Operations Management: Resource Integration at Fletcher Construction
VerifiedAdded on 2021/04/24
|19
|5207
|206
Report
AI Summary
This report provides a comprehensive analysis of resource integration and management practices within Fletcher Construction (FC) Company Limited, a major player in the construction industry. The report explores the application of various theories and models related to resource integration, emphasizing the importance of value creation. It examines key strategic factors that guide planning, policy development, implementation, and management of resources, encompassing tangible, intangible, and human resources. The report discusses resource integration frameworks, the integrated resource management (IRM) process, and the significance of efficient resource planning, including the valuation of assets. It also covers the integrated resource type model, and the importance of resource planning for effective project management. The report emphasizes the importance of resource planning, asset valuation, and the integration of resources, offering valuable insights for organizations in the construction sector.

Running Head: Operations Management 1
Operations Management
Operations Management
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Contents
Introduction:...............................................................................................................................................3
Resource Integration:..................................................................................................................................3
Resources:...............................................................................................................................................3
Integrating resources:..............................................................................................................................4
Resource Management:..............................................................................................................................5
Resource planning:..................................................................................................................................5
Policy Development:................................................................................................................................8
Implementation and management of resource integration:.................................................................10
Conclusion:................................................................................................................................................11
References:................................................................................................................................................12
2
Introduction:...............................................................................................................................................3
Resource Integration:..................................................................................................................................3
Resources:...............................................................................................................................................3
Integrating resources:..............................................................................................................................4
Resource Management:..............................................................................................................................5
Resource planning:..................................................................................................................................5
Policy Development:................................................................................................................................8
Implementation and management of resource integration:.................................................................10
Conclusion:................................................................................................................................................11
References:................................................................................................................................................12
2

Introduction:
The Fletcher Construction (FC) Company Limited is a business organisation which is engaged in
the construction division of Fletcher Building Limited, publicly listed on the New Zealand and
Australian stock exchanges. It has almost 20,000 employees and a market capitalisation of $9
billion. This company is structured into four business units which are managed by the General
Managers and their senior leadership teams (Fletcher, n.d.).
Fletcher Construction works with the customers to build the better communities and economies.
Fletcher construction conduct different activities, and some of these things are stated below:
FC conducts their operations with the local government, central government, and private
clients for developing the building environment and for creating vibrant and livable
cities.
It also involves the activities of transport and utility infrastructure
Develop infrastructure and buildings in the south pacific such as Papua New Guinea, Fiji,
Samoa and American Samoa, Tonga, Vanuatu and the Solomon Islands, and FC also
engaged in the business of Roading (Fletcher, n.d.).
This paper discusses the theories and models which is related to resource integration
management practices and also discuss their validity and reliability for general adoption. This
paper further evaluates the vital strategic factors which provide guidance related to planning,
policy development, implementation and management of resource integration in Fletcher
construction.
It should be noted, resource integration is the process which creates value, and this is the critical
aspect of the discussion in this paper. Majority of the research pays attention to the theory and
models of the resource integration in the context of Fletcher construction. After that, we examine
vital strategic factors which provide guidance in planning, policy development, implementation
and management of resource integration. However, this research includes tangible, intangible
and human resources, but it is not limited to these resources only.
Results of this report can be used by the organisations engaged in the construction industry for
managing their resources effectively and efficiently. Through resource integration model,
organisations can frame accurate plan related to the resource management and create value for
their organisations.
Please note; this paper is a qualitative paper which only discusses theoretical part related to the
resource integration, and limited to the brief description of theories and models. This report does
not include any numerical content because of which results of this report can be varied. As stated
this paper is qualitative because of which it is a time constraint. Because of the high volume data,
it is difficult to
Lastly, the paper is concluded with a brief conclusion which highlights key findings of the paper.
Resource Integration:
As stated by Vargo, all the social and economic factors related to the organisation is considered
as resource integrators, and they also recognise the role played by other factors in the networks.
3
The Fletcher Construction (FC) Company Limited is a business organisation which is engaged in
the construction division of Fletcher Building Limited, publicly listed on the New Zealand and
Australian stock exchanges. It has almost 20,000 employees and a market capitalisation of $9
billion. This company is structured into four business units which are managed by the General
Managers and their senior leadership teams (Fletcher, n.d.).
Fletcher Construction works with the customers to build the better communities and economies.
