Cavity
Walls
UPVC
Building
Finishes
Hand
over
Roof
Column
Set
plumbing
fixture
Rough in
Plumbing
Hardware
HVAC
equipment
Install and
terminate
Test and
clean
Wood
Door
Insulation
UPVC
Window
Wallpapers
Floor
Tiles
Paint
walls
Inspection
Demobilize
Equipment
Cleaning
Gutter
Decking
Roof
TilesVenting
Wall
level 2
Wall
level 1
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Installation of a new first, followed by Superstructure, Utilities, and finally Phase was chosen for
every component and subsection of the construction.
Benefits of WBS
As was previously said, utilising a WBS within a project has several benefits, including:
1. Determine who is responsible for each construction project.
2. Eliminating any misunderstandings, clearly and completely outline the tasks to be
accomplished.
3. Avoid job duplication by assigning anproject to a single individual or item.
4. Help the many job functions engaged in construction project communicate with one
another
5. Increase the level of comprehension of the project among all people concerned
6. Increase the project's comprehension by outsiders
Cost Breakdown Structure
A Cost Breakdown Structure (CBS) is a summary or hierarchy depiction of a project's
expenses. The Cost Breakdown Structure defines the prices of the Work Breakdown Structure's
elements (WBS). The CBS is a significant instrument in project accounts and investment
elements, and it offers a platform for implementing demonstrable price regulation. A Cost
Breakdown Structure (CBS) is a breakdowns or structured depiction of a development's expenses
(Commerford, Hatfield and Houston, 2018). The Cost Breakdown Framework emphasizes the
prices of the Work Breakdown Structure's elements (WBS). The CBS is an essential system for
controlling the life cycle, particularly the monetary components of every enterprise by
establishing a framework for implementing demonstrable price regulation.
The expenditures incurred by a company can be categorized into different heads, but they
have been primarily divided into fixed and variable costs. Even as title suggests, the
aforementioned stays unchanged whereas the latter changes with reverence to the products
generated, and therefore it is critical for a company to maintain parity and an equilibration in
either of eachother because it can add value to the firm’s success.The fixed expenditures should
include financial costs including electricity, mortgage payment, administrative fees, and security
charges for the company, and these are costs that will be experienced even though the firm is not
functioning, and therefore they will continue to accrue all across the lifetime of a product.
Variable expenses for this company will include logistics and distribution fees, inventories, and
every component and subsection of the construction.
Benefits of WBS
As was previously said, utilising a WBS within a project has several benefits, including:
1. Determine who is responsible for each construction project.
2. Eliminating any misunderstandings, clearly and completely outline the tasks to be
accomplished.
3. Avoid job duplication by assigning anproject to a single individual or item.
4. Help the many job functions engaged in construction project communicate with one
another
5. Increase the level of comprehension of the project among all people concerned
6. Increase the project's comprehension by outsiders
Cost Breakdown Structure
A Cost Breakdown Structure (CBS) is a summary or hierarchy depiction of a project's
expenses. The Cost Breakdown Structure defines the prices of the Work Breakdown Structure's
elements (WBS). The CBS is a significant instrument in project accounts and investment
elements, and it offers a platform for implementing demonstrable price regulation. A Cost
Breakdown Structure (CBS) is a breakdowns or structured depiction of a development's expenses
(Commerford, Hatfield and Houston, 2018). The Cost Breakdown Framework emphasizes the
prices of the Work Breakdown Structure's elements (WBS). The CBS is an essential system for
controlling the life cycle, particularly the monetary components of every enterprise by
establishing a framework for implementing demonstrable price regulation.
The expenditures incurred by a company can be categorized into different heads, but they
have been primarily divided into fixed and variable costs. Even as title suggests, the
aforementioned stays unchanged whereas the latter changes with reverence to the products
generated, and therefore it is critical for a company to maintain parity and an equilibration in
either of eachother because it can add value to the firm’s success.The fixed expenditures should
include financial costs including electricity, mortgage payment, administrative fees, and security
charges for the company, and these are costs that will be experienced even though the firm is not
functioning, and therefore they will continue to accrue all across the lifetime of a product.
