University Project: Research on Eco-engineering Systems and Solutions

Verified

Added on  2021/04/24

|21
|4586
|29
Project
AI Summary
This research project, conducted for Eco Solutions, explores next-generation eco-engineering systems. It encompasses a project management plan, including assumptions, constraints, scope, quality, and communication management. The project log book details daily activities, and the project report covers background, aims, schedule, and risk analysis. The research investigates various eco-engineering systems, analyzes existing literature, and identifies potential innovations. The project focuses on providing feasible solutions for future operations, considering factors like resource availability and time constraints. It includes a detailed project management plan, project log book, and a comprehensive report on the findings, emphasizing the importance of effective communication and quality management throughout the research process.
Document Page
Running head: RESEARCH PROJECT FOR ECO SOLUTIONS
Research Project for Eco Solutions
Name of the Student:
Student ID:
Name of the University:
Author’s note:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1RESEARCH PROJECT FOR ECO SOLUTIONS
Table of Contents
1. Task 1: Project Management Plan...............................................................................................2
1.1 Purpose of Project Management Plan....................................................................................2
1.2 Assumptions and Constraints................................................................................................2
1.3 Scope Statement.....................................................................................................................4
1.4 Quality Management Plan.....................................................................................................4
1.5 Communication Management Plan........................................................................................5
Task 2: Project Log Book................................................................................................................5
Task 3: Project Report...................................................................................................................10
3.1 Introduction..........................................................................................................................10
3.2 Project Background.............................................................................................................10
3.3 Project Aims and Objectives...............................................................................................11
3.4 Project Schedule..................................................................................................................11
3.5 Project Risk Analysis...........................................................................................................15
3.6 Conclusion...........................................................................................................................16
Task 5: Performance Review.........................................................................................................17
Bibliography..................................................................................................................................19
Appendix: Project Handout...........................................................................................................22
Document Page
2RESEARCH PROJECT FOR ECO SOLUTIONS
1. Task 1: Project Management Plan
1.1 Purpose of Project Management Plan
The project management plan is developed for ensuring that improved activities of
project are carried on. The project of ‘Research Project on next-generation Eco-engineering
Systems’ is helpful for analysing the various possible systems that are helpful for the
improvement of the eco-friendly operations. The organization of Eco-solution had initiated the
project for analysing various engineering systems and applications that are being prominently
used at all sectors of industries, commercialization, and domestic sectors (Serra and Kunc 2015).
These appliances and sections are helpful for increasing the pace of operations and it had been
beneficial.
However, with the growth of technology, the technology has started forming negative
impact on the environment. The project had been held responsible for listing the operations and
carry out the deployment of the systems that are feasible for the future operations of the Eco
Solutions. The project management ensures that the project is formed successfully and all the
activities had been aligned to the core for the deployment of the successive final completion. The
project management involves tools like scheduler, resource checklist, and quality analysis for
deploying the complete plan successfully. The project management plan also holds an integral
part for deploying the successive and improved activities cohesively.
1.2 Assumptions and Constraints
The project of ‘Research Project on next-generation Eco-engineering Systems’ is
characterized by the deployment of the improved functional processing. The analysis of the
Document Page
3RESEARCH PROJECT FOR ECO SOLUTIONS
project has helped in making some assumptions and identifying the constraints that would impact
the operations of the project. The project assumptions are largely induced by the formation of the
improvement operations and the continuation of the deployment activities. The assumptions of
the project of ‘Research Project on next-generation Eco-engineering Systems’ are,
Ease of resource accumulation: The first assumptions of the project of ‘Research Project
on next-generation Eco-engineering Systems’ include the point that the resources required for the
information collection in the project can be collected easily. There are a number of resources that
would form the inclusion of the operations and formation of the operations.
Completion of Activities: The completion of the activities is helpful for collecting the
varied information on the topic of eco-engineering systems. The activities of the project are
aligned with the continuation of the successive and profound development of the operations.
The constraints of the project of ‘Research Project on next-generation Eco-engineering
Systems’ are,
Activity Completion Time: The time is a major factor that has formed the impact on the
project of ‘Research Project on next-generation Eco-engineering Systems’ as a constraint. The
overall project is calculated by adding the duration of the activities to find out the final
deliverable date of project. Hence, it can be said that the time taken for each of the activities play
a constraint factor for the project completion.
