This dissertation, submitted in partial fulfillment of an MSc in Project Management, explores the critical role of respect in construction projects, specifically focusing on relationships and performance. The research investigates the direct correlation between respectful relationships among project parties (clients, contractors, suppliers, subcontractors) and work performance and project success. The study emphasizes the importance of effective communication, ethical practices, and mutual benefit to bridge the gap between profitability and ethical standards in the construction industry. Through case studies, the research examines aspects, motivators, opportunities, and challenges related to respect, covering procurement methods, organizational culture, power dynamics, and corporate social responsibility. The findings highlight the impact of respect on initiating and articulating effective relationships, leading to improved work performance, professionalism, and adherence to human rights and ethical values. The dissertation concludes with recommendations for fostering respectful environments within the construction industry to enhance project outcomes and stakeholder satisfaction.

The Value and Impact of Respect on Construction
Projects Relationships and Performance
Dissertation submitted in partial fulfilment of
MSc Project Management
Faculty of Business
Dissertation Supervisor
July-2015
ID- 2013000439
Projects Relationships and Performance
Dissertation submitted in partial fulfilment of
MSc Project Management
Faculty of Business
Dissertation Supervisor
July-2015
ID- 2013000439
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

DISSERTATION RELEASE FORM
Student Name: Student ID #: Programme: Date:
Title: The Value and Impact of Respect on Construction Projects Relationships
and Performance
I warrant that the content of this dissertation is the direct result of my own work and that any use
made in it of published or unpublished copyright material falls within the limits permitted by
international copyright conventions.
I understand that one copy of my dissertation will be deposited in the University Library for
permanent retention.
I hereby agree that the material mentioned above for which I am author and copyright holder
may be copied and distributed by The University in abu dhabifor the purposes of research, private
study or education and that The University in abu dhabimay recover from purchasers the costs
incurred in such copying and distribution, where appropriate.
I understand that The University in abu dhabimay make that copy available in digital format if
appropriate.
I understand that I may apply to the University to retain the right to withhold or to restrict access
to my dissertation for a period which shall not normally exceed four calendar years from the
congregation at which the degree is conferred, the length of the period to be specified in the
application, together with the precise reasons for making that application.
ID- 2013000439
Student Name: Student ID #: Programme: Date:
Title: The Value and Impact of Respect on Construction Projects Relationships
and Performance
I warrant that the content of this dissertation is the direct result of my own work and that any use
made in it of published or unpublished copyright material falls within the limits permitted by
international copyright conventions.
I understand that one copy of my dissertation will be deposited in the University Library for
permanent retention.
I hereby agree that the material mentioned above for which I am author and copyright holder
may be copied and distributed by The University in abu dhabifor the purposes of research, private
study or education and that The University in abu dhabimay recover from purchasers the costs
incurred in such copying and distribution, where appropriate.
I understand that The University in abu dhabimay make that copy available in digital format if
appropriate.
I understand that I may apply to the University to retain the right to withhold or to restrict access
to my dissertation for a period which shall not normally exceed four calendar years from the
congregation at which the degree is conferred, the length of the period to be specified in the
application, together with the precise reasons for making that application.
ID- 2013000439

Table of Contents
Abstract.............................................................................................................................................4
Dedication........................................................................................................................................6
List of Figures.................................................................................................................................7
List of Tables...................................................................................................................................7
Chapter One: Introduction........................................................................................................9
1.1 Background..................................................................................................................9
1.2 Motivation of the Study..........................................................................................13
1.3 Research Aim.............................................................................................................14
1.4 Research Objectives.................................................................................................14
1.5 Dissertation Structure..............................................................................................15
Chapter Two: Literature Review.............................................................................................17
2.1 Effective Management of suppliers/ subcontractors......................................17
2.2 The Crucial Role of Relationships with suppliers/ subcontractors............20
2.3 Respect; Meaning and Definition........................................................................24
2.4 Respect in the Relationships between Project Parties...................................27
2.5 Initiating and Developing Mutual Respect between Project Parties;
Motivators and Challenges………………………………………… 32
2.5.1 Procurement Methods.............................................................................32
2.5.2 Dominant and Organization’s Culture.............................................41
2.5.3 Power Matrices........................................................................................43
2.5.4 Corporate Social Responsibility (CSR) and Shared Value. .. 45
Chapter Three: Conceptual Model.........................................................................................48
Chapter Four: Research Methodology..................................................................................57
4.1- Introduction...............................................................................................................57
4.2- Empirical Context and Sample Selection.........................................................58
ID- 2013000439 Page 1
Abstract.............................................................................................................................................4
Dedication........................................................................................................................................6
List of Figures.................................................................................................................................7
List of Tables...................................................................................................................................7
Chapter One: Introduction........................................................................................................9
1.1 Background..................................................................................................................9
1.2 Motivation of the Study..........................................................................................13
1.3 Research Aim.............................................................................................................14
1.4 Research Objectives.................................................................................................14
1.5 Dissertation Structure..............................................................................................15
Chapter Two: Literature Review.............................................................................................17
2.1 Effective Management of suppliers/ subcontractors......................................17
2.2 The Crucial Role of Relationships with suppliers/ subcontractors............20
2.3 Respect; Meaning and Definition........................................................................24
2.4 Respect in the Relationships between Project Parties...................................27
2.5 Initiating and Developing Mutual Respect between Project Parties;
Motivators and Challenges………………………………………… 32
2.5.1 Procurement Methods.............................................................................32
2.5.2 Dominant and Organization’s Culture.............................................41
2.5.3 Power Matrices........................................................................................43
2.5.4 Corporate Social Responsibility (CSR) and Shared Value. .. 45
Chapter Three: Conceptual Model.........................................................................................48
Chapter Four: Research Methodology..................................................................................57
4.1- Introduction...............................................................................................................57
4.2- Empirical Context and Sample Selection.........................................................58
ID- 2013000439 Page 1

4.3 The Projects and Contracts Details……………………………… 62
4.3.1 Project #1………………………………………………. 62
4.3.2 Project #2 …………………………………………….. 63
4.3.3 Project #3 …………………………………………….. 64
4.3.4 Project #4 …………………………………………….. 65
4.3.5 Project #5 …………………………………………….. 66
Chapter Five: Interviews, Data Analysis, Results and Discussion...............................67
5.1- Introduction:.............................................................................................................67
5.2: Case-studies; Interviews and Findings:............................................................68
5.2.1 Case-study #1 (Project #1)...................................................................68
5.2.1.1 Aspects and Practices of Respect in the Project #1..........68
5.2.1.2 Motivators of Respect in the Project #1..............................70
5.2.1.3 Opportunities of Respect in the Project #1.........................71
5.2.1.4 Challenges of Respect in the Project #1..............................72
5.2.2 Case-study #2 (Project #2)...................................................................74
5.2.2.1 Aspects and Practices of Respect in the Project #2..........74
5.2.2.2 Motivators of Respect in the Project #2..............................76
5.2.2.3 Opportunities of Respect in the Project #2.........................76
5.2.2.4 Challenges of Respect in the Project #2..............................77
5.2.3Case-study #3 (Project #3)....................................................................78
5.2.3.1 Aspects and Practices of Respect in the Project #3..........78
5.2.3.2 Motivators of Respect in the Project #3..............................80
5.2.3.3 Opportunities of Respect in the Project #3.........................80
5.2.3.4 Challenges of Respect in the Project #3..............................80
5.2.4 Case-study #4 (Project #4)...................................................................81
5.2.4.1 Aspects and Practices of Respect in the Project #4..........82
5.2.4.2 Motivators of Respect in the Project #4..............................83
5.2.4.3 Opportunities of Respect in the Project #4.........................84
5.2.4.4 Challenges of Respect in the Project #4..............................84
ID- 2013000439 Page 2
4.3.1 Project #1………………………………………………. 62
4.3.2 Project #2 …………………………………………….. 63
4.3.3 Project #3 …………………………………………….. 64
4.3.4 Project #4 …………………………………………….. 65
4.3.5 Project #5 …………………………………………….. 66
Chapter Five: Interviews, Data Analysis, Results and Discussion...............................67
5.1- Introduction:.............................................................................................................67
5.2: Case-studies; Interviews and Findings:............................................................68
5.2.1 Case-study #1 (Project #1)...................................................................68
5.2.1.1 Aspects and Practices of Respect in the Project #1..........68
5.2.1.2 Motivators of Respect in the Project #1..............................70
5.2.1.3 Opportunities of Respect in the Project #1.........................71
5.2.1.4 Challenges of Respect in the Project #1..............................72
5.2.2 Case-study #2 (Project #2)...................................................................74
5.2.2.1 Aspects and Practices of Respect in the Project #2..........74
5.2.2.2 Motivators of Respect in the Project #2..............................76
5.2.2.3 Opportunities of Respect in the Project #2.........................76
5.2.2.4 Challenges of Respect in the Project #2..............................77
5.2.3Case-study #3 (Project #3)....................................................................78
5.2.3.1 Aspects and Practices of Respect in the Project #3..........78
5.2.3.2 Motivators of Respect in the Project #3..............................80
5.2.3.3 Opportunities of Respect in the Project #3.........................80
5.2.3.4 Challenges of Respect in the Project #3..............................80
5.2.4 Case-study #4 (Project #4)...................................................................81
5.2.4.1 Aspects and Practices of Respect in the Project #4..........82
5.2.4.2 Motivators of Respect in the Project #4..............................83
5.2.4.3 Opportunities of Respect in the Project #4.........................84
5.2.4.4 Challenges of Respect in the Project #4..............................84
ID- 2013000439 Page 2
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

5.2.5 Case-study #5 (Project #5)..................................................................85
5.2.5.1 Aspects and Practices of Respect in the Project #5..........85
5.2.5.2 Motivators of Respect in the Project #5..............................87
5.2.5.3 Opportunities of Respect in the Project #5.........................87
5.2.5.4 Challenges of Respect in the Project #5..............................88
5.3 Results, Analysis and Discussion across the Five Case-studies.................89
5.3.1 Respect Issues and Aspects across the Case-studies....................90
5.3.2 Respect Motivators, opportunities and Challenges
across the Case-studies.........................................................................93
5.3.3 Comparison and Discussion across the Outputs of the
Case-studies and the Conceptual Model...........................................97
5.3.3.1 Respect Elements and Components..............................................97
5.3.3.2 Respect Motivators.............................................................................101
5.3.3.3 Respect Opportunities........................................................................101
5.3.3.4 Respect Challenges.............................................................................102
Chapter Six: Conclusion and Recommendations...............................................................106
6.1 Conclusion..................................................................................................................106
6.2 Recommendations.....................................................................................................108
References
Appendices ………………………………………………………………….. 116
Appendix A: Interviewees’ profiles in the Case-studies ……………………… 116
ID- 2013000439 Page 3
5.2.5.1 Aspects and Practices of Respect in the Project #5..........85
5.2.5.2 Motivators of Respect in the Project #5..............................87
5.2.5.3 Opportunities of Respect in the Project #5.........................87
5.2.5.4 Challenges of Respect in the Project #5..............................88
5.3 Results, Analysis and Discussion across the Five Case-studies.................89
5.3.1 Respect Issues and Aspects across the Case-studies....................90
5.3.2 Respect Motivators, opportunities and Challenges
across the Case-studies.........................................................................93
5.3.3 Comparison and Discussion across the Outputs of the
Case-studies and the Conceptual Model...........................................97
5.3.3.1 Respect Elements and Components..............................................97
5.3.3.2 Respect Motivators.............................................................................101
5.3.3.3 Respect Opportunities........................................................................101
5.3.3.4 Respect Challenges.............................................................................102
Chapter Six: Conclusion and Recommendations...............................................................106
6.1 Conclusion..................................................................................................................106
6.2 Recommendations.....................................................................................................108
References
Appendices ………………………………………………………………….. 116
Appendix A: Interviewees’ profiles in the Case-studies ……………………… 116
ID- 2013000439 Page 3

Abstract:
Organizations, experts and practitioners have increasingly become more interested in and
convinced of outsourcing and partnering strategies for many activities in their projects and
business. Besides, they have become more dependent on other suppliers and contractors in
executing and handing over their projects. Hence, more focus and attention have been given to
articulate and maintain effective relationships between organizations in the projects for higher
levels of success and stakeholders’ satisfaction.
This research asserts the crucial role and the great value of respect in articulating effective
relationships between the project parties in the construction industry, in general, and in the
mechanical, electrical and plumbing (MEP) works, specifically. It aims at studying the direct
relation between presenting and practicing respectful relationships with the other parties in the
projects and the levels of work performance and projects success. In addition, this research aims
at bridging the gap between the profitable and the ethical trends within the construction industry
towards win-win, effective and respectful relationships that combine high levels of business
success with high levels of human rights and dignity.
The researcher, in this paper, discusses many meanings, elements, aspects of respect that clients,
owners, contractors, suppliers and subcontractors should keen to practice during their
relationships in the projects to help in and facilitate achieving their needs and requirements with
the maximum levels of integration, collaboration, benefits and satisfaction and minimum levels
of conflicts, disputes and risks. Moreover, this research asserts the great value of respect in
initiating and articulating effective relationships and approaches between the project parties for
better work performance and professionalism, in addition to promoting the level of compliance
with human rights, values and dignity.
Keywords: Business Relationships, Work Performance, Human Rights, Respect, Code of
Conducts, Business Ethics, Procurement, Construction Industry, Project Management.
ID- 2013000439 Page 4
Organizations, experts and practitioners have increasingly become more interested in and
convinced of outsourcing and partnering strategies for many activities in their projects and
business. Besides, they have become more dependent on other suppliers and contractors in
executing and handing over their projects. Hence, more focus and attention have been given to
articulate and maintain effective relationships between organizations in the projects for higher
levels of success and stakeholders’ satisfaction.
This research asserts the crucial role and the great value of respect in articulating effective
relationships between the project parties in the construction industry, in general, and in the
mechanical, electrical and plumbing (MEP) works, specifically. It aims at studying the direct
relation between presenting and practicing respectful relationships with the other parties in the
projects and the levels of work performance and projects success. In addition, this research aims
at bridging the gap between the profitable and the ethical trends within the construction industry
towards win-win, effective and respectful relationships that combine high levels of business
success with high levels of human rights and dignity.
The researcher, in this paper, discusses many meanings, elements, aspects of respect that clients,
owners, contractors, suppliers and subcontractors should keen to practice during their
relationships in the projects to help in and facilitate achieving their needs and requirements with
the maximum levels of integration, collaboration, benefits and satisfaction and minimum levels
of conflicts, disputes and risks. Moreover, this research asserts the great value of respect in
initiating and articulating effective relationships and approaches between the project parties for
better work performance and professionalism, in addition to promoting the level of compliance
with human rights, values and dignity.
Keywords: Business Relationships, Work Performance, Human Rights, Respect, Code of
Conducts, Business Ethics, Procurement, Construction Industry, Project Management.
ID- 2013000439 Page 4

الخالصة
أصبحت المؤسسسات والخبراء في مجال المشاريع واإلدارة أكثر اهتماما وميال نحو استراتيجية الشراكة مع غيرهم من
.الشركات والمقاولين في مجال األعمال والمشاريع كما أصبحت هذه المؤسسات أكثر اعتمادا في مشاريعها وأعمالها
.على مزودي المواد ومقاولي الباطن لذلك كان ال بد من بذل المزيد من االهتمام بكيفية إنشاء والمحافظة على علقات
عمل فعالة وذات كفاءة بين مختلف الشركات واألطراف في المشاريع من أجل تحقيق مستويات عالية من النجاح في
.المشاريع ورضا أتم لذوي المصالح
هذا البحث يركز على الدور المحوري والقيمة العالية للحترام في إنشاء وصياغة علقات عمل مؤثرة وفعالة بين مختلف
.ويهدف هذا البحث إلى االطراف في قطاع اإلنشاءات بشكل عام وفي مجال األعمال الكهروميكانيكية بشكل خاص
تسليط الضوء على الدور المباشر لعلقات العمل القائمة على االحترام في رفع مستوى وكفاءة األعمال في المشاريع
.وكذلك في رفع وزيادة نسبة نجاح المشاريع كما يهدف هذا البحث إلى جسر الهوة بين التوجهات الربحية وبين المعايير
األخلقية في مشاريع اإلنشاء من أجل إنشاء علقات محترمة ومؤثرة تؤدي إلى مستويات عالية من نجاح المشاريع في
. ظل أعلى المعايير من حقوق وكرامة اإلنسان
يبين الباحث في هذه الورقة ويناقش عدة معاني وجوانب وعناصر للحترام والتي ينبغي على أصحاب العمل ووكلئهم
والمقاولين ومزودي المواد والخدمات الحرص التام على ملحظتها وااللتزام بها في أعمالهم وذلك من أجل المساهمة
في تحقيق احتياجاتهم ومتطلبات مشاريعهم بأعلى مستوى من التكامل والتعاون والرضا وأقل مستوى من المشاكل
.هذه الجوانب والممارسات المرجوة تكشف عن مدى أهمية وقيمة االحترام في تكوين وصياغة والخلفات والمخاطر
علقات عمل مؤثرة وفعالة ترفع من مستويات اإلنجاز والمهنية في المشاريع وفي نفس الوقت تضمن الرقي بمستوى
.االلتزام بحقوق وقيم وكرامة اإلنسان
أصبحت المؤسسسات والخبراء في مجال المشاريع واإلدارة أكثر اهتماما وميال نحو استراتيجية الشراكة مع غيرهم من
.الشركات والمقاولين في مجال األعمال والمشاريع كما أصبحت هذه المؤسسات أكثر اعتمادا في مشاريعها وأعمالها
.على مزودي المواد ومقاولي الباطن لذلك كان ال بد من بذل المزيد من االهتمام بكيفية إنشاء والمحافظة على علقات
عمل فعالة وذات كفاءة بين مختلف الشركات واألطراف في المشاريع من أجل تحقيق مستويات عالية من النجاح في
.المشاريع ورضا أتم لذوي المصالح
هذا البحث يركز على الدور المحوري والقيمة العالية للحترام في إنشاء وصياغة علقات عمل مؤثرة وفعالة بين مختلف
.ويهدف هذا البحث إلى االطراف في قطاع اإلنشاءات بشكل عام وفي مجال األعمال الكهروميكانيكية بشكل خاص
تسليط الضوء على الدور المباشر لعلقات العمل القائمة على االحترام في رفع مستوى وكفاءة األعمال في المشاريع
.وكذلك في رفع وزيادة نسبة نجاح المشاريع كما يهدف هذا البحث إلى جسر الهوة بين التوجهات الربحية وبين المعايير
األخلقية في مشاريع اإلنشاء من أجل إنشاء علقات محترمة ومؤثرة تؤدي إلى مستويات عالية من نجاح المشاريع في
. ظل أعلى المعايير من حقوق وكرامة اإلنسان
يبين الباحث في هذه الورقة ويناقش عدة معاني وجوانب وعناصر للحترام والتي ينبغي على أصحاب العمل ووكلئهم
والمقاولين ومزودي المواد والخدمات الحرص التام على ملحظتها وااللتزام بها في أعمالهم وذلك من أجل المساهمة
في تحقيق احتياجاتهم ومتطلبات مشاريعهم بأعلى مستوى من التكامل والتعاون والرضا وأقل مستوى من المشاكل
.هذه الجوانب والممارسات المرجوة تكشف عن مدى أهمية وقيمة االحترام في تكوين وصياغة والخلفات والمخاطر
علقات عمل مؤثرة وفعالة ترفع من مستويات اإلنجاز والمهنية في المشاريع وفي نفس الوقت تضمن الرقي بمستوى
.االلتزام بحقوق وقيم وكرامة اإلنسان
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

ID- 2013000439Page 5

Dedication:
I dedicate this dissertation
To: my mother and soul of my father who whatever I will do, I will never ever
compensate
them.
To: my beloved wife and elder daughter for their continuous support and help
during my
studies.
To: my family for their patience when I was busy with the dissertation.
To: Professor Mohammed Dulaimi, the supervisor of this work, for his advices and
ultimate
help and support.
To: my teachers, colleagues and friends who helped and supported me during this
dissertation.
Thank you all
Yousef Soleiman Mohammed Ibaid
I dedicate this dissertation
To: my mother and soul of my father who whatever I will do, I will never ever
compensate
them.
To: my beloved wife and elder daughter for their continuous support and help
during my
studies.
To: my family for their patience when I was busy with the dissertation.
To: Professor Mohammed Dulaimi, the supervisor of this work, for his advices and
ultimate
help and support.
To: my teachers, colleagues and friends who helped and supported me during this
dissertation.
Thank you all
Yousef Soleiman Mohammed Ibaid

ID- 2013000439 Page 6
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

List of Figures:
Figure #2.1: Procurement as a function of the impact of failure………………… 33
Figure #2.2: Collaborative trading relationships related to project complexity/ impact
on the employer’s core business…………………………………… 34
Figure #2.3: Procurement Strategy as a Function of Market Difficulty and Type of Spend..35
Figure #2.4: A power-Interest Matrix……………………………………………. 45
Figure #2.5: Corporate Responsibility Hierarchy……………………………….. 46
Figure #3.1: Conceptual Model; Value of Respect in the Relationships and
Work Performance………………………………………………… 51
Figure #4.1: Research Flow of Information.........................................................................................58
List of Tables:
Table #2.1: Statistical results of trust at work.....................................................................................31
Table #2.2: Procurement selection constraints....................................................................................37
Table #3.1: Respect Elements, Motivators and Challenges............................................................50
Table # 4.1: Profiles of the Interviewees in the Case-Study...........................................................61
Table #4.2: Questions to the Interviewees in the Case-Study........................................................62
Table #4.3: Summary of suppliers and subcontractors contracts – Project #1 ……. 63
Table #4.4: Summary of suppliers and subcontractors contracts – Project #2 ……. 64
Table #4.5: Summary of suppliers and subcontractors contracts – Project #3 ……. 65
Table #4.6: Summary of suppliers and subcontractors contracts – Project #4 …… 65
Table #4.7: Summary of suppliers and subcontractors contracts – Project #5 ……. 66
Table #5.1: Interviewees’ profiles- Case-study #1 (project #1)…………………… 68
Table #5.2: Interviewees’ profiles- Case-study #2 (project #2)……………………… 74
Table #5.3: Interviewees’ profiles- Case-study #3 (project #3)……………………….. 78
Table #5.4: Interviewees’ profiles- Case-study #4 (project #4)…………………….. 82
ID- 2013000439 Page 7
Figure #2.1: Procurement as a function of the impact of failure………………… 33
Figure #2.2: Collaborative trading relationships related to project complexity/ impact
on the employer’s core business…………………………………… 34
Figure #2.3: Procurement Strategy as a Function of Market Difficulty and Type of Spend..35
Figure #2.4: A power-Interest Matrix……………………………………………. 45
Figure #2.5: Corporate Responsibility Hierarchy……………………………….. 46
Figure #3.1: Conceptual Model; Value of Respect in the Relationships and
Work Performance………………………………………………… 51
Figure #4.1: Research Flow of Information.........................................................................................58
List of Tables:
Table #2.1: Statistical results of trust at work.....................................................................................31
Table #2.2: Procurement selection constraints....................................................................................37
Table #3.1: Respect Elements, Motivators and Challenges............................................................50
Table # 4.1: Profiles of the Interviewees in the Case-Study...........................................................61
Table #4.2: Questions to the Interviewees in the Case-Study........................................................62
Table #4.3: Summary of suppliers and subcontractors contracts – Project #1 ……. 63
Table #4.4: Summary of suppliers and subcontractors contracts – Project #2 ……. 64
Table #4.5: Summary of suppliers and subcontractors contracts – Project #3 ……. 65
Table #4.6: Summary of suppliers and subcontractors contracts – Project #4 …… 65
Table #4.7: Summary of suppliers and subcontractors contracts – Project #5 ……. 66
Table #5.1: Interviewees’ profiles- Case-study #1 (project #1)…………………… 68
Table #5.2: Interviewees’ profiles- Case-study #2 (project #2)……………………… 74
Table #5.3: Interviewees’ profiles- Case-study #3 (project #3)……………………….. 78
Table #5.4: Interviewees’ profiles- Case-study #4 (project #4)…………………….. 82
ID- 2013000439 Page 7

Table #5.5: Interviewees’ profiles- Case-study #5 (project #5)……………………… 85
Table #5.6: The Main Respect Issues that have been raised across the
five Case-studies……………………………………………………... 91
Table #5.7: Respect Motivators, Opportunities and Challenges across the
Five Case-studies. …………………………………………………… 95
Table #5.8: Matching Respect Aspects of the Case-studies with the Literature Findings... 99
Table #5.9: Respect Motivators, Opportunities and Challenges; comparison between
the Case studies and the Literature Findings………………………… 104
ID- 2013000439 Page 8
Table #5.6: The Main Respect Issues that have been raised across the
five Case-studies……………………………………………………... 91
Table #5.7: Respect Motivators, Opportunities and Challenges across the
Five Case-studies. …………………………………………………… 95
Table #5.8: Matching Respect Aspects of the Case-studies with the Literature Findings... 99
Table #5.9: Respect Motivators, Opportunities and Challenges; comparison between
the Case studies and the Literature Findings………………………… 104
ID- 2013000439 Page 8

Chapter One - Introduction:
1.1 Background
The rapid market changes, expands and fluctuations, with high levels of technological and
communication advances, international trade agreements, free markets and projects sensitivity
and complexity lead to high levels of competition in business accompanied with high amounts of
uncertainties and risks in projects deliverables and outcomes.
This business environment of high levels of freedom, competition and uncertainties needs more
focus and emphasis on the type and effectiveness of relations between buyers and suppliers or
between projects clients and project contractors and suppliers, in general. Moreover, this implies
more efforts towards effective and efficient relationships, professionalism and excellence while
managing their business and projects to handover successful projects with maximum levels of
benefits and satisfaction.
Managing these relationships between the partners in construction projects is deemed to be an
important portion of the most comprehensive subject; Supply Chain Management (SCM). In his
extensive study, Deshpande (2012) asserts that achieving sustainable and long-term relationships
between the different parties of the supply chain in projects is considered as one of the most
important and vital dimensions of the SCM. He emphasizes that the procurement concept and
role have evolved over time as the project parties started realizing and recognizing the crucial
role of initiating and maintaining long-term relationships that based on mutual interests, benefits,
respect and trust.
Janvier (2012) highlights the assertions of The Supply Chain Management Professionals' Council
(2009) about the great importance of the effective relations and partnerships between all supply chain
network that could include owners, clients, suppliers, contractors, service providers, suppliers and
customers. These business relationships started facing challenges due to the liberalization,
globalization and free international markets. These challenges require an integrative and cooperative
approaches in SCM that reflect stakeholders needs, priorities and interests with
ID- 2013000439 Page 9
1.1 Background
The rapid market changes, expands and fluctuations, with high levels of technological and
communication advances, international trade agreements, free markets and projects sensitivity
and complexity lead to high levels of competition in business accompanied with high amounts of
uncertainties and risks in projects deliverables and outcomes.
This business environment of high levels of freedom, competition and uncertainties needs more
focus and emphasis on the type and effectiveness of relations between buyers and suppliers or
between projects clients and project contractors and suppliers, in general. Moreover, this implies
more efforts towards effective and efficient relationships, professionalism and excellence while
managing their business and projects to handover successful projects with maximum levels of
benefits and satisfaction.
Managing these relationships between the partners in construction projects is deemed to be an
important portion of the most comprehensive subject; Supply Chain Management (SCM). In his
extensive study, Deshpande (2012) asserts that achieving sustainable and long-term relationships
between the different parties of the supply chain in projects is considered as one of the most
important and vital dimensions of the SCM. He emphasizes that the procurement concept and
role have evolved over time as the project parties started realizing and recognizing the crucial
role of initiating and maintaining long-term relationships that based on mutual interests, benefits,
respect and trust.
Janvier (2012) highlights the assertions of The Supply Chain Management Professionals' Council
(2009) about the great importance of the effective relations and partnerships between all supply chain
network that could include owners, clients, suppliers, contractors, service providers, suppliers and
customers. These business relationships started facing challenges due to the liberalization,
globalization and free international markets. These challenges require an integrative and cooperative
approaches in SCM that reflect stakeholders needs, priorities and interests with
ID- 2013000439 Page 9
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

the maximum amounts of flexibility, benefits, satisfaction and minimum amounts of risks and
uncertainties.
Project management knowledge, skills, competences and best practices are of great importance
for the clients, contractors and suppliers to manage their scopes in projects and achieve the
stakeholders’ needs and requirements. The common interests and benefits of clients, contractors
and suppliers, that related to a specific project or intended projects in future, push and tempt
them to initiate some kinds of relationships that are supposed to help and facilitate achieving
their needs and requirements with the highest levels of benefits and minimum levels of risks and
uncertainties. Morledge, Smith and Kashiwagi (2006), emphasize the great importance of
collaboration and trust in the relationships between the projects’ clients, contractors and
suppliers. Furthermore, they add that collaborative and innovative approaches in the construction
industry support promoting these relationships to be closer to win-win relationships and
partnership. They assert that these approaches are usually resisted by many traditional
approaches and dominant cultures that totally limit construction procurement endeavors within
the lowest bid price, strict compliance with contract terms and conditions and the extreme power
and authority of clients to select and engage others in their projects. Morledge, Smith and
Kashiwagi (2006) highlight that contractors and suppliers even after being part of the project,
clients are used to evaluate their performance and behaviors according to their achievement and
compliance with the clients’ own interests and benefits. This in addition may still a powerful tool
in the hands of the client to impose his interests and requirements as long as the other parties are
still concerned about his current or future projects and business.
All the parties in the project are responsible for and have influence on initiating, maintaining
and empowering effective relationships in the project (eds. Leung & Olomolaiye 2010). But, as
emphasized by Leung & Olomolaiye, project client is of a crucial role and great influence in
initiating such relations by adopting specific criteria and processes while selecting and evaluating
project contractors and suppliers. Then each party in the project has a crucial role in maintaining
and developing these relationships upon their interests, needs, knowledge and experience that
can be realized through their work interactions and communication approaches.
Walker and Rowlinson (2008) confirm the mutual responsibility of clients and
suppliers/subcontractors in projects for the articulation of their business relationships and mostly
ID- 2013000439 Page 10
uncertainties.
Project management knowledge, skills, competences and best practices are of great importance
for the clients, contractors and suppliers to manage their scopes in projects and achieve the
stakeholders’ needs and requirements. The common interests and benefits of clients, contractors
and suppliers, that related to a specific project or intended projects in future, push and tempt
them to initiate some kinds of relationships that are supposed to help and facilitate achieving
their needs and requirements with the highest levels of benefits and minimum levels of risks and
uncertainties. Morledge, Smith and Kashiwagi (2006), emphasize the great importance of
collaboration and trust in the relationships between the projects’ clients, contractors and
suppliers. Furthermore, they add that collaborative and innovative approaches in the construction
industry support promoting these relationships to be closer to win-win relationships and
partnership. They assert that these approaches are usually resisted by many traditional
approaches and dominant cultures that totally limit construction procurement endeavors within
the lowest bid price, strict compliance with contract terms and conditions and the extreme power
and authority of clients to select and engage others in their projects. Morledge, Smith and
Kashiwagi (2006) highlight that contractors and suppliers even after being part of the project,
clients are used to evaluate their performance and behaviors according to their achievement and
compliance with the clients’ own interests and benefits. This in addition may still a powerful tool
in the hands of the client to impose his interests and requirements as long as the other parties are
still concerned about his current or future projects and business.
All the parties in the project are responsible for and have influence on initiating, maintaining
and empowering effective relationships in the project (eds. Leung & Olomolaiye 2010). But, as
emphasized by Leung & Olomolaiye, project client is of a crucial role and great influence in
initiating such relations by adopting specific criteria and processes while selecting and evaluating
project contractors and suppliers. Then each party in the project has a crucial role in maintaining
and developing these relationships upon their interests, needs, knowledge and experience that
can be realized through their work interactions and communication approaches.
Walker and Rowlinson (2008) confirm the mutual responsibility of clients and
suppliers/subcontractors in projects for the articulation of their business relationships and mostly
ID- 2013000439 Page 10

from their actions and behaviors towards each other’s interests, needs and priorities. They add that
applying proper selection criteria to select other project parties will affect the results and deliverables
of this project and organizations’ future competences. They emphasize the great importance of
mutual trust and respect between the parties in projects as a warranty for sustainable and long-term
relationships. They assert the findings of Morledge, Smith and Kashiwagi (2006) and highlight that it
should be win-win relationships that project parties should adopt and initiate, amicably, in their
projects and business to achieve mutual benefits and interests.
Singh and Tiong (2006) emphasize that initiating relationships with suppliers and subcontractors in
projects should be based on respect and trust that lead to long-term relationships and partnerships.
They add that "[c]ontractor selection is a multifaceted decision making process involving the
consideration of multiple selection criteria which are mostly subjective in nature and difficult to
gage" (2006, p. 998). They highlight that selection criteria for suppliers and contractors are of crucial
role in articulating the future relationships and business success. And these selection decisions should
consider many important key factors which include price and non-price criteria.
Davis and Walker (2008) in their extensive study about project alliances in Australian
construction industry, confirm the interrelation between trust, commitment and respect while
initiating and enhancing the business relationships between the project parties. They conclude
that mutual commitment and respect are deemed to be cornerstones in building and maintaining
trust between the parties in the construction industry.
On the other hand, many clients look at and consider the contractors and suppliers as the
weakest party who must accept any unjustified behavior and disrespect in order to secure jobs
and compete with others in the business market (Valenzuela & Villacorta 1999). It is the
traditional perspective of some clients who think and understand the business relationships in the
projects, by default, should serve and achieve the client’s own interests, expectations and
benefits apart from other parties’ interests and benefits.
These signs of business immaturity could be noticed in most countries all over the world, but in
developing countries including the United Arab Emirates (UAE) and other Gulf region countries
could be more and of high impacts. This is due to the moderate business experience, knowledge,
skills and practices compared to the best practices and business experience of some other
ID- 2013000439 Page 11
applying proper selection criteria to select other project parties will affect the results and deliverables
of this project and organizations’ future competences. They emphasize the great importance of
mutual trust and respect between the parties in projects as a warranty for sustainable and long-term
relationships. They assert the findings of Morledge, Smith and Kashiwagi (2006) and highlight that it
should be win-win relationships that project parties should adopt and initiate, amicably, in their
projects and business to achieve mutual benefits and interests.
Singh and Tiong (2006) emphasize that initiating relationships with suppliers and subcontractors in
projects should be based on respect and trust that lead to long-term relationships and partnerships.
They add that "[c]ontractor selection is a multifaceted decision making process involving the
consideration of multiple selection criteria which are mostly subjective in nature and difficult to
gage" (2006, p. 998). They highlight that selection criteria for suppliers and contractors are of crucial
role in articulating the future relationships and business success. And these selection decisions should
consider many important key factors which include price and non-price criteria.
Davis and Walker (2008) in their extensive study about project alliances in Australian
construction industry, confirm the interrelation between trust, commitment and respect while
initiating and enhancing the business relationships between the project parties. They conclude
that mutual commitment and respect are deemed to be cornerstones in building and maintaining
trust between the parties in the construction industry.
On the other hand, many clients look at and consider the contractors and suppliers as the
weakest party who must accept any unjustified behavior and disrespect in order to secure jobs
and compete with others in the business market (Valenzuela & Villacorta 1999). It is the
traditional perspective of some clients who think and understand the business relationships in the
projects, by default, should serve and achieve the client’s own interests, expectations and
benefits apart from other parties’ interests and benefits.
These signs of business immaturity could be noticed in most countries all over the world, but in
developing countries including the United Arab Emirates (UAE) and other Gulf region countries
could be more and of high impacts. This is due to the moderate business experience, knowledge,
skills and practices compared to the best practices and business experience of some other
ID- 2013000439 Page 11

developed countries that have initiated and have known and lived the business and management,
as a science and practice, for decades and centuries (Al Ameemi 2011; Ali 2009; Ghalib 2009).
In view of the above, there are great efforts and findings of researchers and practitioners in project
management, in general, and procurement specifically regarding the type of relationships in projects.
In addition to the features that promote these relationships to be more efficient and sustainable
towards the best achievement of stakeholders’ needs, requirements and satisfaction. Also, there are
many researchers who focus on the ethical issues and conducts like, fairness, trust, respect, openness,
responsibility and commitment. Moreover, the regulatory bodies and institutes of most professionals
and disciplines assert the great importance of ethics in business and present Code of Ethics that all
practitioners should comply with under all situations. For example, Project Management Institute
(PMI) counts ‘Respect’ as one of the four main elements of the Code of
Ethics and Professional Conducts of the project management. PMI adds that “[r]espect is our duty to
show a high regard for ourselves, others, and the resources entrusted to us” PMI (2008, p. 4).
Despite the assertion of all academics and practitioners on ethics, in general, as a holy right and
part of humanitarian features that should be kept and complied with during the relationships, the
researcher in this paper will investigate, discuss and conclude the value of respect, as a specific
element of ethics, towards higher levels of work performance and stakeholders’ satisfaction.
Findings of many academics and practitioners besides many case studies, about the value of
respect in the construction field in the UAE, are presented and discussed. These findings and
case studies that the researcher presented are discussed within the context of effective
relationships between the different parties in the project, and aim at improving and promoting the
levels of performance and stakeholders’ satisfaction. The researcher, in this paper, intends to
present the respect, in the project management and procurement field, as an opportunity for high
levels of performance, business success, organizations’ sustainable and competitive advantages
and society wealth and prosperity rather than regulations, instructions or code of conducts.
1.2 Motivation of the Study:
ID- 2013000439 Page 12
as a science and practice, for decades and centuries (Al Ameemi 2011; Ali 2009; Ghalib 2009).
In view of the above, there are great efforts and findings of researchers and practitioners in project
management, in general, and procurement specifically regarding the type of relationships in projects.
In addition to the features that promote these relationships to be more efficient and sustainable
towards the best achievement of stakeholders’ needs, requirements and satisfaction. Also, there are
many researchers who focus on the ethical issues and conducts like, fairness, trust, respect, openness,
responsibility and commitment. Moreover, the regulatory bodies and institutes of most professionals
and disciplines assert the great importance of ethics in business and present Code of Ethics that all
practitioners should comply with under all situations. For example, Project Management Institute
(PMI) counts ‘Respect’ as one of the four main elements of the Code of
Ethics and Professional Conducts of the project management. PMI adds that “[r]espect is our duty to
show a high regard for ourselves, others, and the resources entrusted to us” PMI (2008, p. 4).
Despite the assertion of all academics and practitioners on ethics, in general, as a holy right and
part of humanitarian features that should be kept and complied with during the relationships, the
researcher in this paper will investigate, discuss and conclude the value of respect, as a specific
element of ethics, towards higher levels of work performance and stakeholders’ satisfaction.
Findings of many academics and practitioners besides many case studies, about the value of
respect in the construction field in the UAE, are presented and discussed. These findings and
case studies that the researcher presented are discussed within the context of effective
relationships between the different parties in the project, and aim at improving and promoting the
levels of performance and stakeholders’ satisfaction. The researcher, in this paper, intends to
present the respect, in the project management and procurement field, as an opportunity for high
levels of performance, business success, organizations’ sustainable and competitive advantages
and society wealth and prosperity rather than regulations, instructions or code of conducts.
1.2 Motivation of the Study:
ID- 2013000439 Page 12
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Many literature findings call for respecting, appreciating, collaboration, and maintaining the
humanitarian core values and ethics in the relationships of the parties who involved in projects
management field and business sector in general (Elmualim 2010). In addition to many adopted
Codes of Ethics and Conducts that initiated and presented, by most regulatory and professional
bodies, as holy values and instructions to regulate professions and practitioners activities.
These values like respect, responsibility, fairness and honesty (PMI 2008) are presented to assert
and warrant humanitarian and professional approaches in the business sector which are
consistent with human being nature and value. In addition to promote the level of
professionalism, performance, projects success and stakeholders satisfaction.
On the other hand, some practitioners and organizations in the construction industry, specially
who are ranked as clients with respect to the other parties in projects, show less concerns about
some ethical issues like respect and trust, based on some traditional perspectives about the nature
of relationship and power distribution between the MEP contractor (as a client) with his suppliers
and subcontractors (Cox & Ireland 2002).
MEP contractors usually have many choices and alternatives regarding whom to select to be part
of their projects. Project specifications usually propose many alternative brands for the same
product and MEP contractor can propose additional alternative brands that should be equivalent
to the specified brands or approved by the project consultant. These alternatives represent a
significant component in the power matrix; sometime in the hands of MEP contractor and
sometime in the hands of subcontractor or specialist who knows that his brand is the only
product that can fit the purpose. So, power matrices tempt some of them to adopt and practice
kinds of behaviors and relationships that create conflicts and minimize the performance of other
parties and may lead to project failure.
This issue is recognized and tangible to the researcher who has about ten years experience in the
UAE, within the MEP works sector, out of eighteen years total experience as a practitioner in
this field. The researcher experience about this issue of respect and its implications and
consequences on subcontractors and suppliers performance create a motivation towards deep
investigations, case studies and research about the value that respect practices and its
implementations, within construction industry and projects relationships, may grant to the project
parties. And how this value can be reflected and interpreted in terms of work performance and
satisfaction in addition of being a matter of culture and ethics.
ID- 2013000439 Page 13
humanitarian core values and ethics in the relationships of the parties who involved in projects
management field and business sector in general (Elmualim 2010). In addition to many adopted
Codes of Ethics and Conducts that initiated and presented, by most regulatory and professional
bodies, as holy values and instructions to regulate professions and practitioners activities.
These values like respect, responsibility, fairness and honesty (PMI 2008) are presented to assert
and warrant humanitarian and professional approaches in the business sector which are
consistent with human being nature and value. In addition to promote the level of
professionalism, performance, projects success and stakeholders satisfaction.
On the other hand, some practitioners and organizations in the construction industry, specially
who are ranked as clients with respect to the other parties in projects, show less concerns about
some ethical issues like respect and trust, based on some traditional perspectives about the nature
of relationship and power distribution between the MEP contractor (as a client) with his suppliers
and subcontractors (Cox & Ireland 2002).
MEP contractors usually have many choices and alternatives regarding whom to select to be part
of their projects. Project specifications usually propose many alternative brands for the same
product and MEP contractor can propose additional alternative brands that should be equivalent
to the specified brands or approved by the project consultant. These alternatives represent a
significant component in the power matrix; sometime in the hands of MEP contractor and
sometime in the hands of subcontractor or specialist who knows that his brand is the only
product that can fit the purpose. So, power matrices tempt some of them to adopt and practice
kinds of behaviors and relationships that create conflicts and minimize the performance of other
parties and may lead to project failure.
This issue is recognized and tangible to the researcher who has about ten years experience in the
UAE, within the MEP works sector, out of eighteen years total experience as a practitioner in
this field. The researcher experience about this issue of respect and its implications and
consequences on subcontractors and suppliers performance create a motivation towards deep
investigations, case studies and research about the value that respect practices and its
implementations, within construction industry and projects relationships, may grant to the project
parties. And how this value can be reflected and interpreted in terms of work performance and
satisfaction in addition of being a matter of culture and ethics.
ID- 2013000439 Page 13