Variable expenses for this company will include logistics and distribution fees, inventories, and
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

most of the other expenditures that will be incurred as a result of the company's direct marketing.
Thus, it is vital for a company to recover most of its fixed expenditures in order to persist and
thrive in the market for a greater duration of time by becoming successful in the industry for a
much prolonged period of time. Furthermore, variable costs are the cost of generating an units of
output, thus it would be more advantageous for the business to generate as much as possible so
its per item cost may be reduced and the company might become competitive in the sector in
which it operates (Fan and Chatterjee, 2019).
Acti
vity
desc
ripti
on
L
a
b
L
ab
Pl
a
nt
M
at
s
Su
b
co
n
Sit
e
O/
H
H.
O.
O/
H
P
ro
fit
To
tal
To
da
te
Per
cen
t
C
a
t
£ £ £ £ £ £ £ Co
mp
lete
Desi
gn
and
Proc
ure
ment
1 1,
35
0
13
50
5
0
0
5
0
0
9,0
00
9,
0
0
0
25
0
2
5
0
250 2
5
0
2
5
0
2
5
0
23,
20
0
23
20
0 100
Set
up
cons
truct
ion
site 1
75
00
75
00
9
5
0
9
5
0
90
0
9
0
0
50
0
5
0
0 500
5
0
0
6
0
0
6
0
0
21,
90
0
21
90
0 100
Exca
vatio
n 1
10
00
0
10
00
0
4
5
0
4
5
0
5
0
0
5
0
0
25
0
2
5
0 250
2
5
0
6
0
0
6
0
0
24,
10
0
24
10
0 100
Fou
ndati
on 1
50
00
50
00
2
5
0
2
5
0
4
0
0
4
0
0
15
0
1
5
0 200
2
0
0
3
5
0
3
5
0
12,
70
0
12
70
0 100
Fra
me
1
50
00
50
00
6
0
0
6
0
0
6
0
0
6
0
0
20
0
2
0
0 300
3
0
0
4
0
0
4
0
0
14,
20
0
14
20
0 100
Elec
trica
l 5
85
00
17
00
3
5
0
3
5
0
2
0
0
2
0
0
30
0
3
0
0 400
4
0
0
5
0
0
5
0
0
13,
70
0
13
70
0 80
Roof
ing
3 60
00
20
00
4
0
4
0
3
5
3
5
50
0
5
0
650 6
5
1
5
1
5
12,
10
12
10
30
Thus, it is vital for a company to recover most of its fixed expenditures in order to persist and
thrive in the market for a greater duration of time by becoming successful in the industry for a
much prolonged period of time. Furthermore, variable costs are the cost of generating an units of
output, thus it would be more advantageous for the business to generate as much as possible so
its per item cost may be reduced and the company might become competitive in the sector in
which it operates (Fan and Chatterjee, 2019).
Acti
vity
desc
ripti
on
L
a
b
L
ab
Pl
a
nt
M
at
s
Su
b
co
n
Sit
e
O/
H
H.
O.