Fletcher construction conduct different activities, and some of these things are stated below:
FC conducts their operations with the local government, central government, and private
clients for developing the building environment and for creating vibrant and livable
cities.
It also involves the activities of transport and utility infrastructure
Develop infrastructure and buildings in the south pacific such as Papua New Guinea, Fiji,
Samoa and American Samoa, Tonga, Vanuatu and the Solomon Islands, and FC also
engaged in the business of Roading (Fletcher, n.d.).
This paper discusses the theories and models which is related to resource integration
management practices and also discuss their validity and reliability for general adoption. This
paper further evaluates the vital strategic factors which provide guidance related to planning,
policy development, implementation and management of resource integration in Fletcher
construction.
It should be noted, resource integration is the process which creates value, and this is the critical
aspect of the discussion in this paper. Majority of the research pays attention to the theory and
models of the resource integration in the context of Fletcher construction. After that, we examine
vital strategic factors which provide guidance in planning, policy development, implementation
and management of resource integration. However, this research includes tangible, intangible
and human resources, but it is not limited to these resources only.
Results of this report can be used by the organisations engaged in the construction industry for
managing their resources effectively and efficiently. Through resource integration model,
organisations can frame accurate plan related to the resource management and create value for
their organisations.
Please note; this paper is a qualitative paper which only discusses theoretical part related to the
resource integration, and limited to the brief description of theories and models. This report does
not include any numerical content because of which results of this report can be varied. As stated
this paper is qualitative because of which it is a time constraint. Because of the high volume data,
it is difficult to
Lastly, the paper is concluded with a brief conclusion which highlights key findings of the paper.
Resource Integration:
As stated by Vargo, all the social and economic factors related to the organisation is considered
as resource integrators, and they also recognise the role played by other factors in the networks.
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

They further stated that it is necessary to understand the commodities of the activities of actors
that constitute the market, and also the nature of network which is linked together in the context
of competence, relationship, and integration (Vargo and Lusch, 2010).
Resources:
Resource integrators utilise the resources to achieve the fundamental source of competitive
advantage (Vargo and Lusch, 2008). S-D logic focuses on the resources provided by all the
factors related to the organisation such as customer, suppliers, and other stakeholders which fall
within a network of relationships. On the other side, with the help of established resource-based
view, they focus on the resources of the supplying organisation and also on the way through
which these resources are developed to ensure sustainable competitive advantage.
Integrating resources:
Integration mainly referred as process and form of collaboration. It is necessary to understand the
practices related to integrating resources, and how to design and configure the integration
process. There are two theories which offer insights in the resource integration process, and these
theories are effectuation theory and configuration theory.
Effectuation theory raises questions related to the predictive rationale for organisational
behaviour, and it suggests collaboration which occurs through commitments between networked
actors. This theory considers the role played by the different actors related to the organisation
and also evaluates the collaboration between them. On the other hand, Configuration theory
explains the process through which organisations configure their resources, and respond to the
environmental issues through the agency of their people. This theory deals with the challenges
thrown by configuration theory and also provides guidelines to deal with these challenges. The
organization uses both the theories to ensure adequate resource integration and for creating value
for the organisation.
4
that constitute the market, and also the nature of network which is linked together in the context
of competence, relationship, and integration (Vargo and Lusch, 2010).
Resources:
Resource integrators utilise the resources to achieve the fundamental source of competitive
advantage (Vargo and Lusch, 2008). S-D logic focuses on the resources provided by all the
factors related to the organisation such as customer, suppliers, and other stakeholders which fall
within a network of relationships. On the other side, with the help of established resource-based
view, they focus on the resources of the supplying organisation and also on the way through
which these resources are developed to ensure sustainable competitive advantage.
Integrating resources:
Integration mainly referred as process and form of collaboration. It is necessary to understand the
practices related to integrating resources, and how to design and configure the integration
process. There are two theories which offer insights in the resource integration process, and these
theories are effectuation theory and configuration theory.
Effectuation theory raises questions related to the predictive rationale for organisational
behaviour, and it suggests collaboration which occurs through commitments between networked
actors. This theory considers the role played by the different actors related to the organisation
and also evaluates the collaboration between them. On the other hand, Configuration theory
explains the process through which organisations configure their resources, and respond to the
environmental issues through the agency of their people. This theory deals with the challenges
thrown by configuration theory and also provides guidelines to deal with these challenges. The
organization uses both the theories to ensure adequate resource integration and for creating value
for the organisation.