1.3- Research Aim:
This research aims at discovering the value and the role of respect in the relationships between
the MEP contractors, in the construction field, and their subcontractors and suppliers. And how
this respect, or disrespect, will be reflected on and affect subcontractors and suppliers
performance and projects success.
To understand the effects of respect on performance and project success, we have to investigate
and highlight the different elements and aspects of respect, in addition to the factors that may
enhance or hinder initiating and implementing respect concepts between project parties. Also, to
link the type of relationships, those clients intend to be dominant in their projects, with the level
of respect that they are willing to show and practice with other project parties.
1.4- Research Objectives:
The following objectives have been set and investigated to achieve the research aim:
Illustrating the meaning of respect and its implications and requisites within the
management context and projects relationships.
Investigating the triggers and motivators of respect in the relationships between main
contractors and subcontractors/suppliers in the construction field.
Investigating the relations between the respect and the effective management of
subcontractors and suppliers.
Determining the main privileges and opportunities that respect can grant to the projects’
success and to the parties involved in these projects and business.
Determining the main impacts and threads that the absence or lack of respect will cause
against work performance and stakeholders satisfaction.
Specifying the main challenges and obstacles in initiating and developing respect-based
and empowered relationships between the MEP contractors and their projects suppliers
and subcontractors.
1.5- Dissertation Structure:
ID- 2013000439 Page 14
This research aims at discovering the value and the role of respect in the relationships between
the MEP contractors, in the construction field, and their subcontractors and suppliers. And how
this respect, or disrespect, will be reflected on and affect subcontractors and suppliers
performance and projects success.
To understand the effects of respect on performance and project success, we have to investigate
and highlight the different elements and aspects of respect, in addition to the factors that may
enhance or hinder initiating and implementing respect concepts between project parties. Also, to
link the type of relationships, those clients intend to be dominant in their projects, with the level
of respect that they are willing to show and practice with other project parties.
1.4- Research Objectives:
The following objectives have been set and investigated to achieve the research aim:
Illustrating the meaning of respect and its implications and requisites within the
management context and projects relationships.
Investigating the triggers and motivators of respect in the relationships between main
contractors and subcontractors/suppliers in the construction field.
Investigating the relations between the respect and the effective management of
subcontractors and suppliers.
Determining the main privileges and opportunities that respect can grant to the projects’
success and to the parties involved in these projects and business.
Determining the main impacts and threads that the absence or lack of respect will cause
against work performance and stakeholders satisfaction.
Specifying the main challenges and obstacles in initiating and developing respect-based
and empowered relationships between the MEP contractors and their projects suppliers
and subcontractors.
1.5- Dissertation Structure:
ID- 2013000439 Page 14

The dissertation structure is composed of six main chapters, and each chapter will be divided into
many sections that are intended to cover all the aspects of chapter subject.
Chapter one title is: Introduction; through which the researcher intends to give clear but brief
background about the value of respect in relationships of project parties with each other, and the
motivation for such subject. Also, in this chapter, the researcher presents an articulated aim
beyond this research and many objectives that to be investigated for better realizing and
achievement of research aim. Dissertation structure section is part of introduction chapter and
aims at presenting the whole structure of dissertation in brief as an integrated unit easier for
summation and understanding.
The second chapter title is: Literature Review; in which the researcher will present the finding of
other researchers about the value of respect and its relations and interferences with the effective
relationships between MEP contractors and their suppliers and subcontractors. This chapter is
intended to cover all the aspects and facets of respect and its interrelation with effective
relationships and work performance from academics’ perspectives.
The third chapter title is: the Conceptual Model. The researcher in this chapter will present a
comprehensive theoretical framework that concluded from the literature findings. This model
represents and covers the aspects and the facets of respect between MEP contractors and their
suppliers and subcontractors, and its interrelations, as a value and a practice, with work
performance and project success.
Chapter four presents the methodology that the researcher followed in answering and addressing
the aim and objectives of research. The researcher adopted the qualitative analysis and carried
out many interviews with key persons of many organizations that represent MEP contractors,
subcontractors and suppliers.
The researcher in Chapter five; Results, Analysis and Discussion, shows and clarifies the results
of this qualitative research by analyzing and discussing the results of the case studies in light of
the comprehensive model and conceptual framework that articulated and presented in chapter
three .
Chapter Six title is: Conclusion and Recommendations. This chapter concludes the results and
findings of the previous chapters regarding the actual value of respect in the relationships between
ID- 2013000439 Page 15
many sections that are intended to cover all the aspects of chapter subject.
Chapter one title is: Introduction; through which the researcher intends to give clear but brief
background about the value of respect in relationships of project parties with each other, and the
motivation for such subject. Also, in this chapter, the researcher presents an articulated aim
beyond this research and many objectives that to be investigated for better realizing and
achievement of research aim. Dissertation structure section is part of introduction chapter and
aims at presenting the whole structure of dissertation in brief as an integrated unit easier for
summation and understanding.
The second chapter title is: Literature Review; in which the researcher will present the finding of
other researchers about the value of respect and its relations and interferences with the effective
relationships between MEP contractors and their suppliers and subcontractors. This chapter is
intended to cover all the aspects and facets of respect and its interrelation with effective
relationships and work performance from academics’ perspectives.
The third chapter title is: the Conceptual Model. The researcher in this chapter will present a
comprehensive theoretical framework that concluded from the literature findings. This model
represents and covers the aspects and the facets of respect between MEP contractors and their
suppliers and subcontractors, and its interrelations, as a value and a practice, with work
performance and project success.
Chapter four presents the methodology that the researcher followed in answering and addressing
the aim and objectives of research. The researcher adopted the qualitative analysis and carried
out many interviews with key persons of many organizations that represent MEP contractors,
subcontractors and suppliers.
The researcher in Chapter five; Results, Analysis and Discussion, shows and clarifies the results
of this qualitative research by analyzing and discussing the results of the case studies in light of
the comprehensive model and conceptual framework that articulated and presented in chapter
three .
Chapter Six title is: Conclusion and Recommendations. This chapter concludes the results and
findings of the previous chapters regarding the actual value of respect in the relationships between
ID- 2013000439 Page 15
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

the parties in the MEP construction industry and its specific influences on work performance, in
light of many case studies that carried out within the UAE construction field. Limitations of
research and recommendations for further researches are also presented in this chapter.
Chapter Two- Literature Review:
2.1 Effective Management of Suppliers/Subcontractors:
ID- 2013000439 Page 16
light of many case studies that carried out within the UAE construction field. Limitations of
research and recommendations for further researches are also presented in this chapter.
Chapter Two- Literature Review:
2.1 Effective Management of Suppliers/Subcontractors:
ID- 2013000439 Page 16

Appropriate knowledge, skills tools and techniques are deemed to be important qualifications to
posses while different teams and parties intend to deal with each other pertaining some common
interests and benefits. This becomes more crucial and of great importance for owners and clients
who initially select the contractors and suppliers to be involved in executing and realizing their
endeavors and projects.
Turner (1995) highlights the crucial role of owners/clients in articulating their interests and
determining their actual needs and requirements. He calls clients to articulate and communicate
the best proper scope of works that achieves their actual needs and requirements. Also, he
emphasizes the need for a proper type of contracts that should be accomplished between the
owner and the contractor. He mentions many types of contracts like: supply of materials and
services, turnkey contracts, managing contracts and consultancy contracts, (to mention more if
available). Moreover, Turner highlights the role of law towards contracts and its commitments
when he defines the contract as "a promise or set of promises between parties, which the law will
enforce" (1995, p. 244). And according to Turner (1995) there are lump sum contracts and
reimbursable contracts that have different aspects towards motivations and risks. Client and his
suppliers/subcontractors should select the most proper contract and terms that represent their
clearly mentioned interests and needs without any hidden agenda that may defect the mutual trust
or the agreed objectives.( to cite).
Oberlinder (2000) highlights the importance of three main components namely; scope, schedule
and cost, that project parties should mange and cooperate effectively to achieve their objectives
and project success with high levels of satisfaction.
Moreover, Wanger (2000) highlighted the great importance of possessing high levels of knowledge
and smartness while managing projects suppliers and subcontractors. He emphasized the findings of
Burt (1989) who calls clients to adopt a strategic and an effective management while selecting and
dealing with the other parties of projects. Talluri and Sarkis (2002) justify that suppliers selection
processes, negotiation of contracts and its terms, performance monitoring and feedback represent the
cornerstone for an effective supplier/contractor management and successful project.
Narayanan and Raman (2004) highlight the importance of aligning project parties’ interests and
incentives in the early stages of the project. They concluded that managing other parties in the
project may implies risk distributions, costs, responsibilities and benefits which should be clearly
ID- 2013000439 Page 17
posses while different teams and parties intend to deal with each other pertaining some common
interests and benefits. This becomes more crucial and of great importance for owners and clients
who initially select the contractors and suppliers to be involved in executing and realizing their
endeavors and projects.
Turner (1995) highlights the crucial role of owners/clients in articulating their interests and
determining their actual needs and requirements. He calls clients to articulate and communicate
the best proper scope of works that achieves their actual needs and requirements. Also, he
emphasizes the need for a proper type of contracts that should be accomplished between the
owner and the contractor. He mentions many types of contracts like: supply of materials and
services, turnkey contracts, managing contracts and consultancy contracts, (to mention more if
available). Moreover, Turner highlights the role of law towards contracts and its commitments
when he defines the contract as "a promise or set of promises between parties, which the law will
enforce" (1995, p. 244). And according to Turner (1995) there are lump sum contracts and
reimbursable contracts that have different aspects towards motivations and risks. Client and his
suppliers/subcontractors should select the most proper contract and terms that represent their
clearly mentioned interests and needs without any hidden agenda that may defect the mutual trust
or the agreed objectives.( to cite).
Oberlinder (2000) highlights the importance of three main components namely; scope, schedule
and cost, that project parties should mange and cooperate effectively to achieve their objectives
and project success with high levels of satisfaction.
Moreover, Wanger (2000) highlighted the great importance of possessing high levels of knowledge
and smartness while managing projects suppliers and subcontractors. He emphasized the findings of
Burt (1989) who calls clients to adopt a strategic and an effective management while selecting and
dealing with the other parties of projects. Talluri and Sarkis (2002) justify that suppliers selection
processes, negotiation of contracts and its terms, performance monitoring and feedback represent the
cornerstone for an effective supplier/contractor management and successful project.
Narayanan and Raman (2004) highlight the importance of aligning project parties’ interests and
incentives in the early stages of the project. They concluded that managing other parties in the
project may implies risk distributions, costs, responsibilities and benefits which should be clearly
ID- 2013000439 Page 17

articulated, openly communicated and mutually agreed by all parties, within fairness and equity
spirits.
On the other hand, Dyer, Cho, and Chu in 1998 (citing in Smith 2007) present two main models
in managing suppliers and contractors that clients usually adopt according to their business needs
and sensitivity and according to the supplier/contractor intended role or actual influence and
importance on client’s business and pipeline. They proposed 'arms-length model' that pertaining
non- strategic activities that clients prefer to be more independent from supplier/contractors
influence and to have a wider margin of control and decision making. The other proposed model,
'strategic partnership model', represents client’s strategic choice to have a high quality
deliverables within interactional, sustainable and transparent relationships with
suppliers/contractors, for a higher levels of success in the client’s recent and future projects.
Nevertheless, Smith (2007) emphasizes the necessity of interests’ alignment and initiating and
maintaining a mutual trust, respect and commitment towards project objectives and success for
the both management models.
OGC (2007), guide 5, asserts the great importance of partnering and teamwork in project success
and cultivating the maximum mutual benefits for all project parties. OGC emphasizes that the
need to partnering and teamwork mentality is of crucial role in the complex projects and in the
situations of uncertainties in project scope and requirements, or when there will be many similar
projects with the client and he needs more improvements in cost and quality.
Walker and Rowlinson (2008) confirm that the proper management of suppliers and contractors
can minimize the disputes in the project in addition to mitigating the unreasonable claims. They
call all project parties to adopt friendly policies towards any conflict during project lifecycle.
Moreover, Project Management Institute (PMI) (2008), counts 'project procurement management' as
one of the main components of project management ‘knowledge areas’. PMI divides 'project
procurement management' into four main process groups namely: ‘plan procurement’, ‘conduct
procurement’, ‘administer procurement’ and ‘close procurement’. Moreover, PMI confirms the great
importance and the crucial role of the well articulated and agreed contracts in mitigating risks and
disputes in the projects besides improving all parties’ performance and satisfaction.
PMI states that a contract "represents a mutually binding agreement that obligates the seller to
provide the specified products, services or results, and obligates the buyer to provide monetary or
ID- 2013000439 Page 18
spirits.
On the other hand, Dyer, Cho, and Chu in 1998 (citing in Smith 2007) present two main models
in managing suppliers and contractors that clients usually adopt according to their business needs
and sensitivity and according to the supplier/contractor intended role or actual influence and
importance on client’s business and pipeline. They proposed 'arms-length model' that pertaining
non- strategic activities that clients prefer to be more independent from supplier/contractors
influence and to have a wider margin of control and decision making. The other proposed model,
'strategic partnership model', represents client’s strategic choice to have a high quality
deliverables within interactional, sustainable and transparent relationships with
suppliers/contractors, for a higher levels of success in the client’s recent and future projects.
Nevertheless, Smith (2007) emphasizes the necessity of interests’ alignment and initiating and
maintaining a mutual trust, respect and commitment towards project objectives and success for
the both management models.
OGC (2007), guide 5, asserts the great importance of partnering and teamwork in project success
and cultivating the maximum mutual benefits for all project parties. OGC emphasizes that the
need to partnering and teamwork mentality is of crucial role in the complex projects and in the
situations of uncertainties in project scope and requirements, or when there will be many similar
projects with the client and he needs more improvements in cost and quality.
Walker and Rowlinson (2008) confirm that the proper management of suppliers and contractors
can minimize the disputes in the project in addition to mitigating the unreasonable claims. They
call all project parties to adopt friendly policies towards any conflict during project lifecycle.
Moreover, Project Management Institute (PMI) (2008), counts 'project procurement management' as
one of the main components of project management ‘knowledge areas’. PMI divides 'project
procurement management' into four main process groups namely: ‘plan procurement’, ‘conduct
procurement’, ‘administer procurement’ and ‘close procurement’. Moreover, PMI confirms the great
importance and the crucial role of the well articulated and agreed contracts in mitigating risks and
disputes in the projects besides improving all parties’ performance and satisfaction.
PMI states that a contract "represents a mutually binding agreement that obligates the seller to
provide the specified products, services or results, and obligates the buyer to provide monetary or
ID- 2013000439 Page 18
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

any other valuable consideration"(2008, p. 315). PMI highlights that in construction projects there
are two famous types of contracts namely: ‘fixed-price contract’ and ‘cost-reimbursable contracts’.
Also, 'time and material contracts' are used as a hybrid type in many projects. The importance of
contracts, as a supportive and an effective tool in managing relationships and projects, is
highlighted by Mahotra (2009). He adds that proper types of contracts in projects can mitigate
risks, eliminate disputes and improve the parties’ performance and stakeholders’ satisfaction.
Harris (2010) asserts that the main purpose of stakeholders’ management in general is to manage
the relationships effectively and to offer a high levels of performance , productivity, success and
satisfaction for all the interrelated parties within a common perspective towards long-term and
win-win relationships.
Elmualim (2010) confirms that the management of any organization should serve the interests of
its stakeholders. He asserts the stakeholders concept which has elaborated by Starik (1994) who
presents the stakeholders as the individuals or groups who have interests, influences and can be
affected by the organization’s activities and actions. In addition, Elmualim (2010) counts
‘corporate legitimacy’ and ‘fiduciary’ towards stakeholders’ rights and commitments as main
concepts that the management of the organization should consider and keep while dealing with other
parties in business and projects. Fiduciary as per Elmualim (2010) requires transparency, trust,
liability, credibility, honesty, fairness, professionalism, and alignment of stakeholders’ interests to
serve their common endeavors and long-term objectives. On the other hand, Elmualim (2010) argues
that the role of power in the management and relationships between the groups and organizations is
neglected by most researchers. He emphasizes the findings of Wild (2002) that
‘unequal distribution of power’ between the parties in construction projects usually creates many
conflicts and disputes. He offers the ‘mutual empowerment’ concept to be the dominant
mentality and approach while initiating lasting and sustainable business relationships in
construction projects.
Porter and Kramer (2011) assert the great importance of adopting cooperative and integrative
approaches while creating business between organizations. They state that “Shared value holds
the key to unlocking the next wave of business innovation and growth” (2011, p. 17). Porter and
Kramer add that shared value should encourage initiating deep relationships between the
business parties based on respecting, initiating and delivering true social values that qualify them
to be respected by society members.
ID- 2013000439 Page 19
are two famous types of contracts namely: ‘fixed-price contract’ and ‘cost-reimbursable contracts’.
Also, 'time and material contracts' are used as a hybrid type in many projects. The importance of
contracts, as a supportive and an effective tool in managing relationships and projects, is
highlighted by Mahotra (2009). He adds that proper types of contracts in projects can mitigate
risks, eliminate disputes and improve the parties’ performance and stakeholders’ satisfaction.
Harris (2010) asserts that the main purpose of stakeholders’ management in general is to manage
the relationships effectively and to offer a high levels of performance , productivity, success and
satisfaction for all the interrelated parties within a common perspective towards long-term and
win-win relationships.
Elmualim (2010) confirms that the management of any organization should serve the interests of
its stakeholders. He asserts the stakeholders concept which has elaborated by Starik (1994) who
presents the stakeholders as the individuals or groups who have interests, influences and can be
affected by the organization’s activities and actions. In addition, Elmualim (2010) counts
‘corporate legitimacy’ and ‘fiduciary’ towards stakeholders’ rights and commitments as main
concepts that the management of the organization should consider and keep while dealing with other
parties in business and projects. Fiduciary as per Elmualim (2010) requires transparency, trust,
liability, credibility, honesty, fairness, professionalism, and alignment of stakeholders’ interests to
serve their common endeavors and long-term objectives. On the other hand, Elmualim (2010) argues
that the role of power in the management and relationships between the groups and organizations is
neglected by most researchers. He emphasizes the findings of Wild (2002) that
‘unequal distribution of power’ between the parties in construction projects usually creates many
conflicts and disputes. He offers the ‘mutual empowerment’ concept to be the dominant
mentality and approach while initiating lasting and sustainable business relationships in
construction projects.
Porter and Kramer (2011) assert the great importance of adopting cooperative and integrative
approaches while creating business between organizations. They state that “Shared value holds
the key to unlocking the next wave of business innovation and growth” (2011, p. 17). Porter and
Kramer add that shared value should encourage initiating deep relationships between the
business parties based on respecting, initiating and delivering true social values that qualify them
to be respected by society members.
ID- 2013000439 Page 19

Chiu and Huang 2003, Gunasekaran and Cheng 2008 and Wadhwa et al. 2009 (citing in Saetta et
al 2012) assert the crucial role of SCM in improving organizational competitiveness, and add
that the cooperative approaches in the relationships between the organizations should be adopted
by all projects parties to promote performance levels and satisfaction. Moreover, Saetta et al
(2012) call for effective SCM that based on mutual agreed decisions and interests rather than
independent or autonomous decision-making mentalities.
2.2 The Crucial Role of Relationships with Suppliers/Subcontractors:
Turner (1995) emphasizes that the client’s relationships with project suppliers/contractors should
be on win-win basis in order to minimize the risks, improve the performance and optimize the
mutual benefits. He adds that “there is a need to manage the relationship between owner and
contractor in order to help both sides to achieve the objectives which the contract between them
is designed to express"(1995, p.145).
Oberlinder (2000) asserted that relationships between clients and suppliers/contractors should be
initiated upon agreed objectives and aligned interests within a trust, equity and cooperative
environment. In case of any conflict or dispute, he calls all parties to cooperate within positive
attitudes towards project success and all parties benefits.
Wagner (2000) expresses the crucial role of the integrative relationships between the project
parties in project success and stakeholders satisfaction. He calls all project parties to align their
needs, requirements and interests and to be focused towards mutual benefits, project success and
long-term relationships rather than selfish and win-lose mentalities.
On the other hand, Talluri and Sarkis (2002) assert the findings of Smallwood and Venter (2001) that
long-term relationships between client and contractor are deemed to be critical components of the
effective management of the project itself and the organization strategy and business in general. They
highlight that respect, trust, integrity and cooperative mentalities are of a great influence and high
impacts on the type of the relationships between the parties in the construction industry. Talluri and
Sarkis (2002) add that the relationships which are only built on prices can’t initiate real partnership
or grant sustainable benefits and competitive advantages to the organizations.
Moreover, Beth et al (2003) confirm that despite the great importance and crucial role of good-
willing attitudes, trust, openness and credibility in business relationships, this should be
accompanied by transparent and proper types of contracts.
ID- 2013000439 Page 20
al 2012) assert the crucial role of SCM in improving organizational competitiveness, and add
that the cooperative approaches in the relationships between the organizations should be adopted
by all projects parties to promote performance levels and satisfaction. Moreover, Saetta et al
(2012) call for effective SCM that based on mutual agreed decisions and interests rather than
independent or autonomous decision-making mentalities.
2.2 The Crucial Role of Relationships with Suppliers/Subcontractors:
Turner (1995) emphasizes that the client’s relationships with project suppliers/contractors should
be on win-win basis in order to minimize the risks, improve the performance and optimize the
mutual benefits. He adds that “there is a need to manage the relationship between owner and
contractor in order to help both sides to achieve the objectives which the contract between them
is designed to express"(1995, p.145).
Oberlinder (2000) asserted that relationships between clients and suppliers/contractors should be
initiated upon agreed objectives and aligned interests within a trust, equity and cooperative
environment. In case of any conflict or dispute, he calls all parties to cooperate within positive
attitudes towards project success and all parties benefits.
Wagner (2000) expresses the crucial role of the integrative relationships between the project
parties in project success and stakeholders satisfaction. He calls all project parties to align their
needs, requirements and interests and to be focused towards mutual benefits, project success and
long-term relationships rather than selfish and win-lose mentalities.
On the other hand, Talluri and Sarkis (2002) assert the findings of Smallwood and Venter (2001) that
long-term relationships between client and contractor are deemed to be critical components of the
effective management of the project itself and the organization strategy and business in general. They
highlight that respect, trust, integrity and cooperative mentalities are of a great influence and high
impacts on the type of the relationships between the parties in the construction industry. Talluri and
Sarkis (2002) add that the relationships which are only built on prices can’t initiate real partnership
or grant sustainable benefits and competitive advantages to the organizations.
Moreover, Beth et al (2003) confirm that despite the great importance and crucial role of good-
willing attitudes, trust, openness and credibility in business relationships, this should be
accompanied by transparent and proper types of contracts.
ID- 2013000439 Page 20

These findings are supported by Turner and Muller (2004) who assert that the interests, needs,
requirements and objectives of all parties should be expressed, openly discussed and aligned for
the higher levels of professionalism and satisfaction. They highlighted the necessity of mutual
respect and understanding of each party responsibility, rights and associated risks. They assert
initiating, developing and maintaining a cooperative, integrative and productive environment
rather than selfish and competition relationship between client and supplier/contractor.
On the other hand, Liker and Choi (2004) propose a ‘supplier-Partnering Hierarchy’ that consists
of six components, namely: ‘understand how your suppliers work’, ‘turn supplier rivalry into
opportunity’, ‘supervise your suppliers’, ‘develop suppliers’ technical capabilities’, ‘share
information intensively but selectively’ and ‘conduct joint improvement activities’. Moreover,
they assert that clients rely on their suppliers for cost savings, higher quality and better
development in processes and products than the other rivals. Regarding the trust, Liker and Choi
(2004) emphasize that it should be accompanied by proper monitoring and controlling tools and
processes.
Smith (2007) justifies the great importance of transparency and sharing the sensitive and critical
information between the different parties in the project. That should be based on mutual trust and
oriented towards mutual benefits, higher levels of performance and future competitive
advantage. Besides, he asserts that organization financial position is of a crucial role in
enhancing the business relationships with other parties, and can eliminate many problems and
disputes that may arise during the business deals and projects.
In the same context, Walker and Rowlinson (2008) confirm the findings of Smith (2007) and
highlight that win-win relationships should be a common intention between the client and his
suppliers/contractors. This, in contrast to win-lose mentality, will push towards developing long-
term and sustainable business relationships besides the achievement of high levels of work
performance, projects success and stakeholders satisfaction.
Clarke (2008) asserts that the lack of respect leads to many relationships disputes between the
project stakeholders. He calls for a unified and a well articulated definition for the term of
respect because of the crucial role of the mutual respect in enhancing the effective relationships
and promoting the levels of work performance and projects success.
Elmualim (2010) asserts the necessity of long-term relationships that are based on mutual benefits
and proper collaboration between all the participants in constructing the project. He highlights that
ID- 2013000439 Page 21
requirements and objectives of all parties should be expressed, openly discussed and aligned for
the higher levels of professionalism and satisfaction. They highlighted the necessity of mutual
respect and understanding of each party responsibility, rights and associated risks. They assert
initiating, developing and maintaining a cooperative, integrative and productive environment
rather than selfish and competition relationship between client and supplier/contractor.
On the other hand, Liker and Choi (2004) propose a ‘supplier-Partnering Hierarchy’ that consists
of six components, namely: ‘understand how your suppliers work’, ‘turn supplier rivalry into
opportunity’, ‘supervise your suppliers’, ‘develop suppliers’ technical capabilities’, ‘share
information intensively but selectively’ and ‘conduct joint improvement activities’. Moreover,
they assert that clients rely on their suppliers for cost savings, higher quality and better
development in processes and products than the other rivals. Regarding the trust, Liker and Choi
(2004) emphasize that it should be accompanied by proper monitoring and controlling tools and
processes.
Smith (2007) justifies the great importance of transparency and sharing the sensitive and critical
information between the different parties in the project. That should be based on mutual trust and
oriented towards mutual benefits, higher levels of performance and future competitive
advantage. Besides, he asserts that organization financial position is of a crucial role in
enhancing the business relationships with other parties, and can eliminate many problems and
disputes that may arise during the business deals and projects.
In the same context, Walker and Rowlinson (2008) confirm the findings of Smith (2007) and
highlight that win-win relationships should be a common intention between the client and his
suppliers/contractors. This, in contrast to win-lose mentality, will push towards developing long-
term and sustainable business relationships besides the achievement of high levels of work
performance, projects success and stakeholders satisfaction.
Clarke (2008) asserts that the lack of respect leads to many relationships disputes between the
project stakeholders. He calls for a unified and a well articulated definition for the term of
respect because of the crucial role of the mutual respect in enhancing the effective relationships
and promoting the levels of work performance and projects success.
Elmualim (2010) asserts the necessity of long-term relationships that are based on mutual benefits
and proper collaboration between all the participants in constructing the project. He highlights that
ID- 2013000439 Page 21
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

each party in the project, traditionally, has his own agenda and interests. These interests are mainly,
as asserted by Elmualim (2010) of financial type to acquire the maximum amounts of profits and
benefits. He emphasizes the great importance of aligning all parties’ requirements and interests in the
early stages of the project. In addition, he argues that fragmentation of construction industry, in
general, leads to outsourcing most of project works towards more dependency on suppliers and
subcontractors in projects and minimizes the efficiency and effectiveness of team work. Elmualim
(2010), while discussing the findings of Karlberg (2004), highlights the mutual and adversarial
relationships between the stakeholders in general and states that “[a]dversarialism appears in the
form of contest, competition and confrontational relationships’’ and adds that “[m]utualism enhances
the chances of all members of the groups to have the benefit of being winners, though the sense of
winning might not be a tangible form” (Elmualim 2010, p. 179).
Moreover, he argues that while organizations are seeking the competitive advantage many
conflicts and disputes may appear and confront initiating long-term relationships. Elmualim
(2010) asserts that organizations should adopt the collaborative approach to be more competitive
and to achieve better performance, long-term returns, benefits and improvements.
Ohdar and Ray (2012) justify the need for successful and sustainable relationships with other
suppliers and contractors as most organizations have recognized the importance and feasibility of
outsourcing their non-core activities and projects to other specialized parties who can present
better performance, excellence and professionalism.
Dulaimi (2013) asserts the crucial role of fairness, openness and transparency environment in
creating and maintaining sustainable and win-win relationships. This healthy environment should
be initiated and adopted by all business parties and maintained all the time through an effective
relationship management that motivates all parties to high levels of performance, success and
competence. Client’s needs and requirements, project specification and interests should be
aligned, articulated, communicated and agreed by all parties in the early stages of the project or
business relationships.
Ertel (1999), confirm the crucial role and great importance of initiating and maintaining a long
term relationships with suppliers and subcontractors. The relationships between project parties
should be win-win relationships and far away from the traditional procurement mentality of a
zero-sum game that only considers the lowest price , while discussing outsourcing and contracts
with suppliers and project parties, highlights that negotiations is deemed to be a main component
ID- 2013000439 Page 22
as asserted by Elmualim (2010) of financial type to acquire the maximum amounts of profits and
benefits. He emphasizes the great importance of aligning all parties’ requirements and interests in the
early stages of the project. In addition, he argues that fragmentation of construction industry, in
general, leads to outsourcing most of project works towards more dependency on suppliers and
subcontractors in projects and minimizes the efficiency and effectiveness of team work. Elmualim
(2010), while discussing the findings of Karlberg (2004), highlights the mutual and adversarial
relationships between the stakeholders in general and states that “[a]dversarialism appears in the
form of contest, competition and confrontational relationships’’ and adds that “[m]utualism enhances
the chances of all members of the groups to have the benefit of being winners, though the sense of
winning might not be a tangible form” (Elmualim 2010, p. 179).
Moreover, he argues that while organizations are seeking the competitive advantage many
conflicts and disputes may appear and confront initiating long-term relationships. Elmualim
(2010) asserts that organizations should adopt the collaborative approach to be more competitive
and to achieve better performance, long-term returns, benefits and improvements.
Ohdar and Ray (2012) justify the need for successful and sustainable relationships with other
suppliers and contractors as most organizations have recognized the importance and feasibility of
outsourcing their non-core activities and projects to other specialized parties who can present
better performance, excellence and professionalism.
Dulaimi (2013) asserts the crucial role of fairness, openness and transparency environment in
creating and maintaining sustainable and win-win relationships. This healthy environment should
be initiated and adopted by all business parties and maintained all the time through an effective
relationship management that motivates all parties to high levels of performance, success and
competence. Client’s needs and requirements, project specification and interests should be
aligned, articulated, communicated and agreed by all parties in the early stages of the project or
business relationships.
Ertel (1999), confirm the crucial role and great importance of initiating and maintaining a long
term relationships with suppliers and subcontractors. The relationships between project parties
should be win-win relationships and far away from the traditional procurement mentality of a
zero-sum game that only considers the lowest price , while discussing outsourcing and contracts
with suppliers and project parties, highlights that negotiations is deemed to be a main component
ID- 2013000439 Page 22

of any procurement activity and business relationships. He adds that negotiations require openness,
transparency, integrative and cooperative mentalities from all the parties that involved in the project.
Ertel points out the dominant procurement practitioners’ perspective and approaches that
implemented differently while closing a deal or intending long-term relationships with suppliers or
subcontractors. The dominant traditional practice, as Ertel (1999) asserts, shows that negotiators
usually depends solely on their skills in closing business deals that usually perceived and ranked by
traditional corporate as win or lose deals. On the other hand, negotiators should keen to keep terms
and conditions of long-term and sustainable relationships with other suppliers and subcontractors
based on reliability, mutual interests and mutual respect rather than short term deals that are based on
low prices and costs. Ertel (1999, p. 11) confirm the importance of the findings of Fisher and Ury
(1981) who introduced the terminology of ‘Best Alternative To
Negotiated Agreement’ (BATNA) to provide high levels of success and satisfaction for all the
parties when involved in an agreement. It implies coordinated and standardized approaches that
finally interpreted into mutual benefits and stronger, closer and creative relationships with
project partners.
2.3 Respect; Meaning and Definition:
As we intend to discuss the role and value of respect in clients’ relationships with the suppliers
and subcontractors and how it may affect work performance, we have first to point out and
highlight the meaning of respect.
Oxford dictionaries (online) define respect as “[a] feeling of deep admiration for someone or
something elicited by their abilities, qualities, or achievements”
(http://www.oxforddictionaries.com/definition/american_english/respect). It means that
originally each human being possesses his own abilities and competences that should be
esteemed and rated properly by others.
ID- 2013000439 Page 23
transparency, integrative and cooperative mentalities from all the parties that involved in the project.
Ertel points out the dominant procurement practitioners’ perspective and approaches that
implemented differently while closing a deal or intending long-term relationships with suppliers or
subcontractors. The dominant traditional practice, as Ertel (1999) asserts, shows that negotiators
usually depends solely on their skills in closing business deals that usually perceived and ranked by
traditional corporate as win or lose deals. On the other hand, negotiators should keen to keep terms
and conditions of long-term and sustainable relationships with other suppliers and subcontractors
based on reliability, mutual interests and mutual respect rather than short term deals that are based on
low prices and costs. Ertel (1999, p. 11) confirm the importance of the findings of Fisher and Ury
(1981) who introduced the terminology of ‘Best Alternative To
Negotiated Agreement’ (BATNA) to provide high levels of success and satisfaction for all the
parties when involved in an agreement. It implies coordinated and standardized approaches that
finally interpreted into mutual benefits and stronger, closer and creative relationships with
project partners.
2.3 Respect; Meaning and Definition:
As we intend to discuss the role and value of respect in clients’ relationships with the suppliers
and subcontractors and how it may affect work performance, we have first to point out and
highlight the meaning of respect.
Oxford dictionaries (online) define respect as “[a] feeling of deep admiration for someone or
something elicited by their abilities, qualities, or achievements”
(http://www.oxforddictionaries.com/definition/american_english/respect). It means that
originally each human being possesses his own abilities and competences that should be
esteemed and rated properly by others.
ID- 2013000439 Page 23