O/
H
P
ro
fit
To
tal
To
da
te
Per
cen
t
C
a
t
£ £ £ £ £ £ £ Co
mp
lete
Desi
gn
and
Proc
ure
ment
1 1,
35
0
13
50
5
0
0
5
0
0
9,0
00
9,
0
0
0
25
0
2
5
0
250 2
5
0
2
5
0
2
5
0
23,
20
0
23
20
0 100
Set
up
cons
truct
ion
site 1
75
00
75
00
9
5
0
9
5
0
90
0
9
0
0
50
0
5
0
0 500
5
0
0
6
0
0
6
0
0
21,
90
0
21
90
0 100
Exca
vatio
n 1
10
00
0
10
00
0
4
5
0
4
5
0
5
0
0
5
0
0
25
0
2
5
0 250
2
5
0
6
0
0
6
0
0
24,
10
0
24
10
0 100
Fou
ndati
on 1
50
00
50
00
2
5
0
2
5
0
4
0
0
4
0
0
15
0
1
5
0 200
2
0
0
3
5
0
3
5
0
12,
70
0
12
70
0 100
Fra
me
1
50
00
50
00
6
0
0
6
0
0
6
0
0
6
0
0
20
0
2
0
0 300
3
0
0
4
0
0
4
0
0
14,
20
0
14
20
0 100
Elec
trica
l 5
85
00
17
00
3
5
0
3
5
0
2
0
0
2
0
0
30
0
3
0
0 400
4
0
0
5
0
0
5
0
0
13,
70
0
13
70
0 80
Roof
ing
3 60
00
20
00
4
0
4
0
3
5
3
5
50
0
5
0
650 6
5
1
5
1
5
12,
10
12
10
30

0 0 0 0 0 0 0 0 0 0
Mas
onry
1
15
00
15
00
6
0
0
6
0
0
8
0
0
8
0
0
40
0
4
0
0 800
8
0
0
2
0
0
2
0
0
8,6
00
86
00 100
Plu
mbi
ng 1
10
00
10
00
7
5
0
7
5
0
5
0
0
5
0
0
35
0
3
5
0 200
2
0
0
2
5
0
2
5
0
6,1
00
61
00 100
Equi
pme
nt
insta
llati
on 1
20
00
20
00
2
5
0
2
5
0
6
5
0
6
5
0
25
0
2
5
0 600
6
0
0
4
0
0
4
0
0
8,3
00
83
00 100
Inter
ior
1
11
00
0
11
00
0
8
5
0
8
5
0
1
0
0
0
1
0
0
0
20
0
2
0
0 450
4
5
0
3
0
0
3
0
0
27,
60
0
27
60
0 100
Exte
rior
1
95
00
95
00
4
0
0
4
0
0
9
5
0
9
5
0
35
0
3
5
0 500
5
0
0
2
5
0
2
5
0
23,
90
0
23
90
0 100
Lan
dsca
pe 1
37
00
37
00
5
0
0
5
0
0
6
0
0
6
0
0
45
0
4
5
0 300
3
0
0
4
0
0
4
0
0
11,
90
0
11
90
0 100
Val
ue
end
mon
th 7
72
,0
50
61
,2
50
6,
8
5
0
6,
8
5
0
6,
5
5
0
6,
5
5
0
9,9
00
9,
9
0
0
4,1
50
4,
1
5
0
5,4
00
5,
4
0
0
4,
6
5
0
4,
6
5
0
20
8,3
00
20
83
00 100
(Source: Cost Breakdown Structure created in Excel)
Mas
onry
1
15
00
15
00
6
0
0
6
0
0
8
0
0
8
0
0
40
0
4
0
0 800
8
0
0
2
0
0
2
0
0
8,6
00
86
00 100
Plu
mbi
ng 1
10
00
10
00
7
5
0
7
5
0
5
0
0
5
0
0
35
0
3
5
0 200
2
0
0
2
5
0
2
5
0
6,1
00
61
00 100
Equi
pme
nt
insta
llati
on 1
20
00
20
00
2
5
0
2
5
0
6
5
0
6
5
0
25
0
2
5
0 600
6
0
0
4
0
0
4
0
0
8,3
00
83
00 100
Inter
ior
1
11
00
0
11
00
0
8
5
0
8
5
0
1
0
0
0
1
0
0
0
20
0
2
0
0 450
4
5
0
3
0
0
3
0
0
27,
60
0
27
60
0 100
Exte
rior
1
95
00
95
00
4
0
0
4
0
0
9
5
0
9
5
0
35
0
3
5
0 500
5
0
0
2
5
0
2
5
0
23,
90
0
23
90
0 100
Lan
dsca
pe 1
37
00
37
00
5
0
0
5
0
0
6
0
0
6
0
0
45
0
4
5
0 300
3
0
0
4
0
0
4
0
0
11,
90
0
11
90
0 100
Val
ue
end
mon
th 7
72
,0
50
61
,2
50
6,
8
5
0
6,
8
5
0
6,
5
5
0
6,
5
5
0
9,9
00
9,
9
0
0
4,1
50
4,
1
5
0
5,4
00
5,
4
0
0
4,
6
5
0
4,
6
5
0
20
8,3
00
20
83
00 100
(Source: Cost Breakdown Structure created in Excel)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Design and Procurement
Set up construction site
Excavation
Foundation
Frame
Electrical
Roofing
Masonry
Plumbing
Equipment installation
Interior
Exterior
Landscape
0 2000 4000 6000 8000 10000 12000 14000 16000
Gaint chart
Lab Lab Plant Mats
Sub con Site O/H H.O. O/H
This table is based on the project management plan in which categorised all the cost as per the
process follow to develop Wolfron city. These costs are based on the analysis from the market
after that set up best cost for the city and budgeted for construction. On the basis of set
profitability and cost of each product which are using in construction activities and it is helping
to control spending activities in proper manner.