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Resource Integration Framework
Figure 1
Source: (Kleinaltenkamp, 2012)
Above stated graph provides the framework through which organisation can ensure efficient
resource integration process and ensure value creation for business. This framework stated that
different actors use the resources to integrate these resources. All resources are evaluated for
creating value for the business.
Integrated resource management (IRM), is a planning and decision-making process which
mainly coordinates the resources to get long-term sustainable benefits, and it also deals with the
conflicts among users are minimised. IRM brings all the resources groups together instead of
each group working separately to the different balance requirements of the society in the context
of economic, environmental and social areas (Peters, 2014).
The process of IRM includes various stages, and all these stages are stated below:
5
Figure 1
Source: (Kleinaltenkamp, 2012)
Above stated graph provides the framework through which organisation can ensure efficient
resource integration process and ensure value creation for business. This framework stated that
different actors use the resources to integrate these resources. All resources are evaluated for
creating value for the business.
Integrated resource management (IRM), is a planning and decision-making process which
mainly coordinates the resources to get long-term sustainable benefits, and it also deals with the
conflicts among users are minimised. IRM brings all the resources groups together instead of
each group working separately to the different balance requirements of the society in the context
of economic, environmental and social areas (Peters, 2014).
The process of IRM includes various stages, and all these stages are stated below:
5

(All factors described below)
resource planning
Development of policy
Implementation of resource integration and resource planning
Resource Management:
Good construction managers are considered as unsung heroes of construction projects, and
because of their skills, diligence, and efficient practices, construction projects are delivered
without delay. Efficient management of resources ensures that right people are working with the
right equipment for the right job and at the right time (Burger, 2015). Resource management is
the process which ensures the effective and efficient development of the resources used by
organisation whenever required. Different type f resources fall under this category such as
financial resources, inventory, human skills, production resources, or information technology
(IT).
Resource planning:
Resource management and project management are two concepts which depend on each other in
the construction industry, but both the concepts reflect different aspects. The primary purpose of
resource management plan is to identify and reserve resources to meet long term and short term
goals of the organisation. However, this process sounds straightforward, but in practice, it is
involved in nature because different things are interconnected. A resource plan must:
Management must ensure availability of the resources which include both workers and
equipment, and also identifies any conflict related to resources and resolves such issue
before time. For example; a cement mixer cannot be on two buildings at the same time.
6
resource planning
Development of policy
Implementation of resource integration and resource planning
Resource Management:
Good construction managers are considered as unsung heroes of construction projects, and
because of their skills, diligence, and efficient practices, construction projects are delivered
without delay. Efficient management of resources ensures that right people are working with the
right equipment for the right job and at the right time (Burger, 2015). Resource management is
the process which ensures the effective and efficient development of the resources used by
organisation whenever required. Different type f resources fall under this category such as
financial resources, inventory, human skills, production resources, or information technology
(IT).
Resource planning:
Resource management and project management are two concepts which depend on each other in
the construction industry, but both the concepts reflect different aspects. The primary purpose of
resource management plan is to identify and reserve resources to meet long term and short term
goals of the organisation. However, this process sounds straightforward, but in practice, it is
involved in nature because different things are interconnected. A resource plan must:
Management must ensure availability of the resources which include both workers and
equipment, and also identifies any conflict related to resources and resolves such issue
before time. For example; a cement mixer cannot be on two buildings at the same time.
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Process related to the resource planning must be quick and efficient at the time when the
building construction teams make efforts for meeting project objectives (Hillerbrandt &
Meikle, 2006).
While conducting the activities related to the construction project, it is necessary for Fletcher to
consider whether they like to work with their equipment or like to take these resources on rent.
Fletcher does not take equipment’s on rent because this company worked on large scales and
preferred to make investments in these equipment’s (Fletcher, 2016). Therefore, the primary
purpose of resource planning is to design, develop and evaluate a service given by another
person for ensuring efficient management and resource allocation between different departments.
There are some resources which can be shared such as equipment, human resources, buildings,
and warehouse space. It is necessary for the user to describe the tasks they need to achieve and
resource management ensure efficient supply of resources for this purpose (Simon, Snow &
Read, 2004).
It is suggested, resources are selected from a shared resources pool which involves all the
necessary resource required by the organisation. To describe a specific set of resources, and an
extensive number of parameters which measure these resources, it is necessary for an
organisation to set the framework which is useful. Therefore, a pre-requisite for the resource
management is the availability of an integrated resource description model which met above-
stated requirements.