Another definition given by Oxford dictionaries (online) as the “[d]ue regard for the feelings,
wishes, rights, or traditions of others”
(http://www.oxforddictionaries.com/definition/american_english/respect). This definition links
respect with human rights that should never been disregarded or ignored in any kind of
relationships.
Merriam –Webster dictionary (online) defines respect as “a feeling of admiring someone or
something that is good, valuable, important, etc”. Or “a feeling or understanding that someone or
something is important, serious, etc., and should be treated in an appropriate way”
(http://www.merriam-webster.com/dictionary/respect).
Cambridge Dictionaries Online submitted two definitions for the respect; one definition is
“admiration felt or shown for someone or something that you believe has good ideas or
qualities”. And the other definition is “the feeling you show when you accept that different
customs or cultures are different from your own and behave towards them in a way that would
not cause offence” (http://dictionary.cambridge.org/dictionary/british/respect).
In 1948, the United Nations (UN) issued the Universal Declaration of Human Rights (UDHR)
that asserts and calls all individuals, entities and nations to show and promote the respect of
human rights and freedoms as a holy value that humanity imposes regardless of religion, race,
color, language, sex or any kind of distinction or discrimination. UN (1948) states that:
[n]ow, therefore the General Assembly proclaims this Universal Declaration of Human
Right as a common standard of achievement for all peoples and all nations, to the end
that every individual and every organ of society, keeping this Declaration constantly in
mind, shall strive by teaching and education to promote respect for these rights and
freedoms and by progressive measures, national and international, to secure their
universal and effective recognition and observance, both among the peoples of Member
States themselves and among the peoples of territories under their jurisdiction.
http://www.un.org/en/documents/udhr/
PMI (2008) presents ‘Code of Ethics and Professional Conducts’ that represents the most important
values that project management practitioners and community, in general, need and should comply
with. PMI considers ‘Respect’ as one of the four main elements of the Code of Ethics and
Professional Conducts of the project management. PMI states that “[r]espect is our duty
ID- 2013000439 Page 24
wishes, rights, or traditions of others”
(http://www.oxforddictionaries.com/definition/american_english/respect). This definition links
respect with human rights that should never been disregarded or ignored in any kind of
relationships.
Merriam –Webster dictionary (online) defines respect as “a feeling of admiring someone or
something that is good, valuable, important, etc”. Or “a feeling or understanding that someone or
something is important, serious, etc., and should be treated in an appropriate way”
(http://www.merriam-webster.com/dictionary/respect).
Cambridge Dictionaries Online submitted two definitions for the respect; one definition is
“admiration felt or shown for someone or something that you believe has good ideas or
qualities”. And the other definition is “the feeling you show when you accept that different
customs or cultures are different from your own and behave towards them in a way that would
not cause offence” (http://dictionary.cambridge.org/dictionary/british/respect).
In 1948, the United Nations (UN) issued the Universal Declaration of Human Rights (UDHR)
that asserts and calls all individuals, entities and nations to show and promote the respect of
human rights and freedoms as a holy value that humanity imposes regardless of religion, race,
color, language, sex or any kind of distinction or discrimination. UN (1948) states that:
[n]ow, therefore the General Assembly proclaims this Universal Declaration of Human
Right as a common standard of achievement for all peoples and all nations, to the end
that every individual and every organ of society, keeping this Declaration constantly in
mind, shall strive by teaching and education to promote respect for these rights and
freedoms and by progressive measures, national and international, to secure their
universal and effective recognition and observance, both among the peoples of Member
States themselves and among the peoples of territories under their jurisdiction.
http://www.un.org/en/documents/udhr/
PMI (2008) presents ‘Code of Ethics and Professional Conducts’ that represents the most important
values that project management practitioners and community, in general, need and should comply
with. PMI considers ‘Respect’ as one of the four main elements of the Code of Ethics and
Professional Conducts of the project management. PMI states that “[r]espect is our duty
ID- 2013000439 Page 24
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

to show a high regard for ourselves, others, and the resources entrusted to us” (PMI, p. 4)
http://www.pmi.org/~/media/PDF/Ethics/ap_pmicodeofethics.ashx. And asserts that respect
environment can initiate and enhance the trust and can improve cooperation and lead to higher
levels of work performance and excellence. Moreover, PMI divides Code of Ethics and
Professional Conducts that related to Respect into: ‘Mandatory Standards’ and ‘Aspirational
Standards’.
‘Mandatory standards’ of respect, as presented by PMI, impose that the practitioner has to
comply with the following terms:
1- To negotiate in good faith, 2- not to exercise the power or position in influencing others
decisions or actions for personal benefits, 3- not to act in an abusive manner toward others and 4-
to respect the property rights of others.
While ‘Aspirational Standards’ of respect impose:
1-Respecting other parties norms and customs, 2-making the best to understand others
perspectives and points of view, 3- direct approaches and contacts with the concerned people or
parties for better solving conflict issues and 4- to comply with professional manners all the time
(http://www.pmi.org/~/media/PDF/Ethics/ap_pmicodeofethics.ashx).
Hermarij (2013) asserts the crucial role of ethics in the practices of project management, and
states that “at the time of writing this book, the International Project Management Association
does not yet have a code of conduct, but some of the affiliated members do” (2013, p. 498).
Clarke (2008) while discussing the notion of respect within leadership theories context, highlights
many types for respect namely: ‘appraisal’, ‘identification’, ‘recognition’ and ‘acceptance’. He
shows that leadership theories present respect as notion and terminology differently. Moreover,
Clarke (2008) argues that most researchers in the leadership’s theories have not shown or discussed
what they mean by respect. He adds that “Indeed most writers would appear to assume that there
exists a shared understanding of what the term actually means, despite authors using the notion of
respect in leadership very differently” (2008, p. 4). He concludes that “[r]espect based upon the
principle of shared humanity therefore represents a far more enlightened notion of respect than that
based upon judgements or appraisal of worth” (2008, p. 5).
Allan and Davidson, while discussing the meaning of ‘Respect for the Dignity of People’ within
psychological context, state that “[d]isplaying socially and culturally acceptable manners is an
essential component of respecting persons as such” (2013, p. 345). Simpsons (1971) (citing in
ID- 2013000439 Page 25
http://www.pmi.org/~/media/PDF/Ethics/ap_pmicodeofethics.ashx. And asserts that respect
environment can initiate and enhance the trust and can improve cooperation and lead to higher
levels of work performance and excellence. Moreover, PMI divides Code of Ethics and
Professional Conducts that related to Respect into: ‘Mandatory Standards’ and ‘Aspirational
Standards’.
‘Mandatory standards’ of respect, as presented by PMI, impose that the practitioner has to
comply with the following terms:
1- To negotiate in good faith, 2- not to exercise the power or position in influencing others
decisions or actions for personal benefits, 3- not to act in an abusive manner toward others and 4-
to respect the property rights of others.
While ‘Aspirational Standards’ of respect impose:
1-Respecting other parties norms and customs, 2-making the best to understand others
perspectives and points of view, 3- direct approaches and contacts with the concerned people or
parties for better solving conflict issues and 4- to comply with professional manners all the time
(http://www.pmi.org/~/media/PDF/Ethics/ap_pmicodeofethics.ashx).
Hermarij (2013) asserts the crucial role of ethics in the practices of project management, and
states that “at the time of writing this book, the International Project Management Association
does not yet have a code of conduct, but some of the affiliated members do” (2013, p. 498).
Clarke (2008) while discussing the notion of respect within leadership theories context, highlights
many types for respect namely: ‘appraisal’, ‘identification’, ‘recognition’ and ‘acceptance’. He
shows that leadership theories present respect as notion and terminology differently. Moreover,
Clarke (2008) argues that most researchers in the leadership’s theories have not shown or discussed
what they mean by respect. He adds that “Indeed most writers would appear to assume that there
exists a shared understanding of what the term actually means, despite authors using the notion of
respect in leadership very differently” (2008, p. 4). He concludes that “[r]espect based upon the
principle of shared humanity therefore represents a far more enlightened notion of respect than that
based upon judgements or appraisal of worth” (2008, p. 5).
Allan and Davidson, while discussing the meaning of ‘Respect for the Dignity of People’ within
psychological context, state that “[d]isplaying socially and culturally acceptable manners is an
essential component of respecting persons as such” (2013, p. 345). Simpsons (1971) (citing in
ID- 2013000439 Page 25

Allan and Davidson 2013) points out that the word ‘Respect’ is derived from the Latin word
‘Respicio’ that literally means ‘to look behind’ or ‘to look back’, but used figuratively to mean
‘to have regard for’ or ‘to care for’ or ‘to consider’ (2013, p. 346). They discuss two main
philosophical meanings of respect, namely: ‘Appraisal Respect for Persons’ and ‘Recognition
Respect for Persons’. Allan and Davidson (2013) assert that “[w]e demonstrate recognition
respect for other persons, not because we want to or because we appraise them as meriting our
respect, but because we feel morally obliged to do so” (p. 347). They assert the findings of Kain
(2009) that respect is an unconditional, intrinsic, a priceless and a moral obligation towards the
humanity and the dignity of people.
United Nations Educational, Scientific and Cultural Organization (UNESCO) proposes an
educational approach that may enhance and support respect as individuals and societies.
UNESCO (2014) asserts that, in such cases of high levels of violence, intolerance, racism and
cultures conflicts, teaching respect in schools, institutes and societies can warrant many social
values like tolerance and respect for all people regardless of gender, colour, class, nationality,
religion or ethnic identity. Moreover, UNESCO discusses and points out that initiating and
strengthening respect between individuals and societies, in general, needs openness,
communication skills, training and knowledge of others norms, traditions, cultures, and rights.
On the other hand, Department of Foreign Affairs and Trade (DFAT) –Australia (2012) in the
context of procurement, defines the ethical behaviour as:
behaviour which ensures that individuals and organisations are trusted and respected by
those with whom they deal. It also ensures that all parties conduct business efficiently,
in a fair and reasonable manner, and with integrity. (2012, p. 66).
Bartlett and Preston (2000) in their extensive study about the existence of ethical behaviour in
business conclude that “employees often question the existence of business ethics because there is no
good and bad between which to choose. The choice is between success and failure” (2000, p.
199). They assert that managers and employees will practice high ethical standards if they
recognize that they are an integral part in the organization and this organization itself appreciate
and respect ethical codes and standards. On the other hand, Bartlett and Preston (2000) highlight
that the organizations, usually, communicate and support the values of efficiency and
profitability through many effective and creative techniques more than those used in
communicating and promoting codes of conducts and ethics.
ID- 2013000439 Page 26
‘Respicio’ that literally means ‘to look behind’ or ‘to look back’, but used figuratively to mean
‘to have regard for’ or ‘to care for’ or ‘to consider’ (2013, p. 346). They discuss two main
philosophical meanings of respect, namely: ‘Appraisal Respect for Persons’ and ‘Recognition
Respect for Persons’. Allan and Davidson (2013) assert that “[w]e demonstrate recognition
respect for other persons, not because we want to or because we appraise them as meriting our
respect, but because we feel morally obliged to do so” (p. 347). They assert the findings of Kain
(2009) that respect is an unconditional, intrinsic, a priceless and a moral obligation towards the
humanity and the dignity of people.
United Nations Educational, Scientific and Cultural Organization (UNESCO) proposes an
educational approach that may enhance and support respect as individuals and societies.
UNESCO (2014) asserts that, in such cases of high levels of violence, intolerance, racism and
cultures conflicts, teaching respect in schools, institutes and societies can warrant many social
values like tolerance and respect for all people regardless of gender, colour, class, nationality,
religion or ethnic identity. Moreover, UNESCO discusses and points out that initiating and
strengthening respect between individuals and societies, in general, needs openness,
communication skills, training and knowledge of others norms, traditions, cultures, and rights.
On the other hand, Department of Foreign Affairs and Trade (DFAT) –Australia (2012) in the
context of procurement, defines the ethical behaviour as:
behaviour which ensures that individuals and organisations are trusted and respected by
those with whom they deal. It also ensures that all parties conduct business efficiently,
in a fair and reasonable manner, and with integrity. (2012, p. 66).
Bartlett and Preston (2000) in their extensive study about the existence of ethical behaviour in
business conclude that “employees often question the existence of business ethics because there is no
good and bad between which to choose. The choice is between success and failure” (2000, p.
199). They assert that managers and employees will practice high ethical standards if they
recognize that they are an integral part in the organization and this organization itself appreciate
and respect ethical codes and standards. On the other hand, Bartlett and Preston (2000) highlight
that the organizations, usually, communicate and support the values of efficiency and
profitability through many effective and creative techniques more than those used in
communicating and promoting codes of conducts and ethics.
ID- 2013000439 Page 26

2.4- Respect in the Relationships between Project Parties:
Smallwood (2004) highlights that respect for people is of great importance in construction
industry since human being is the only element in projects who manages, supervises and owns
the whole construction processes. In his study about the value of respect in the South African
construction industry, Smallwood adopts many aspects to investigate and show the amount of
respect for the people in the construction field. He states that “[t]he work environment influences
the morale, behavior and performance of people” (2004, p. 1). And he adds that “[t]he provision
of appropriate welfare facilities and site establishment is paramount in ensuring that the work
force feels respected and part of the project, the rationale being inter alia the resultant
improvement in productivity” (2004, p. 3).
The United Kingdom Movement for Innovation ( M4I) (2000) emphasizes that respect of people
is a crucial issue that related to the great value of human being and his employment rights like
health and safety, proper environment, personal development and training, diversity and equal
opportunities. M4I counts respect of people as a necessity for business to deliver successful
projects and organizational competitive advantages within high levels of appreciation and
commitments to the humanitarian values and norms.
M4I’s Working Group on Respect for People (2000) highlights four main components for
respect namely: invest-in-people standard, workforce involvement, behavioral issues and an
overarching management framework. M4I asserts the relationships between people respect and
their performance and calls clients and organizations to adopt and activate codes of conduct and
ethics while managing their projects and business.
The Movement for Innovation (M4I), part of Construction Excellence (citing in Office of
Government Commerce (OGC), 2007 guide 8) emphasizes that respect for people should be one
of the organizations priorities, and should be addressed through health and safety issues in the
projects and its supply chain. M4I calls for continuous and effective improvements in projects
performance through effective relationships, learning culture and practices that show and
implement respect for people as a crucial component for high levels of project success and
ID- 2013000439 Page 27
Smallwood (2004) highlights that respect for people is of great importance in construction
industry since human being is the only element in projects who manages, supervises and owns
the whole construction processes. In his study about the value of respect in the South African
construction industry, Smallwood adopts many aspects to investigate and show the amount of
respect for the people in the construction field. He states that “[t]he work environment influences
the morale, behavior and performance of people” (2004, p. 1). And he adds that “[t]he provision
of appropriate welfare facilities and site establishment is paramount in ensuring that the work
force feels respected and part of the project, the rationale being inter alia the resultant
improvement in productivity” (2004, p. 3).
The United Kingdom Movement for Innovation ( M4I) (2000) emphasizes that respect of people
is a crucial issue that related to the great value of human being and his employment rights like
health and safety, proper environment, personal development and training, diversity and equal
opportunities. M4I counts respect of people as a necessity for business to deliver successful
projects and organizational competitive advantages within high levels of appreciation and
commitments to the humanitarian values and norms.
M4I’s Working Group on Respect for People (2000) highlights four main components for
respect namely: invest-in-people standard, workforce involvement, behavioral issues and an
overarching management framework. M4I asserts the relationships between people respect and
their performance and calls clients and organizations to adopt and activate codes of conduct and
ethics while managing their projects and business.
The Movement for Innovation (M4I), part of Construction Excellence (citing in Office of
Government Commerce (OGC), 2007 guide 8) emphasizes that respect for people should be one
of the organizations priorities, and should be addressed through health and safety issues in the
projects and its supply chain. M4I calls for continuous and effective improvements in projects
performance through effective relationships, learning culture and practices that show and
implement respect for people as a crucial component for high levels of project success and
ID- 2013000439 Page 27
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

stakeholders’ satisfaction. OGC (Guide 5), while discussing the prerequisites of partnering and
building integrated project team, considers health and safety as the most important component of
respecting people by saying “respect for people (health and safety) – zero tolerance of
accidents”(2007, p. 9).
Department for Environment, Food and Rural Affairs (DEFRA) (2011), while presenting the
ethical procurement policy in the public sector in the UK, highlights that procurement ethics
consist of two main principles namely: ‘Employment is freely chosen’ and ‘No inhumane
treatment is allowed’.
DEFRA (2011) asserts that client’s partnership with suppliers can promote the level of ethical
behaviours and work performance in the projects. DEFRA explains that client can’t ask suppliers
and subcontractors to adopt higher levels of ethics more than the requirements of Europe Union
(EU) standards as this may contradict Free Trade agreements and International standard business
law. Instead client can promote the level of ethical behaviours by initiating partnerships with the
other project parties. And these high levels of ethics should be practiced on a voluntary basis
during the post-award stage to warrant equal opportunities and high participation levels and not
restricting free trade concepts and agreements.
Grosse (2007), while investigating the United States-Asian (US-Asian) strategies in developing trust
in business relationships, highlights that US and Asian cultures have many differences in
demonstrating respect behaviors and the value of respect and trust in initiating and maintaining
business relationships. And emphasizes that global managers should be aware of other peoples’
cultures and should understand and adopt specific behaviors and communication skills and strategies
that create mutual respect and effective relationships between all project parties. She adds that “[i]n
the global economy, knowing how to communicate across cultures helps businesses to open new
markets” (2007, p. 42). And she highlights that “[t]oo often the US manager simply wants to close
the deal as quickly as possible, without taking time to build a working relationship and foundation for
mutual respect”. In addition, Grosse highlights that most respondents from the five cultures namely:
China, India, Japan, Korea and Taiwan assert the significant role of language knowledge,
understanding of cultures and how to say greetings and express appreciation.
Moreover, Grosse (2007) asserts that mutual respect as one of the main requisites that leads to trust
in the relationships by saying that “[r]espect plays an important role in winning trust” (2007, p.
ID- 2013000439 Page 28
building integrated project team, considers health and safety as the most important component of
respecting people by saying “respect for people (health and safety) – zero tolerance of
accidents”(2007, p. 9).
Department for Environment, Food and Rural Affairs (DEFRA) (2011), while presenting the
ethical procurement policy in the public sector in the UK, highlights that procurement ethics
consist of two main principles namely: ‘Employment is freely chosen’ and ‘No inhumane
treatment is allowed’.
DEFRA (2011) asserts that client’s partnership with suppliers can promote the level of ethical
behaviours and work performance in the projects. DEFRA explains that client can’t ask suppliers
and subcontractors to adopt higher levels of ethics more than the requirements of Europe Union
(EU) standards as this may contradict Free Trade agreements and International standard business
law. Instead client can promote the level of ethical behaviours by initiating partnerships with the
other project parties. And these high levels of ethics should be practiced on a voluntary basis
during the post-award stage to warrant equal opportunities and high participation levels and not
restricting free trade concepts and agreements.
Grosse (2007), while investigating the United States-Asian (US-Asian) strategies in developing trust
in business relationships, highlights that US and Asian cultures have many differences in
demonstrating respect behaviors and the value of respect and trust in initiating and maintaining
business relationships. And emphasizes that global managers should be aware of other peoples’
cultures and should understand and adopt specific behaviors and communication skills and strategies
that create mutual respect and effective relationships between all project parties. She adds that “[i]n
the global economy, knowing how to communicate across cultures helps businesses to open new
markets” (2007, p. 42). And she highlights that “[t]oo often the US manager simply wants to close
the deal as quickly as possible, without taking time to build a working relationship and foundation for
mutual respect”. In addition, Grosse highlights that most respondents from the five cultures namely:
China, India, Japan, Korea and Taiwan assert the significant role of language knowledge,
understanding of cultures and how to say greetings and express appreciation.
Moreover, Grosse (2007) asserts that mutual respect as one of the main requisites that leads to trust
in the relationships by saying that “[r]espect plays an important role in winning trust” (2007, p.
ID- 2013000439 Page 28

48). She finds out that knowledge of other project parties’ languages and understanding their
cultures along with the attitudes of honesty, respect, sincerity, friendship, humility are deemed to
be of crucial role in initiating solid and effective relationships with other parties in the Asian
countries. In addition, proper communication approaches and interpersonal skills play an
essential role in creating and maintaining long-term business relationships.
Lau and Rowlinson (2009) in their extensive study about the value of trust in construction
projects assert the vital role of mutual trust in initiating alliances and partnering relationships.
They add that mutual trust in business is a major factor in integrating the key elements of
cooperation and partnership that Hong Kong Housing Authority (HKHA) proposed, like:
commitment, risk sharing, clear roles and responsibilities and proper communication, appraisal
and rewarding systems that require cooperative spirit from all the stakeholders.
And regarding the relationships between trust and respect, Lau and Rowlinson (2009) show that
trust at work is divided into inter-firm trust , which is mostly based on the mutual benefits,
shared objectives and fairness, and interpersonal trust which is based on mutual respect,
competence, adherence to ethics and common beliefs. And their study (2009) shows that “mutual
respect” either to firms or to persons is deemed to be one of the most important elements in
initiating trust at work, as shown in the below table #2.1 that Lau and Rowlinson concluded from
their study. Also, they find out that ‘adherence to ethics’, as shown in table# 2.1 below, is of
moderate role in initiating inter-firm trust, but of crucial role in initiating trust between persons.
Trust at Work To Firms To Persons
Valid N Yes YES% Valid N Yes YES%
(frequency) (frequency)
Mutual 469 285 60.8% 469 227 28.4%
objectives
Sincere 468 272 58.1% 468 265 56.6%
cooperation
Fair dealings 468 268 57.3% 468 217 46.4%
Mutual benefits 468 265 56.6% 468 204 43.6%
ID- 2013000439 Page 29
cultures along with the attitudes of honesty, respect, sincerity, friendship, humility are deemed to
be of crucial role in initiating solid and effective relationships with other parties in the Asian
countries. In addition, proper communication approaches and interpersonal skills play an
essential role in creating and maintaining long-term business relationships.
Lau and Rowlinson (2009) in their extensive study about the value of trust in construction
projects assert the vital role of mutual trust in initiating alliances and partnering relationships.
They add that mutual trust in business is a major factor in integrating the key elements of
cooperation and partnership that Hong Kong Housing Authority (HKHA) proposed, like:
commitment, risk sharing, clear roles and responsibilities and proper communication, appraisal
and rewarding systems that require cooperative spirit from all the stakeholders.
And regarding the relationships between trust and respect, Lau and Rowlinson (2009) show that
trust at work is divided into inter-firm trust , which is mostly based on the mutual benefits,
shared objectives and fairness, and interpersonal trust which is based on mutual respect,
competence, adherence to ethics and common beliefs. And their study (2009) shows that “mutual
respect” either to firms or to persons is deemed to be one of the most important elements in
initiating trust at work, as shown in the below table #2.1 that Lau and Rowlinson concluded from
their study. Also, they find out that ‘adherence to ethics’, as shown in table# 2.1 below, is of
moderate role in initiating inter-firm trust, but of crucial role in initiating trust between persons.
Trust at Work To Firms To Persons
Valid N Yes YES% Valid N Yes YES%
(frequency) (frequency)
Mutual 469 285 60.8% 469 227 28.4%
objectives
Sincere 468 272 58.1% 468 265 56.6%
cooperation
Fair dealings 468 268 57.3% 468 217 46.4%
Mutual benefits 468 265 56.6% 468 204 43.6%
ID- 2013000439 Page 29

Accommodate 468 255 54.5% 468 183 39.1%
risks and
unpredictability
Enhanced 468 254 54.3% 468 173 37.0%
morale
Keep promises 468 252 53.8% 468 196 63.2%
Open 468 249 53.2% 469 231 49.4%
communication
Accountable to 468 247 53.8% 467 290 62.0%
actions taken
Interest in 468 229 48.9% 468 205 43.8%
people
Competence 469 225 48.0% 468 318 67.8%
Mutual respect 468 224 47.9% 468 317 67.9%
Improve 468 205 43.8% 468 247 52.8%
relationships
Accept 468 201 42.9% 468 229 48.9%
diversity
Share pricing 468 196 41.9% 468 184 39.3%
Assurance with 468 190 40.6% 468 142 30.3%
safeguard
Value 468 180 38.5% 468 186 39.7%
congruence
Adherence to 469 178 38.0% 469 291 62.0%
ethics
Table #2.1: Statistical results of trust at work, Lau and Rowlinson (2009).
Moreover, Lau and Rowlinson (2009) assert that the elements and factors which are essential to
initiate mutual trust between organizations, like mutual respect, are mostly demonstrated by actions
that are mainly related to beliefs and expectations. So, the behavior of some project parties
ID- 2013000439 Page 30
risks and
unpredictability
Enhanced 468 254 54.3% 468 173 37.0%
morale
Keep promises 468 252 53.8% 468 196 63.2%
Open 468 249 53.2% 469 231 49.4%
communication
Accountable to 468 247 53.8% 467 290 62.0%
actions taken
Interest in 468 229 48.9% 468 205 43.8%
people
Competence 469 225 48.0% 468 318 67.8%
Mutual respect 468 224 47.9% 468 317 67.9%
Improve 468 205 43.8% 468 247 52.8%
relationships
Accept 468 201 42.9% 468 229 48.9%
diversity
Share pricing 468 196 41.9% 468 184 39.3%
Assurance with 468 190 40.6% 468 142 30.3%
safeguard
Value 468 180 38.5% 468 186 39.7%
congruence
Adherence to 469 178 38.0% 469 291 62.0%
ethics
Table #2.1: Statistical results of trust at work, Lau and Rowlinson (2009).
Moreover, Lau and Rowlinson (2009) assert that the elements and factors which are essential to
initiate mutual trust between organizations, like mutual respect, are mostly demonstrated by actions
that are mainly related to beliefs and expectations. So, the behavior of some project parties
ID- 2013000439 Page 30
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

towards the others will be close to the respect as much as they share common values, concepts
and beliefs (Child 1998).
On the other hand, Lau and Rowlinson (2009) assert the findings of Barney and Hansen (1994) and
Dirk (1999) regarding the strong and direct relation between the level of trust between project parties
and the levels of efficiency, performance, project success and stakeholders satisfaction.
Almahmoud and Doloi (2012) specify many factors that are related to social issues in the
construction industry, and argue that in order to achieve social sustainability; these factors should
be fulfilled for all the project parties and stakeholders. These factors include: job opportunity,
equity, safe work site, communication and information, health, skills development, comfort
(physical, psychological) and enhancing the local economy.
Almahmoud and Doloi (2012 , p. 102) state that “[a]s stakeholders of construction projects are
connected within communities, their coordination toward project success is important”. In
addition, they highlight that interactions between the stakeholders in the construction projects
produce social issues that should be addressed within social sustainability and culture
perspectives. They add that, in the context of social sustainability within construction industry,
the level of project’s success is related directly with the level of social values that are practiced
with and delivered to project stakeholders.
On the other hand, Klein (2001) (citing in Clegg, Kornberger & Pitsis (2011), P. 580) highlights
the immoral role of globalization and transnational in the developing countries by adopting and
dealing with contractors who behave disrespectfully with their employees, suppliers and
subcontractors as they pay them low wages and have poor working and environment conditions.
2.5- Initiating and Developing Mutual Respect between Project Parties;
Motivators and Challenges:
2.5.1- Procurement Methods:
Morledge, Smith and Kashiwagi (2006) discuss the relationships between the client and his
contractors, and differentiate between the two types of relationships; ‘supplier/customer’ and
‘partnership’ relationships. They assert that poor management knowledge and inappropriate
ID- 2013000439 Page 31
and beliefs (Child 1998).
On the other hand, Lau and Rowlinson (2009) assert the findings of Barney and Hansen (1994) and
Dirk (1999) regarding the strong and direct relation between the level of trust between project parties
and the levels of efficiency, performance, project success and stakeholders satisfaction.
Almahmoud and Doloi (2012) specify many factors that are related to social issues in the
construction industry, and argue that in order to achieve social sustainability; these factors should
be fulfilled for all the project parties and stakeholders. These factors include: job opportunity,
equity, safe work site, communication and information, health, skills development, comfort
(physical, psychological) and enhancing the local economy.
Almahmoud and Doloi (2012 , p. 102) state that “[a]s stakeholders of construction projects are
connected within communities, their coordination toward project success is important”. In
addition, they highlight that interactions between the stakeholders in the construction projects
produce social issues that should be addressed within social sustainability and culture
perspectives. They add that, in the context of social sustainability within construction industry,
the level of project’s success is related directly with the level of social values that are practiced
with and delivered to project stakeholders.
On the other hand, Klein (2001) (citing in Clegg, Kornberger & Pitsis (2011), P. 580) highlights
the immoral role of globalization and transnational in the developing countries by adopting and
dealing with contractors who behave disrespectfully with their employees, suppliers and
subcontractors as they pay them low wages and have poor working and environment conditions.
2.5- Initiating and Developing Mutual Respect between Project Parties;
Motivators and Challenges:
2.5.1- Procurement Methods:
Morledge, Smith and Kashiwagi (2006) discuss the relationships between the client and his
contractors, and differentiate between the two types of relationships; ‘supplier/customer’ and
‘partnership’ relationships. They assert that poor management knowledge and inappropriate
ID- 2013000439 Page 31

procurement methods and processes in which clients take the responsibility of designing and
specifying the requirements totally before floating the tenders, and their selection of contractors is
mainly done according to the lowest tender price . They argue that clients in this method ignore
contractors’ early contributions and roles in articulating and sharing their perspectives towards the
requirements and deliverables. Morledge, Smith and Kashiwagi (2006) emphasize that neglecting the
contractor’s previous experience, knowledge and skills while designing and articulating the project
requirements could lead to many disputes in the execution stages, low levels of work quality, poor
deliverables, stakeholders’ dissatisfaction and project failure. In the same context,
Morledge, Smith and Kashiwagi (2006) call clients to practice ‘partnership’ relationships with
their suppliers/contractors by adopting alternative procurement methods that emphasize the
alignment of interests and common objectives in the early stages of projects.
Moreover, Morledge, Smith and Kashiwagi (2006) argue that there is no ‘best practice’ method
or ready-made solutions to be adopted for construction management or procurement. Instead, and
due to the uniqueness of each project and its own circumstances and deliverables, procurement
strategy should be a combination of processes, tools and techniques that clients should select to
fit their needs and requirements and achieve clients’ satisfaction or even exceed. They offer and
discuss many components for each procurement process; the first component is the needs,
objectives and requirements analysis: in which client’s brief and project’s objectives should be
articulated cooperatively with client’s main and influencing stakeholders. Also, this component
should specify the key performance indicators (KPI) that to be cited for the level of success in
achieving project objectives and deliverables.
The second component is the development of procurement philosophy in which client should
analyze, specify and select the most proper procurement strategy that can achieve his project or
business objectives. Morledge, Smith and Kashiwagi (2006, pp. 36-37) present three different
figures with multi-relational scenarios that the client should decide and select the most
appropriate to be dominant while initiating a relationships with his suppliers/contractors. Figure
# 2.1, below, represents many procurement strategic choices and their financial and non-financial
impacts on the client, such as reputation. It shows that imposing the clients’ power and authority
through the hard contracts or arms-length relations could have the minimum financial and non-
financial impacts on the client.
ID- 2013000439 Page 32
specifying the requirements totally before floating the tenders, and their selection of contractors is
mainly done according to the lowest tender price . They argue that clients in this method ignore
contractors’ early contributions and roles in articulating and sharing their perspectives towards the
requirements and deliverables. Morledge, Smith and Kashiwagi (2006) emphasize that neglecting the
contractor’s previous experience, knowledge and skills while designing and articulating the project
requirements could lead to many disputes in the execution stages, low levels of work quality, poor
deliverables, stakeholders’ dissatisfaction and project failure. In the same context,
Morledge, Smith and Kashiwagi (2006) call clients to practice ‘partnership’ relationships with
their suppliers/contractors by adopting alternative procurement methods that emphasize the
alignment of interests and common objectives in the early stages of projects.
Moreover, Morledge, Smith and Kashiwagi (2006) argue that there is no ‘best practice’ method
or ready-made solutions to be adopted for construction management or procurement. Instead, and
due to the uniqueness of each project and its own circumstances and deliverables, procurement
strategy should be a combination of processes, tools and techniques that clients should select to
fit their needs and requirements and achieve clients’ satisfaction or even exceed. They offer and
discuss many components for each procurement process; the first component is the needs,
objectives and requirements analysis: in which client’s brief and project’s objectives should be
articulated cooperatively with client’s main and influencing stakeholders. Also, this component
should specify the key performance indicators (KPI) that to be cited for the level of success in
achieving project objectives and deliverables.
The second component is the development of procurement philosophy in which client should
analyze, specify and select the most proper procurement strategy that can achieve his project or
business objectives. Morledge, Smith and Kashiwagi (2006, pp. 36-37) present three different
figures with multi-relational scenarios that the client should decide and select the most
appropriate to be dominant while initiating a relationships with his suppliers/contractors. Figure
# 2.1, below, represents many procurement strategic choices and their financial and non-financial
impacts on the client, such as reputation. It shows that imposing the clients’ power and authority
through the hard contracts or arms-length relations could have the minimum financial and non-
financial impacts on the client.
ID- 2013000439 Page 32

act n-Imp
(No
• Emphasis On • Relationship
Reliability Contracting
• Incentivise Time And • Partnering
•
Quality Performance • Strategic Alliances
Hard Contracts
• Hard Price Negotiation
• Ruthlessness
• Incentivise Cost
• Lots Of Choice Savings
Value (
Incurred
Figure #2.1 procurement as a function of the Costs)
impact of failure, (Morledge, Smith and
Kashiwagi, 2006).
(No
• Emphasis On • Relationship
Reliability Contracting
• Incentivise Time And • Partnering
•
Quality Performance • Strategic Alliances
Hard Contracts
• Hard Price Negotiation
• Ruthlessness
• Incentivise Cost
• Lots Of Choice Savings
Value (
Incurred
Figure #2.1 procurement as a function of the Costs)
impact of failure, (Morledge, Smith and
Kashiwagi, 2006).
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

While promoting the relation to be partnership and strategic relationships with supplier/contractor,
could lead to very serious impacts towards clients’ reputation, incurred costs and projects’ success.
Figure #2.2, below, shows many scenarios of collaborative relationships with suppliers/
contractors and the levels of its impacts on the clients’ core business.
ID- 2013000439 Page 33
could lead to very serious impacts towards clients’ reputation, incurred costs and projects’ success.
Figure #2.2, below, shows many scenarios of collaborative relationships with suppliers/
contractors and the levels of its impacts on the clients’ core business.
ID- 2013000439 Page 33

Impact
Merger or acquisition
Joint ventures
Multiple project
strategic relationships
Single project partnering
Merger or acquisition
Joint ventures
Multiple project
strategic relationships
Single project partnering

Value
Figure #2.2: Collaborative trading relationships related to project
complexity/ impact on the employer’s core business (Morledge,
Smith and Kashiwagi, 2006).
It shows that merger or acquisition is the most important decision and of crucial and significant
impact towards the clients’ core business and that requires awareness and more concentration
from the client on the best and safest routes and transformations in relationships with specific
suppliers and contractors.
Moreover, Morledge, Smith and Kashiwagi (2006), as shown in the figure #2.3 below, present
many procurement strategies based on the external market difficulties and clients’ intention for
the relation to be continuous or one off.
ID- 2013000439 Page 34
Figure #2.2: Collaborative trading relationships related to project
complexity/ impact on the employer’s core business (Morledge,
Smith and Kashiwagi, 2006).
It shows that merger or acquisition is the most important decision and of crucial and significant
impact towards the clients’ core business and that requires awareness and more concentration
from the client on the best and safest routes and transformations in relationships with specific
suppliers and contractors.
Moreover, Morledge, Smith and Kashiwagi (2006), as shown in the figure #2.3 below, present
many procurement strategies based on the external market difficulties and clients’ intention for
the relation to be continuous or one off.
ID- 2013000439 Page 34
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Potential Market
Difficulty
• Arms length • Very close
• Strategic Alliances/collaborative • single source• single source relationshipsrelationships
• Arms length • Relatively close
• Multiple supply relationships
relationships • preferred supplier
One Regul
off Type of ar
Spend
Figure # 2.3: Procurement Strategy as a Function
of Market Difficulty and Type of Spend.
(Morledge, Smith and Kashiwagi, 2006).
Difficulty
• Arms length • Very close
• Strategic Alliances/collaborative • single source• single source relationshipsrelationships
• Arms length • Relatively close
• Multiple supply relationships
relationships • preferred supplier
One Regul
off Type of ar
Spend
Figure # 2.3: Procurement Strategy as a Function
of Market Difficulty and Type of Spend.
(Morledge, Smith and Kashiwagi, 2006).