Electrical: A certified electrical contractor should develop, implement, examine, and test all
construction wiring to satisfy BS: 7671 in order to comply with the design regulation's part p
provision for electric safety.
Design and procurement: In contrast to a standard contract, where the client hires experts to
design the development and then a contractor is hired to build the works, design and implement
is a purchasing approach wherein the construction manager is assigned to design and create the
actually does work.
Develop a Network Diagram
A network diagram is a visual depiction of a project that uses a sequence of interconnected lines
and squares to show the interrelationships between the project's operations. The action
specification is represented by boxes or networks, and the link between the tasks is shown by
connections. Every action must have a beginning and an end, and other such actions must fit
Set up construction site
Excavation
Foundation
Frame
Electrical
Roofing
Masonry
Plumbing
Equipment installation
Interior
Exterior
Landscape
0 2000 4000 6000 8000 10000 12000 14000 16000
Gaint chart
Lab Lab Plant Mats
Sub con Site O/H H.O. O/H
This table is based on the project management plan in which categorised all the cost as per the
process follow to develop Wolfron city. These costs are based on the analysis from the market
after that set up best cost for the city and budgeted for construction. On the basis of set
profitability and cost of each product which are using in construction activities and it is helping
to control spending activities in proper manner.
Electrical: A certified electrical contractor should develop, implement, examine, and test all
construction wiring to satisfy BS: 7671 in order to comply with the design regulation's part p
provision for electric safety.
Design and procurement: In contrast to a standard contract, where the client hires experts to
design the development and then a contractor is hired to build the works, design and implement
is a purchasing approach wherein the construction manager is assigned to design and create the
actually does work.
Develop a Network Diagram
A network diagram is a visual depiction of a project that uses a sequence of interconnected lines
and squares to show the interrelationships between the project's operations. The action
specification is represented by boxes or networks, and the link between the tasks is shown by
connections. Every action must have a beginning and an end, and other such actions must fit
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

among these constraints. There are various techniques to design a network diagram, but the
priority flowchart and the vector charting technique are the two most used(Guironnet, Attuyer
and Halbert, 2016). Several project teams nowadays design their network diagrams using the
consequence Gantt charts.When beginning project activities, it is critical to create the Network
Diagram. During creating the Network Diagram, a project coordinator should incorporate
different users, such as the participants. Unless a new squad member(s) joins their work in the
middle, a project coordinator can direct him/her to the Network Diagram to obtain a better grasp
of the program and close the gap to everybody.
1 2 4
207
19
9 10
171665
14
8
1513
3
2221
11 12 18
priority flowchart and the vector charting technique are the two most used(Guironnet, Attuyer
and Halbert, 2016). Several project teams nowadays design their network diagrams using the
consequence Gantt charts.When beginning project activities, it is critical to create the Network
Diagram. During creating the Network Diagram, a project coordinator should incorporate
different users, such as the participants. Unless a new squad member(s) joins their work in the
middle, a project coordinator can direct him/her to the Network Diagram to obtain a better grasp
of the program and close the gap to everybody.