The primary factor of development of the integrated resource model in the resource management
process was an analysis of standards and procedures related to construction equipment’s,
7
building construction teams make efforts for meeting project objectives (Hillerbrandt &
Meikle, 2006).
While conducting the activities related to the construction project, it is necessary for Fletcher to
consider whether they like to work with their equipment or like to take these resources on rent.
Fletcher does not take equipment’s on rent because this company worked on large scales and
preferred to make investments in these equipment’s (Fletcher, 2016). Therefore, the primary
purpose of resource planning is to design, develop and evaluate a service given by another
person for ensuring efficient management and resource allocation between different departments.
There are some resources which can be shared such as equipment, human resources, buildings,
and warehouse space. It is necessary for the user to describe the tasks they need to achieve and
resource management ensure efficient supply of resources for this purpose (Simon, Snow &
Read, 2004).
It is suggested, resources are selected from a shared resources pool which involves all the
necessary resource required by the organisation. To describe a specific set of resources, and an
extensive number of parameters which measure these resources, it is necessary for an
organisation to set the framework which is useful. Therefore, a pre-requisite for the resource
management is the availability of an integrated resource description model which met above-
stated requirements.
The primary factor of development of the integrated resource model in the resource management
process was an analysis of standards and procedures related to construction equipment’s,
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

construction tasks, and qualification profiles to select the most detailed and general content
models (Menzel, n.d.).
This evaluation can be conducted in tow subparts. Firstly, management analyses content
information related to equipment’s and tasks and also qualification profiles related to
construction industry. In the second step, specifications of content are compared with the
existing strategies of the organisation to define the existing scheme to manage and maintain
resource information. This evaluation process was conducted in close cooperation with the
partners of the industry and also with the potential of end users (Katranuschkov, 2001).
The primary purpose of integrated resource type model is to provide an appropriate method to
manage different categories of resources and also generates a harmonised set of descriptive
attributes and proper relationships (Menzel, n.d.). Therefore, mapping and merging strategies
related to the resource management provide support to the integrated use of the existing,
standardised, and singular models. Policies related to the resource management contribute to the
development of a similar description of the integrated e-Sharing resource model.
Resource planning provides support to the leasing concepts also on a cross-sectoral, and finally,
it results in improved business opportunities. In this manner, it becomes easy for SME’s to share
their services more efficiently. Services provided by ICT sector or any other sector, are readily
available for the construction sector (Simon & Holyoak, 2002). Bellow stated figure describes
stated model:
8
models (Menzel, n.d.).
This evaluation can be conducted in tow subparts. Firstly, management analyses content
information related to equipment’s and tasks and also qualification profiles related to
construction industry. In the second step, specifications of content are compared with the
existing strategies of the organisation to define the existing scheme to manage and maintain
resource information. This evaluation process was conducted in close cooperation with the
partners of the industry and also with the potential of end users (Katranuschkov, 2001).
The primary purpose of integrated resource type model is to provide an appropriate method to
manage different categories of resources and also generates a harmonised set of descriptive
attributes and proper relationships (Menzel, n.d.). Therefore, mapping and merging strategies
related to the resource management provide support to the integrated use of the existing,
standardised, and singular models. Policies related to the resource management contribute to the
development of a similar description of the integrated e-Sharing resource model.
Resource planning provides support to the leasing concepts also on a cross-sectoral, and finally,
it results in improved business opportunities. In this manner, it becomes easy for SME’s to share
their services more efficiently. Services provided by ICT sector or any other sector, are readily
available for the construction sector (Simon & Holyoak, 2002). Bellow stated figure describes
stated model:
8

Figure 3
Integrated resource type model
(Source: Simon & Holyoak, 2002)
The primary objective of this graph is to provide an appropriate method to manage different
categories of resources, and also for generating a consistent set of descriptive factors and
appropriate relationships. Therefore, within the e-sharing project mapping and merging
strategies, this model develops the enabling and supporting of the integrated use of the existing,
standardised, singular models and content descriptions. This strategy will contribute to the
development of the homogeneous description of the integrated e-Sharing resource model
(Menzel, n.d.).