They highlight that in case of difficult market situation and high competitive environment clients
have choices to proceed with supplier/contractor in one off deals strategy or can proceed on
regular basis deals upon the level of importance and influences these suppliers and contractors
represent for the client’s business or project.
The third component is: analysis for the best type of relationships with suppliers/contractors.
The fourth is: adopting of the procurement approach.
The fifth is: formalization of the contractual relationships.
The sixth is: selection of suppliers/contractors.
The final component, as per Morledge, Smith and Kashiwagi findings (2006), is the
implementation of the whole process components.
Elmualim (2010) argues that the intended relationships between projects parties are usually
predetermined by the procurement methods that the client selected to proceed with in his project.
For example, the design-tender-build method, in which the design is separated and apart from
construction activities, represents and imposes fragmentation, mistrust, selfish, non coordinated
decisions and low levels of interests’ alignments between the project stakeholders.
ID- 2013000439 Page 35
have choices to proceed with supplier/contractor in one off deals strategy or can proceed on
regular basis deals upon the level of importance and influences these suppliers and contractors
represent for the client’s business or project.
The third component is: analysis for the best type of relationships with suppliers/contractors.
The fourth is: adopting of the procurement approach.
The fifth is: formalization of the contractual relationships.
The sixth is: selection of suppliers/contractors.
The final component, as per Morledge, Smith and Kashiwagi findings (2006), is the
implementation of the whole process components.
Elmualim (2010) argues that the intended relationships between projects parties are usually
predetermined by the procurement methods that the client selected to proceed with in his project.
For example, the design-tender-build method, in which the design is separated and apart from
construction activities, represents and imposes fragmentation, mistrust, selfish, non coordinated
decisions and low levels of interests’ alignments between the project stakeholders.
ID- 2013000439 Page 35

Luu, Thomas and Chen (2003) (citing in Al Kukhun, 2012) stated three main constraints of
procurement methods. Some constraints are related to clients like management experience, type,
and financial capability.
Others are related to the project like its size, type, and location. Also, some constraints are
related to the external environment like the availability of material, competition in the market
and technology. Table #2.2, below, presents the summary of these constraints as concluded by
Luu, Thomas and Chen (2003).
Procurement Selection AM AT B GI H H K M MG N R SM T W
Factors F U D
Client’s characteristics
and objectives
Clients type and √ √ √ √
experience
Client’s in-house √ √ √ √
technical capability
Client’s financial √ √ √ √
capability
Client’s willingness to √ √
take risk
Client’s willingness to be √ √ √ √ √
involved
Client’s trust forward √ √
other parties
Client’s schedule √ √ √ √ √
requirement
Client’s requirement for √ √ √
the budget
Client’s requirement for √ √
low maintenance cost
Client’s requirement for √ √
low operational cost
ID- 2013000439 Page 36
procurement methods. Some constraints are related to clients like management experience, type,
and financial capability.
Others are related to the project like its size, type, and location. Also, some constraints are
related to the external environment like the availability of material, competition in the market
and technology. Table #2.2, below, presents the summary of these constraints as concluded by
Luu, Thomas and Chen (2003).
Procurement Selection AM AT B GI H H K M MG N R SM T W
Factors F U D
Client’s characteristics
and objectives
Clients type and √ √ √ √
experience
Client’s in-house √ √ √ √
technical capability
Client’s financial √ √ √ √
capability
Client’s willingness to √ √
take risk
Client’s willingness to be √ √ √ √ √
involved
Client’s trust forward √ √
other parties
Client’s schedule √ √ √ √ √
requirement
Client’s requirement for √ √ √
the budget
Client’s requirement for √ √
low maintenance cost
Client’s requirement for √ √
low operational cost
ID- 2013000439 Page 36
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Client’s requirement for √ √ √
value for money
Project Characteristics
Project size √ √ √
Project type √ √ √
Building construction √ √ √
type
Project site location √ √
Unknown site risk factors √ √
Known site factors likely √ √
to cause problems
Usage of pioneering √ √
technology
External Environment
Market’s √ √ √ √ √
competitiveness
Technology feasibility √ √ √ √
Regulatory feasibility √ √ √ √
Materials availability √ √ √
Experienced contractor √ √ √
availability
Labour productivity √ √ √ √ √
Neighbours and lobby √ √ √
groups
Political and cultural √ √ √
constrains
Notes : AM=Alhazmi and McCaffer (2000) ;AT=Ambrose and Tucker (1999); BF=Bennett and
Flanagan(1983); GI=Gibb and Lsack(2001); H=Hewitt(1985); HU=Hughes(1989);
KD=Kumaraswamy and Dissanayaka (2001); M=Molenaar (1999); MG=Masterman and
Gameson (1994); N= NEDO (1985); R=Rowlinson (1999); SM=Skitmore and Marsden (1988);
T=Tumer(1990); W=Walker(1989)
Table #2.2: Procurement selection constraints. (Luu, Thomas and Chen, 2003)
value for money
Project Characteristics
Project size √ √ √
Project type √ √ √
Building construction √ √ √
type
Project site location √ √
Unknown site risk factors √ √
Known site factors likely √ √
to cause problems
Usage of pioneering √ √
technology
External Environment
Market’s √ √ √ √ √
competitiveness
Technology feasibility √ √ √ √
Regulatory feasibility √ √ √ √
Materials availability √ √ √
Experienced contractor √ √ √
availability
Labour productivity √ √ √ √ √
Neighbours and lobby √ √ √
groups
Political and cultural √ √ √
constrains
Notes : AM=Alhazmi and McCaffer (2000) ;AT=Ambrose and Tucker (1999); BF=Bennett and
Flanagan(1983); GI=Gibb and Lsack(2001); H=Hewitt(1985); HU=Hughes(1989);
KD=Kumaraswamy and Dissanayaka (2001); M=Molenaar (1999); MG=Masterman and
Gameson (1994); N= NEDO (1985); R=Rowlinson (1999); SM=Skitmore and Marsden (1988);
T=Tumer(1990); W=Walker(1989)
Table #2.2: Procurement selection constraints. (Luu, Thomas and Chen, 2003)

ID- 2013000439 Page 37

Zue, Zhao and Zillante (2008) argue that the poor management skills and inappropriate
procurement approaches are behind the confrontational relationships and the poor performance
and disputes in the construction industry. They highlight that projects in the traditional
procurement are usually procured within competitive approaches that are mainly related to the
minimum bid prices. Also, the power matrix qualifies the client to transfer the highest amounts
of risks to the other project parties like the main contractor and subcontractors. Moreover, the
main contractor and subcontractors also try to cover their weakness, during the bidding stage, by
submitting huge claims and amounts as variation orders and extension of time to compensate
what they missed during the early stages of the project. Consequently, the construction industry
is suffering from huge amounts of conflicts, disputes poor performance and high levels of project
failures and stakeholders dissatisfaction.
Zue, Zhao and Zillante (2008) propose the ‘relationship contracting’ as an alternative and effective
procurement approaches that designed to align stakeholders interests, improve work performance and
stakeholders satisfaction and promote the levels of construction projects success. They count mutual
respect and mutual trust as crucial factors in initiating and maintaining ‘partnering’ and ‘alliancing’
which are considered forms of ‘relationship contracting’.
Rendon (2008) proposes ‘contract management maturity model (CMMM)’ as a tool in assessing,
measuring and improving the procurement processes. He intends to measure the maturity of
procurement processes in addition to promote the existing level of maturity to a higher level of
performance and success. Rendon (2008) highlights the findings of Haiachmi and Bouckaert,
(1996), Kearney and Berman (1999), Niven (2003) , Poister (2003) and Scott (2004) that private
and public organizations are facing a common challenge represented in measuring its processes
performance , which may include measuring many areas such as financial accountability,
adherence to quality standards, code of conducts and ethical issues, key performance indicators
and stakeholders’ satisfaction, and how to improve these processes towards professionalism and
maturity.
On the other hand, Rendon (2008) points out that the public sector organizations have already
started recognizing the benefits of implementing the Balanced Scorecards approaches in
measuring organizational performance with respect to four components: customer, internal
processes, learning and growth, and financial status.
ID- 2013000439 Page 38
procurement approaches are behind the confrontational relationships and the poor performance
and disputes in the construction industry. They highlight that projects in the traditional
procurement are usually procured within competitive approaches that are mainly related to the
minimum bid prices. Also, the power matrix qualifies the client to transfer the highest amounts
of risks to the other project parties like the main contractor and subcontractors. Moreover, the
main contractor and subcontractors also try to cover their weakness, during the bidding stage, by
submitting huge claims and amounts as variation orders and extension of time to compensate
what they missed during the early stages of the project. Consequently, the construction industry
is suffering from huge amounts of conflicts, disputes poor performance and high levels of project
failures and stakeholders dissatisfaction.
Zue, Zhao and Zillante (2008) propose the ‘relationship contracting’ as an alternative and effective
procurement approaches that designed to align stakeholders interests, improve work performance and
stakeholders satisfaction and promote the levels of construction projects success. They count mutual
respect and mutual trust as crucial factors in initiating and maintaining ‘partnering’ and ‘alliancing’
which are considered forms of ‘relationship contracting’.
Rendon (2008) proposes ‘contract management maturity model (CMMM)’ as a tool in assessing,
measuring and improving the procurement processes. He intends to measure the maturity of
procurement processes in addition to promote the existing level of maturity to a higher level of
performance and success. Rendon (2008) highlights the findings of Haiachmi and Bouckaert,
(1996), Kearney and Berman (1999), Niven (2003) , Poister (2003) and Scott (2004) that private
and public organizations are facing a common challenge represented in measuring its processes
performance , which may include measuring many areas such as financial accountability,
adherence to quality standards, code of conducts and ethical issues, key performance indicators
and stakeholders’ satisfaction, and how to improve these processes towards professionalism and
maturity.
On the other hand, Rendon (2008) points out that the public sector organizations have already
started recognizing the benefits of implementing the Balanced Scorecards approaches in
measuring organizational performance with respect to four components: customer, internal
processes, learning and growth, and financial status.
ID- 2013000439 Page 38
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Moreover, Rendon (2008), while presenting and discussing the CMMM indicates five levels of
procurement processes maturity, namely: ‘ad hoc’ level which is the lowest level of maturity,
‘basic’ level, ‘fully structured’ level, ‘integrated’ level and ‘optimized level’ which is the highest
level of maturity in which organization systematically adopts and implements performance
measures for quality, efficiency, effectiveness and integration with other organizations and
business parties.
Cabinet Office (CO) in the United Kingdom (UK) (2014) presents and recommends three new
models for construction procurement in the public and private sectors. These models, namely:
Cost Led Procurement, Integrated Project Insurance and Two Stage Open Book, are intended to
assist clients, consultants, suppliers and subcontractors in initiating, adopting and developing
collaborative, integrative and innovative procurement approaches and processes that are led
mainly by clients and supported by the existing best practise. Cabinet Office adds that “[e]arly
involvement and collaboration are the centre-piece of all three models”. (2014, p. 15).
Porter and Kramer (2011) confirm the infeasibility of the traditional perspective and practices in
which procurement departments and clients exploit and impose power matrix to impose lower
pricing mentality on suppliers and subcontractors. Instead, they call to adopt cooperative and
more productive approaches that empower suppliers and stimulate them for higher levels of
productivity, quality and professionalism. Porter and Kramer (2011) point out that clients, while
sharing the technology and financing solutions with suppliers, enhance and improve performance
and efficiency and create shared values.
Office of Government Commerce (OGC) (2007) asserts the great importance of the integrated
team work through adopting effective procurement methods like design and build, private
finance initiative (PFI) and prime contracting. OGC calls clients to initiate long-term
relationships with their suppliers and subcontractors. In addition, OGC recommends adopting the
European Community (EC) procurement rules that promoting the level of performance and
projects success. OGC considers health and Safety issues of crucial role that affect work progress
and performance. And adopts a Guide namely: ‘Achieving Excellence in Construction
Procurement Guide AE10:Health and Safety’ and identifies how the decisions of clients in
projects may affect health and safety issues and how these health and safety issues, in turn, affect
contract performance and parties satisfaction.
ID- 2013000439 Page 39
procurement processes maturity, namely: ‘ad hoc’ level which is the lowest level of maturity,
‘basic’ level, ‘fully structured’ level, ‘integrated’ level and ‘optimized level’ which is the highest
level of maturity in which organization systematically adopts and implements performance
measures for quality, efficiency, effectiveness and integration with other organizations and
business parties.
Cabinet Office (CO) in the United Kingdom (UK) (2014) presents and recommends three new
models for construction procurement in the public and private sectors. These models, namely:
Cost Led Procurement, Integrated Project Insurance and Two Stage Open Book, are intended to
assist clients, consultants, suppliers and subcontractors in initiating, adopting and developing
collaborative, integrative and innovative procurement approaches and processes that are led
mainly by clients and supported by the existing best practise. Cabinet Office adds that “[e]arly
involvement and collaboration are the centre-piece of all three models”. (2014, p. 15).
Porter and Kramer (2011) confirm the infeasibility of the traditional perspective and practices in
which procurement departments and clients exploit and impose power matrix to impose lower
pricing mentality on suppliers and subcontractors. Instead, they call to adopt cooperative and
more productive approaches that empower suppliers and stimulate them for higher levels of
productivity, quality and professionalism. Porter and Kramer (2011) point out that clients, while
sharing the technology and financing solutions with suppliers, enhance and improve performance
and efficiency and create shared values.
Office of Government Commerce (OGC) (2007) asserts the great importance of the integrated
team work through adopting effective procurement methods like design and build, private
finance initiative (PFI) and prime contracting. OGC calls clients to initiate long-term
relationships with their suppliers and subcontractors. In addition, OGC recommends adopting the
European Community (EC) procurement rules that promoting the level of performance and
projects success. OGC considers health and Safety issues of crucial role that affect work progress
and performance. And adopts a Guide namely: ‘Achieving Excellence in Construction
Procurement Guide AE10:Health and Safety’ and identifies how the decisions of clients in
projects may affect health and safety issues and how these health and safety issues, in turn, affect
contract performance and parties satisfaction.
ID- 2013000439 Page 39

Moreover, OGC indicates a link between ethics and adopting and practicing health and safety
guide during organizations’ business and projects. OGC highlights that there is an ethical reason
beyond the necessity of delivering Excellence in health and safety during the construction
process and that should be practiced within the supply chain and project team as a priority which
is built on respecting people and their environment.
Office of Government Commerce (OGC) (2007) asserts the great importance of working as one team
that consists of all project parties. Integrated project team as recommended by OGC should be
consisted of the project client, consultants, main contractor, subcontractors and suppliers as a
complete supply chain in which all should inter into partnering relationships for their maximum
mutual benefits and project success. OGC states that “[t]he teamworking ethic must be demonstrated
by senior management, who should act as exemplars of good practice and behaviour, and show
commitment to collaboration and partnering throughout the project” (2007, p. 6).
Smallwood and Venter (2001) assert that the type of management and procurement systems (PS)
affect project parties interactions, work performance and project deliverables and stakeholders’
satisfaction. They point out the great importance of the integration between the design and
construction stages that leads to better performance and results.
They highlight that traditional project management perspective towards contractors performance
focuses on cost, quality and schedule as the main features for evaluation and ranking. They add
that “However, international research indicates that performance relative to cost, quality and
schedule is influenced by: health & safety; productivity; performance relative to the
environment, and worker satisfaction” (2001, p. 1).
Moreover, Smallwood and Venter (2001) assert the findings of Allen (1998) and Smallwood
(1999) that despite the dominant nature of the traditional contractors’ performance measures, i.e.
cost, quality and schedule within project management academics, practitioners, designers and
clients, most projects parties failed in handing over the projects within the assigned quality,
budget and time.
ID- 2013000439 Page 40
guide during organizations’ business and projects. OGC highlights that there is an ethical reason
beyond the necessity of delivering Excellence in health and safety during the construction
process and that should be practiced within the supply chain and project team as a priority which
is built on respecting people and their environment.
Office of Government Commerce (OGC) (2007) asserts the great importance of working as one team
that consists of all project parties. Integrated project team as recommended by OGC should be
consisted of the project client, consultants, main contractor, subcontractors and suppliers as a
complete supply chain in which all should inter into partnering relationships for their maximum
mutual benefits and project success. OGC states that “[t]he teamworking ethic must be demonstrated
by senior management, who should act as exemplars of good practice and behaviour, and show
commitment to collaboration and partnering throughout the project” (2007, p. 6).
Smallwood and Venter (2001) assert that the type of management and procurement systems (PS)
affect project parties interactions, work performance and project deliverables and stakeholders’
satisfaction. They point out the great importance of the integration between the design and
construction stages that leads to better performance and results.
They highlight that traditional project management perspective towards contractors performance
focuses on cost, quality and schedule as the main features for evaluation and ranking. They add
that “However, international research indicates that performance relative to cost, quality and
schedule is influenced by: health & safety; productivity; performance relative to the
environment, and worker satisfaction” (2001, p. 1).
Moreover, Smallwood and Venter (2001) assert the findings of Allen (1998) and Smallwood
(1999) that despite the dominant nature of the traditional contractors’ performance measures, i.e.
cost, quality and schedule within project management academics, practitioners, designers and
clients, most projects parties failed in handing over the projects within the assigned quality,
budget and time.
ID- 2013000439 Page 40

2.5.2- Dominant and Organization’s Culture:
Zue, Zhao and Zillante state that “[a]n alliance culture, featured with trust, co-operation, mutual
support and respect are essential for the success of relationship contracting projects” (2008, p. 1).
They call all project parties to develop and maintain a positive project culture by adopting and
practicing the proper values and behaviours that encourage initiating and developing relationship
contracting, partnering and alliance perspectives in the construction industry especially in multi-
national projects and environment.
While discussing cultures and leadership in projects and stakeholders management, Elmualim
(2010, p. 180) states that:
[a]t organisational level, culture is the collection of relatively uniform and enduring
values, beliefs and customs, traditions and practices that are shared by an organisation’s
members, learned by new recruits and transmitted from one generation of employees to
the next; it is the way we do things around here; the way we interact and the way we
cooperate or compete.
Elmualim (2010) asserts the findings of Hofstede (2003) that the national culture has a crucial and
great influence on the behaviors and ethics of the society in general and its components like
individuals and organizations specifically. And the conflicts usually arise when each member or
party tries to satisfy his interests and needs apart from others’ needs and interests. Elmualim adds that
“[i]n today’s western-liberal culture, competitiveness and conflictual relationships are ubiquitous
cultural practices that are hegemonic in nature serving the interests of a few” (2010, p.
178). Moreover, Elmualim (2010) highlights the findings of Karlberg (2004) about the role of
western-liberal cultures in initiating, institutionalizing and legitimating the norms of conflictual
and competitive relationships. In addition, Elmulaim argues that the dominant culture and
ideology are of crucial role in spreading and legitimating some norms and misleading concepts
like the inevitability of conflicts and adversarial relationships that are based on winner- loser
ranking. Moreover, he criticizes the argument that the conflictual relationships between societies,
organizations and individuals are an inevitable and part of human nature.
Porter and Kramer (2011) assert a shortage of the conceptual understanding and practices of the
capitalism during the previous decades. They state that “[c]apitalism is an unparalleled vehicle
for meeting human needs, improving efficiency, creating jobs, and building wealth” (2011, p. 4).
ID- 2013000439 Page 41
Zue, Zhao and Zillante state that “[a]n alliance culture, featured with trust, co-operation, mutual
support and respect are essential for the success of relationship contracting projects” (2008, p. 1).
They call all project parties to develop and maintain a positive project culture by adopting and
practicing the proper values and behaviours that encourage initiating and developing relationship
contracting, partnering and alliance perspectives in the construction industry especially in multi-
national projects and environment.
While discussing cultures and leadership in projects and stakeholders management, Elmualim
(2010, p. 180) states that:
[a]t organisational level, culture is the collection of relatively uniform and enduring
values, beliefs and customs, traditions and practices that are shared by an organisation’s
members, learned by new recruits and transmitted from one generation of employees to
the next; it is the way we do things around here; the way we interact and the way we
cooperate or compete.
Elmualim (2010) asserts the findings of Hofstede (2003) that the national culture has a crucial and
great influence on the behaviors and ethics of the society in general and its components like
individuals and organizations specifically. And the conflicts usually arise when each member or
party tries to satisfy his interests and needs apart from others’ needs and interests. Elmualim adds that
“[i]n today’s western-liberal culture, competitiveness and conflictual relationships are ubiquitous
cultural practices that are hegemonic in nature serving the interests of a few” (2010, p.
178). Moreover, Elmualim (2010) highlights the findings of Karlberg (2004) about the role of
western-liberal cultures in initiating, institutionalizing and legitimating the norms of conflictual
and competitive relationships. In addition, Elmulaim argues that the dominant culture and
ideology are of crucial role in spreading and legitimating some norms and misleading concepts
like the inevitability of conflicts and adversarial relationships that are based on winner- loser
ranking. Moreover, he criticizes the argument that the conflictual relationships between societies,
organizations and individuals are an inevitable and part of human nature.
Porter and Kramer (2011) assert a shortage of the conceptual understanding and practices of the
capitalism during the previous decades. They state that “[c]apitalism is an unparalleled vehicle
for meeting human needs, improving efficiency, creating jobs, and building wealth” (2011, p. 4).
ID- 2013000439 Page 41
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Moreover, they state that “Capital markets will undoubtedly continue to pressure companies to
generate short-term profits, and some companies will surely continue to reap profits at the
expense of societal needs” (2011, p. 17). They call to adopt a broader understanding of values
and to implement new concepts that are related to organizations current cultures to minimize the
gap between the profitable trend and direction of organization and the actual society needs and
values. In their extensive research, Porter and Kramer (2011) explain that ‘capitalism is under
siege’ and call business schools and organizations to adopt new curricula and business practices
that warrant compliance with society actual needs and values in order to deserve society respect
and appreciation. Porter and Kramer (2011) argue that their proposed ‘Creating Shared Value’
(CSV) should supersede CSR in order to rescue the business world from the narrow perceptions,
concepts and practices of capitalism that prevail for decades. They (2011) have carried out a
comparison between the concept of CSR and the new proposed concept of CSV and assert that
“[t]he concept of shared value resets the boundaries of capitalism” (2011, p. 7).
In his extensive report, Perez-Lopez (1993) discusses many aspects pertaining business codes of
conduct and how these codes may promote ‘International Respect for Worker Rights’. His findings
were mainly drawn from the efforts, initiatives and approaches of the United States (U.S)
government and the International Labor Organization (ILO) to enhance and promote the level of
respect of workers and human rights globally. He highlights that U.S government utilizes business
codes of conduct to promote and enhance respect of human rights by adopting three main
approaches. The first approach by the U.S foreign affairs policies and influences on other countries
issues pertaining societies cultures, economy, security and politics. The second approach through
initiating, supporting and maintaining democracy concepts and free societies globally and in the
developing countries specifically. The third approach, by initiating and developing global trade
agreements and direct relationships with the national and international labor organizations.
Bartlett and Preston (2000) highlight the argument of Maclntyre in his book ‘After Virtue’(Carr
(1968) and Friedman (1976)) that Western liberal democracy as ideology and practice has
fragmented the moral and ethical standards in business, and organizations and businessmen are
concerned about ethics and behave ethically only if they expect benefits from such behaviours.
Moreover, Trevino (1986) states that "Codes of ethics will affect ethical/ unethical behaviour
significantly only if they are consistent with the organisational culture and are enforced."
ID- 2013000439 Page 42
generate short-term profits, and some companies will surely continue to reap profits at the
expense of societal needs” (2011, p. 17). They call to adopt a broader understanding of values
and to implement new concepts that are related to organizations current cultures to minimize the
gap between the profitable trend and direction of organization and the actual society needs and
values. In their extensive research, Porter and Kramer (2011) explain that ‘capitalism is under
siege’ and call business schools and organizations to adopt new curricula and business practices
that warrant compliance with society actual needs and values in order to deserve society respect
and appreciation. Porter and Kramer (2011) argue that their proposed ‘Creating Shared Value’
(CSV) should supersede CSR in order to rescue the business world from the narrow perceptions,
concepts and practices of capitalism that prevail for decades. They (2011) have carried out a
comparison between the concept of CSR and the new proposed concept of CSV and assert that
“[t]he concept of shared value resets the boundaries of capitalism” (2011, p. 7).
In his extensive report, Perez-Lopez (1993) discusses many aspects pertaining business codes of
conduct and how these codes may promote ‘International Respect for Worker Rights’. His findings
were mainly drawn from the efforts, initiatives and approaches of the United States (U.S)
government and the International Labor Organization (ILO) to enhance and promote the level of
respect of workers and human rights globally. He highlights that U.S government utilizes business
codes of conduct to promote and enhance respect of human rights by adopting three main
approaches. The first approach by the U.S foreign affairs policies and influences on other countries
issues pertaining societies cultures, economy, security and politics. The second approach through
initiating, supporting and maintaining democracy concepts and free societies globally and in the
developing countries specifically. The third approach, by initiating and developing global trade
agreements and direct relationships with the national and international labor organizations.
Bartlett and Preston (2000) highlight the argument of Maclntyre in his book ‘After Virtue’(Carr
(1968) and Friedman (1976)) that Western liberal democracy as ideology and practice has
fragmented the moral and ethical standards in business, and organizations and businessmen are
concerned about ethics and behave ethically only if they expect benefits from such behaviours.
Moreover, Trevino (1986) states that "Codes of ethics will affect ethical/ unethical behaviour
significantly only if they are consistent with the organisational culture and are enforced."
ID- 2013000439 Page 42

Perez-Lopez (1993) points out that many U.S corporations, supported by U.S government
perspective, started broadening the concept of Codes of conduct globally and enhancing its
crucial role in promoting the respect for labor laws and workers and human rights to include
organizations’ suppliers and subcontractors. He asserts that many approaches may be adopted to
promote the level of respect towards workers and human rights and one of these approaches is
adopting and implementing business codes of conducts by organizations when dealing with its
employees, suppliers and subcontractors.
2.5.3- Power Matrices:
OGC in Guide 5 (2007) asserts that power matrices techniques and analysis should not be
interpreted and understood by organizations against the other party, but should be exploited as a
tool for integrative and cooperative relationships between all project parties. OGC adds that
identifying the areas of weakness and strength of each party should push towards effective and
collective strength for the project team as one entity with mutual and agreed responsibilities,
objectives and benefits. This should help in identifying how the work progress and issues will be
tracked and controlled for the highest levels of project success and maximum mutual benefits for
all the project parties and stakeholders.
While Elmualim (2010) asserts the crucial role of power matrix in articulating stakeholders’
interactions and relationships, he argues that most researchers neglect the impacts of power-
interest matrix, analysis and consequent behaviors between groups and organizations. He
emphasizes the findings of Ertel (1999) and Wild (2002) that ‘unequal distribution of power’
between the parties in construction projects usually creates many conflicts and disputes. He
presents the concept of ‘mutual empowerment’ as an efficient tool and approach that can initiate
and enhance sustainable and effective long-term relationships in construction projects.
Ertel (1999) highlights that negotiators of contracts and deals in construction projects usually try
to impose their proposals and accept the deals and its terms and conditions according to their
strength or weakness at the time of agreement. But they also try to compensate some aspects of
weakness or unfairness in the future while executing the contract. Moreover, Ertel (1999) asserts
that these negotiators depend solely on their organizations interests and skills apart from other
parties’ interests or qualifications, and these efforts are traditionally judged as win or lose deals.
ID- 2013000439 Page 43
perspective, started broadening the concept of Codes of conduct globally and enhancing its
crucial role in promoting the respect for labor laws and workers and human rights to include
organizations’ suppliers and subcontractors. He asserts that many approaches may be adopted to
promote the level of respect towards workers and human rights and one of these approaches is
adopting and implementing business codes of conducts by organizations when dealing with its
employees, suppliers and subcontractors.
2.5.3- Power Matrices:
OGC in Guide 5 (2007) asserts that power matrices techniques and analysis should not be
interpreted and understood by organizations against the other party, but should be exploited as a
tool for integrative and cooperative relationships between all project parties. OGC adds that
identifying the areas of weakness and strength of each party should push towards effective and
collective strength for the project team as one entity with mutual and agreed responsibilities,
objectives and benefits. This should help in identifying how the work progress and issues will be
tracked and controlled for the highest levels of project success and maximum mutual benefits for
all the project parties and stakeholders.
While Elmualim (2010) asserts the crucial role of power matrix in articulating stakeholders’
interactions and relationships, he argues that most researchers neglect the impacts of power-
interest matrix, analysis and consequent behaviors between groups and organizations. He
emphasizes the findings of Ertel (1999) and Wild (2002) that ‘unequal distribution of power’
between the parties in construction projects usually creates many conflicts and disputes. He
presents the concept of ‘mutual empowerment’ as an efficient tool and approach that can initiate
and enhance sustainable and effective long-term relationships in construction projects.
Ertel (1999) highlights that negotiators of contracts and deals in construction projects usually try
to impose their proposals and accept the deals and its terms and conditions according to their
strength or weakness at the time of agreement. But they also try to compensate some aspects of
weakness or unfairness in the future while executing the contract. Moreover, Ertel (1999) asserts
that these negotiators depend solely on their organizations interests and skills apart from other
parties’ interests or qualifications, and these efforts are traditionally judged as win or lose deals.
ID- 2013000439 Page 43

Zue, Zhao and Zillante (2008) assert the findings of Ertel (1999) regarding the misunderstanding
of the developed power matrices and analysis that tempt the client to transfer the highest
amounts of risks to the other project parties like main contractor and subcontractors. In addition,
the main contractor and subcontractors also try to cover their weakness, during the bidding stage,
by submitting huge claims and amounts as variation orders and extension of time to compensate
what they missed during the early stages of the project.
Moreover, Lau and Rowlinson (2009) highlight that power and weakness analysis within the
business context may lead to disrespect, aggressive behaviors, disputes, conflicts and poor
performance. They state that “[w]hen fairness is jeopardized, people will suffer in different ways,
particularly the weaker party” (2009, p. 468).
Chinyio and Olomolaiye (2010), while discussing the legitimacy and power of stakeholders,
assert the findings of Johnson, Scholes and Whittington (2005) and Ihlen and Berntzen (2007)
that power matrix may qualify one project party to impose his will and interests on the other
parties or stakeholders by means of power whether through force ‘coercive power’, material or
financial resources ‘utilitarian power’ or symbolic ‘normative power’.
Chinyio and Olomolaiye (2010) discuss power-interest matrix, as shown in figure #2.4, which
shows that stakeholders in the left bottom square are the weakest party that may suffer from
ignorance, and disrespect until they become stronger and have the power that qualifies him to be
of priority and eligibility of respect and satisfaction.
ID- 2013000439 Page 44
of the developed power matrices and analysis that tempt the client to transfer the highest
amounts of risks to the other project parties like main contractor and subcontractors. In addition,
the main contractor and subcontractors also try to cover their weakness, during the bidding stage,
by submitting huge claims and amounts as variation orders and extension of time to compensate
what they missed during the early stages of the project.
Moreover, Lau and Rowlinson (2009) highlight that power and weakness analysis within the
business context may lead to disrespect, aggressive behaviors, disputes, conflicts and poor
performance. They state that “[w]hen fairness is jeopardized, people will suffer in different ways,
particularly the weaker party” (2009, p. 468).
Chinyio and Olomolaiye (2010), while discussing the legitimacy and power of stakeholders,
assert the findings of Johnson, Scholes and Whittington (2005) and Ihlen and Berntzen (2007)
that power matrix may qualify one project party to impose his will and interests on the other
parties or stakeholders by means of power whether through force ‘coercive power’, material or
financial resources ‘utilitarian power’ or symbolic ‘normative power’.
Chinyio and Olomolaiye (2010) discuss power-interest matrix, as shown in figure #2.4, which
shows that stakeholders in the left bottom square are the weakest party that may suffer from
ignorance, and disrespect until they become stronger and have the power that qualifies him to be
of priority and eligibility of respect and satisfaction.
ID- 2013000439 Page 44
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Hig
Maintain these
Manage these
h stakeholders closelystakeholders in a
happy state
Pow
er
Low Keep an eye on Keep these
stakeholdersthese stakeholders happy andand act when informedpromoted
Low High
Interes
t
Figure #2.4: A power-Interest Matrix. (Chinyio &
Olomolaiye, 2010)
2.5.4 Corporate Social Responsibility (CSR) and Shared Value:
Carroll (1991) (citing in Al Kukhun, 2012) presents a hierarchy for CSR consisting of four layers
for CSR namely: Discretionally responsibility, ethical responsibility, legal responsibility, and
economic responsibility as shown below, in Figure #2.5.
ID- 2013000439 Page 45
Maintain these
Manage these
h stakeholders closelystakeholders in a
happy state
Pow
er
Low Keep an eye on Keep these
stakeholdersthese stakeholders happy andand act when informedpromoted
Low High
Interes
t
Figure #2.4: A power-Interest Matrix. (Chinyio &
Olomolaiye, 2010)
2.5.4 Corporate Social Responsibility (CSR) and Shared Value:
Carroll (1991) (citing in Al Kukhun, 2012) presents a hierarchy for CSR consisting of four layers
for CSR namely: Discretionally responsibility, ethical responsibility, legal responsibility, and
economic responsibility as shown below, in Figure #2.5.
ID- 2013000439 Page 45

Discretionar
y
Responsibili
ties
Ethical
Responsibilities
Legal
Responsibilities
Economic
Responsibilities
Figure #2.5: Corporate Responsibility Hierarchy, (Caroll,
1991).
Moreover, in 1999, World Business Council for the Sustainable Development (citing in Castka et
al. 2004) defines CSR as “the continuing commitment by business to behave ethically and
contribute to economic development while improving the quality of life of the workforce and
their families as well as of the local community and society at large”.
Castka et al. (2004) highlights that CSR has three dimensions, namely: External environment
dimension that integrates the social responsibility with the community, suppliers, subcontractors,
consumers and shareholders relationships. Internal environment; includes employees working
conditions, organization structure, transparency, training and educational aspects. And Holistic
approach; which is concerned with the ethical aspects of the organization. Holistic approach
according to Castka et al. (2004) includes initiating and adopting the codes of ethics to warrant
high levels of values and ethics, employees training and development and promoting the
efficiency and quality of communications plans and procedures.
Moreover, Castka et al. (2004) propose an innovative approach for CSR that connects organization
responsibility with the society and environment simultaneously with its endeavours to achieve
ID- 2013000439 Page 46
y
Responsibili
ties
Ethical
Responsibilities
Legal
Responsibilities
Economic
Responsibilities
Figure #2.5: Corporate Responsibility Hierarchy, (Caroll,
1991).
Moreover, in 1999, World Business Council for the Sustainable Development (citing in Castka et
al. 2004) defines CSR as “the continuing commitment by business to behave ethically and
contribute to economic development while improving the quality of life of the workforce and
their families as well as of the local community and society at large”.
Castka et al. (2004) highlights that CSR has three dimensions, namely: External environment
dimension that integrates the social responsibility with the community, suppliers, subcontractors,
consumers and shareholders relationships. Internal environment; includes employees working
conditions, organization structure, transparency, training and educational aspects. And Holistic
approach; which is concerned with the ethical aspects of the organization. Holistic approach
according to Castka et al. (2004) includes initiating and adopting the codes of ethics to warrant
high levels of values and ethics, employees training and development and promoting the
efficiency and quality of communications plans and procedures.
Moreover, Castka et al. (2004) propose an innovative approach for CSR that connects organization
responsibility with the society and environment simultaneously with its endeavours to achieve
ID- 2013000439 Page 46

sustainable and profitable business and stakeholders’ satisfaction within an accepted level of
ethics and transparency.
Balkau and Sonnemann (2011) call governments and the financial institutions to support the
organizations in its CSR obligations which also can be supported by adopting many environmental
and management systems like ISO 14000 and ISO 26000. Balkau and Sonnemann (2011) agree with
the findings of Menard (2011) about the responsibility of procurement entities and structures towards
funding social activities and ethical relationships with supplier and subcontractors. This
responsibility may include many objectives like: transparency, honesty, openness, ethical and
equitable treatment with all suppliers and subcontractors, proper and unified selection criteria and
opportunities, fairness and transparency in measuring suppliers and other parties’ performances.
On the other hand, Porter and Kramer (2011) argue that there is a direct relation between the
increasing number of organizations that adopt the CSR and the level of non-compliance with
society needs and ethical standards. Porter and Kramer (2011) argue that their proposed
‘Creating Shared Value’ (CSV) should supersede CSR in order to rescue the business world from
the narrow perceptions, concepts and practices of capitalism that prevail for decades. They
(2011) have carried out a comparison between the concept of CSR and the new proposed concept
of CSV and assert that “[t]he concept of shared value resets the boundaries of capitalism” (2011,
p. 7). They call organizations to adopt CSV concepts and practices in order to rebuild trust and
respect with their stakeholders.
ID- 2013000439 Page 47
ethics and transparency.
Balkau and Sonnemann (2011) call governments and the financial institutions to support the
organizations in its CSR obligations which also can be supported by adopting many environmental
and management systems like ISO 14000 and ISO 26000. Balkau and Sonnemann (2011) agree with
the findings of Menard (2011) about the responsibility of procurement entities and structures towards
funding social activities and ethical relationships with supplier and subcontractors. This
responsibility may include many objectives like: transparency, honesty, openness, ethical and
equitable treatment with all suppliers and subcontractors, proper and unified selection criteria and
opportunities, fairness and transparency in measuring suppliers and other parties’ performances.
On the other hand, Porter and Kramer (2011) argue that there is a direct relation between the
increasing number of organizations that adopt the CSR and the level of non-compliance with
society needs and ethical standards. Porter and Kramer (2011) argue that their proposed
‘Creating Shared Value’ (CSV) should supersede CSR in order to rescue the business world from
the narrow perceptions, concepts and practices of capitalism that prevail for decades. They
(2011) have carried out a comparison between the concept of CSR and the new proposed concept
of CSV and assert that “[t]he concept of shared value resets the boundaries of capitalism” (2011,
p. 7). They call organizations to adopt CSV concepts and practices in order to rebuild trust and
respect with their stakeholders.
ID- 2013000439 Page 47
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Chapter Three- Conceptual Model:
From the above detailed literature review, the researcher concludes and presents the following
conceptual model that can help in summarizing, understanding and developing insightful
directions and initiatives towards higher levels of understanding and evaluation of the value of
respect in project management and business in general.
Table#3.1, below, summarizes the literature finding that related to the value of respect in the
relationships between clients, in general, and their suppliers and subcontractors.
Respect Elements and Components, Motivators, Opportunities and
Challenges
(as Concluded from the Literature Review)
a- Respect Elements and Source:
Components:
Recognition and Admiration of the
importance ,quality, abilities and Oxford Dictionary, Merriam –Webster Dictionary and
achievements of others Cambridge Dictionaries.
Due regard , acceptance and Oxford Dictionary, Cambridge Dictionaries, PMI
tolerance towards others rights, (2008), UNESCO (2014), Grosse (2007), Lau and
cultures and traditions Rowlinson (2009).
Obligation towards Humanitarian Universal Declaration of Human Rights-UN (1948),
Values, Rights and Dignity Clarke (2008), M4I (2000), DEFRA (2011) and OGC
(2007).
Complying with professional manner
and business commitments DFAT-Australia (2012) and PMI (2008)
Not to exercise power or position
against others for personal benefits PMI (2008) and Lau & Rowlinson (2009)
ID- 2013000439 Page 48
From the above detailed literature review, the researcher concludes and presents the following
conceptual model that can help in summarizing, understanding and developing insightful
directions and initiatives towards higher levels of understanding and evaluation of the value of
respect in project management and business in general.
Table#3.1, below, summarizes the literature finding that related to the value of respect in the
relationships between clients, in general, and their suppliers and subcontractors.
Respect Elements and Components, Motivators, Opportunities and
Challenges
(as Concluded from the Literature Review)
a- Respect Elements and Source:
Components:
Recognition and Admiration of the
importance ,quality, abilities and Oxford Dictionary, Merriam –Webster Dictionary and
achievements of others Cambridge Dictionaries.
Due regard , acceptance and Oxford Dictionary, Cambridge Dictionaries, PMI
tolerance towards others rights, (2008), UNESCO (2014), Grosse (2007), Lau and
cultures and traditions Rowlinson (2009).
Obligation towards Humanitarian Universal Declaration of Human Rights-UN (1948),
Values, Rights and Dignity Clarke (2008), M4I (2000), DEFRA (2011) and OGC
(2007).
Complying with professional manner
and business commitments DFAT-Australia (2012) and PMI (2008)
Not to exercise power or position
against others for personal benefits PMI (2008) and Lau & Rowlinson (2009)
ID- 2013000439 Page 48