1 2 4
207
19
9 10
171665
14
8
1513
3
2221
11 12 18

Fig 2: Network Daigram Source: Self
These graph depicts research on the creation of visual depictions of objectives or operations.
This diagram requires various jobs to be grouped in a periodic time manner while controlling job
tasks. These event will bring together a variety of organizational kinds to tackle work plans and
procedures. These numerous actions are classified into groups depending on the needs and
carried out in accordance with a strategic process. This has an impact on the multiple projects
and responsibilities that are being used to organise job and deliver established goals. When
development projects are concluded, the organisation may conduct an analysis of the project.
Upon work completed, a network diagram may aid in the management of various procedures
including such project job responsibility distribution and analyzing success monitoring based on
predefined criteria (Park and Lee, 2019).
Project Management and Tracking Plans for Delivery
A project plan is a set of official papers that specify the project's involved in the
implementation phases. The plan incorporates risk mitigation, management systems, and
marketing concerns, as well as scope, price, and part of the strategy. Project tracking commences
with planning stage and continues till the task is finished. Checking work progress in case of
complications and make corrections in a reasonable timeframe. Monitoring projects progress on
a daily basis to discover deviations from the project management plan in order to keep work on
schedule. Project tracking is among the most important responsibilities they have as a product
owner. Visitors should be able to provide the correct progress reports at any moment, including
how much good change has been done in comparison to projected development. Management
should also be aware of what main activities and objectives have been completed, as well as if
the plan is on track to fulfil its closing date. Without the need for a project monitoring system,
they risk losing sight of needs to enter that might jeopardise project implementation and being
caught off guard whenever a greater seeks a help expand (Ma, 2020).
Any proposed action that does not contribute significantly to the manufacture of a product
should be reformed or deleted from the planning phase. Whether they are unsure about the
concept of deliberative, they may always read the story on determining project outcomes.
Despite of how many activities the projects team and management perform, the project
management team may not have been compensated unless a deliverable is generated and
These graph depicts research on the creation of visual depictions of objectives or operations.
This diagram requires various jobs to be grouped in a periodic time manner while controlling job
tasks. These event will bring together a variety of organizational kinds to tackle work plans and
procedures. These numerous actions are classified into groups depending on the needs and
carried out in accordance with a strategic process. This has an impact on the multiple projects
and responsibilities that are being used to organise job and deliver established goals. When
development projects are concluded, the organisation may conduct an analysis of the project.
Upon work completed, a network diagram may aid in the management of various procedures
including such project job responsibility distribution and analyzing success monitoring based on
predefined criteria (Park and Lee, 2019).
Project Management and Tracking Plans for Delivery
A project plan is a set of official papers that specify the project's involved in the
implementation phases. The plan incorporates risk mitigation, management systems, and
marketing concerns, as well as scope, price, and part of the strategy. Project tracking commences
with planning stage and continues till the task is finished. Checking work progress in case of
complications and make corrections in a reasonable timeframe. Monitoring projects progress on
a daily basis to discover deviations from the project management plan in order to keep work on
schedule. Project tracking is among the most important responsibilities they have as a product
owner. Visitors should be able to provide the correct progress reports at any moment, including
how much good change has been done in comparison to projected development. Management
should also be aware of what main activities and objectives have been completed, as well as if
the plan is on track to fulfil its closing date. Without the need for a project monitoring system,
they risk losing sight of needs to enter that might jeopardise project implementation and being
caught off guard whenever a greater seeks a help expand (Ma, 2020).
Any proposed action that does not contribute significantly to the manufacture of a product
should be reformed or deleted from the planning phase. Whether they are unsure about the
concept of deliberative, they may always read the story on determining project outcomes.
Despite of how many activities the projects team and management perform, the project
management team may not have been compensated unless a deliverable is generated and
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 18
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.