Valuations of Assets are considered as another important part of the resource planning, as it
helps the organisation in determining the availability and requirement of resources in the
9
Integrated resource type model
(Source: Simon & Holyoak, 2002)
The primary objective of this graph is to provide an appropriate method to manage different
categories of resources, and also for generating a consistent set of descriptive factors and
appropriate relationships. Therefore, within the e-sharing project mapping and merging
strategies, this model develops the enabling and supporting of the integrated use of the existing,
standardised, singular models and content descriptions. This strategy will contribute to the
development of the homogeneous description of the integrated e-Sharing resource model
(Menzel, n.d.).
Valuations of Assets are considered as another important part of the resource planning, as it
helps the organisation in determining the availability and requirement of resources in the
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

organisation. Generally, in resource planning, it determines the cost of plant and equipment.
Undervaluation of assets, the organisation, determines the actual value of the land, buildings,
plant and machinery, fixtures and equipment (Siltaloppi & Vargo, 2014). In case of Fletcher, a
value related to property plant and equipment includes the cost needed to acquire the asset and
another related cost such as cost occurred in bringing the asset to the location and maintenance
cost.
Fletcher also considers the cost related to self-constructed assets, and this includes cost related to
the material used in a construction project, direct labour related to the project, site preparation,
and installation cost. All these costs must be considered while making the policy (Fletcher,
2016).
Some of the resources of Fletcher building are stated below, and this section also stated how
these resources are valued by the organization:
Tangible assets- tangible assets of the organization are property, equipment’s, self-constructed
assets. For considering the value of these assets organization conduct fair value adjustments.
Currently, organization has total 2214 million tangible assets (Fletcher,2017).
Cost related to the self-constructed assets include, cost related to the all the materials used in
construction such as direct labor related to the project, preparation and installation costs of site,
costs of obtaining resource consents, financing costs attributable to the project, variable and
fixed overheads and unrecovered operating costs incurred during planned commissioning. It
must be noted that feasibility cost are expensed as incurred
Leases are another tangible assets in which group stated that all the risks and rewards of
ownership are considered as finance lease, and these leases are measured at lower than their fair
10
Undervaluation of assets, the organisation, determines the actual value of the land, buildings,
plant and machinery, fixtures and equipment (Siltaloppi & Vargo, 2014). In case of Fletcher, a
value related to property plant and equipment includes the cost needed to acquire the asset and
another related cost such as cost occurred in bringing the asset to the location and maintenance
cost.
Fletcher also considers the cost related to self-constructed assets, and this includes cost related to
the material used in a construction project, direct labour related to the project, site preparation,
and installation cost. All these costs must be considered while making the policy (Fletcher,
2016).
Some of the resources of Fletcher building are stated below, and this section also stated how
these resources are valued by the organization:
Tangible assets- tangible assets of the organization are property, equipment’s, self-constructed
assets. For considering the value of these assets organization conduct fair value adjustments.
Currently, organization has total 2214 million tangible assets (Fletcher,2017).
Cost related to the self-constructed assets include, cost related to the all the materials used in
construction such as direct labor related to the project, preparation and installation costs of site,
costs of obtaining resource consents, financing costs attributable to the project, variable and
fixed overheads and unrecovered operating costs incurred during planned commissioning. It
must be noted that feasibility cost are expensed as incurred
Leases are another tangible assets in which group stated that all the risks and rewards of
ownership are considered as finance lease, and these leases are measured at lower than their fair
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

value or at the present value of the minimum lease payments at the beginning of the lease. Land,
buildings, plant and machinery, finance leased assets and fixtures and equipment are valued at
cost after reducing the depreciation. Development cost in context of sites for the purpose of
initiating extraction is capitalized in the form of resource extraction assets. Assets related to the
resource extraction are held at historic cost and depleted over the shorter of the life of the site or
right to use period.
Intangible assets- currently organization has 609 million of intangible assets which does not
include goodwill(Fletcher,2017). An intangible asset can be recognized as an asset apart from
goodwill that is derived from either contractual or other legal rights. Other form of intangible
assets Fletcher owns trademarks, Internet domains, advertising, construction permits and
contracts, employment contracts, patented and unpatented technologies, and secret formula
(Foster. P. Benjamin et al.,2003).
It must be noted that intangible assets in fletcher group acquired separately, and these assets are
measured on initial recognition at cost. Subsequently, these assets are carried at cost after
reducing accumulated amortization and accumulated impairment losses. Intangible assets with
the indefinite useful lives are not amortized, but these assets are tested for impairment annually,
either at individual level or at CGU level.
It must be noted that, definite lived intangible assets are amortized on a straight-line basis.