Doing the best to understand,
Merriam –Webster Dictionary, Cambridge Dictionaries,
appreciate and treat others in an
PMI (2008) and Grosse (2007).
appropriate way.
Invest in people development, health
Smallwood (2004), M4I (2000), DEFRA (2011), OGC
and safety issues, and proper work
(2007), Clegg and Kornberger & Pitsis (2011).
environment.
b- Respect Motivators: Source:
Code of Conducts and Ethics PMI (2008), DFAT (2012), DEFRA (2011) and Perez-
Lopez (1993)
Professionalism PMI (2008), Smallwood (2004) and M4I (2000)
Humanitarian Values, Human Rights UN (1948), Clarke (2008), UNESCO (2014), Smallwood
and Dignity. (2004), OGC (2007), Rowlinson (2009),Child (1998)
and Perez-Lopez (1993).
Cultures( individual, organization, Grosse (2007), Lau & Rowlinson (2009), Child (1998),
society and global) Almahmoud &Doloi (2012) and Zue, Zhao & Zillante
(2008)
Procurement Methods (that are based Morledge, Smith & Kashiwagi (2006), Elmualim (2010),
on integration, collaboration and Luu et al. (2003), Al Kukhun (2012), Zue, Zhao &
partnering) Zillante (2008), Rendon (2008), Cabinet Office- CO
(2014), Porter & Kramer (2011), OGC (2007) and
Smallwood & Venter (2001).
Corporate Social Responsibility Porter & Kramer (2011), Castka et al. (2004), Al
(CSR) and Shared Value Kukhun (2012), Balkau & Sonnemann (2011).
c- Respect Consequences Source
and Opportunities
Trust Bartlett and Preston (2000), Grosse (2007) and Lau and
Rowlinson (2009)
Deshpande (2012), Morledge, Smith and Kashiwagi
(2006), Rowlinson (2008), Singh and Tiong (2006),
Davis and Walker (2008), Oberlinder (2000), Wanger
Effective Relationships and high (2000), (PMI) (2008), Talluri and Sarkis (2002), OGC
(2007), Smith (2007), Walker and Rowlinson (2008),
levels of Performance and Success Mahotra (2009), Harris (2010), Ohdar and Ray (2012) ,
Chiu and Huang (2003), Gunasekaran and Cheng
(2008), Clarke (2008), Elmualim (2010) and Dulaimi
(2013)
d- Respect Challenges Source:
Merriam –Webster Dictionary, Cambridge Dictionaries,
appreciate and treat others in an
PMI (2008) and Grosse (2007).
appropriate way.
Invest in people development, health
Smallwood (2004), M4I (2000), DEFRA (2011), OGC
and safety issues, and proper work
(2007), Clegg and Kornberger & Pitsis (2011).
environment.
b- Respect Motivators: Source:
Code of Conducts and Ethics PMI (2008), DFAT (2012), DEFRA (2011) and Perez-
Lopez (1993)
Professionalism PMI (2008), Smallwood (2004) and M4I (2000)
Humanitarian Values, Human Rights UN (1948), Clarke (2008), UNESCO (2014), Smallwood
and Dignity. (2004), OGC (2007), Rowlinson (2009),Child (1998)
and Perez-Lopez (1993).
Cultures( individual, organization, Grosse (2007), Lau & Rowlinson (2009), Child (1998),
society and global) Almahmoud &Doloi (2012) and Zue, Zhao & Zillante
(2008)
Procurement Methods (that are based Morledge, Smith & Kashiwagi (2006), Elmualim (2010),
on integration, collaboration and Luu et al. (2003), Al Kukhun (2012), Zue, Zhao &
partnering) Zillante (2008), Rendon (2008), Cabinet Office- CO
(2014), Porter & Kramer (2011), OGC (2007) and
Smallwood & Venter (2001).
Corporate Social Responsibility Porter & Kramer (2011), Castka et al. (2004), Al
(CSR) and Shared Value Kukhun (2012), Balkau & Sonnemann (2011).
c- Respect Consequences Source
and Opportunities
Trust Bartlett and Preston (2000), Grosse (2007) and Lau and
Rowlinson (2009)
Deshpande (2012), Morledge, Smith and Kashiwagi
(2006), Rowlinson (2008), Singh and Tiong (2006),
Davis and Walker (2008), Oberlinder (2000), Wanger
Effective Relationships and high (2000), (PMI) (2008), Talluri and Sarkis (2002), OGC
(2007), Smith (2007), Walker and Rowlinson (2008),
levels of Performance and Success Mahotra (2009), Harris (2010), Ohdar and Ray (2012) ,
Chiu and Huang (2003), Gunasekaran and Cheng
(2008), Clarke (2008), Elmualim (2010) and Dulaimi
(2013)
d- Respect Challenges Source:

ID- 2013000439 Page 49
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Short-termism, Unethical Behaviours Klein (2001), Clegg,Kornberger & Pitsis (2011),
Elmualim (2010), Hofstede (2003), Karlberg (2004),Zue,
and Poor-values Cultures. Zhao & Zillante (2008), Porter & Kramer (2011)
Power Matrices (unbalanced power OGC (2007), Elmualim (2010), Ertel (1999), Lau &
structure). Rowlinson (2009), Zue, Zhao & Zillante (2008), Chinyio
& Olomolaiye (2010),Johnson, Scholes & Wittington
(2005), Ihlen & Berntzen (2007)
Inappropriate Procurement Methods, Morledge, Smith & Kashiwagi (2006), Elmualim (2010),
Poor Management Knowledge and Luu et al. (2003), Al Kukhun (2012), Zue, Zhao &
Poor Experience Zillante (2008), Rendon (2008), Cabinet Office- CO
(2014), Porter & Kramer (2011), OGC (2007),
Smallwood & Venter (2001).
Table#3.1: Respect Elements, Motivators, Opportunities and Challenges.
From the above literature review and table #3.1 above, the researcher concludes and presents the
below conceptual model, Figure #3.1 below, that summarizes the value of respect between the
parties in projects and business. The conceptual model shows the elements and components of
respect besides its triggers and motivators in the relations of clients and their suppliers and
subcontractors. Also, it tracks and shows the relation between respect and the work performance.
As concluded from the literature review above, there are many meanings and components for
respect summarized in table #3.1 and represented in the conceptual model, figure #3.1 below.
ID- 2013000439 Page 50
Elmualim (2010), Hofstede (2003), Karlberg (2004),Zue,
and Poor-values Cultures. Zhao & Zillante (2008), Porter & Kramer (2011)
Power Matrices (unbalanced power OGC (2007), Elmualim (2010), Ertel (1999), Lau &
structure). Rowlinson (2009), Zue, Zhao & Zillante (2008), Chinyio
& Olomolaiye (2010),Johnson, Scholes & Wittington
(2005), Ihlen & Berntzen (2007)
Inappropriate Procurement Methods, Morledge, Smith & Kashiwagi (2006), Elmualim (2010),
Poor Management Knowledge and Luu et al. (2003), Al Kukhun (2012), Zue, Zhao &
Poor Experience Zillante (2008), Rendon (2008), Cabinet Office- CO
(2014), Porter & Kramer (2011), OGC (2007),
Smallwood & Venter (2001).
Table#3.1: Respect Elements, Motivators, Opportunities and Challenges.
From the above literature review and table #3.1 above, the researcher concludes and presents the
below conceptual model, Figure #3.1 below, that summarizes the value of respect between the
parties in projects and business. The conceptual model shows the elements and components of
respect besides its triggers and motivators in the relations of clients and their suppliers and
subcontractors. Also, it tracks and shows the relation between respect and the work performance.
As concluded from the literature review above, there are many meanings and components for
respect summarized in table #3.1 and represented in the conceptual model, figure #3.1 below.
ID- 2013000439 Page 50

Respect
Motivators
Human
Rights &
Humanita
Profession
alism
Dominant
Culture
Codes of
Conduct
and Ethics
Procurem
ent
Methods
Corporate
Social
Responsi
bility
Respect Elements & Opportunities and
Components Consequences of
Respect
Recognition and Admiration of
the importance ,quality, abilities Trustand achievements of others
Due regard , acceptance and
tolerance towards others rights,
cultures and traditions Effecti
Obligation towards Humanitarian ve
Values, Rights and Dignity Busines
s
Complying with professional manner Relatio
and business commitments nships
Not to exercise power or
position against others for High
personal benefits Work
Doing the best to understand, Perform
ance &appreciate and treat others in an Projectappropriate way Success
Invest in people development,
health and safety issues, and
proper work environment.
Motivators
Human
Rights &
Humanita
Profession
alism
Dominant
Culture
Codes of
Conduct
and Ethics
Procurem
ent
Methods
Corporate
Social
Responsi
bility
Respect Elements & Opportunities and
Components Consequences of
Respect
Recognition and Admiration of
the importance ,quality, abilities Trustand achievements of others
Due regard , acceptance and
tolerance towards others rights,
cultures and traditions Effecti
Obligation towards Humanitarian ve
Values, Rights and Dignity Busines
s
Complying with professional manner Relatio
and business commitments nships
Not to exercise power or
position against others for High
personal benefits Work
Doing the best to understand, Perform
ance &appreciate and treat others in an Projectappropriate way Success
Invest in people development,
health and safety issues, and
proper work environment.

Figure #3.1: Conceptual Model; Value of Respect in the
Relationships and Work Performance.
We can conclude six basic elements that are hypothesized to motivate and encourage parties to
respect the others. These motivators and triggers are summarized as the following:
1- Human Rights and Humanitarian Values: This element imposes respect relations between
project parties as human beings who deserve respect and dignity for mere humanitarian
considerations regardless of profitable or lost deals and projects. This element is mainly
based on the UN declaration of human rights (1948) and the subsequent literature findings of
Perez-Lopez (1993), Child (1998), Smallwood (2004), OGC (2007), Clarke (2008),
ID- 2013000439 Page 51
Relationships and Work Performance.
We can conclude six basic elements that are hypothesized to motivate and encourage parties to
respect the others. These motivators and triggers are summarized as the following:
1- Human Rights and Humanitarian Values: This element imposes respect relations between
project parties as human beings who deserve respect and dignity for mere humanitarian
considerations regardless of profitable or lost deals and projects. This element is mainly
based on the UN declaration of human rights (1948) and the subsequent literature findings of
Perez-Lopez (1993), Child (1998), Smallwood (2004), OGC (2007), Clarke (2008),
ID- 2013000439 Page 51
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Rowlinson (2009) and UNESCO (2014). These findings emphasize that respect is one of
the basic human rights that people deserve as human beings anywhere under any
circumstances. This definitely includes presenting and practicing respect in the relations
with the other parties in the projects and business. Employees who are convinced by and
believe in human rights and humanitarian values are deemed to be of more readiness to
show and practice respectful behavior while dealing with others in work and projects.
2- Professionalism: This motivation element calls for respect from professionalism
perspective that imposes appreciation and respect as a crucial and essential element in
initiating and maintaining business relations, between individuals and partners, to achieve
mutual benefits and high levels of projects success and stakeholders satisfaction. The
findings of PMI (2008), Smallwood (2004) and M4I (2000) highlight that the best
practice and professionalism call for respecting the other parties in the project in order to
create effective relationships that promote the levels of employees’ productivity and work
performance. As a result, professional employees and organizations tend to comply with
respect issues and practices with the other parties in the projects due to their awareness of
and knowledge about its crucial role in project success and stakeholders satisfaction.
3- Dominant Culture: This element actually represents the prevailing beliefs, concepts,
notions and ideas that affect organizations and individuals’ perspectives about respect
and its implementations. This element also affect individuals own perspectives and
interpretations about who and what deserves to be respected. Organizations and
individuals behaviors usually affected by the global or dominant concepts and culture.
This element is mostly concluded from the findings of Klein (2001), Hofstede (2003),
Karlberg (2004), Zue, Zhao and Zillante (2008), Elmualim (2010), Clegg, Kornberger
and Pitsis (2011) and Porter and Kramer (2011). These findings call the decision makers
and organizations top managements to recognize the crucial role of creating, adopting
and communicating a unified organizational culture that enhances and supports respect as
a concept and practice with the other parties. Creating and unifying a specific culture that
supports collaboration, integration and partnering mentalities based on humanitarian
values and human rights will support and enhance respect environment and practices.
This item is different than item number one (1) above in that item #1 is related to the
individuals and employees relationships, within the level of project work and activities,
ID- 2013000439 Page 52
the basic human rights that people deserve as human beings anywhere under any
circumstances. This definitely includes presenting and practicing respect in the relations
with the other parties in the projects and business. Employees who are convinced by and
believe in human rights and humanitarian values are deemed to be of more readiness to
show and practice respectful behavior while dealing with others in work and projects.
2- Professionalism: This motivation element calls for respect from professionalism
perspective that imposes appreciation and respect as a crucial and essential element in
initiating and maintaining business relations, between individuals and partners, to achieve
mutual benefits and high levels of projects success and stakeholders satisfaction. The
findings of PMI (2008), Smallwood (2004) and M4I (2000) highlight that the best
practice and professionalism call for respecting the other parties in the project in order to
create effective relationships that promote the levels of employees’ productivity and work
performance. As a result, professional employees and organizations tend to comply with
respect issues and practices with the other parties in the projects due to their awareness of
and knowledge about its crucial role in project success and stakeholders satisfaction.
3- Dominant Culture: This element actually represents the prevailing beliefs, concepts,
notions and ideas that affect organizations and individuals’ perspectives about respect
and its implementations. This element also affect individuals own perspectives and
interpretations about who and what deserves to be respected. Organizations and
individuals behaviors usually affected by the global or dominant concepts and culture.
This element is mostly concluded from the findings of Klein (2001), Hofstede (2003),
Karlberg (2004), Zue, Zhao and Zillante (2008), Elmualim (2010), Clegg, Kornberger
and Pitsis (2011) and Porter and Kramer (2011). These findings call the decision makers
and organizations top managements to recognize the crucial role of creating, adopting
and communicating a unified organizational culture that enhances and supports respect as
a concept and practice with the other parties. Creating and unifying a specific culture that
supports collaboration, integration and partnering mentalities based on humanitarian
values and human rights will support and enhance respect environment and practices.
This item is different than item number one (1) above in that item #1 is related to the
individuals and employees relationships, within the level of project work and activities,
ID- 2013000439 Page 52

upon their own beliefs in human rights and values. While this item ‘dominant culture’ is
related mainly to the maturity of individuals’, organizations’ and society’s relationships,
concepts and understandings about who deserves respect and how to be respected. It is
about the prevailing understanding, definition and ideas in the society about respect
issues, which will definitely participate in articulating the relationships of all
organizations and entities within the society.
4- Codes of Conduct and Ethics: these published or enforced codes of conducts, by some
professional bodies or governmental entities, stimulate organizations and parties to
warrant respecting human rights while performing works and practicing relations with the
others. It dictates respect as a behavior that employee or entity must show toward other
members of organization or society regardless of the employee’s own perspective or
opinion. It is a commitment from organizations and governmental entities towards others
and environment. Finding of PMI (2008), DFAT (2012), DEFRA (2011), Perez-Lopez
(1993) stand up for this element as a motivator and trigger for respect and appreciation.
These findings encourage organizations not only to adopt codes of conduct and ethics,
but also to communicate these codes and regulations properly with the employees.
Furthermore, organizations should create and develop techniques and methods to
measure, maintain and promote the levels of compliance with these codes of conducts
among their employees and partners.
5- Procurement Methods and Management Skills: These methods, as detailed in the literature
review above, may support or hinder respect behaviour. Client usually, upon his
management knowledge and experience, selects and decides which procurement method
to adopt and apply for his projects, and he is ready to present and practice the amounts of
respect or disrespect behaviours accordingly. This element is concluded from the above
findings of Morledge, Smith and Kashiwagi (2006), Elmualim (2010), Luu et al. (2003),
Al Kukhun (2012), Zue, Zhao and Zillante (2008), Rendon (2008), Cabinet Office- CO
(2014), Porter and Kramer (2011), OGC (2007) and Smallwood and Venter (2001).
Organizations should proceed with new trends and methods in management and
procurement that are based on high levels of respect and trust between the project parties.
Traditional procurement and management methods in which the client depends totally on
his own perspective and knowledge apart from other parties’ early participation of their
ID- 2013000439 Page 53
related mainly to the maturity of individuals’, organizations’ and society’s relationships,
concepts and understandings about who deserves respect and how to be respected. It is
about the prevailing understanding, definition and ideas in the society about respect
issues, which will definitely participate in articulating the relationships of all
organizations and entities within the society.
4- Codes of Conduct and Ethics: these published or enforced codes of conducts, by some
professional bodies or governmental entities, stimulate organizations and parties to
warrant respecting human rights while performing works and practicing relations with the
others. It dictates respect as a behavior that employee or entity must show toward other
members of organization or society regardless of the employee’s own perspective or
opinion. It is a commitment from organizations and governmental entities towards others
and environment. Finding of PMI (2008), DFAT (2012), DEFRA (2011), Perez-Lopez
(1993) stand up for this element as a motivator and trigger for respect and appreciation.
These findings encourage organizations not only to adopt codes of conduct and ethics,
but also to communicate these codes and regulations properly with the employees.
Furthermore, organizations should create and develop techniques and methods to
measure, maintain and promote the levels of compliance with these codes of conducts
among their employees and partners.
5- Procurement Methods and Management Skills: These methods, as detailed in the literature
review above, may support or hinder respect behaviour. Client usually, upon his
management knowledge and experience, selects and decides which procurement method
to adopt and apply for his projects, and he is ready to present and practice the amounts of
respect or disrespect behaviours accordingly. This element is concluded from the above
findings of Morledge, Smith and Kashiwagi (2006), Elmualim (2010), Luu et al. (2003),
Al Kukhun (2012), Zue, Zhao and Zillante (2008), Rendon (2008), Cabinet Office- CO
(2014), Porter and Kramer (2011), OGC (2007) and Smallwood and Venter (2001).
Organizations should proceed with new trends and methods in management and
procurement that are based on high levels of respect and trust between the project parties.
Traditional procurement and management methods in which the client depends totally on
his own perspective and knowledge apart from other parties’ early participation of their
ID- 2013000439 Page 53

knowledge and experience tend to be an appropriate environment for higher levels of
conflicts and disputes. These methods of poor levels of coordination and collaboration
push towards disrespect environment by encouraging unidirectional actions and
fragmentation, ignorance of others parties experience and importance and
underestimating their abilities and achievements. Organizations and practitioners should
look for and encourage new trends, methods and innovative approaches in management
and procurement that empower respect initiatives and practices, in the construction
projects, within maximum levels of integration, collaboration and partnering.
6- Corporate Social Responsibility (CSR) and Shared Value (SV): This CSR as per the
findings of Porter and Kramer (2011), Castka et al. (2004), Al Kukhun (2012) and Balkau
and Sonnemann (2011) count ethical behaviours, which include respect as one of the
main social responsibilities of organizations towards individuals and society. These
findings focus on the ethical responsibility of each organization and the great importance
of the ethical issues and respect practices while dealing with the other parties in the
construction fields and business in general. CSR and SV push organizations to care about
and pay attention to the society needs, values, respect and ethical issues in general during
their projects and business as part of their scope and responsibility. These findings of
Castka et al. (2004), Porter and Kramer (2011), Balkau & Sonnemann (2011) and Al
Kukhun (2012) reveal the huge amount of pressure on organizations to adopt CSR as a
trend in the business sector, globally, to grant them a competitive advantage of being
pioneers not only in business sector, but in all aspects of society and life. CSR calls
organizations to respect people and societies and to align their interests with the actual
society’s needs and core values.
On the other hand, the direct opportunity of respect as per the above findings of Grosse (2007),
Lau and Rowlinson (2009) and Bartlett and Preston (2000) is the trust. Trust between the parties in
the project means more delegations and exchange of tasks. It is deemed as a key factor and crucial
tool in integrating, aligning and allocating the best efforts of each party in the way of excellence and
innovation. Moreover, existence of trust between project parties empowers the spirit of teamwork
and partnership and improves the levels of mutual benefits, fair dealings, proper allocation and
acceptance of tasks, risks and accountability in the projects. The above findings of
ID- 2013000439 Page 54
conflicts and disputes. These methods of poor levels of coordination and collaboration
push towards disrespect environment by encouraging unidirectional actions and
fragmentation, ignorance of others parties experience and importance and
underestimating their abilities and achievements. Organizations and practitioners should
look for and encourage new trends, methods and innovative approaches in management
and procurement that empower respect initiatives and practices, in the construction
projects, within maximum levels of integration, collaboration and partnering.
6- Corporate Social Responsibility (CSR) and Shared Value (SV): This CSR as per the
findings of Porter and Kramer (2011), Castka et al. (2004), Al Kukhun (2012) and Balkau
and Sonnemann (2011) count ethical behaviours, which include respect as one of the
main social responsibilities of organizations towards individuals and society. These
findings focus on the ethical responsibility of each organization and the great importance
of the ethical issues and respect practices while dealing with the other parties in the
construction fields and business in general. CSR and SV push organizations to care about
and pay attention to the society needs, values, respect and ethical issues in general during
their projects and business as part of their scope and responsibility. These findings of
Castka et al. (2004), Porter and Kramer (2011), Balkau & Sonnemann (2011) and Al
Kukhun (2012) reveal the huge amount of pressure on organizations to adopt CSR as a
trend in the business sector, globally, to grant them a competitive advantage of being
pioneers not only in business sector, but in all aspects of society and life. CSR calls
organizations to respect people and societies and to align their interests with the actual
society’s needs and core values.
On the other hand, the direct opportunity of respect as per the above findings of Grosse (2007),
Lau and Rowlinson (2009) and Bartlett and Preston (2000) is the trust. Trust between the parties in
the project means more delegations and exchange of tasks. It is deemed as a key factor and crucial
tool in integrating, aligning and allocating the best efforts of each party in the way of excellence and
innovation. Moreover, existence of trust between project parties empowers the spirit of teamwork
and partnership and improves the levels of mutual benefits, fair dealings, proper allocation and
acceptance of tasks, risks and accountability in the projects. The above findings of
ID- 2013000439 Page 54
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Deshpande (2012), (PMI) (2008), Walker and Rowlinson (2008), Mahotra (2009), Harris (2010),
Ohdar and Ray (2012), Elmualim (2010) and Dulaimi (2013) assert the significant role of trust
between project parties in initiating and developing long-term, win-win and effective
relationships. Trust within this environment of transparency, openness, mutual respect, mutual
benefits, cooperative and integrative approaches and mentalities participates in achieving high
levels of productivity, performance, project success and stakeholders’ satisfaction.
On the other hand and as concluded from the above literature, there are many challenges against
initiating and maintaining respect between the clients and their suppliers and subcontractors.
These challenges, as summarized in table# 3.1 above, are:
1- Short-termism, Unethical Behaviours and Poor-values Cultures: Findings of Klein (2001),
Clegg, Kornberger and Pitsis (2011), Elmualim (2010), Hofstede (2003), Karlberg (2004),
Zue, Zhao and Zillante (2008), Porter and Kramer (2011) support this point. The western-
liberal culture and capitalism give priority to profits and short-term monetary revenues as a
measure of organizations success and shareholders’ satisfaction. This may influence and push
organizations and employees to look for selfish benefits and unethical behaviors apart from
other parties’ benefits, rights and dignity. Capitalism and poor –values cultures, within this
understanding, institutionalize and legitimate the adversarial relationships and
competitiveness that serves the interests of a few (Elmualim 2010; Porter and Kramer 2011).
Within this perspective, organizations and employees may underestimate and overlook the
value of respect and ethics due to the profitable trend that capitalism imposes to be dominant
away from other issues and values. This shortage of western-liberal culture in understanding
and appreciating the actual humanitarian and society values, push some organizations and
employees to ignore respect as a value and practice in projects if there are no monetary
revenues or direct benefits from such behaviors. This perspective of short-term and profitable
trend in business can be faced through intensive efforts by all concerned parties such as
institutions, regulatory and professional bodies, governments and organizations. Their efforts
should focus on increasing awareness of initiating, developing and maintaining sustainable
relationships between project parties within a wider recognition and compliance with society
needs, values, ethics and prosperity rather than merely shareholders’ annual profits and
organization’s prosperity.
ID- 2013000439 Page 55
Ohdar and Ray (2012), Elmualim (2010) and Dulaimi (2013) assert the significant role of trust
between project parties in initiating and developing long-term, win-win and effective
relationships. Trust within this environment of transparency, openness, mutual respect, mutual
benefits, cooperative and integrative approaches and mentalities participates in achieving high
levels of productivity, performance, project success and stakeholders’ satisfaction.
On the other hand and as concluded from the above literature, there are many challenges against
initiating and maintaining respect between the clients and their suppliers and subcontractors.
These challenges, as summarized in table# 3.1 above, are:
1- Short-termism, Unethical Behaviours and Poor-values Cultures: Findings of Klein (2001),
Clegg, Kornberger and Pitsis (2011), Elmualim (2010), Hofstede (2003), Karlberg (2004),
Zue, Zhao and Zillante (2008), Porter and Kramer (2011) support this point. The western-
liberal culture and capitalism give priority to profits and short-term monetary revenues as a
measure of organizations success and shareholders’ satisfaction. This may influence and push
organizations and employees to look for selfish benefits and unethical behaviors apart from
other parties’ benefits, rights and dignity. Capitalism and poor –values cultures, within this
understanding, institutionalize and legitimate the adversarial relationships and
competitiveness that serves the interests of a few (Elmualim 2010; Porter and Kramer 2011).
Within this perspective, organizations and employees may underestimate and overlook the
value of respect and ethics due to the profitable trend that capitalism imposes to be dominant
away from other issues and values. This shortage of western-liberal culture in understanding
and appreciating the actual humanitarian and society values, push some organizations and
employees to ignore respect as a value and practice in projects if there are no monetary
revenues or direct benefits from such behaviors. This perspective of short-term and profitable
trend in business can be faced through intensive efforts by all concerned parties such as
institutions, regulatory and professional bodies, governments and organizations. Their efforts
should focus on increasing awareness of initiating, developing and maintaining sustainable
relationships between project parties within a wider recognition and compliance with society
needs, values, ethics and prosperity rather than merely shareholders’ annual profits and
organization’s prosperity.
ID- 2013000439 Page 55

2- The power-interest matrices and its allocation between the project parties, as per the
findings of OGC (2007), Elmualim (2010), Ertel (1999), Lau and Rowlinson (2009), Zue,
Zhao and Zillante (2008), Chinyio and Olomolaiye (2010), Johnson, Scholes and
Wittington (2005) and Ihlen and Berntzen (2007), may tempt some parties to disregard
respect issues and value while dealing with the weak or less powerful parties.
Organizations in projects should carry out and interpret power-interest matrices and
analysis not to show and practice power against other parties in the project, but to cover
their weakness aspects as partners for higher levels of integration, collaboration and
respect.
3- Poor Management Knowledge and Inappropriate Procurement Methods: some
management styles and procurement methods still empower fragmentation in the
construction industry and hinder collaboration, trust and respect initiatives. Findings of
Morledge, Smith and Kashiwagi (2006), Elmualim (2010), Luu et al. (2003), Al Kukhun
(2012), Zue, Zhao and Zillante (2008), Rendon (2008), OGC (2007), Smallwood and
Venter (2001), Cabinet Office- CO (2014) and Porter and Kramer (2011) talk about the
same issue. They assert that neglecting the contractor’s previous experience, knowledge
and skills in the early stages could lead to crucial conflicts in the execution stages, poor
work quality and low levels of stakeholders’ satisfaction. Clients should practice
‘partnership’ relationships with their suppliers/contractors by adopting effective
management and alternative procurement methods that emphasize respecting other
parties’ interests and benefits within an integrative and collaborative environment in the
early stages of the project.
ID- 2013000439 Page 56
findings of OGC (2007), Elmualim (2010), Ertel (1999), Lau and Rowlinson (2009), Zue,
Zhao and Zillante (2008), Chinyio and Olomolaiye (2010), Johnson, Scholes and
Wittington (2005) and Ihlen and Berntzen (2007), may tempt some parties to disregard
respect issues and value while dealing with the weak or less powerful parties.
Organizations in projects should carry out and interpret power-interest matrices and
analysis not to show and practice power against other parties in the project, but to cover
their weakness aspects as partners for higher levels of integration, collaboration and
respect.
3- Poor Management Knowledge and Inappropriate Procurement Methods: some
management styles and procurement methods still empower fragmentation in the
construction industry and hinder collaboration, trust and respect initiatives. Findings of
Morledge, Smith and Kashiwagi (2006), Elmualim (2010), Luu et al. (2003), Al Kukhun
(2012), Zue, Zhao and Zillante (2008), Rendon (2008), OGC (2007), Smallwood and
Venter (2001), Cabinet Office- CO (2014) and Porter and Kramer (2011) talk about the
same issue. They assert that neglecting the contractor’s previous experience, knowledge
and skills in the early stages could lead to crucial conflicts in the execution stages, poor
work quality and low levels of stakeholders’ satisfaction. Clients should practice
‘partnership’ relationships with their suppliers/contractors by adopting effective
management and alternative procurement methods that emphasize respecting other
parties’ interests and benefits within an integrative and collaborative environment in the
early stages of the project.
ID- 2013000439 Page 56

Chapter Four- Research Methodology:
4.1- Introduction:
As the researcher in this paper intends to investigate the value of respect in the relationships and
work performance within the construction industry, a qualitative approach was selected to be
able to explain and clarify the value of respect in the relations between the main contractors and
their suppliers and subcontractors. The interpretive nature of the qualitative approach supports
highlighting, clarifying and reflecting the owners, clients, main contractors, MEP contractors,
subcontractors and suppliers’ best practices and perspectives about this important issue in the
construction field in the UAE (Saunders, Lewis & Thornhill 2012).
This research paper is conducted firstly by studying the literature articles and presenting the
related findings of other researchers and academics. These literature findings were ranked and
grouped into many main categories that summarize the elements and components of respect, its
triggers and motivators, challenges and consequences, as shown in chapter three above.
Secondly, based on the researcher experience of about eighteen years (18) in the construction
industry in general, and his experience of about eight (8) years, as an employee and procurement
manager in an MEP organization (XY), five MEP projects of XY in the UAE were selected as the
case studies of this research. The researcher has selected MEP projects to be the case studies, due to
the nature and complexity of the relationships between the parties in the MEP projects. Each MEP
project may include about thirty to forty (30-40) numbers of suppliers and subcontractors who all
participate in project work and activities. The MEP contractor and these suppliers and subcontractors
have to manage their activities and relationships which require high levels of coordination,
knowledge, experience and effectiveness. These five projects were studied, analyzed, discussed and
presented to investigate, explore and conclude respect value and practice in the relationships between
XY and its suppliers and subcontractors in these five projects. In addition, to explore the relation
between these respect practices and the level of work performance and success. Within this case-
study, twenty (20) interviews were carried out with employees and
ID- 2013000439 Page 57
4.1- Introduction:
As the researcher in this paper intends to investigate the value of respect in the relationships and
work performance within the construction industry, a qualitative approach was selected to be
able to explain and clarify the value of respect in the relations between the main contractors and
their suppliers and subcontractors. The interpretive nature of the qualitative approach supports
highlighting, clarifying and reflecting the owners, clients, main contractors, MEP contractors,
subcontractors and suppliers’ best practices and perspectives about this important issue in the
construction field in the UAE (Saunders, Lewis & Thornhill 2012).
This research paper is conducted firstly by studying the literature articles and presenting the
related findings of other researchers and academics. These literature findings were ranked and
grouped into many main categories that summarize the elements and components of respect, its
triggers and motivators, challenges and consequences, as shown in chapter three above.
Secondly, based on the researcher experience of about eighteen years (18) in the construction
industry in general, and his experience of about eight (8) years, as an employee and procurement
manager in an MEP organization (XY), five MEP projects of XY in the UAE were selected as the
case studies of this research. The researcher has selected MEP projects to be the case studies, due to
the nature and complexity of the relationships between the parties in the MEP projects. Each MEP
project may include about thirty to forty (30-40) numbers of suppliers and subcontractors who all
participate in project work and activities. The MEP contractor and these suppliers and subcontractors
have to manage their activities and relationships which require high levels of coordination,
knowledge, experience and effectiveness. These five projects were studied, analyzed, discussed and
presented to investigate, explore and conclude respect value and practice in the relationships between
XY and its suppliers and subcontractors in these five projects. In addition, to explore the relation
between these respect practices and the level of work performance and success. Within this case-
study, twenty (20) interviews were carried out with employees and
ID- 2013000439 Page 57
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

experts from different MEP organizations (XY and its suppliers and subcontractors) within these
five (5) projects.
These interviews within the context of the case studies aim at investigating the knowledge and
the understanding of respect value, practices and status between the parties in these five MEP
projects, specifically, and the MEP projects in the UAE, in general. The information and results,
that were obtained and concluded from these interviews are analyzed and compared with the
conceptual model that the researcher has concluded in order to obtain and present a clear, reliable
and solid knowledge about many aspects and practices of respect and its impacts on work
performance in the construction industry within the private sector. Figure #4.1, below, presents
the flow of information in this research.
Selectin Empirical Data Conclusion
g Context & Analysis, &
Researc Sample Results Recommen
h Selection &Discussio dations
Figure #4.1: Research Flow of
Information
4.2- Empirical Context and Sample Selection:
Generally, construction projects aggregate and engage many organizations, entities and individuals
under one umbrella represented in the project works, schedule and cost. These projects are executed,
controlled and managed by people who work with each other and are influenced by set of procedures,
policies, code of conducts, perspectives and cultures that they believe in and adopt
ID- 2013000439 Page 58
five (5) projects.
These interviews within the context of the case studies aim at investigating the knowledge and
the understanding of respect value, practices and status between the parties in these five MEP
projects, specifically, and the MEP projects in the UAE, in general. The information and results,
that were obtained and concluded from these interviews are analyzed and compared with the
conceptual model that the researcher has concluded in order to obtain and present a clear, reliable
and solid knowledge about many aspects and practices of respect and its impacts on work
performance in the construction industry within the private sector. Figure #4.1, below, presents
the flow of information in this research.
Selectin Empirical Data Conclusion
g Context & Analysis, &
Researc Sample Results Recommen
h Selection &Discussio dations
Figure #4.1: Research Flow of
Information
4.2- Empirical Context and Sample Selection:
Generally, construction projects aggregate and engage many organizations, entities and individuals
under one umbrella represented in the project works, schedule and cost. These projects are executed,
controlled and managed by people who work with each other and are influenced by set of procedures,
policies, code of conducts, perspectives and cultures that they believe in and adopt
ID- 2013000439 Page 58