Information Availability: The project of ‘Research Project on next-generation Eco-
engineering Systems’ is largely dependent on the amount of the resource available on the
selected topic. Hence, it can be said that the information availability is a major constraint for the
project.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4RESEARCH PROJECT FOR ECO SOLUTIONS
1.3 Scope Statement
The project of ‘Research Project on next-generation Eco-engineering Systems’ is largely
dependent on the research activities and processes. Hence, the continuation of the project would
tend to form the successful integration of the existing literature and form the inference for final
deliverable of the project. The scope of the project can be divided into two sections,
In scope- The in scope items of the project are the factors that have direct relation with
the final deliverable of the project. The in scope items of the project are the project plan,
accumulation of the information, and development of final report. The completion of the final
documents based on the study is also included in this project works. The study of various
literatures would also allow the formation of the complete system analysis for the project.
Out of scope- The out of scope items for the project are the factors that does not have
direct impact on the operations of the project. The completion of the project does not involve any
prospect of communication medium and consideration of the development. The project is solely
based for analysing the computational process of the various systems used and analyse their
impact on the ecological conditions. The project is based on existing information does not
anticipate any future operations of the system.
1.4 Quality Management Plan
The quality management plan is formed so that the analysis of the activities can be done
and the final deliverable obtained for the project of ‘Research Project on next-generation Eco-
engineering Systems’ is appropriate. The study of various literatures and development of an
inference is largely based on the selection of the literature sources (Svejvig and Andersen 2015).
The use of effective literature review is done for ensuring that appropriate final deliverable can
Document Page
5RESEARCH PROJECT FOR ECO SOLUTIONS
be obtained. The deployment of the final deliverable is largely dependent on the appropriateness
of the resources acquired for the project. The quality management plan is helpful for forming the
final project deliverable and ensuring that all the information obtained are genuine. The quality
management plan comprise of improving the quality of the deliverables with the help of change
management plan implementation for meeting the project quality.
1.5 Communication Management Plan
The communication plan is largely responsible with the analysis of the various factors of
the information sharing in the project. Since the project of ‘Research Project on next-generation
Eco-engineering Systems’ is dependent on the appropriateness of the information acquired, the
use of the correct information sharing among the project team members is must. The
communication management plan would help in considering the management of the information
transfer among the project team members (Kerzner 2017). The deployment of the project plan is
also dependent on the effective communication employed in the project system. The study of
various literatures and development of an inference is also dependent on the methods of
information sharing and collection using communication.
Task 2: Project Log Book
The project log books is formed for entering the day to day activities of the ‘Research
Project on next-generation Eco-engineering Systems’ and it would also allow the formation of
the final deliverable for the project. The project log book is also helpful for rechecking the
development of the activities and keeping a track of the activities that had been completed
(Hornstein 2015). The analysis had employed for the management of the day to day activities of
Document Page
6RESEARCH PROJECT FOR ECO SOLUTIONS
the project. The following is the project log book for the project of ‘Research Project on next-
generation Eco-engineering Systems’,
PROJECT LOG BOOK
Project: ‘Research Project on next-generation Eco-engineering Systems’
Da
y
Activity Involved Phase of
Project
1 The first day was spent on project initialization meeting where the
project team members had to convey the requirements for forming
the deployment of the improved research project.
Initialization and
Resource
Accumulation
4 The project initiation document had been completed and the
project team members would get to know about the project
requirements, scope, aims, and final deliverable for the project.
Initialization and
Resource
Accumulation
7 The project charter documentation is formed for listing the
deployment of the successive and intrigued information
processing of the initial requirements of the project for listing the
development of the operations.
Initialization and
Resource
Accumulation
8 The signing off the documents is a major factor for the completion
of the project operations. The alignment of the project
documentation is based on the analysis of the various
documentation processes.
Initialization and
Resource
Accumulation
10 The list of topics for analysis was made on this day and the
various topics had been related to the eco-engineering process.
The study would help in forming the alignment of the operations
Selection of Topic
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7RESEARCH PROJECT FOR ECO SOLUTIONS
for the studying.
15 The topic feasibility study would allow the formation of the
detailed report of the topics. The feasibility study is helpful for
analysing the continuation of the study for future works.
Selection of Topic
18 The information collection on the various topics identified in the
first step is a major factor as the varied sources of the information
would be helpful in the project.
Selection of Topic
19 The approval of the project would be done only after the analysis
and formation of the complete project reports so that the most
appropriate analysis could have been done.
Selection of Topic
26 The various literatures on the topic of eco-engineering systems are
collected for forming the study and analysis as required in the
project for forming complete project development.
Literature Review
29 The valid resources of the literature must be selected as it would
help in forming the study and analysis as required in the project
for forming complete project development.
Literature Review
34 Some appropriate data and information must be sorted for forming
the final development of the operations and the alignment of the
project research study. The data would be helpful for forming the
alignment of the operations.