Expenditure related to research activities is recognized in earnings as incurred. Important
development related to the expenditure is considered as an asset if particular framework related
to the technical feasibility and future economic benefits are met. Other developed expenditures
are recognized in the income statement as they incurred. Brands related to which all other
necessary factors indicate that there is no limit on the foreseeable net cash flows which are
11
buildings, plant and machinery, finance leased assets and fixtures and equipment are valued at
cost after reducing the depreciation. Development cost in context of sites for the purpose of
initiating extraction is capitalized in the form of resource extraction assets. Assets related to the
resource extraction are held at historic cost and depleted over the shorter of the life of the site or
right to use period.
Intangible assets- currently organization has 609 million of intangible assets which does not
include goodwill(Fletcher,2017). An intangible asset can be recognized as an asset apart from
goodwill that is derived from either contractual or other legal rights. Other form of intangible
assets Fletcher owns trademarks, Internet domains, advertising, construction permits and
contracts, employment contracts, patented and unpatented technologies, and secret formula
(Foster. P. Benjamin et al.,2003).
It must be noted that intangible assets in fletcher group acquired separately, and these assets are
measured on initial recognition at cost. Subsequently, these assets are carried at cost after
reducing accumulated amortization and accumulated impairment losses. Intangible assets with
the indefinite useful lives are not amortized, but these assets are tested for impairment annually,
either at individual level or at CGU level.
It must be noted that, definite lived intangible assets are amortized on a straight-line basis.
Expenditure related to research activities is recognized in earnings as incurred. Important
development related to the expenditure is considered as an asset if particular framework related
to the technical feasibility and future economic benefits are met. Other developed expenditures
are recognized in the income statement as they incurred. Brands related to which all other
necessary factors indicate that there is no limit on the foreseeable net cash flows which are
11

considered to have an indefinite useful life, are held at cost, and are not amortized but are subject
to an annual impairment test.
Human Resources- Fletcher has approx. 20,000 employees working the company and its
subsidiaries (Fletcher,2017).
Goodwill- goodwill of the organization amounted to 1069 million and for calculating this
organization assign Fair values to the identifiable assets and liabilities of subsidiaries and
associates of the group at the date they are acquired (Fletcher, 2017). At 30th June 2017 this
group holds and carried the goodwill and other intangible assets at $1.7 billion. The recoverable
amount of goodwill and other assets of intangible nature are determined in each reporting period
in context of valuations prepared by using discounted cash flow models. These models contain
reliable judgments for the purpose of forecasting and estimating future cash flow, discount rate
and terminal growth rate assumptions. Changes occurred in assumption can result in the
assessment of the recoverable amount.
Policy Development:
A policy is considered an action which is predetermined by the organisation, and which is
established to provide guidance related to the accepted business strategies and objectives. It can
be said that policy is the direct link between the vision of the organisation and the daily
operations. Policies are considered as a forward step of resource planning.
Policies not only identify the essential activities of the organisation and also provide standard
strategy for the decision makers for guiding then how to deal with the issues arise in future. The
policy provides the limit to the reader and also provides different choices which are used for
guiding the decision-making process (Weise, 2014).
12
to an annual impairment test.
Human Resources- Fletcher has approx. 20,000 employees working the company and its
subsidiaries (Fletcher,2017).
Goodwill- goodwill of the organization amounted to 1069 million and for calculating this
organization assign Fair values to the identifiable assets and liabilities of subsidiaries and
associates of the group at the date they are acquired (Fletcher, 2017). At 30th June 2017 this
group holds and carried the goodwill and other intangible assets at $1.7 billion. The recoverable
amount of goodwill and other assets of intangible nature are determined in each reporting period
in context of valuations prepared by using discounted cash flow models. These models contain
reliable judgments for the purpose of forecasting and estimating future cash flow, discount rate
and terminal growth rate assumptions. Changes occurred in assumption can result in the
assessment of the recoverable amount.
Policy Development:
A policy is considered an action which is predetermined by the organisation, and which is
established to provide guidance related to the accepted business strategies and objectives. It can
be said that policy is the direct link between the vision of the organisation and the daily
operations. Policies are considered as a forward step of resource planning.
Policies not only identify the essential activities of the organisation and also provide standard
strategy for the decision makers for guiding then how to deal with the issues arise in future. The
policy provides the limit to the reader and also provides different choices which are used for
guiding the decision-making process (Weise, 2014).
12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 19
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.