(Manowong & Ogunlana 2010). The researcher in this section selected XY as an MEP
organization with more than twenty (20) years experience in the MEP projects in the UAE and
Gulf region. XY executed many huge, complex and luxurious projects and is deemed as one of
the most famous and largest MEP organizations within the UAE and Middle East of about seven
hundred (700) million-US$ annual turnover and of about eight thousand (8,000) employees. The
researcher selects one MEP contractor (XY) in the five (5) projects to give a complete and
comprehensive picture about XY relationships, as one of the largest MEP organizations in the
Middle East, with its suppliers and subcontractors, and to investigate and cover all aspects and
practices of respect between the MEP parties with a minimum number of variables within the
MEP projects and organizations’ relationships.
The researcher has carried out five (5) case-studies that are consisted of five (5) MEP projects.
These projects were executed by XY and different specialist contractors as subcontractors to XY
with different disciplines and roles within the MEP general contracts. The five projects were
selected from the portfolio of the MEP contractor (XY) that the researcher was involved with as
an employee and procurement manager of XY. The researcher examines these five case-studies
by tracking, highlighting and analyzing the different aspects and issues that related to respect
practices within projects contexts and relationships between this MEP contractor (XY) and his
suppliers and subcontractors. XY is usually awarded the MEP contract from the Main contractor.
XY is deemed to be the client with respect to the suppliers and subcontractors, because their
subcontracts are part from the MEP contractor’s general contract, and XY is the party who
usually awards parts of his general contract to suppliers and subcontractors. The information and
details of each contract were taken from the both concerned parties, i.e. the MEP contractor (XY)
and the supplier or the subcontractor.
For each project, the researcher will start with a summary to provide a general idea about project
size, location, scope, schedule and cost. Also, details of contract of each supplier or subcontractor in
the project will be presented before starting investigating and analyzing respect issues and its value
within the relations of the project parties with each other. Interviews were carried out with the
relevant contact at XY for that project, two suppliers and one subcontractor for each project. Twenty
(20) interviews were carried out with employees from several parties who are in direct relation and
have main roles in the five projects, and each employee with not less than ten years
ID- 2013000439 Page 59
organization with more than twenty (20) years experience in the MEP projects in the UAE and
Gulf region. XY executed many huge, complex and luxurious projects and is deemed as one of
the most famous and largest MEP organizations within the UAE and Middle East of about seven
hundred (700) million-US$ annual turnover and of about eight thousand (8,000) employees. The
researcher selects one MEP contractor (XY) in the five (5) projects to give a complete and
comprehensive picture about XY relationships, as one of the largest MEP organizations in the
Middle East, with its suppliers and subcontractors, and to investigate and cover all aspects and
practices of respect between the MEP parties with a minimum number of variables within the
MEP projects and organizations’ relationships.
The researcher has carried out five (5) case-studies that are consisted of five (5) MEP projects.
These projects were executed by XY and different specialist contractors as subcontractors to XY
with different disciplines and roles within the MEP general contracts. The five projects were
selected from the portfolio of the MEP contractor (XY) that the researcher was involved with as
an employee and procurement manager of XY. The researcher examines these five case-studies
by tracking, highlighting and analyzing the different aspects and issues that related to respect
practices within projects contexts and relationships between this MEP contractor (XY) and his
suppliers and subcontractors. XY is usually awarded the MEP contract from the Main contractor.
XY is deemed to be the client with respect to the suppliers and subcontractors, because their
subcontracts are part from the MEP contractor’s general contract, and XY is the party who
usually awards parts of his general contract to suppliers and subcontractors. The information and
details of each contract were taken from the both concerned parties, i.e. the MEP contractor (XY)
and the supplier or the subcontractor.
For each project, the researcher will start with a summary to provide a general idea about project
size, location, scope, schedule and cost. Also, details of contract of each supplier or subcontractor in
the project will be presented before starting investigating and analyzing respect issues and its value
within the relations of the project parties with each other. Interviews were carried out with the
relevant contact at XY for that project, two suppliers and one subcontractor for each project. Twenty
(20) interviews were carried out with employees from several parties who are in direct relation and
have main roles in the five projects, and each employee with not less than ten years
ID- 2013000439 Page 59

experience in the MEP construction projects. The researcher position in XY, as a procurement
manager, grants an advantage regarding the selection of the interviewees who have an adequate
awareness and proper involvement and knowledge about their companies’ scope and the
relationships with other parties in the project. The one to one interviews were face to face, and
were completed within eight weeks period. Table #4.2 shows the profiles of the twenty (20)
interviewees in these five projects.
Table #4.1: Profiles of the Interviewees in the Case-studies.
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
A.A(p1) Sr. Private
Intervie Procureme Male Jordanian 15 MEP Contractor (+8000)
wee # 1 nt (in projects #1)
Manager
Intervie A.S(p1) Account Female Jordanian 12 Supplier1- in Private (+150)
wee # 2 Manager Project #1
Intervie A.K (p1) Sr. Sales Male Iraqi 12 Supplier2- in Private (+100)
wee #3 Manager Project #1
Intervie S.S(p1) Sr. Project Male Palestinian 15 Subcontractor- Private (+200)
wee #4 Manager in project #1
Intervie R.G(p2) Project Male Jordanian 10 MEP Contractor Private
wee #5 Manager (in projects #2) (+8000)
Intervie T.A(p2) Sr. sales Male Pakistani 20 Supplier1- in Private (+50)
wee #6 Manager Project #2
Intervie M.O(p2) Sales Male Palestinian 18 Supplier2- in Private (+100)
wee #7 Manager Project #2
Intervie H.I(p2) Contracts Male Lebanese 12 Subcontractor- Private (+150)
wee #8 Manager in project #2
Intervie S.H (p3) Sr. Project Male Palestinian 18 MEP Contractor Private
wee #9 Manager (in projects #3) (+8000)
Intervie R.A(p3) Account Female Lebanese 11 Supplier1- in Private (+50)
wee #10 Manager Project #3
Intervie S.K(p3) account Male Indian 15 Supplier2- in Private (+50)
wee #11 Manager Project #3
Intervie H.A(p3) Sr. Subcontractor- Private (+150)
Technical Male Jordanian 12
wee #12 in project #3
Manager
Intervie M.Q (p4) Project Male Iraqi 12 MEP Contractor Private
wee #13 Manager (in projects #4) (+8000)
Intervie M.H(p4) Sales Male Iraqi 13 Supplier1- in Private (+50)
wee #14 Manager Project #4
ID- 2013000439 Page 60
manager, grants an advantage regarding the selection of the interviewees who have an adequate
awareness and proper involvement and knowledge about their companies’ scope and the
relationships with other parties in the project. The one to one interviews were face to face, and
were completed within eight weeks period. Table #4.2 shows the profiles of the twenty (20)
interviewees in these five projects.
Table #4.1: Profiles of the Interviewees in the Case-studies.
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
A.A(p1) Sr. Private
Intervie Procureme Male Jordanian 15 MEP Contractor (+8000)
wee # 1 nt (in projects #1)
Manager
Intervie A.S(p1) Account Female Jordanian 12 Supplier1- in Private (+150)
wee # 2 Manager Project #1
Intervie A.K (p1) Sr. Sales Male Iraqi 12 Supplier2- in Private (+100)
wee #3 Manager Project #1
Intervie S.S(p1) Sr. Project Male Palestinian 15 Subcontractor- Private (+200)
wee #4 Manager in project #1
Intervie R.G(p2) Project Male Jordanian 10 MEP Contractor Private
wee #5 Manager (in projects #2) (+8000)
Intervie T.A(p2) Sr. sales Male Pakistani 20 Supplier1- in Private (+50)
wee #6 Manager Project #2
Intervie M.O(p2) Sales Male Palestinian 18 Supplier2- in Private (+100)
wee #7 Manager Project #2
Intervie H.I(p2) Contracts Male Lebanese 12 Subcontractor- Private (+150)
wee #8 Manager in project #2
Intervie S.H (p3) Sr. Project Male Palestinian 18 MEP Contractor Private
wee #9 Manager (in projects #3) (+8000)
Intervie R.A(p3) Account Female Lebanese 11 Supplier1- in Private (+50)
wee #10 Manager Project #3
Intervie S.K(p3) account Male Indian 15 Supplier2- in Private (+50)
wee #11 Manager Project #3
Intervie H.A(p3) Sr. Subcontractor- Private (+150)
Technical Male Jordanian 12
wee #12 in project #3
Manager
Intervie M.Q (p4) Project Male Iraqi 12 MEP Contractor Private
wee #13 Manager (in projects #4) (+8000)
Intervie M.H(p4) Sales Male Iraqi 13 Supplier1- in Private (+50)
wee #14 Manager Project #4
ID- 2013000439 Page 60
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Intervie A.P(p4) Sales Male Indian 13 Supplier2- in Private (+100)
wee #15 Manager Project #4
Intervie H.M(p4) Project Male Egyptian 15 Subcontractor- Private (+100)
wee #16 Manager in project #4
Intervie I.M (p5) Constructi MEP Contractor Private
on Male Jordanian 12 (+8000)
wee #17 (in projects #5)
Manager
Intervie B.I(p5) Developm Supplier1- in Private (+50)
ent Male Jordanian 11
wee #18 Project #5
Manager
Intervie J.D(p5) Sr. Project Female Indian 14 Supplier2- in Private (+100)
wee #19 Manager Project #5
Intervie B.M(p5) Sr. Project Male Palestinian 12 Subcontractor- Private (+100)
wee #20 Manager in project #5
A number of questions were designed to cover the respect aspects and issues between the parties
in these projects, and to discover the existence of respect or disrespect behavior between the MEP
contractor (XY) and his suppliers and subcontractors. These questions were intended to identify
and highlight respect value and its practices, motivators, opportunities and challenges from many
perspectives of the different parties engaged in the same contract and project. These questions
are shown in Table #4.2, below. These were the main questions, and a number of follow up
questions were asked to the interviewees to provide the depth of knowledge needed for better
analysis and understanding of respect issues and practices in the projects.
Question #1: In general; how do you look at and evaluate the relationships with the other
parties in the project?
Question #2: In your point of view, is there respect in the relations with the other parties in
your projects? How?
Question #3: Can you pls. give examples of respect or disrespect aspects, behaviors or
initiatives from your organization or others while all of you were engaged in
this project?
Question #4: Do you think that the level of respect that presented in this project has any effect
on the levels of profits, trust, work performance and success of the project?
How?
Question #5: What were the factors that motivate and encourage showing and practicing respect
ID- 2013000439 Page 61
wee #15 Manager Project #4
Intervie H.M(p4) Project Male Egyptian 15 Subcontractor- Private (+100)
wee #16 Manager in project #4
Intervie I.M (p5) Constructi MEP Contractor Private
on Male Jordanian 12 (+8000)
wee #17 (in projects #5)
Manager
Intervie B.I(p5) Developm Supplier1- in Private (+50)
ent Male Jordanian 11
wee #18 Project #5
Manager
Intervie J.D(p5) Sr. Project Female Indian 14 Supplier2- in Private (+100)
wee #19 Manager Project #5
Intervie B.M(p5) Sr. Project Male Palestinian 12 Subcontractor- Private (+100)
wee #20 Manager in project #5
A number of questions were designed to cover the respect aspects and issues between the parties
in these projects, and to discover the existence of respect or disrespect behavior between the MEP
contractor (XY) and his suppliers and subcontractors. These questions were intended to identify
and highlight respect value and its practices, motivators, opportunities and challenges from many
perspectives of the different parties engaged in the same contract and project. These questions
are shown in Table #4.2, below. These were the main questions, and a number of follow up
questions were asked to the interviewees to provide the depth of knowledge needed for better
analysis and understanding of respect issues and practices in the projects.
Question #1: In general; how do you look at and evaluate the relationships with the other
parties in the project?
Question #2: In your point of view, is there respect in the relations with the other parties in
your projects? How?
Question #3: Can you pls. give examples of respect or disrespect aspects, behaviors or
initiatives from your organization or others while all of you were engaged in
this project?
Question #4: Do you think that the level of respect that presented in this project has any effect
on the levels of profits, trust, work performance and success of the project?
How?
Question #5: What were the factors that motivate and encourage showing and practicing respect
ID- 2013000439 Page 61

relations between the parties in this project?
Question #6: What were the challenges and constrains against showing and practicing respect
relations between the parties in this project?
Table #4.2: Questions to the Interviewees in the Case-studies.
Each project, from the five MEP projects, is consisted of many contracts with suppliers and
subcontractors who were awarded these contracts from the MEP contractor (XY). Details of
these projects and the work packages for the suppliers and subcontractors are summarized in
tables #4.3, #4.4, #4.5, #4.6 and # 4.7 below:
4.3 The Projects and Contracts Details:
4.3.1 Project #1:
Project Type: Commercial Tower (48 levels).
Location: Dubai- UAE
Project total amount (MEP Contract): 110,000,000 AED
Procurement Method: Design-Tender-Build Method.
Duration: Feb 2008- Dec 2011
Suppliers and subcontractors contracts summary is shown in table #4.3 below:
MEP Contract Material/ Work Package Contract Contract type
(110,000,000) Service Scope Amount
AED (Million
AED)
ID- 2013000439 Page 62
Question #6: What were the challenges and constrains against showing and practicing respect
relations between the parties in this project?
Table #4.2: Questions to the Interviewees in the Case-studies.
Each project, from the five MEP projects, is consisted of many contracts with suppliers and
subcontractors who were awarded these contracts from the MEP contractor (XY). Details of
these projects and the work packages for the suppliers and subcontractors are summarized in
tables #4.3, #4.4, #4.5, #4.6 and # 4.7 below:
4.3 The Projects and Contracts Details:
4.3.1 Project #1:
Project Type: Commercial Tower (48 levels).
Location: Dubai- UAE
Project total amount (MEP Contract): 110,000,000 AED
Procurement Method: Design-Tender-Build Method.
Duration: Feb 2008- Dec 2011
Suppliers and subcontractors contracts summary is shown in table #4.3 below:
MEP Contract Material/ Work Package Contract Contract type
(110,000,000) Service Scope Amount
AED (Million
AED)
ID- 2013000439 Page 62

MEP Contractor MEP General Supply, Installation, 110.0 Lump sum- fixed
(XY) Contract Testing and
Commissioning
Supplier #1 Air Cond. Supply, testing& 8.0 Purchase Order-
Sys. commissioning fixed unit price/ re-
measurable
Supplier #2 Switchgear Supply, testing& 10.0 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 Security Supply, Installation, 6.5 Lump sum- fixed
Systems testing &
commissioning
Table #4.3: Summary of suppliers and subcontractors contracts – Project #1, (adapted from XY
archive).
4.3.2 Project #2:
Project Type: Commercial and Residential Twin Towers (54 levels each).
Location: Abu Dhabi- UAE
Project total amount (MEP Contract): 180,000,000
AED Procurement Method: Design-Tender-Build
Method. Duration: June 2010- June 2013
Suppliers and subcontractors contracts summary is shown in table #4.4 below:
MEP Contract Material/ Work Package Contract Contract type
(180,000,000) Service Scope Amount
AED (Million
AED)
ID- 2013000439 Page 63
(XY) Contract Testing and
Commissioning
Supplier #1 Air Cond. Supply, testing& 8.0 Purchase Order-
Sys. commissioning fixed unit price/ re-
measurable
Supplier #2 Switchgear Supply, testing& 10.0 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 Security Supply, Installation, 6.5 Lump sum- fixed
Systems testing &
commissioning
Table #4.3: Summary of suppliers and subcontractors contracts – Project #1, (adapted from XY
archive).
4.3.2 Project #2:
Project Type: Commercial and Residential Twin Towers (54 levels each).
Location: Abu Dhabi- UAE
Project total amount (MEP Contract): 180,000,000
AED Procurement Method: Design-Tender-Build
Method. Duration: June 2010- June 2013
Suppliers and subcontractors contracts summary is shown in table #4.4 below:
MEP Contract Material/ Work Package Contract Contract type
(180,000,000) Service Scope Amount
AED (Million
AED)
ID- 2013000439 Page 63
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

MEP Contractor MEP General Supply, Installation, 180.0 Lump sum- fixed
(XY) Contract Testing and
Commissioning
Supplier #1 Air Cond. Supply, testing& 17.0 Purchase Order-
Sys. commissioning fixed unit price/ re-
measurable
Supplier #2 Switchgear Supply, testing& 21.0 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 BMS system Supply, Installation, 4.0 Lump sum- fixed
testing &
commissioning
Table #4.4: Summary of suppliers and subcontractors contracts – Project #2, (adapted from XY -
MEP contractor archive).
4.3.3 Project #3:
Project Type: Community Villas (1200 Villas).
Location: Dubai- UAE
Project total amount (MEP Contract): 950,000,000
AED Procurement Method: Design-Tender-Build
Method. Duration: May 2009- Dec 2011
Suppliers and subcontractors contracts summary is shown in table #4.5 below:
MEP Contract Material/ Work Package Contract Contract type
(950,000,000) Service Scope Amount
AED (Million
AED)
MEP Contractor MEP General Supply, Installation, 950.0 Lump sum- fixed
(XY) Contract Testing and
Commissioning
ID- 2013000439 Page 64
(XY) Contract Testing and
Commissioning
Supplier #1 Air Cond. Supply, testing& 17.0 Purchase Order-
Sys. commissioning fixed unit price/ re-
measurable
Supplier #2 Switchgear Supply, testing& 21.0 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 BMS system Supply, Installation, 4.0 Lump sum- fixed
testing &
commissioning
Table #4.4: Summary of suppliers and subcontractors contracts – Project #2, (adapted from XY -
MEP contractor archive).
4.3.3 Project #3:
Project Type: Community Villas (1200 Villas).
Location: Dubai- UAE
Project total amount (MEP Contract): 950,000,000
AED Procurement Method: Design-Tender-Build
Method. Duration: May 2009- Dec 2011
Suppliers and subcontractors contracts summary is shown in table #4.5 below:
MEP Contract Material/ Work Package Contract Contract type
(950,000,000) Service Scope Amount
AED (Million
AED)
MEP Contractor MEP General Supply, Installation, 950.0 Lump sum- fixed
(XY) Contract Testing and
Commissioning
ID- 2013000439 Page 64

Supplier #1 Sanitary Supply, testing& 43.0 Purchase Order-
Wares commissioning fixed unit price/ re-
measurable
Supplier #2 Light fixtures Supply, testing& 45.0 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 Aluminum Supply, Installation, 4.5 Purchase Order-
cladding testing & fixed unit price/ re-
commissioning measurable
Table #4.5: Summary of suppliers and subcontractors contracts – Project #3, (adapted from XY
archive).
4.3.4 Project #4:
Project Type: Offices and Hotel Tower (64 levels).
Location: Dubai- UAE
Project total amount (MEP Contract): 160,000,000
AED Procurement Method: Design-Tender-Build
Method. Duration: Feb 2008- Dec 2011
Suppliers and subcontractors contracts summary is shown in table #4.6 below:
MEP Contract Material/ Work Package Contract Contract type
(160,000,000) Service Scope Amount
AED (Million
AED)
MEP Contractor MEP General Supply, Installation, 160.0 Lump sum- fixed
(XY) Contract Testing and
Commissioning
Supplier #1 Air Cond. Supply, testing& 10.0 Purchase Order-
Sys. commissioning fixed unit price/ re-
measurable
Supplier #2 Switchgear Supply, testing& 9.5 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 Security Supply, Installation, 5.5 Lump sum- fixed
Systems testing &
commissioning
ID- 2013000439 Page 65
Wares commissioning fixed unit price/ re-
measurable
Supplier #2 Light fixtures Supply, testing& 45.0 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 Aluminum Supply, Installation, 4.5 Purchase Order-
cladding testing & fixed unit price/ re-
commissioning measurable
Table #4.5: Summary of suppliers and subcontractors contracts – Project #3, (adapted from XY
archive).
4.3.4 Project #4:
Project Type: Offices and Hotel Tower (64 levels).
Location: Dubai- UAE
Project total amount (MEP Contract): 160,000,000
AED Procurement Method: Design-Tender-Build
Method. Duration: Feb 2008- Dec 2011
Suppliers and subcontractors contracts summary is shown in table #4.6 below:
MEP Contract Material/ Work Package Contract Contract type
(160,000,000) Service Scope Amount
AED (Million
AED)
MEP Contractor MEP General Supply, Installation, 160.0 Lump sum- fixed
(XY) Contract Testing and
Commissioning
Supplier #1 Air Cond. Supply, testing& 10.0 Purchase Order-
Sys. commissioning fixed unit price/ re-
measurable
Supplier #2 Switchgear Supply, testing& 9.5 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 Security Supply, Installation, 5.5 Lump sum- fixed
Systems testing &
commissioning
ID- 2013000439 Page 65

Table #4.6: Summary of suppliers and subcontractors contracts – Project #4, (adapted from XY
archive).
4.3.5 Project #5:
Project Type: Commercial and Residential / twin-Towers, 48 and 56 levels.
Location: Dubai- UAE
Project total amount (MEP Contract): 300,000,000
AED Procurement Method: Design-Tender-Build
Method. Duration: Feb. 2012- Feb. 2015
Suppliers and subcontractors contracts summary is shown in table #4.7 below:
MEP Contract Material/ Work Package Contract Contract type
(300,000,000) Service Scope Amount
AED (Million
AED)
MEP Contractor MEP General Supply, Installation, 300.0 Lump sum- fixed
(XY) Contract Testing and
Commissioning
Supplier #1 Hot Cold Supply, testing & 12.0 Purchase Order-
water pipes commissioning fixed unit price/ re-
measurable
Supplier #2 Exhaust Fans Supply, testing & 10.0 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 LP Gas Supply, Installation, 3.5 Lump sum- fixed
system testing &
commissioning
ID- 2013000439 Page 66
archive).
4.3.5 Project #5:
Project Type: Commercial and Residential / twin-Towers, 48 and 56 levels.
Location: Dubai- UAE
Project total amount (MEP Contract): 300,000,000
AED Procurement Method: Design-Tender-Build
Method. Duration: Feb. 2012- Feb. 2015
Suppliers and subcontractors contracts summary is shown in table #4.7 below:
MEP Contract Material/ Work Package Contract Contract type
(300,000,000) Service Scope Amount
AED (Million
AED)
MEP Contractor MEP General Supply, Installation, 300.0 Lump sum- fixed
(XY) Contract Testing and
Commissioning
Supplier #1 Hot Cold Supply, testing & 12.0 Purchase Order-
water pipes commissioning fixed unit price/ re-
measurable
Supplier #2 Exhaust Fans Supply, testing & 10.0 Purchase Order-
commissioning fixed unit price/ re-
measurable
Subcontractor #1 LP Gas Supply, Installation, 3.5 Lump sum- fixed
system testing &
commissioning
ID- 2013000439 Page 66
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table #4.7: Summary of suppliers and subcontractors contracts – Project #5, (adapted from XY
archive).
Chapter Five- Interviews, Data Analysis, Results and Discussion:
5.1- Introduction:
In these case-studies, the researcher has investigated respect between the main MEP contractor (XY)
and its suppliers and subcontractors, to identify the motivators, opportunities and challenges of
respect within the projects environment. In addition, the case-studies are intended to reveal the
impacts of these, respect or disrespect, practices and initiatives on the level of work performance and
success. The approach that the researcher has adopted in this section focuses mainly on the
MEP contractor’s (XY), suppliers’ and subcontractors’ understanding, initiatives and practices
regarding respect issues accompanying executing the MEP works contracts in these five selected
projects. The analysis of the interviews are presented under the headings: aspects and issues of
respect, motivators of respect, opportunities of respect and challenges of respect in order to facilitate
analyzing and understanding the practices and status of respect within these case-studies.
While presenting these case-studies, in the context of construction projects, the researcher finds his
experience, as an employee and procurement manager in XY since about eight (8) years and an
overall experience of about eighteen (18) years in the construction industry, is of a great value to this
research . This experience supports him to recognize the business relationships and respect practices
and aspects within the projects and construction industry, and helps in carrying out and analyzing the
case-studies and the related respect issues and practices objectively and impartially.
It is worth to mention that while presenting and discussing interviewees’ opinions, interpretation,
understanding and narrations of respect issues, practices and events during the projects, the
researcher intention is to examine the perceptions of respect issues, practices, elements,
ID- 2013000439 Page 67
archive).
Chapter Five- Interviews, Data Analysis, Results and Discussion:
5.1- Introduction:
In these case-studies, the researcher has investigated respect between the main MEP contractor (XY)
and its suppliers and subcontractors, to identify the motivators, opportunities and challenges of
respect within the projects environment. In addition, the case-studies are intended to reveal the
impacts of these, respect or disrespect, practices and initiatives on the level of work performance and
success. The approach that the researcher has adopted in this section focuses mainly on the
MEP contractor’s (XY), suppliers’ and subcontractors’ understanding, initiatives and practices
regarding respect issues accompanying executing the MEP works contracts in these five selected
projects. The analysis of the interviews are presented under the headings: aspects and issues of
respect, motivators of respect, opportunities of respect and challenges of respect in order to facilitate
analyzing and understanding the practices and status of respect within these case-studies.
While presenting these case-studies, in the context of construction projects, the researcher finds his
experience, as an employee and procurement manager in XY since about eight (8) years and an
overall experience of about eighteen (18) years in the construction industry, is of a great value to this
research . This experience supports him to recognize the business relationships and respect practices
and aspects within the projects and construction industry, and helps in carrying out and analyzing the
case-studies and the related respect issues and practices objectively and impartially.
It is worth to mention that while presenting and discussing interviewees’ opinions, interpretation,
understanding and narrations of respect issues, practices and events during the projects, the
researcher intention is to examine the perceptions of respect issues, practices, elements,
ID- 2013000439 Page 67

motivators, opportunities and challenges rather than acceptation or recognition of the validity or
authenticity of any specific claim from any party against others.
5. 2 – Case-studies: Interviews and Findings:
5.2.1 Case-study #1 (Project #1)
The following table #5.1 presents the interviewees’ profiles within the case-study #1.
Table #5.1: Interviewees’ profiles – Case-study #1 (Project #1)
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
A.A(p1) Sr. Private
Intervie Procureme Male Jordanian 15 MEP Contractor (+8000)
wee # 1 nt (in projects #1)
Manager
Intervie A.S(p1) Account Female Jordanian 12 Supplier1- in Private (+150)
wee # 2 Manager Project #1
Intervie A.K (p1) Sr. Sales Male Iraqi 12 Supplier2- in Private (+100)
wee #3 Manager Project #1
Intervie S.S(p1) Sr. Project Male Palestinian 15 Subcontractor- Private (+200)
wee #4 Manager in project #1
5.2.1.1 Aspects and Practices of Respect in the Project #1:
All the interviewees in the project #1 emphasize the crucial role of the compliance with the project
requirements and responsibilities as per the agreed terms and conditions. The senior procurement
manager (A.A) from the MEP contracting organization (XY) states that “our relations with these
suppliers are usually based on mutual commitments towards project success which means success of
all”. In addition, they assert that caring about the other parties’ rights and benefits is interpreted
ID- 2013000439 Page 68
authenticity of any specific claim from any party against others.
5. 2 – Case-studies: Interviews and Findings:
5.2.1 Case-study #1 (Project #1)
The following table #5.1 presents the interviewees’ profiles within the case-study #1.
Table #5.1: Interviewees’ profiles – Case-study #1 (Project #1)
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
A.A(p1) Sr. Private
Intervie Procureme Male Jordanian 15 MEP Contractor (+8000)
wee # 1 nt (in projects #1)
Manager
Intervie A.S(p1) Account Female Jordanian 12 Supplier1- in Private (+150)
wee # 2 Manager Project #1
Intervie A.K (p1) Sr. Sales Male Iraqi 12 Supplier2- in Private (+100)
wee #3 Manager Project #1
Intervie S.S(p1) Sr. Project Male Palestinian 15 Subcontractor- Private (+200)
wee #4 Manager in project #1
5.2.1.1 Aspects and Practices of Respect in the Project #1:
All the interviewees in the project #1 emphasize the crucial role of the compliance with the project
requirements and responsibilities as per the agreed terms and conditions. The senior procurement
manager (A.A) from the MEP contracting organization (XY) states that “our relations with these
suppliers are usually based on mutual commitments towards project success which means success of
all”. In addition, they assert that caring about the other parties’ rights and benefits is interpreted
ID- 2013000439 Page 68

as an aspect and indicator of respecting and appreciating them. A.S adds that “without respect,
no work progress can be achieved and all parties will lose”.
A.K talks about delaying his last payment of about 1.0 M (AED), by XY, for six months after the
material testing and commissioning, whilst this amount as per the agreed payment terms should
be paid within two months from the testing and commissioning date. A.K asserts the same
remarks of A.S regarding the poor response of XY in this project pertaining payments issues,
slippage in promises dates and ignorance of meetings and calls. A.A points out that they keen on
showing respect for the other parties in communications, meetings and daily activities of this
project, and highlights that complying with project specifications and schedule is part of
respecting other parties.
A.K mentions many touch points that usually reflect respect or disrespect issues and practices
during project works and activities. For example, parties’ behaviors during the meetings, level of
compliance with the agreed quality, delivery dates and payment dates, words and phrases of
correspondences between the parties, confidentiality of business deals and prices, respecting the
rights and properties of others and to behave ethically and politely with others.
Moreover, the interviewee S.S talks about the same respect issues while dealing with the XY and
other parties in the project. Mainly, he focuses on the compliance of each party with his
commitments, work scope and project schedule since these issues, according to S.S, represent the
core of respect towards project and stakeholders in general. In addition, S.S talks about the
commitment of each party with the payments terms and project requirements. These issues, as per
S.S, can show and reflect to which extent that respect existed and implemented in the relationships
between the organizations in the project. S.S states that “any project has its own conflicts and
disputes that are mainly related to monetary issues, but the professional parties know how to manage
these issues… for the benefits of all”. Also, S.S remarks that there were many disrespect behaviors
from the project manger of XY in the project especially during the site meetings.
Some disrespectful aspects, as emphasized by A.K and A.S, are related to the evaluation process
of their performance in the project by the MEP contractor (XY). A.S counts their evaluation of
poor performance unfair since XY could not justify these low rates despite many requests and
reminders to arrange a meeting pertaining evaluation criteria and credibility. A.S adds that they
ID- 2013000439 Page 69
no work progress can be achieved and all parties will lose”.
A.K talks about delaying his last payment of about 1.0 M (AED), by XY, for six months after the
material testing and commissioning, whilst this amount as per the agreed payment terms should
be paid within two months from the testing and commissioning date. A.K asserts the same
remarks of A.S regarding the poor response of XY in this project pertaining payments issues,
slippage in promises dates and ignorance of meetings and calls. A.A points out that they keen on
showing respect for the other parties in communications, meetings and daily activities of this
project, and highlights that complying with project specifications and schedule is part of
respecting other parties.
A.K mentions many touch points that usually reflect respect or disrespect issues and practices
during project works and activities. For example, parties’ behaviors during the meetings, level of
compliance with the agreed quality, delivery dates and payment dates, words and phrases of
correspondences between the parties, confidentiality of business deals and prices, respecting the
rights and properties of others and to behave ethically and politely with others.
Moreover, the interviewee S.S talks about the same respect issues while dealing with the XY and
other parties in the project. Mainly, he focuses on the compliance of each party with his
commitments, work scope and project schedule since these issues, according to S.S, represent the
core of respect towards project and stakeholders in general. In addition, S.S talks about the
commitment of each party with the payments terms and project requirements. These issues, as per
S.S, can show and reflect to which extent that respect existed and implemented in the relationships
between the organizations in the project. S.S states that “any project has its own conflicts and
disputes that are mainly related to monetary issues, but the professional parties know how to manage
these issues… for the benefits of all”. Also, S.S remarks that there were many disrespect behaviors
from the project manger of XY in the project especially during the site meetings.
Some disrespectful aspects, as emphasized by A.K and A.S, are related to the evaluation process
of their performance in the project by the MEP contractor (XY). A.S counts their evaluation of
poor performance unfair since XY could not justify these low rates despite many requests and
reminders to arrange a meeting pertaining evaluation criteria and credibility. A.S adds that they
ID- 2013000439 Page 69
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

also received a warning letter from XY stating that in case of not improving the performance rate
to be good or very good, they will be black listed and will not be invited for any future projects
or deals.
A.K points out that, during the project, even in the periods of disputes and conflicts they kept polite
and respectful relations with XY’s project manager. A.K asserts that XY’s project manager
succeeded in differentiating between the business disputes and the personal rights and dignity of the
supplier’s employees. A.K appreciates this mentality and expresses his respect for this project
manager personally despite the existed disputes and pending payments. Moreover, A.S highlights
that despite there were no codes of conducts and ethics adopted by their company, she and her team
presented and complied with high levels of respect and honesty while dealing with XY in the project.
A.S considers delaying their payments and the ignorance of some terms of the agreement by XY an
example of this dominant and short-term perspective that focuses on the MEP contractor’s profits
and benefits apart from the other parties in the project. Moreover, A.S claims that the MEP contractor
(XY) in this project has an ultimate power and authorities to behave and articulate the relationships
with the suppliers upon his own perspective and plans. She argues that
“suppliers, as per XY mentality, must only receive instructions and they have to comply with
XY’s plans and schedules regardless of their companies’ plans or benefits”. A.S asserts that this
mentality in the project undermined the integration and partnership endeavors and hindered
initiating respectful relations.
5.2.1.2 Motivators of Respect in the Project #1:
The main factors, as per A.A, that help them as MEP contractor to show and behave respectfully with
other parties in this project, are their commitments and compliance with the agreed work scope and
schedule without any deviation from the specifications or works completion dates. Also, he adds that
“behaviors and actions of other parties and people in the project ……..usually affect the type of our
actions and behaviors”. He puts and example that Supplier #1 as per the agreed deliveries schedule
was supposed to deliver some air conditioning (AC) units in November, 2009, but for some reasons
they delayed the delivery up to March, 2010. He adds that “consequently,
ID- 2013000439 Page 70
to be good or very good, they will be black listed and will not be invited for any future projects
or deals.
A.K points out that, during the project, even in the periods of disputes and conflicts they kept polite
and respectful relations with XY’s project manager. A.K asserts that XY’s project manager
succeeded in differentiating between the business disputes and the personal rights and dignity of the
supplier’s employees. A.K appreciates this mentality and expresses his respect for this project
manager personally despite the existed disputes and pending payments. Moreover, A.S highlights
that despite there were no codes of conducts and ethics adopted by their company, she and her team
presented and complied with high levels of respect and honesty while dealing with XY in the project.
A.S considers delaying their payments and the ignorance of some terms of the agreement by XY an
example of this dominant and short-term perspective that focuses on the MEP contractor’s profits
and benefits apart from the other parties in the project. Moreover, A.S claims that the MEP contractor
(XY) in this project has an ultimate power and authorities to behave and articulate the relationships
with the suppliers upon his own perspective and plans. She argues that
“suppliers, as per XY mentality, must only receive instructions and they have to comply with
XY’s plans and schedules regardless of their companies’ plans or benefits”. A.S asserts that this
mentality in the project undermined the integration and partnership endeavors and hindered
initiating respectful relations.
5.2.1.2 Motivators of Respect in the Project #1:
The main factors, as per A.A, that help them as MEP contractor to show and behave respectfully with
other parties in this project, are their commitments and compliance with the agreed work scope and
schedule without any deviation from the specifications or works completion dates. Also, he adds that
“behaviors and actions of other parties and people in the project ……..usually affect the type of our
actions and behaviors”. He puts and example that Supplier #1 as per the agreed deliveries schedule
was supposed to deliver some air conditioning (AC) units in November, 2009, but for some reasons
they delayed the delivery up to March, 2010. He adds that “consequently,
ID- 2013000439 Page 70

this delay in the material delivery pushed the project owner to stop his payments to us and that forced
us to stop the due payments to the supplier #1, not only that but even our payments and commitments
with other suppliers and subcontractors were affected”. A.A points out that they had many
professional trials such as official meetings and action plans with the supplier #1 but unfortunately,
they did not show any respect for their promises and the schedule of the material delivery. He argues
that such poor response from the supplier forced them to behave in a way that may be seen as
disrespectful in the meetings and correspondences. During the business meetings,
A.A adds that “we used to shout at them and to use some rude words …….to push them for fast
delivery of materials without any more delay”.
The same is confirmed by S.S who concluded that the main factors which affect respect between
the parties in this project are: the commitments of one’s responsibilities and duties, the
commitments to human rights and the personal traits that are related to the nature and beliefs of
each employee.
5.2.1.3 Opportunities of Respect in the Project #1:
All the interviewees in this project #1, highlight that the cooperative and collaborative
approaches between the project parties support initiating and developing trust and long-term
relationships between the parties in the current project, and can open further opportunities to all
parties within the current project and in the future. They assert the great importance for all the
parties to be engaged in a real partnership as one team in the project, within win-win mentalities
and respectful relations. Moreover, A.A confirms that high levels of respect in the relations and
commitments towards work quality and schedule will directly affect the levels of work
performance and project success.
A.A shares A.S and A.K the opinion that many practices within the project #1 affect their future
decisions regarding whom to be selected to be part of their projects. Moreover, A.K agrees with A.S
that respectful relations may grant more opportunities for higher levels of benefits and profits for all
stakeholders since it minimizes the number of conflicts and disputes and improves the work progress.
A.K states that “as suppliers we recognize the importance and the huge amounts of
ID- 2013000439 Page 71
us to stop the due payments to the supplier #1, not only that but even our payments and commitments
with other suppliers and subcontractors were affected”. A.A points out that they had many
professional trials such as official meetings and action plans with the supplier #1 but unfortunately,
they did not show any respect for their promises and the schedule of the material delivery. He argues
that such poor response from the supplier forced them to behave in a way that may be seen as
disrespectful in the meetings and correspondences. During the business meetings,
A.A adds that “we used to shout at them and to use some rude words …….to push them for fast
delivery of materials without any more delay”.
The same is confirmed by S.S who concluded that the main factors which affect respect between
the parties in this project are: the commitments of one’s responsibilities and duties, the
commitments to human rights and the personal traits that are related to the nature and beliefs of
each employee.
5.2.1.3 Opportunities of Respect in the Project #1:
All the interviewees in this project #1, highlight that the cooperative and collaborative
approaches between the project parties support initiating and developing trust and long-term
relationships between the parties in the current project, and can open further opportunities to all
parties within the current project and in the future. They assert the great importance for all the
parties to be engaged in a real partnership as one team in the project, within win-win mentalities
and respectful relations. Moreover, A.A confirms that high levels of respect in the relations and
commitments towards work quality and schedule will directly affect the levels of work
performance and project success.
A.A shares A.S and A.K the opinion that many practices within the project #1 affect their future
decisions regarding whom to be selected to be part of their projects. Moreover, A.K agrees with A.S
that respectful relations may grant more opportunities for higher levels of benefits and profits for all
stakeholders since it minimizes the number of conflicts and disputes and improves the work progress.
A.K states that “as suppliers we recognize the importance and the huge amounts of
ID- 2013000439 Page 71

benefits, profits and business opportunities of respecting the MEP contractors”. S.S adds that
“MEP contractors should recognize that the mutual benefits and the high levels of project
success require cooperation, collaboration and mutual respect”.
5.2.1.4 Challenges of Respect in the Project #1:
Despite her recognition of the great importance of the cooperative and effective relationships with
the MEP contractor (XY), A.S (Supplier #1) describes the actual relationships with XY by saying
“it was selfish and disrespectful relations from its early stages”. She adds that they were awarded
the air conditioning (AC) works contract from the MEP contractor against eight (8.0) million
(AED) and they agreed to receive 10% as an advance payment upon signing the contract, but
MEP contractor delayed their payment. Consequently they could not send the order to the factory
to start manufacturing the AC units. This in its turn delayed material delivery to site and MEP
contractor stopped their due payments accordingly. A.S emphasizes the importance of payments
and its agreed dates with respect to him as a supplier in order to comply with and respect his
commitments and schedule of project.
In addition, A.S remarks that XY continued in showing disrespectful actions towards the
agreement with the supplier #1 and delayed opening the letter of credit (LC) to start the
fabrication process of the AC units. A.S explains these behaviors by XY as being a result of poor
knowledge in management and weak financial position that pushed him to compensate this
weakness through delaying the suppliers’ payments.
Moreover, A.K talks about delaying their due payments by XY and ignorance of their e-mails and
letters. Even the MEP account manager refused to meet him to discuss the payments issue. S.S adds
that “the MEP project manager used to shout and say rude and impolite words over phone”.
S.S remarks that such behaviors from XY push the subcontractors and suppliers to slow down the
material delivery and work progress, intentionally, to enforce XY to pay their pending payments.
S.S asserts that “many times the owner of the project himself intervened to solve this issue
between the MEP contractor and the suppliers and to mitigate the impacts of these practices”. He
adds that “such behaviors and practices lead to mistrust in the relations between project parties,
more disputes and poor progress at the site”.
ID- 2013000439 Page 72
“MEP contractors should recognize that the mutual benefits and the high levels of project
success require cooperation, collaboration and mutual respect”.
5.2.1.4 Challenges of Respect in the Project #1:
Despite her recognition of the great importance of the cooperative and effective relationships with
the MEP contractor (XY), A.S (Supplier #1) describes the actual relationships with XY by saying
“it was selfish and disrespectful relations from its early stages”. She adds that they were awarded
the air conditioning (AC) works contract from the MEP contractor against eight (8.0) million
(AED) and they agreed to receive 10% as an advance payment upon signing the contract, but
MEP contractor delayed their payment. Consequently they could not send the order to the factory
to start manufacturing the AC units. This in its turn delayed material delivery to site and MEP
contractor stopped their due payments accordingly. A.S emphasizes the importance of payments
and its agreed dates with respect to him as a supplier in order to comply with and respect his
commitments and schedule of project.
In addition, A.S remarks that XY continued in showing disrespectful actions towards the
agreement with the supplier #1 and delayed opening the letter of credit (LC) to start the
fabrication process of the AC units. A.S explains these behaviors by XY as being a result of poor
knowledge in management and weak financial position that pushed him to compensate this
weakness through delaying the suppliers’ payments.
Moreover, A.K talks about delaying their due payments by XY and ignorance of their e-mails and
letters. Even the MEP account manager refused to meet him to discuss the payments issue. S.S adds
that “the MEP project manager used to shout and say rude and impolite words over phone”.
S.S remarks that such behaviors from XY push the subcontractors and suppliers to slow down the
material delivery and work progress, intentionally, to enforce XY to pay their pending payments.
S.S asserts that “many times the owner of the project himself intervened to solve this issue
between the MEP contractor and the suppliers and to mitigate the impacts of these practices”. He
adds that “such behaviors and practices lead to mistrust in the relations between project parties,
more disputes and poor progress at the site”.
ID- 2013000439 Page 72
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