Literature Review
35 The literature review would be helpful for forming the
development of the proper task analysis for deploying effective
and improved operations.
Literature Review
Document Page
8RESEARCH PROJECT FOR ECO SOLUTIONS
37 The existing systems for the eco-engineering are sorted and
analysed for developing the proper solution of the report. The
analysis would also allow the formation of the supportive and
effective integration model.
Analysis of Existing
Systems
41 The feasibility study would allow the formation of the detailed
analysis of the existing systems. The feasibility study is helpful for
analysing the continuation of the study for any problems of issues
of the system in use.
Analysis of Existing
Systems
46 The eco-engineering systems and applications are analysed for the
development of the operations and formation of the successive
development models.
Analysis of Existing
Systems
48 The day was marked by the listing of the issues of the operations
and formation of the successive and profound development of the
activities. The various issues of the existing systems were aligned
with the professional development.
Analysis of Existing
Systems
49 The various innovations present in the contemporary world where
the completion of the project would be supported by the alignment
of the operations for forming the analysis of the final
documentation.
Selection of future
innovations in topic
52 The innovations of the system would be helpful for forming the
deployment of the improved functional operations and alignment
of the operations for listing the modification of the existing
operations and development.
Selection of future
innovations in topic
Document Page
9RESEARCH PROJECT FOR ECO SOLUTIONS
56 The huge amount of information on the topic for analysis would
be implied for developing the final submission of the activities
and the allowance of the improved functional and development
activities.
Selection of future
innovations in topic
57 The innovations are finalized for deploying with the improvement
facilities of the operations. The successful alignment of the
activities is helpful for aligning the operations.
Selection of future
innovations in topic
59 An outline plan would be aligned for listing the implementation of
the project activities and develop the final deliverable of the
project activities.
Implementation Plan
Development
64 The complete plan developed would be helpful for the successful
alignment of the operations for the deployment of the research
project in the organization.
Implementation Plan
Development
65 The plan approval is helpful for ensuring the development of the
effective formation model and the new innovation would help in
integrating the formation of the complete development model.
Implementation Plan
Development
68 The final reports are based on the study analysis and the formation
of the effective system innovation for eco-engineering system as it
helps in forming the deployment of the operations.
Final Report and
Documentation
69 The submission of the reports is helpful for listing the formation
of the improved functional and deployment model. The analysis
would allow the formation of the successive and affirmative
deployment of the operations.
Final Report and
Documentation
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10RESEARCH PROJECT FOR ECO SOLUTIONS
70 The sign off and final closure of the project is helpful for aligning
with the formation of the improved functional and development
factor.
Final Report and
Documentation
Task 3: Project Report
3.1 Introduction
The project report is developed for the listing the development of the improvement
activities of the improvement operations (Correa 2016). The alignment of the successive
development would be helpful for the continuation of the development of the eco-engineering
systems for the Eco Solutions.
The following report is based on the development of the documentation for the project of
‘Research Project on next-generation Eco-engineering Systems’. The alignment of the various
project management tools and operations would help in forming the final documentation of the
system selection model.
3.2 Project Background
The project of ‘Research Project on next-generation Eco-engineering Systems’ is formed
for evaluating the various functions of the effective and improved functional development. The
association of Eco-arrangement had started the project for dissecting different designing
frameworks and applications that are as a rule noticeably utilized at all areas of projects,
commercialization, and household segments. These machines and segments are useful for
expanding the pace of projects and it had been advantageous. The project had been considered in
Document Page
11RESEARCH PROJECT FOR ECO SOLUTIONS
charge of posting the activities and sending of the frameworks that are practical for the future
activities of the Eco Solutions (Sears et al. 2015). The project administration includes devices
like scheduler, asset agenda, and quality investigation for conveying the total arrangement
effectively.
3.3 Project Aims and Objectives
The aims and objectives of the project of ‘Research Project on next-generation Eco-
engineering Systems’ are listed below,
To study the development of the eco-engineering for Eco Solutions so that
improved facilities could be implied
To form the plan for the alignment of the successive and intrigued development
model
To complete the study analysis and form the management of the successive
management process
3.4 Project Schedule
The project schedule for the project of ‘Research Project on next-generation Eco-
engineering Systems’ can be depicted with the help of table, Gantt chart, and Work breakdown
structure. All these would help in showing the project schedule. The schedule of the project of
Research Project on next-generation Eco-engineering Systems’ is shown below,
WBS Task Name Duration Start Finish Predecessors
0 Research Project on next-generation Eco-
engineering Systems 70 days Mon
4/16/18
Fri
7/20/18
chevron_up_icon
1 out of 21
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]