The same is confirmed by A.A, A.K and S.S who assert that the mentality of selfish profitability
in this project has affected implementing respect concepts and practices in the projects. In
addition, A.S highlighted that allocation of power and authorities in projects push some MEP
contractors to ignore the respectful relations with the other parties of less power or authorities in
the project. A.S points out that his experience with most MEP contractors asserts that they adopt
the logic of power and the wide levels of authorization in dealing with suppliers apart from
respect for people and humanitarian values and rights.
Furthermore, A.K highlights that their experience in this project shows that selfish and
nonprofessional approaches are the main factors that pushed some parties to show non-respectful
behaviors with others. In addition, A.K admits that the absence of code of conducts and ethics from
the systems and procedures of their company increased the probability of confrontational approaches
and disrespectful relations especially with XY contractor who searches only for his own benefits and
profits. A.K adds that “business environment and culture generally push some parties and employees
to be of profitable perspective regardless of other parties’ losses or profits”.
A.K considers delaying his due payments by the MEP contractor as an example of this prevailing
culture in business.
Moreover, S.S asserts that the lack of professionalism and skills is deemed to be the main
challenge and constrain against respect behaviors with the other parties and employees in the
projects. He argues that the MEP contractor has an idea that the suppliers and subcontractors will
not comply with their commitments and responsibilities in projects unless practicing a strict and
tough instructions with them.
ID- 2013000439 Page 73
in this project has affected implementing respect concepts and practices in the projects. In
addition, A.S highlighted that allocation of power and authorities in projects push some MEP
contractors to ignore the respectful relations with the other parties of less power or authorities in
the project. A.S points out that his experience with most MEP contractors asserts that they adopt
the logic of power and the wide levels of authorization in dealing with suppliers apart from
respect for people and humanitarian values and rights.
Furthermore, A.K highlights that their experience in this project shows that selfish and
nonprofessional approaches are the main factors that pushed some parties to show non-respectful
behaviors with others. In addition, A.K admits that the absence of code of conducts and ethics from
the systems and procedures of their company increased the probability of confrontational approaches
and disrespectful relations especially with XY contractor who searches only for his own benefits and
profits. A.K adds that “business environment and culture generally push some parties and employees
to be of profitable perspective regardless of other parties’ losses or profits”.
A.K considers delaying his due payments by the MEP contractor as an example of this prevailing
culture in business.
Moreover, S.S asserts that the lack of professionalism and skills is deemed to be the main
challenge and constrain against respect behaviors with the other parties and employees in the
projects. He argues that the MEP contractor has an idea that the suppliers and subcontractors will
not comply with their commitments and responsibilities in projects unless practicing a strict and
tough instructions with them.
ID- 2013000439 Page 73

5.2.2 Case-study #2 (Project #2):
The following table #5.2 presents the interviewees’ profiles within the case-study #2.
Table #5.2: Interviewees’ profiles – Case-study #2 (Project #2)
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
Intervie R.G(p2) Project Male Jordanian 10 MEP Contractor Private
wee #5 Manager (in projects #2) (+8000)
Intervie T.A(p2) Sr. sales Male Pakistani 20 Supplier1- in Private (+50)
wee #6 Manager Project #2
Intervie M.O(p2) Sales Male Palestinian 18 Supplier2- in Private (+100)
wee #7 Manager Project #2
Intervie H.I(p2) Contracts Male Lebanese 12 Subcontractor- Private (+150)
wee #8 Manager in project #2
5.2.2.1 Aspects and Practices of Respect in the Project #2:
M.O agrees with H.I that each party in the project must comply with his scope of work and
commitments professionally to obtain high levels of benefits and success to all project parties. H.I
states that “in this project we did our best to adhere with our scope of work and responsibilities but
XY’s project manager tried many times to expand our scope without covering the additional cost”.
M.O and H.I highlight the role of respecting other parties during work meetings, and respecting
payment dates as important elements of respect. Also they talked about the contractual power of the
MEP contractor with wide authorities that he sometimes used against others such as delaying
payments or imposing new terms and conditions. H.I adds that “despite our right for extra cost and
extension of time against many additional works, XY insisted to consider this additional work as part
of our original subcontract agreement”. He remarks that XY delayed their
ID- 2013000439 Page 74
The following table #5.2 presents the interviewees’ profiles within the case-study #2.
Table #5.2: Interviewees’ profiles – Case-study #2 (Project #2)
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
Intervie R.G(p2) Project Male Jordanian 10 MEP Contractor Private
wee #5 Manager (in projects #2) (+8000)
Intervie T.A(p2) Sr. sales Male Pakistani 20 Supplier1- in Private (+50)
wee #6 Manager Project #2
Intervie M.O(p2) Sales Male Palestinian 18 Supplier2- in Private (+100)
wee #7 Manager Project #2
Intervie H.I(p2) Contracts Male Lebanese 12 Subcontractor- Private (+150)
wee #8 Manager in project #2
5.2.2.1 Aspects and Practices of Respect in the Project #2:
M.O agrees with H.I that each party in the project must comply with his scope of work and
commitments professionally to obtain high levels of benefits and success to all project parties. H.I
states that “in this project we did our best to adhere with our scope of work and responsibilities but
XY’s project manager tried many times to expand our scope without covering the additional cost”.
M.O and H.I highlight the role of respecting other parties during work meetings, and respecting
payment dates as important elements of respect. Also they talked about the contractual power of the
MEP contractor with wide authorities that he sometimes used against others such as delaying
payments or imposing new terms and conditions. H.I adds that “despite our right for extra cost and
extension of time against many additional works, XY insisted to consider this additional work as part
of our original subcontract agreement”. He remarks that XY delayed their
ID- 2013000439 Page 74

due payments in this project many times to force them to execute additional work free of cost.
H.I remarks that XY under the logic of being the client of this project, with respect to the
suppliers and subcontractors, imagines that all other parties have to satisfy his needs and execute
his instructions to have opportunities for more projects with him in the future.
Moreover, R.G states that “as MEP contractor we respect and appreciate the suppliers and
subcontractors who comply with project requirements and their appointed and agreed tasks and
responsibilities”. Moreover, he points out that they select their suppliers and subcontractors upon
many effective criteria that count professionalism and respecting others’ interests and benefits as
part of the most important qualifications. R.G adds that in this project and any other project
suppliers and subcontractors must comply with the project schedule and specifications to hand
over a successful project on time for the benefits of all parties. In addition, R.G remarks that the
whole MEP works in this project are his responsibility in front of the project owner, construction
main contractor and the project consultant. He and his suppliers and subcontractors,
contractually, have to comply with the specified quality and baselines of this project. Otherwise,
the project handing over will be delayed which means loss for all project parties. Moreover, R.G
highlights that there are penalties of three hundred thousand dirhams (300,000 AED) against the
delay of one day beyond the agreed handing over date of this project, and the total penalties may
accumulate up to twenty million dirhams (20.0M AED). R.G points out that this situation
imposes strict monitoring and controlling processes by XY to warrant respecting the project
requirements and obligations by all the parties.
T.A shares M.O and H.I the opinion about the great importance of being polite and objective
during business meeting, paying the other parties on time and appreciating the different roles and
positions of the other parties in the project. In addition, T.A explained many other respect aspects
in this project such as caring about other parties’ benefits and rights as human beings besides
showing a high level of responsibility and professionalism. T.A states that “XY in this project
shows moderate levels of respecting others for their humanity or professionalism; they focus
only on profits regardless of the other parties’ interests and benefits”.
On the other hand, H.I asserted the important role for organizations to adopt code of conducts and
procedures to enhance respect and ethical behaviors between the project parties. H.I emphasizes that
his company does not adopt specific codes of conduct but their behaviors with the other parties
ID- 2013000439 Page 75
H.I remarks that XY under the logic of being the client of this project, with respect to the
suppliers and subcontractors, imagines that all other parties have to satisfy his needs and execute
his instructions to have opportunities for more projects with him in the future.
Moreover, R.G states that “as MEP contractor we respect and appreciate the suppliers and
subcontractors who comply with project requirements and their appointed and agreed tasks and
responsibilities”. Moreover, he points out that they select their suppliers and subcontractors upon
many effective criteria that count professionalism and respecting others’ interests and benefits as
part of the most important qualifications. R.G adds that in this project and any other project
suppliers and subcontractors must comply with the project schedule and specifications to hand
over a successful project on time for the benefits of all parties. In addition, R.G remarks that the
whole MEP works in this project are his responsibility in front of the project owner, construction
main contractor and the project consultant. He and his suppliers and subcontractors,
contractually, have to comply with the specified quality and baselines of this project. Otherwise,
the project handing over will be delayed which means loss for all project parties. Moreover, R.G
highlights that there are penalties of three hundred thousand dirhams (300,000 AED) against the
delay of one day beyond the agreed handing over date of this project, and the total penalties may
accumulate up to twenty million dirhams (20.0M AED). R.G points out that this situation
imposes strict monitoring and controlling processes by XY to warrant respecting the project
requirements and obligations by all the parties.
T.A shares M.O and H.I the opinion about the great importance of being polite and objective
during business meeting, paying the other parties on time and appreciating the different roles and
positions of the other parties in the project. In addition, T.A explained many other respect aspects
in this project such as caring about other parties’ benefits and rights as human beings besides
showing a high level of responsibility and professionalism. T.A states that “XY in this project
shows moderate levels of respecting others for their humanity or professionalism; they focus
only on profits regardless of the other parties’ interests and benefits”.
On the other hand, H.I asserted the important role for organizations to adopt code of conducts and
procedures to enhance respect and ethical behaviors between the project parties. H.I emphasizes that
his company does not adopt specific codes of conduct but their behaviors with the other parties
ID- 2013000439 Page 75
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

in this project or others are fully based on respecting all as companies and individual regardless
of profits or conflicts. In addition, H.I remarks that recognition of the other parties’ rights in the
project to achieve profits and benefits within high levels of dignity and humanitarian values
support initiating and developing respectful relationships. H.I adds that “I did my best to comply
with our company’s responsibilities and commitments towards this project within high levels of
ethics and professionalism”.
5.2.2.2 Motivators of Respect in the Project #2:
Most interviewees highlight that there are many factors that support and motivate demonstrating
respectful relationships between the parties in this project. They named the human rights and
dignity, pursuing the best practice and professionalism and the employees’ personal beliefs and
attitudes. M.O, while talking about his company’s practice with the other parties in this project,
adds that “adopting code of conducts by the companies encourage and push its employees to
align their behaviors and concerns according to the company’s new orientation”. M.O asserts
that practicing this code of conducts properly in this project helped him to solve many conflicts
with the MEP contractor for their mutual benefits and project success.
5.2.2.3 Opportunities of Respect in the Project #2:
On the other hand, all interviewees in this project talked about building trust and improving the
productivity of the employees as a result of adopting and implementing respect concept between
the project parties. They affirm that respectful relations can improve work performance and
encourage all to exert their best efforts for mutual benefits and project success. T.A highlights
that despite that respect practices from the other parties in this project were poor, his company
insisted on respecting its commitments in the contract and dealing with the entire project parties
respectfully. T.A explains that by saying “continuous respect practices with the other parties can
initiate trust between our companies and push them to invite us to be part of their projects in the
future”.
ID- 2013000439 Page 76
of profits or conflicts. In addition, H.I remarks that recognition of the other parties’ rights in the
project to achieve profits and benefits within high levels of dignity and humanitarian values
support initiating and developing respectful relationships. H.I adds that “I did my best to comply
with our company’s responsibilities and commitments towards this project within high levels of
ethics and professionalism”.
5.2.2.2 Motivators of Respect in the Project #2:
Most interviewees highlight that there are many factors that support and motivate demonstrating
respectful relationships between the parties in this project. They named the human rights and
dignity, pursuing the best practice and professionalism and the employees’ personal beliefs and
attitudes. M.O, while talking about his company’s practice with the other parties in this project,
adds that “adopting code of conducts by the companies encourage and push its employees to
align their behaviors and concerns according to the company’s new orientation”. M.O asserts
that practicing this code of conducts properly in this project helped him to solve many conflicts
with the MEP contractor for their mutual benefits and project success.
5.2.2.3 Opportunities of Respect in the Project #2:
On the other hand, all interviewees in this project talked about building trust and improving the
productivity of the employees as a result of adopting and implementing respect concept between
the project parties. They affirm that respectful relations can improve work performance and
encourage all to exert their best efforts for mutual benefits and project success. T.A highlights
that despite that respect practices from the other parties in this project were poor, his company
insisted on respecting its commitments in the contract and dealing with the entire project parties
respectfully. T.A explains that by saying “continuous respect practices with the other parties can
initiate trust between our companies and push them to invite us to be part of their projects in the
future”.
ID- 2013000439 Page 76

Despite the crucial role of trust as confirmed by H.I, he highlights that within this project they
could not put trust in the MEP contractor due to the weak respect initiatives and the logic of
power that he practiced in this project. H.I adds that “these disrespectful practices in the project
affected work performance and progress badly, and led to many financial impacts and disputes”.
5.2.2.4 Challenges of Respect in the Project #2:
Regarding the challenges and constrains against respect in the project #2, R.G highlighted the role of
poor experience of some suppliers and subcontractors in project besides irresponsible actions from
some parties towards project schedule and quality. He explained some cases during which some
suppliers or subcontractors intentionally stopped material delivery and work at site to impose early
payments or variation orders. R.G affirms that his responsibility and commitment towards the MEP
works in the project impose strict plans and alternative solutions in case of any shortage from any
supplier or subcontractor. R.G adds that “in this project we terminated two suppliers due to their
temporization and delay in material delivery”. Moreover, he remarks that they coordinated and took
the approval from the project consultant on new brands of materials as an alternative to the previous
approved brands since the agents of these brands tried to impose new payment terms.
T.A named many challenges that may hinder showing respect during project work and activities,
such as: payment issues, personal beliefs and manners, and the importance of each party’s role
and position in the project. He added that “MEP contractor and project consultant usually show
more respect and appreciation for the suppliers who have important materials or crucial role in
the project”. M.O and H.I explained many other factors that hinder respect practices in this
project like: selfish mentality of some parties, delaying the due payments and unbalanced power
allocation between the project parties. M.O added more factors like: the dominant culture within
the organization, the beliefs and mentalities of some employees. Moreover, H.I agrees with R.G
that some companies in this project were of poor management skills and experience and that was
reflected on their daily activities and on the type of the relations they initiated with the other
parties in the project.
ID- 2013000439 Page 77
could not put trust in the MEP contractor due to the weak respect initiatives and the logic of
power that he practiced in this project. H.I adds that “these disrespectful practices in the project
affected work performance and progress badly, and led to many financial impacts and disputes”.
5.2.2.4 Challenges of Respect in the Project #2:
Regarding the challenges and constrains against respect in the project #2, R.G highlighted the role of
poor experience of some suppliers and subcontractors in project besides irresponsible actions from
some parties towards project schedule and quality. He explained some cases during which some
suppliers or subcontractors intentionally stopped material delivery and work at site to impose early
payments or variation orders. R.G affirms that his responsibility and commitment towards the MEP
works in the project impose strict plans and alternative solutions in case of any shortage from any
supplier or subcontractor. R.G adds that “in this project we terminated two suppliers due to their
temporization and delay in material delivery”. Moreover, he remarks that they coordinated and took
the approval from the project consultant on new brands of materials as an alternative to the previous
approved brands since the agents of these brands tried to impose new payment terms.
T.A named many challenges that may hinder showing respect during project work and activities,
such as: payment issues, personal beliefs and manners, and the importance of each party’s role
and position in the project. He added that “MEP contractor and project consultant usually show
more respect and appreciation for the suppliers who have important materials or crucial role in
the project”. M.O and H.I explained many other factors that hinder respect practices in this
project like: selfish mentality of some parties, delaying the due payments and unbalanced power
allocation between the project parties. M.O added more factors like: the dominant culture within
the organization, the beliefs and mentalities of some employees. Moreover, H.I agrees with R.G
that some companies in this project were of poor management skills and experience and that was
reflected on their daily activities and on the type of the relations they initiated with the other
parties in the project.
ID- 2013000439 Page 77

5.2.3 Case-study #3 (Project #3):
The following table #5.3 presents the interviewees’ profiles within the case-study #3.
Table #5.3: Interviewees’ profiles – Case-study #3 (Project #3)
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
Intervie S.H (p3) Sr. Project Male Palestinian 18 MEP Contractor Private
wee #9 Manager (in projects #3) (+8000)
Intervie R.A(p3) Account Female Lebanese 11 Supplier1- in Private (+50)
wee #10 Manager Project #3
Intervie S.K(p3) account Male Indian 15 Supplier2- in Private (+50)
wee #11 Manager Project #3
Intervie H.A(p3) Sr. Subcontractor- Private (+150)
Technical Male Jordanian 12
wee #12 in project #3
Manager
5.2.3.1 Aspects and Practices of Respect in the Project #3:
S.K and H.A assert that respect has many aspects and practices that have been presented by the
project parties in this project. They count compliance with each party’s responsibilities and agreed
tasks as the cornerstone of respect issues in the relationships. Also, they highlighted that respecting
others during the meetings and communications, paying others on time, caring about others benefits
and profits and fair allocation and usage of authorities in this project are deemed to be main
components of respect they faced while dealing with each other. H.A remarks that as a subcontractor
for aluminum cladding works in this project, he was in a weak position compared to the wide
authorities and power of the MEP contractor and his contract with him is of low priority and can find
alternative subcontractor easily. This situation, as per H.A, encouraged XY to ignore their requests to
approve variation orders of about half million dirhams (0.5 M AED) against the additional scope of
work. H.A adds that “we preferred to absorb the additional cost just to continue work in the project
otherwise XY has many alternatives and can easily terminate our contract”.
ID- 2013000439 Page 78
The following table #5.3 presents the interviewees’ profiles within the case-study #3.
Table #5.3: Interviewees’ profiles – Case-study #3 (Project #3)
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
Intervie S.H (p3) Sr. Project Male Palestinian 18 MEP Contractor Private
wee #9 Manager (in projects #3) (+8000)
Intervie R.A(p3) Account Female Lebanese 11 Supplier1- in Private (+50)
wee #10 Manager Project #3
Intervie S.K(p3) account Male Indian 15 Supplier2- in Private (+50)
wee #11 Manager Project #3
Intervie H.A(p3) Sr. Subcontractor- Private (+150)
Technical Male Jordanian 12
wee #12 in project #3
Manager
5.2.3.1 Aspects and Practices of Respect in the Project #3:
S.K and H.A assert that respect has many aspects and practices that have been presented by the
project parties in this project. They count compliance with each party’s responsibilities and agreed
tasks as the cornerstone of respect issues in the relationships. Also, they highlighted that respecting
others during the meetings and communications, paying others on time, caring about others benefits
and profits and fair allocation and usage of authorities in this project are deemed to be main
components of respect they faced while dealing with each other. H.A remarks that as a subcontractor
for aluminum cladding works in this project, he was in a weak position compared to the wide
authorities and power of the MEP contractor and his contract with him is of low priority and can find
alternative subcontractor easily. This situation, as per H.A, encouraged XY to ignore their requests to
approve variation orders of about half million dirhams (0.5 M AED) against the additional scope of
work. H.A adds that “we preferred to absorb the additional cost just to continue work in the project
otherwise XY has many alternatives and can easily terminate our contract”.
ID- 2013000439 Page 78
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

R.A agrees with S.K that complying with human rights and values is another way of showing respect
in the relationships between the parties. R.A states that “despite the financial and payments issues
with the MEP contractor, we succeeded in building polite and respectful relations with his project
manager and employees at site”. She adds that the personal respectful relations with the MEP
contractor employees were the key success factors that they focused on in the project to warrant their
support and approval of claims and payments. Respecting the employee for his humanity and dignity
regardless of any other issue in the project as emphasized by R.A is the most important skill that
leads to effective and fruitful relations by means of performance and productivity. Moreover, S.H
emphasizes that as MEP contractor they consider that compliance and best execution of the
agreements and commitments as the real and actual sign of respecting others. He remarks high
concerns about handing over the project within its planned quality, budget and schedule that will
only be achieved if each party respects the agreement and responsibilities with high levels of
cooperation and professionalism for the benefits of all stakeholders. S.H asserts that
“as MEP contractor we could not finalize any milestone successfully in this project without full
coordination and cooperation with many suppliers and subcontractors”. Moreover, he adds that
many suppliers and subcontractors in the project did not show adequate respect and compliance
with the schedule of some activities unless the MEP manager follows up their work progress
properly. S.H emphasizes that “many times I imposed action plans on some subcontractors in the
project which pushed them to hire extra employees and work two shifts to finish their tasks”. On
the other hand, H.A highlighted a different aspect of respect when he talked about the
importance of giving adequate and fair time for the subcontractor to complete his tasks and work.
When talking about their experience with XY in this project, H.A adds that “the MEP contractor
used to take long periods in executing his scope of work, but he gave us, as a subcontractor,
insufficient and unreasonable schedule to finalize our part”.
5.2.3.2 Motivators of Respect in the Project #3:
R.A and S.K named many issues that they faced in this project and support and encourage showing
respect with the others, such as: high levels of commitments towards work agreements and
ID- 2013000439 Page 79
in the relationships between the parties. R.A states that “despite the financial and payments issues
with the MEP contractor, we succeeded in building polite and respectful relations with his project
manager and employees at site”. She adds that the personal respectful relations with the MEP
contractor employees were the key success factors that they focused on in the project to warrant their
support and approval of claims and payments. Respecting the employee for his humanity and dignity
regardless of any other issue in the project as emphasized by R.A is the most important skill that
leads to effective and fruitful relations by means of performance and productivity. Moreover, S.H
emphasizes that as MEP contractor they consider that compliance and best execution of the
agreements and commitments as the real and actual sign of respecting others. He remarks high
concerns about handing over the project within its planned quality, budget and schedule that will
only be achieved if each party respects the agreement and responsibilities with high levels of
cooperation and professionalism for the benefits of all stakeholders. S.H asserts that
“as MEP contractor we could not finalize any milestone successfully in this project without full
coordination and cooperation with many suppliers and subcontractors”. Moreover, he adds that
many suppliers and subcontractors in the project did not show adequate respect and compliance
with the schedule of some activities unless the MEP manager follows up their work progress
properly. S.H emphasizes that “many times I imposed action plans on some subcontractors in the
project which pushed them to hire extra employees and work two shifts to finish their tasks”. On
the other hand, H.A highlighted a different aspect of respect when he talked about the
importance of giving adequate and fair time for the subcontractor to complete his tasks and work.
When talking about their experience with XY in this project, H.A adds that “the MEP contractor
used to take long periods in executing his scope of work, but he gave us, as a subcontractor,
insufficient and unreasonable schedule to finalize our part”.
5.2.3.2 Motivators of Respect in the Project #3:
R.A and S.K named many issues that they faced in this project and support and encourage showing
respect with the others, such as: high levels of commitments towards work agreements and
ID- 2013000439 Page 79

responsibilities and compliance with human rights. They add that, from this project, they have
learned that the companies should adopt many important policies, procedures and code of
conducts that motivate the employee to show and keep respectful relations with the others. S.H
agrees with R.A and S.K regarding the crucial role of complying with each scope of work in
motivating the spirit of cooperation and respect. Furthermore, R.A remarks that respect mostly
stems from personal characteristics, traits and beliefs that affect employee’s behaviors with the
other parties and employees. R.A states that “most relationships between the parties in this
project were actually articulated through personal initiatives of the employees and their own
experience about the best practice in this field”.
5.2.3.3 Opportunities of Respect in the Project #3:
Regarding the consequences of the respectful relations between project parties, S.H, R.A, S.K
and H.A asserted that respect eliminates many conflicts and disputes and improves the
productivity of the organizations and work progress. S.H adds that “respect support initiating and
developing trusty and fruitful relations between the companies”. S.K agrees with S.H on the
important role of respect in creating trust and added that “showing respect continuously with the
other parties creates good reputation and more success in the current project and in the future”.
5.2.3.4 Challenges of Respect in the Project #3:
During the interviews, S.H, R.A and S.K remarked that the selfish mentalities of some parties and
their tendency to exploit their position or authorities in this project are of crucial impacts against the
respectful relationships between the companies. H.A asserted that XY from the early stages of the
project, during the negotiations and agreements stages, tried to impose certain conditions and terms
that mostly serve him as an MEP contractor without taking into consideration supplier’s capacity and
benefits. H.A and S.K remarked that payment issues within this project besides many complicated
procedures, policies and mentalities within XY formed real challenges against showing respectful
relations with the suppliers and subcontractors. S.K added that personal norms and mentalities of
some employees may contradict the ethical behaviors and respect relations. He
ID- 2013000439 Page 80
learned that the companies should adopt many important policies, procedures and code of
conducts that motivate the employee to show and keep respectful relations with the others. S.H
agrees with R.A and S.K regarding the crucial role of complying with each scope of work in
motivating the spirit of cooperation and respect. Furthermore, R.A remarks that respect mostly
stems from personal characteristics, traits and beliefs that affect employee’s behaviors with the
other parties and employees. R.A states that “most relationships between the parties in this
project were actually articulated through personal initiatives of the employees and their own
experience about the best practice in this field”.
5.2.3.3 Opportunities of Respect in the Project #3:
Regarding the consequences of the respectful relations between project parties, S.H, R.A, S.K
and H.A asserted that respect eliminates many conflicts and disputes and improves the
productivity of the organizations and work progress. S.H adds that “respect support initiating and
developing trusty and fruitful relations between the companies”. S.K agrees with S.H on the
important role of respect in creating trust and added that “showing respect continuously with the
other parties creates good reputation and more success in the current project and in the future”.
5.2.3.4 Challenges of Respect in the Project #3:
During the interviews, S.H, R.A and S.K remarked that the selfish mentalities of some parties and
their tendency to exploit their position or authorities in this project are of crucial impacts against the
respectful relationships between the companies. H.A asserted that XY from the early stages of the
project, during the negotiations and agreements stages, tried to impose certain conditions and terms
that mostly serve him as an MEP contractor without taking into consideration supplier’s capacity and
benefits. H.A and S.K remarked that payment issues within this project besides many complicated
procedures, policies and mentalities within XY formed real challenges against showing respectful
relations with the suppliers and subcontractors. S.K added that personal norms and mentalities of
some employees may contradict the ethical behaviors and respect relations. He
ID- 2013000439 Page 80

added that “organizations should create a unified culture of cooperation, integration and respect
within a spirit of teamwork and partnering between all project parties”.
Furthermore, R.A and S.H highlighted that low levels of professionalism and experience of some
project parties lead to many deviations and breaches regarding the agreed quality and schedule.
S.H, as an MEP contractor, states that “professional company usually respects its commitments
and agreements”. He remarks that despite the effective criteria that the procurement department
adopts while selecting the suppliers and subcontractors in his MEP projects and this project
specifically, they still face many nonprofessional suppliers and subcontractors with low
competences and insufficient qualifications.
5.2.4 Case-study #4 (Project #4):
The following table #5.4 presents the interviewees’ profiles within the case-study #4.
Table #5.4: Interviewees’ profiles – Case-study #4 (Project #4)
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
Intervie M.Q (p4) Project Male Iraqi 12 MEP Contractor Private
wee #13 Manager (in projects #4) (+8000)
Intervie M.H(p4) Sales Male Iraqi 13 Supplier1- in Private (+50)
wee #14 Manager Project #4
Intervie A.P(p4) Sales Male Indian 13 Supplier2- in Private (+100)
wee #15 Manager Project #4
Intervie H.M(p4) Project Male Egyptian 15 Subcontractor- Private (+100)
wee #16 Manager in project #4
5.2.4.1 Aspects and Practices of Respect in the Project #4:
ID- 2013000439 Page 81
within a spirit of teamwork and partnering between all project parties”.
Furthermore, R.A and S.H highlighted that low levels of professionalism and experience of some
project parties lead to many deviations and breaches regarding the agreed quality and schedule.
S.H, as an MEP contractor, states that “professional company usually respects its commitments
and agreements”. He remarks that despite the effective criteria that the procurement department
adopts while selecting the suppliers and subcontractors in his MEP projects and this project
specifically, they still face many nonprofessional suppliers and subcontractors with low
competences and insufficient qualifications.
5.2.4 Case-study #4 (Project #4):
The following table #5.4 presents the interviewees’ profiles within the case-study #4.
Table #5.4: Interviewees’ profiles – Case-study #4 (Project #4)
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
Intervie M.Q (p4) Project Male Iraqi 12 MEP Contractor Private
wee #13 Manager (in projects #4) (+8000)
Intervie M.H(p4) Sales Male Iraqi 13 Supplier1- in Private (+50)
wee #14 Manager Project #4
Intervie A.P(p4) Sales Male Indian 13 Supplier2- in Private (+100)
wee #15 Manager Project #4
Intervie H.M(p4) Project Male Egyptian 15 Subcontractor- Private (+100)
wee #16 Manager in project #4
5.2.4.1 Aspects and Practices of Respect in the Project #4:
ID- 2013000439 Page 81
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

A.P and H.M highlighted many aspects of respects that were practiced during the project #4 such
as: the actions and behaviors of the companies during the site meetings, considering the benefits
and profits of the other parties, paying others on time and imposing unacceptable situations on
others. A.P asserted many other important aspects of respect based on his experience as a
supplier for the switchgear in this project. He counts the full compliance with each party’s scope
of work, human rights and dignity and adopting code of conducts and ethics by the organizations
as positive indicators for the existence of respect within project activities and relations.
Moreover, A.P talks about the importance not only of adopting code of conducts by the
companies, but also the importance of measuring and tracking the status of respect and its
implementations within the different levels of the organization structure and projects.
Furthermore, A.P talked about the necessity for a reasonable and fair performance evaluation
processes with the proper evaluation criteria that should be communicated well and professionally
with the other parties, specifically the suppliers and subcontractors. Moreover, A.P asserted the
significant role of the openness, transparency and fairness in evaluating suppliers and subcontractors
performance. A.P argues that “XY considerations while evaluating our performance in the project
were biased towards their own benefits and profits”. A.P points out that XY conducted their
performance evaluation semi-annually only to justify delaying the due payments. A.P adds that
“evaluation of supplier’s performance should be a tool for better work quality and progress and not
as a tool to justify delaying their payments”. During the interview, M.Q highlights that respecting
project requirements and time frame is an important issue of respect towards others rights and
benefits. He calls all project parties to be professional in managing project works and activities. This,
as per M.Q, is part of the implementations and the aspects of respect towards the other parties’
interests and benefits in the projects. M.Q states that “the true measurement for the level of respect in
the project is the actual compliance with project requirements and mutual agreements”. He adds that
their relations with this project suppliers and subcontractors were based on official contracts with
agreed terms and conditions that warranted successful project and high levels of respect between the
project parties during the daily activities. M.Q asserts that in this project he focused on creating
cooperative and teamwork culture between the project parties to achieve high levels of mutual
benefits and success. M.H agrees with A.P on the great importance of caring about the other parties’
payments, benefits and human rights.
ID- 2013000439 Page 82
as: the actions and behaviors of the companies during the site meetings, considering the benefits
and profits of the other parties, paying others on time and imposing unacceptable situations on
others. A.P asserted many other important aspects of respect based on his experience as a
supplier for the switchgear in this project. He counts the full compliance with each party’s scope
of work, human rights and dignity and adopting code of conducts and ethics by the organizations
as positive indicators for the existence of respect within project activities and relations.
Moreover, A.P talks about the importance not only of adopting code of conducts by the
companies, but also the importance of measuring and tracking the status of respect and its
implementations within the different levels of the organization structure and projects.
Furthermore, A.P talked about the necessity for a reasonable and fair performance evaluation
processes with the proper evaluation criteria that should be communicated well and professionally
with the other parties, specifically the suppliers and subcontractors. Moreover, A.P asserted the
significant role of the openness, transparency and fairness in evaluating suppliers and subcontractors
performance. A.P argues that “XY considerations while evaluating our performance in the project
were biased towards their own benefits and profits”. A.P points out that XY conducted their
performance evaluation semi-annually only to justify delaying the due payments. A.P adds that
“evaluation of supplier’s performance should be a tool for better work quality and progress and not
as a tool to justify delaying their payments”. During the interview, M.Q highlights that respecting
project requirements and time frame is an important issue of respect towards others rights and
benefits. He calls all project parties to be professional in managing project works and activities. This,
as per M.Q, is part of the implementations and the aspects of respect towards the other parties’
interests and benefits in the projects. M.Q states that “the true measurement for the level of respect in
the project is the actual compliance with project requirements and mutual agreements”. He adds that
their relations with this project suppliers and subcontractors were based on official contracts with
agreed terms and conditions that warranted successful project and high levels of respect between the
project parties during the daily activities. M.Q asserts that in this project he focused on creating
cooperative and teamwork culture between the project parties to achieve high levels of mutual
benefits and success. M.H agrees with A.P on the great importance of caring about the other parties’
payments, benefits and human rights.
ID- 2013000439 Page 82

He highlighted that respect relations means that all parties must keen to handover a successful project
with high levels of quality and satisfaction within a spirit of partnership and team working.
5.2.4.2 Motivators of Respect in the Project #4:
And regarding the motivators of respect in project #4, the MEP contractor and his suppliers and
subcontractors, i.e. M.Q, M.H, A.P and H.M assert the importance of adopting code of conducts by
organizations to control employees’ behaviors within an acceptable margin. Also, they highlight
company’s commitment with the terms and conditions of the contract and project requirements
motivate others in the project to respect and appreciate this company. M.H and H.M also talked about
the role of religion and employees beliefs in showing respect for others. M.H adds that “respectful
actions from XY support creating an environment of mutual respect with the suppliers and
subcontractors in the project”. On the other hand, A.P emphasizes the crucial role of human rights as
a value and beliefs in enhancing and empowering respect initiatives in the projects. A.P talked about
M.Q, the project manager from XY, who personally behaves respectfully with all the parties and
employees in this project. A.P asserts that despite delaying their due payments for about two (2)
months by XY, but personally he respects M.Q for his kindness and politeness while dealing with all
project parties and employees even during conflicts and disputes.
5.2.4.3 Opportunities of Respect in the Project #4:
All the parties in the project #4 highlighted that the existence of respect in their relations has led to
better work progress and reduced the number of problems and disputes at the site. M.H and A.P
emphasized the direct relation between respect for the other parties at the site and the level of trust
between the parties in their current and future relations. M.H states that “if the other party respects
the agreements, project specifications and our rights, we will trust him in any other deal or project”.
ID- 2013000439 Page 83
with high levels of quality and satisfaction within a spirit of partnership and team working.
5.2.4.2 Motivators of Respect in the Project #4:
And regarding the motivators of respect in project #4, the MEP contractor and his suppliers and
subcontractors, i.e. M.Q, M.H, A.P and H.M assert the importance of adopting code of conducts by
organizations to control employees’ behaviors within an acceptable margin. Also, they highlight
company’s commitment with the terms and conditions of the contract and project requirements
motivate others in the project to respect and appreciate this company. M.H and H.M also talked about
the role of religion and employees beliefs in showing respect for others. M.H adds that “respectful
actions from XY support creating an environment of mutual respect with the suppliers and
subcontractors in the project”. On the other hand, A.P emphasizes the crucial role of human rights as
a value and beliefs in enhancing and empowering respect initiatives in the projects. A.P talked about
M.Q, the project manager from XY, who personally behaves respectfully with all the parties and
employees in this project. A.P asserts that despite delaying their due payments for about two (2)
months by XY, but personally he respects M.Q for his kindness and politeness while dealing with all
project parties and employees even during conflicts and disputes.
5.2.4.3 Opportunities of Respect in the Project #4:
All the parties in the project #4 highlighted that the existence of respect in their relations has led to
better work progress and reduced the number of problems and disputes at the site. M.H and A.P
emphasized the direct relation between respect for the other parties at the site and the level of trust
between the parties in their current and future relations. M.H states that “if the other party respects
the agreements, project specifications and our rights, we will trust him in any other deal or project”.
ID- 2013000439 Page 83

Moreover, A.P asserts that practicing respectful relations by M.Q with them and other parties in
the project has enhanced the business reputation of XY and led to high levels of project success
and mutual benefits. M.Q asserts that showing respect for the other parties in this project
promoted the level of project success and at the same time improves their opportunity for future
projects with the same client or others.
5.2.4.4 Challenges of Respect in the Project #4:
The subcontractor H.M in the project #4 agrees with the other two suppliers, M.H and A.P, that
delaying the due payments, selfish activities and the unfair behaviors within unbalanced
allocations of power and authorities at the site are the most constrains that discourage respect
initiatives between the parties in project #4. H.M highlighted that “he will never respect XY or
his agreements with him such as the material delivery schedule, unless XY shows respect and
fairness regarding our due payments and rights”. Moreover, A.P and M.Q remarked that the
absence of professionalism and effective management of some parties in this project led to
ignoring other parties’ interests and stakeholders’ satisfaction. A.P added that “organizations as
minimum requirements should adopt effective policies and procedures to enhance respect
implementations and practices during their business relationships”. Furthermore, M.H points out
that the tough nature and negative attitudes of some employees for personal reasons usually
destruct any trial towards creating a mutual respect between the project parties.
5.2.5 Case study #5 (Project #5):
The following table #5.5 presents the interviewees’ profiles within the case-study #5.
Table #5.5: Interviewees’ profiles – Case-study #5 (Project #5)
ID- 2013000439 Page 84
the project has enhanced the business reputation of XY and led to high levels of project success
and mutual benefits. M.Q asserts that showing respect for the other parties in this project
promoted the level of project success and at the same time improves their opportunity for future
projects with the same client or others.
5.2.4.4 Challenges of Respect in the Project #4:
The subcontractor H.M in the project #4 agrees with the other two suppliers, M.H and A.P, that
delaying the due payments, selfish activities and the unfair behaviors within unbalanced
allocations of power and authorities at the site are the most constrains that discourage respect
initiatives between the parties in project #4. H.M highlighted that “he will never respect XY or
his agreements with him such as the material delivery schedule, unless XY shows respect and
fairness regarding our due payments and rights”. Moreover, A.P and M.Q remarked that the
absence of professionalism and effective management of some parties in this project led to
ignoring other parties’ interests and stakeholders’ satisfaction. A.P added that “organizations as
minimum requirements should adopt effective policies and procedures to enhance respect
implementations and practices during their business relationships”. Furthermore, M.H points out
that the tough nature and negative attitudes of some employees for personal reasons usually
destruct any trial towards creating a mutual respect between the project parties.
5.2.5 Case study #5 (Project #5):
The following table #5.5 presents the interviewees’ profiles within the case-study #5.
Table #5.5: Interviewees’ profiles – Case-study #5 (Project #5)
ID- 2013000439 Page 84
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

5.2.5.1 Aspects and Practices of Respect in the Project #5:
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
Intervie I.M (p5) Constructi MEP Contractor Private
on Male Jordanian 12 (+8000)
wee #17 (in projects #5)
Manager
Intervie B.I(p5) Developm Supplier1- in Private (+50)
ent Male Jordanian 11
wee #18 Project #5
Manager
Intervie J.D(p5) Sr. Project Female Indian 14 Supplier2- in Private (+100)
wee #19 Manager Project #5
Intervie B.M(p5) Sr. Project Male Palestinian 12 Subcontractor- Private (+100)
wee #20 Manager in project #5
Interviewees B.I and J.D assert that, in project #5, they faced many practices of strong relation with
respect value and issues such as: delaying their payments by XY and the breaching of the terms and
conditions of the agreements. J.D points out that “the MEP contractor only activates and considers
the terms and conditions of the agreements which only serve his benefits and profits regardless of the
other terms that may serve the other parties’ rights and payments”. He adds that
“this method may be justified against some suppliers and subcontractors of bad reputation but for
our company we respect the agreed material quality and the agreed delivery schedule”. J.D
asserts that XY breached the agreements with them regarding the payment terms. She highlights
that their agreement with XY for the payment terms was twenty five percent (25%) of the total
amount to be an advance payment, sixty five percent (65%) to be against the exhaust fans
delivery to the site, and the balance ten percent (10%) to be ninety days (90) from the date of
testing and commissioning. J.D adds that after the material delivery XY refused to pay the 65%,
instead XY released 55% and kept 20% of the total amount to be after testing and commissioning
of the exhaust fans.
J.D and B.I remark that XY intended to ignore their rights and benefits and practiced impolite
methods in the communications and business meetings. In the same context, I.M, B.I, J.D and B.M
talked about the mentality of power and enforcing others in some critical financial or contractual
situations to accept some oppressive terms without any respect to other companies’ benefits or
interests. B.M claims that the MEP contractor in this project faced some financial and cash flow
problems which he tried to solve through delaying the due payments of the suppliers and
ID- 2013000439 Page 85
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
Intervie I.M (p5) Constructi MEP Contractor Private
on Male Jordanian 12 (+8000)
wee #17 (in projects #5)
Manager
Intervie B.I(p5) Developm Supplier1- in Private (+50)
ent Male Jordanian 11
wee #18 Project #5
Manager
Intervie J.D(p5) Sr. Project Female Indian 14 Supplier2- in Private (+100)
wee #19 Manager Project #5
Intervie B.M(p5) Sr. Project Male Palestinian 12 Subcontractor- Private (+100)
wee #20 Manager in project #5
Interviewees B.I and J.D assert that, in project #5, they faced many practices of strong relation with
respect value and issues such as: delaying their payments by XY and the breaching of the terms and
conditions of the agreements. J.D points out that “the MEP contractor only activates and considers
the terms and conditions of the agreements which only serve his benefits and profits regardless of the
other terms that may serve the other parties’ rights and payments”. He adds that
“this method may be justified against some suppliers and subcontractors of bad reputation but for
our company we respect the agreed material quality and the agreed delivery schedule”. J.D
asserts that XY breached the agreements with them regarding the payment terms. She highlights
that their agreement with XY for the payment terms was twenty five percent (25%) of the total
amount to be an advance payment, sixty five percent (65%) to be against the exhaust fans
delivery to the site, and the balance ten percent (10%) to be ninety days (90) from the date of
testing and commissioning. J.D adds that after the material delivery XY refused to pay the 65%,
instead XY released 55% and kept 20% of the total amount to be after testing and commissioning
of the exhaust fans.
J.D and B.I remark that XY intended to ignore their rights and benefits and practiced impolite
methods in the communications and business meetings. In the same context, I.M, B.I, J.D and B.M
talked about the mentality of power and enforcing others in some critical financial or contractual
situations to accept some oppressive terms without any respect to other companies’ benefits or
interests. B.M claims that the MEP contractor in this project faced some financial and cash flow
problems which he tried to solve through delaying the due payments of the suppliers and
ID- 2013000439 Page 85

subcontractors. He adds that they complied with the agreed scope of work and handing over dates but
XY delayed some due payments about sixty (60) days beyond the agreed dates. Moreover, B.M
points out that XY in this project deducted an amount of 150,000AED from the agreed contract
amount as penalties against the delayed handing over of the gas system in this project. On the other
hand, I.M argues that “some suppliers in this project tried unprofessional methods such as delaying
material delivery and gave false promises to impose some terms and claims”. I.M adds that as an
MEP contractor, they cannot allow any supplier to delay material delivery to the site or to slow down
work progress. I.M adds that they faced such an issue in this project with one of the suppliers who
refused to deliver the material before receiving some payments. I.M states that “we expected such
behavior from that supplier and implemented alternative solution through another supplier to prevent
project failure”. Moreover, B.I and B.M expressed their concerns about the unfair methodology that
the MEP contractor adopts in evaluating the suppliers and subcontractors in project #5. B.I argues
that “XY evaluation is based on some specific criteria that lack transparency and credibility”. He
adds that “we asked XY to arrange a meeting to discuss these criteria and the basis of evaluation but
they ignored our request”.
Furthermore, the MEP manager in the project #5, I.M, focused on many shortages and delays
that were caused by some suppliers and subcontractors such as: not complying with the schedule
of the project, deviation in the quality of the materials and systems and poor management to their
scope in the project. I.M asserts that “as an MEP project manager his duty is to hand over a
successful project within the planned schedule, quality and budget which finally serve all the
parties”. B.M agrees strongly with B.I and J.D regarding the role of payments issue and polite
communications and meetings in elevating the level of respect between the companies in the
MEP projects. Moreover, B.M adds that “the MEP contractor did not respect the confidentiality
of our proposals and prices that were submitted to him for this project as he showed it to one of
our competitors for negotiations purposes”.
5.2.5.2 Motivators of Respect in the Project #5:
Most interviewees in the project #5 emphasize the crucial role of executing each party’s
commitments and scope of work in motivating and creating the spirit of respect and appreciation
ID- 2013000439 Page 86
XY delayed some due payments about sixty (60) days beyond the agreed dates. Moreover, B.M
points out that XY in this project deducted an amount of 150,000AED from the agreed contract
amount as penalties against the delayed handing over of the gas system in this project. On the other
hand, I.M argues that “some suppliers in this project tried unprofessional methods such as delaying
material delivery and gave false promises to impose some terms and claims”. I.M adds that as an
MEP contractor, they cannot allow any supplier to delay material delivery to the site or to slow down
work progress. I.M adds that they faced such an issue in this project with one of the suppliers who
refused to deliver the material before receiving some payments. I.M states that “we expected such
behavior from that supplier and implemented alternative solution through another supplier to prevent
project failure”. Moreover, B.I and B.M expressed their concerns about the unfair methodology that
the MEP contractor adopts in evaluating the suppliers and subcontractors in project #5. B.I argues
that “XY evaluation is based on some specific criteria that lack transparency and credibility”. He
adds that “we asked XY to arrange a meeting to discuss these criteria and the basis of evaluation but
they ignored our request”.
Furthermore, the MEP manager in the project #5, I.M, focused on many shortages and delays
that were caused by some suppliers and subcontractors such as: not complying with the schedule
of the project, deviation in the quality of the materials and systems and poor management to their
scope in the project. I.M asserts that “as an MEP project manager his duty is to hand over a
successful project within the planned schedule, quality and budget which finally serve all the
parties”. B.M agrees strongly with B.I and J.D regarding the role of payments issue and polite
communications and meetings in elevating the level of respect between the companies in the
MEP projects. Moreover, B.M adds that “the MEP contractor did not respect the confidentiality
of our proposals and prices that were submitted to him for this project as he showed it to one of
our competitors for negotiations purposes”.
5.2.5.2 Motivators of Respect in the Project #5:
Most interviewees in the project #5 emphasize the crucial role of executing each party’s
commitments and scope of work in motivating and creating the spirit of respect and appreciation
ID- 2013000439 Page 86

within the project atmosphere. B.M added that his respect initiatives in this project such as
respecting the humanitarian values of the other employees and parties motivate these employees
to exchange the same relations and practices with him and facilitate solving the conflicts and
disputes. He did not ignore the role of religion, personal beliefs and code of conducts in
encouraging and implementing respect within the organizations’ relationships. J.D confirms the
role of code of conducts and ethics in supporting respect initiatives. IM agrees with B.M
regarding the role of religion in supporting the spirit of respect and recognition between the
employees in the projects.
5.2.5.3 Opportunities of Respect in the Project #5:
Most interviewees in the project #5 highlighted that despite the fact that respect itself is a value
which is related to human rights and dignity, it leads to less amounts of conflicts and disputes and to
many opportunities like good business reputation, more productivity and better work performance.
I.M asserted that suppliers’ and subcontractors’ compliance with this project requirement and
agreements push XY to trust and invite them to a new tenders and work proposals. He gives an
example of this project in which one of the suppliers could not comply with the agreement regarding
the delivery of material since he has some financial disputes with the manufacturer in the United
Kingdom and refused to start the delivery of the equipments to the supplier in the UAE. I.M adds that
“we trust this supplier as we are dealing with him since ten years without any problem or delay”. I.M
points out that they contacted the factory directly in coordination with the supplier and opened the
letter of credit (LC) directly to the manufacturer from XY account. B.I agrees with J.D that respectful
and cooperative practices are necessary in any project to avoid disputes and conflicts between the
project parties besides raising the percentage and probability of mutual profits and project success.
J.D asserts that “in this project we showed respect for our commitments and responsibilities and dealt
with the other project parties respectfully as our own team”. J.D adds that they believe in and practice
respectful relations with the other parties in the project and its crucial role in promoting the levels of
productivity and project success. Moreover, B.M points out that in this project their perception was
not only profits and short-term benefits; he asserts that they also look at good business relationships
and reputation that grant their company better opportunities and success in the future.
ID- 2013000439 Page 87
respecting the humanitarian values of the other employees and parties motivate these employees
to exchange the same relations and practices with him and facilitate solving the conflicts and
disputes. He did not ignore the role of religion, personal beliefs and code of conducts in
encouraging and implementing respect within the organizations’ relationships. J.D confirms the
role of code of conducts and ethics in supporting respect initiatives. IM agrees with B.M
regarding the role of religion in supporting the spirit of respect and recognition between the
employees in the projects.
5.2.5.3 Opportunities of Respect in the Project #5:
Most interviewees in the project #5 highlighted that despite the fact that respect itself is a value
which is related to human rights and dignity, it leads to less amounts of conflicts and disputes and to
many opportunities like good business reputation, more productivity and better work performance.
I.M asserted that suppliers’ and subcontractors’ compliance with this project requirement and
agreements push XY to trust and invite them to a new tenders and work proposals. He gives an
example of this project in which one of the suppliers could not comply with the agreement regarding
the delivery of material since he has some financial disputes with the manufacturer in the United
Kingdom and refused to start the delivery of the equipments to the supplier in the UAE. I.M adds that
“we trust this supplier as we are dealing with him since ten years without any problem or delay”. I.M
points out that they contacted the factory directly in coordination with the supplier and opened the
letter of credit (LC) directly to the manufacturer from XY account. B.I agrees with J.D that respectful
and cooperative practices are necessary in any project to avoid disputes and conflicts between the
project parties besides raising the percentage and probability of mutual profits and project success.
J.D asserts that “in this project we showed respect for our commitments and responsibilities and dealt
with the other project parties respectfully as our own team”. J.D adds that they believe in and practice
respectful relations with the other parties in the project and its crucial role in promoting the levels of
productivity and project success. Moreover, B.M points out that in this project their perception was
not only profits and short-term benefits; he asserts that they also look at good business relationships
and reputation that grant their company better opportunities and success in the future.
ID- 2013000439 Page 87
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

5.2.5.4 Challenges of Respect in the Project #5:
Moreover, B.M talks about some disrespectful practices and delaying their due payments by the
account department of the MEP contractor. B.M states that they called and sent many e-mails to the
account manager and to the finance director of the XY asking them about the readiness of their
payments upon previous agreement and promises, but they did not reply despite many reminders.
Moreover, the account department manager used to ignore their attendance to his department to ask
about their payments without any justification. They waited outside the account department of the
MEP contractor for hours without any opportunity to meet the manager and discuss the payments
issue. B.M adds that “XY delayed our due payments and showed disrespectful behaviors mostly after
the final completion of our scope of work as there are no more services or activities that may be
affected due to this delay”. B.M counts this behavior part of power logic that XY adopted and
implemented against them as subcontractors of limited authorities especially after finalizing their
scope of work and no critical role is still needed in the project.
The supplier J.D agreed with the subcontractor B.M that the selfish and profitable perspective of
some employees and parties in the project, complicated polices or procedures of some companies in
processing action or transactions and delaying others payments are common practices within the
project #5. They assert its negative effect on the type of relationships and reactions with the other
parties. J.D describes the relationships in this project by saying “it was confrontational relations
oriented towards selfish profits of each party regardless of others’ profits of losses”. On the other
hand, I.M and B.M remark that the lack of professionalism and effective skills and management
besides characteristics and traits of some employees were of a significant role against initiating and
developing respectful relations in this project. I.M points out that their company (XY) encourages its
employees to attend training sessions and coaching programs to gain skills and improve their
qualifications and productivity while managing projects and dealing with other parties. Most
interviewees in the project #5 focus on the crucial role of payments issues in hindering respect
practices and initiatives. J.D remarks that he will never recommend any company to work with XY
due to delaying the due payments and its ignorance to others’ interests and rights. B.M states that
“we incurred a huge loss in this project due to the nonprofessional and selfish mentalities of some
project parties who missed teamwork and cooperation approaches”.
ID- 2013000439 Page 88
Moreover, B.M talks about some disrespectful practices and delaying their due payments by the
account department of the MEP contractor. B.M states that they called and sent many e-mails to the
account manager and to the finance director of the XY asking them about the readiness of their
payments upon previous agreement and promises, but they did not reply despite many reminders.
Moreover, the account department manager used to ignore their attendance to his department to ask
about their payments without any justification. They waited outside the account department of the
MEP contractor for hours without any opportunity to meet the manager and discuss the payments
issue. B.M adds that “XY delayed our due payments and showed disrespectful behaviors mostly after
the final completion of our scope of work as there are no more services or activities that may be
affected due to this delay”. B.M counts this behavior part of power logic that XY adopted and
implemented against them as subcontractors of limited authorities especially after finalizing their
scope of work and no critical role is still needed in the project.
The supplier J.D agreed with the subcontractor B.M that the selfish and profitable perspective of
some employees and parties in the project, complicated polices or procedures of some companies in
processing action or transactions and delaying others payments are common practices within the
project #5. They assert its negative effect on the type of relationships and reactions with the other
parties. J.D describes the relationships in this project by saying “it was confrontational relations
oriented towards selfish profits of each party regardless of others’ profits of losses”. On the other
hand, I.M and B.M remark that the lack of professionalism and effective skills and management
besides characteristics and traits of some employees were of a significant role against initiating and
developing respectful relations in this project. I.M points out that their company (XY) encourages its
employees to attend training sessions and coaching programs to gain skills and improve their
qualifications and productivity while managing projects and dealing with other parties. Most
interviewees in the project #5 focus on the crucial role of payments issues in hindering respect
practices and initiatives. J.D remarks that he will never recommend any company to work with XY
due to delaying the due payments and its ignorance to others’ interests and rights. B.M states that
“we incurred a huge loss in this project due to the nonprofessional and selfish mentalities of some
project parties who missed teamwork and cooperation approaches”.
ID- 2013000439 Page 88

5.3 Results, Analysis and Discussions across the Five Case-studies:
Interviews with the MEP contractor and his suppliers and subcontractors in the five case-studies were
carried out in the previous sections. During the interviews, all interviewees have asserted the great
importance of business relationships between the project parties, and emphasized that their
relationships should be based on mutual respect and benefits. They highlighted many events and
practices that reveal respect and disrespect aspects and issues between the parties in these projects.
The following sections are intended to present more and deeper analysis and discussions on the
status of respect and its practices between the parties across the five (5) case-studies.
5.3.1 Respect Issues and Aspects across the Case-studies:
Respect issues and practices that have been highlighted in the five case-studies are combined in
table #5.6, below, to form a comprehensive picture and a better understanding about these
aspects and issues of respect in these five case-studies. These results summarize respect issues
and aspects that the interviewees have raised and highlighted across the five (5) projects.
Respect Aspects and Practices that are concerned and highlighted by the
Parties across the Five Case- Studies
Weight of this
item (%)=
a- Issues and Practices that Interviewee: (interviewees
/20)*100, where 20
are related to Respect is the total number
(across the five case-studies) of the interviewees
1- Commitment with each party’s A.A, A.S, 75
scope of work and responsibilities. A.K,S.S,R.G,M.O,H.I,
ID- 2013000439 Page 89
Interviews with the MEP contractor and his suppliers and subcontractors in the five case-studies were
carried out in the previous sections. During the interviews, all interviewees have asserted the great
importance of business relationships between the project parties, and emphasized that their
relationships should be based on mutual respect and benefits. They highlighted many events and
practices that reveal respect and disrespect aspects and issues between the parties in these projects.
The following sections are intended to present more and deeper analysis and discussions on the
status of respect and its practices between the parties across the five (5) case-studies.
5.3.1 Respect Issues and Aspects across the Case-studies:
Respect issues and practices that have been highlighted in the five case-studies are combined in
table #5.6, below, to form a comprehensive picture and a better understanding about these
aspects and issues of respect in these five case-studies. These results summarize respect issues
and aspects that the interviewees have raised and highlighted across the five (5) projects.
Respect Aspects and Practices that are concerned and highlighted by the
Parties across the Five Case- Studies
Weight of this
item (%)=
a- Issues and Practices that Interviewee: (interviewees
/20)*100, where 20
are related to Respect is the total number
(across the five case-studies) of the interviewees
1- Commitment with each party’s A.A, A.S, 75
scope of work and responsibilities. A.K,S.S,R.G,M.O,H.I,
ID- 2013000439 Page 89

S.H,S.K,H.A, M.Q, A.P,
I.M, B.I & J.D
2- Respecting others during the A.A, A.K, S.S, T.A, M.O, 65
business meetings. H.I, R.A,S.K, H.A, A.P,
H.M, J.D & B.M
3- Paying others on time as per the A.S, A.K, S.S, T.A, M.O, 75
agreements. H.I, R.A, S.K, H.A, M.H,
A.P, H.M, B.I, J.D & B.M
4- Caring about other parties’ profits A.A,A.S,A.K, S.S, 85
and benefits. R.G,T.A, H.I, S.H, R.A,
S.K, H.A, M.Q, M.H,
A.P,H.M, B.I & J.D
5- Caring about the human rights and A.S, A.K, T.A,H.I, R.A, 45
dignity of the other parties. S.K, M.H, A.P & B.I
6- Showing professionalism in 30
managing works and activities. R.G,T.A, M.O,S.H, M.Q &
B.M
7- Fair performance evaluation of 25
suppliers and subcontractors (by A.K, A.S, A.P, B.I & B.M
XY).
8- Fairness and transparency in 20
performance criteria and A.K, A.S A.P & B.I
evaluation
9- Confidentiality of business deals B.M & A.K 10
and prices.
10- Adopting codes of conduct and 15
ethics by organizations. A.S, H.I & A.P
11- Proper tools in communicating, 5
tracking and measuring the adopted
codes of conduct and respect, A.P
internally and externally.
12- Giving the other parties an 5
adequate and reasonable time to H.A
complete their tasks.
13- Polite communication methods B.I, J.D & B.M 15
with other project parties.
14- Not to exploit weakness of other A.S, R.A,S.K,H.A, M.H, 55
parties to achieve or impose unfair A.P, H.M, I.M, B.I, J.D &
situations. B.M
ID- 2013000439 Page 90
I.M, B.I & J.D
2- Respecting others during the A.A, A.K, S.S, T.A, M.O, 65
business meetings. H.I, R.A,S.K, H.A, A.P,
H.M, J.D & B.M
3- Paying others on time as per the A.S, A.K, S.S, T.A, M.O, 75
agreements. H.I, R.A, S.K, H.A, M.H,
A.P, H.M, B.I, J.D & B.M
4- Caring about other parties’ profits A.A,A.S,A.K, S.S, 85
and benefits. R.G,T.A, H.I, S.H, R.A,
S.K, H.A, M.Q, M.H,
A.P,H.M, B.I & J.D
5- Caring about the human rights and A.S, A.K, T.A,H.I, R.A, 45
dignity of the other parties. S.K, M.H, A.P & B.I
6- Showing professionalism in 30
managing works and activities. R.G,T.A, M.O,S.H, M.Q &
B.M
7- Fair performance evaluation of 25
suppliers and subcontractors (by A.K, A.S, A.P, B.I & B.M
XY).
8- Fairness and transparency in 20
performance criteria and A.K, A.S A.P & B.I
evaluation
9- Confidentiality of business deals B.M & A.K 10
and prices.
10- Adopting codes of conduct and 15
ethics by organizations. A.S, H.I & A.P
11- Proper tools in communicating, 5
tracking and measuring the adopted
codes of conduct and respect, A.P
internally and externally.
12- Giving the other parties an 5
adequate and reasonable time to H.A
complete their tasks.
13- Polite communication methods B.I, J.D & B.M 15
with other project parties.
14- Not to exploit weakness of other A.S, R.A,S.K,H.A, M.H, 55
parties to achieve or impose unfair A.P, H.M, I.M, B.I, J.D &
situations. B.M
ID- 2013000439 Page 90
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table #5.6: The Main Respect Aspects that have been raised across the Five Case-studies.
These respect aspects and practices are highlighted and raised by the twenty (20) interviewees in
the five (5) MEP projects. Column #3, in Table # 5.16 above, shows the percentages of the
interviewees, who have mentioned and raised each item, with respect to the total number of the
interviewees, i.e. twenty (20). This column shows the weight, as percentages, of each item with
respect to the other items according to the interviewees in the five case-studies. Weight of each
aspect of respect reveals its importance and tangible effect within the MEP projects, of the case-
studies, upon the interviewees’ practical experience and daily practices and activities.
In general, interviewees assert that there are fourteen (14) aspects and respect elements that
existed and are practiced within these five projects. These fourteen (14) aspects of respect, as
shown in the table #5.6 above, are of significant importance as they are in direct and strong
influence on the core values and the rights of human beings, effectiveness of the relationships
between the parties and the level of work performance, projects success and stakeholders
satisfaction. These aspects and practices represent the field of respect that all concerned parties,
academics, practitioners, professional institutions, regulatory bodies should notice and care about
to elevate the levels of human dignity and professionalism within the construction industry in
general and the MEP projects specifically.
Furthermore, most interviewees emphasize the great importance and the high value of some respect
aspects and practices, as shown in table #5.16 with the highest weight percentages, namely:
‘caring about other parties’ profits and benefits’, ‘paying others on time as per the agreements’,
‘respecting others during the business meetings’, ‘commitment with each party’s scope of work
and responsibilities’ and ‘not to exploit weakness of other parties to achieve or impose unfair
situations’. These five aspects of respect, in addition to the other aspects that are shown in table
#5.16, are considered upon interviewees’ confirmation, the main components and elements of
respect with a high significant value due to their direct relation with human rights and dignity,
from one side, and their crucial role in articulating the relationships between the organizations in
the construction projects, from the other side.
ID- 2013000439 Page 91
These respect aspects and practices are highlighted and raised by the twenty (20) interviewees in
the five (5) MEP projects. Column #3, in Table # 5.16 above, shows the percentages of the
interviewees, who have mentioned and raised each item, with respect to the total number of the
interviewees, i.e. twenty (20). This column shows the weight, as percentages, of each item with
respect to the other items according to the interviewees in the five case-studies. Weight of each
aspect of respect reveals its importance and tangible effect within the MEP projects, of the case-
studies, upon the interviewees’ practical experience and daily practices and activities.
In general, interviewees assert that there are fourteen (14) aspects and respect elements that
existed and are practiced within these five projects. These fourteen (14) aspects of respect, as
shown in the table #5.6 above, are of significant importance as they are in direct and strong
influence on the core values and the rights of human beings, effectiveness of the relationships
between the parties and the level of work performance, projects success and stakeholders
satisfaction. These aspects and practices represent the field of respect that all concerned parties,
academics, practitioners, professional institutions, regulatory bodies should notice and care about
to elevate the levels of human dignity and professionalism within the construction industry in
general and the MEP projects specifically.
Furthermore, most interviewees emphasize the great importance and the high value of some respect
aspects and practices, as shown in table #5.16 with the highest weight percentages, namely:
‘caring about other parties’ profits and benefits’, ‘paying others on time as per the agreements’,
‘respecting others during the business meetings’, ‘commitment with each party’s scope of work
and responsibilities’ and ‘not to exploit weakness of other parties to achieve or impose unfair
situations’. These five aspects of respect, in addition to the other aspects that are shown in table
#5.16, are considered upon interviewees’ confirmation, the main components and elements of
respect with a high significant value due to their direct relation with human rights and dignity,
from one side, and their crucial role in articulating the relationships between the organizations in
the construction projects, from the other side.
ID- 2013000439 Page 91

During the interviews, all the interviewees who represent XY show high concerns about item #1,
‘commitment with each party’s scope of work and responsibilities’. From XY position, as a
client with respect to the suppliers and subcontractors, and the owner of the main MEP contract
in the project, they focus on the completion of each party’s scope and their full compliance with
their commitments, responsibilities, project specifications and requirements in order to complete
the project on time within an accepted quality and budget. They recognize that handing over the
MEP works in the project as a full scope is their main duty and responsibility. As per the MEP
contract with the main contractor and project consultant, XY bears the full responsibility of any
delay or deviation in the MEP works. This responsibility, as per A.A, R.G, S.H, M.Q and I.M,
may require and impose some actions and initiatives that may be interpreted by suppliers and
subcontractors as disrespectful practices, but based on their experience and management
knowledge as MEP contractor; they justify that as inevitable and professional actions for project
success and common benefits of all parties. A.A talks a lot about his responsibility, as the MEP
contractor in the project, for handing over these works completely to the project owner or the
client on time and with the agreed levels of quality. Hence, A.A in many occasions through the
interview asserts that he may delay the payments of any supplier or subcontractor in case of any
deviation by these parties from the agreed work scope, schedule or quality . S.H states that “we
were awarded the MEP works package by the project main contractor and we have to execute
and hand over this scope within the agreed quality and schedule”. S.H adds that “in case of our
delay or deviation in handing over the MEP works, the main contractor will make deductions of
about one million AED per any day beyond the agreed schedule”.
In the same context, ten (10) suppliers and subcontractors, out of the fifteen (15) in the five
projects, assert the importance of complying with the commitments, agreements and the assigned
responsibilities by each party. S.K, supplier in the project #3, states that “complying with the
agreements and responsibilities within the construction projects is a must, but most deviations
are related to pending the due payment by XY”.
This issue, ‘compliance with each party commitments and responsibilities’, is in full agreement
with literature findings that count it as one of the main components and requisites that help
initiating and empowering respect practices between the parties in the construction projects. In
addition, these issues must be solved within cooperative and respectful approaches rather than
ID- 2013000439 Page 92
‘commitment with each party’s scope of work and responsibilities’. From XY position, as a
client with respect to the suppliers and subcontractors, and the owner of the main MEP contract
in the project, they focus on the completion of each party’s scope and their full compliance with
their commitments, responsibilities, project specifications and requirements in order to complete
the project on time within an accepted quality and budget. They recognize that handing over the
MEP works in the project as a full scope is their main duty and responsibility. As per the MEP
contract with the main contractor and project consultant, XY bears the full responsibility of any
delay or deviation in the MEP works. This responsibility, as per A.A, R.G, S.H, M.Q and I.M,
may require and impose some actions and initiatives that may be interpreted by suppliers and
subcontractors as disrespectful practices, but based on their experience and management
knowledge as MEP contractor; they justify that as inevitable and professional actions for project
success and common benefits of all parties. A.A talks a lot about his responsibility, as the MEP
contractor in the project, for handing over these works completely to the project owner or the
client on time and with the agreed levels of quality. Hence, A.A in many occasions through the
interview asserts that he may delay the payments of any supplier or subcontractor in case of any
deviation by these parties from the agreed work scope, schedule or quality . S.H states that “we
were awarded the MEP works package by the project main contractor and we have to execute
and hand over this scope within the agreed quality and schedule”. S.H adds that “in case of our
delay or deviation in handing over the MEP works, the main contractor will make deductions of
about one million AED per any day beyond the agreed schedule”.
In the same context, ten (10) suppliers and subcontractors, out of the fifteen (15) in the five
projects, assert the importance of complying with the commitments, agreements and the assigned
responsibilities by each party. S.K, supplier in the project #3, states that “complying with the
agreements and responsibilities within the construction projects is a must, but most deviations
are related to pending the due payment by XY”.
This issue, ‘compliance with each party commitments and responsibilities’, is in full agreement
with literature findings that count it as one of the main components and requisites that help
initiating and empowering respect practices between the parties in the construction projects. In
addition, these issues must be solved within cooperative and respectful approaches rather than
ID- 2013000439 Page 92

additional deviations or breaches of the agreements (Harris 2010; OGC 2007; PMI 2008; Smith
2007; Wagner 2000).
5.3.2 Respect Motivators, Opportunities and Challenges across the Case-
studies:
Table #5.7 below, shows respect motivators, opportunities and challenges as concluded from the
interviews within the five (5) case-studies. In addition, the weight of each item is shown to
reflect its importance with respect to the others within the relationships of XY and its suppliers
and subcontractors in the projects.
Respect Motivators, Opportunities and Challenges across the Five
Case-Studies
a- Respect Motivators Interviewee: Weight of this item
(%)
1- Commitment with Human Rights S.S, T.A,M.O, H.I, R.A, 40
S.K, A.P & B.M
A.A,S.S, R.G, T.A, M.O, 80
2- Commitments with Work Scope H.I, S.H, R.A, S.K, M,Q,
and Responsibilities M,H, A.P, H.M, I.M, B.I
& J.D
3- Religion and beliefs M.H, H.M, I.M & B.I 20
4- Organization’s Code of conducts M.OR.A, S.K, M.Q, M.H, 45
A.P, H.M, J.D & B.M
5- Actions and behaviors of the other M.H 5
parties
6- Personal traits, nature, beliefs and S.S, R.G,T.A, M.O, H.I & 30
culture R.A
ID- 2013000439 Page 93
2007; Wagner 2000).
5.3.2 Respect Motivators, Opportunities and Challenges across the Case-
studies:
Table #5.7 below, shows respect motivators, opportunities and challenges as concluded from the
interviews within the five (5) case-studies. In addition, the weight of each item is shown to
reflect its importance with respect to the others within the relationships of XY and its suppliers
and subcontractors in the projects.
Respect Motivators, Opportunities and Challenges across the Five
Case-Studies
a- Respect Motivators Interviewee: Weight of this item
(%)
1- Commitment with Human Rights S.S, T.A,M.O, H.I, R.A, 40
S.K, A.P & B.M
A.A,S.S, R.G, T.A, M.O, 80
2- Commitments with Work Scope H.I, S.H, R.A, S.K, M,Q,
and Responsibilities M,H, A.P, H.M, I.M, B.I
& J.D
3- Religion and beliefs M.H, H.M, I.M & B.I 20
4- Organization’s Code of conducts M.OR.A, S.K, M.Q, M.H, 45
A.P, H.M, J.D & B.M
5- Actions and behaviors of the other M.H 5
parties
6- Personal traits, nature, beliefs and S.S, R.G,T.A, M.O, H.I & 30
culture R.A
ID- 2013000439 Page 93
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

a- Opportunities and Interviewee:
Consequences of Respect
A.A, A.S, A.K, S.S, 65
1- More Trust. R.G,T.A,M.O,H.I,
S.H,S.K, M.H, A.P & I.M
2- Low level of conflicts and disputes A.A, A.S, A.K, S.S, 100
R.G,T.A,M.O,H.I, S.H,
and high levels of productivity, R.A, S.K, H.A, M.Q,
performance and success. M.H, A.P, H.M, I.M, B.I,
J.D & B.M
3- Good Business Reputation T.M, B.M, A.P & S.K 20
b- Respect Challenges and Interviewee:
Constrains
1- Profitability and selfish perspective A.S, A.K, S.S,M.O,H.I, 65
of some project parties. S.H, R.A, S.K, M.H,A.P,
H.M, J.D & B.M
2- Payments issues A.S, A.K, S.S, T.A, M.O, 75
H.I, R.A,S.K, H.A, M.H,
A.P, H.M, B.I, J.D & B.M
3- Personal beliefs and traits of the T.A, M.O, S.K, M.H, I.M, 35
employees B.I & B.M
4- Impolite words and behaviors A.A & S.S 15
5- Profitable Business Culture A.K 5
6- Organization policies, procedures S.S, M.O, S.K,H.A, A.P, 35
and culture J.D, B.M
7- Exploiting power and position A.S, S.S, R.G, T.A, M.O, 80
authorities to impose unfair H.I, S.H, R.A, S.K, H.A,
conditions and situations. M.H, A.P, H.M, B.I, J.D &
B.M
8- Lack of management knowledge A.A, A.K, S.S, R.G, H.I, 80
and professionalism. S.H, R.A, M.Q, A.P, I.M
& B.M
Table #5.7: Respect Motivators, Opportunities and Challenges across the Five Case-studies
Most interviewees confirm that ‘Commitments with work scope and responsibilities’ is the most
important motivator that pushes to show respect for the other parties in the project, with a weight
of eighty percent (80%). It means that when the organization complies with its commitments and
responsibilities towards the project, it motivates the other parties to respect and appreciate this
organization accordingly. A.A in the project #1 states that “behaviors and actions of the other
parties and people in the project ……..usually affect the type of our actions and behaviors”. This
ID- 2013000439 Page 94
Consequences of Respect
A.A, A.S, A.K, S.S, 65
1- More Trust. R.G,T.A,M.O,H.I,
S.H,S.K, M.H, A.P & I.M
2- Low level of conflicts and disputes A.A, A.S, A.K, S.S, 100
R.G,T.A,M.O,H.I, S.H,
and high levels of productivity, R.A, S.K, H.A, M.Q,
performance and success. M.H, A.P, H.M, I.M, B.I,
J.D & B.M
3- Good Business Reputation T.M, B.M, A.P & S.K 20
b- Respect Challenges and Interviewee:
Constrains
1- Profitability and selfish perspective A.S, A.K, S.S,M.O,H.I, 65
of some project parties. S.H, R.A, S.K, M.H,A.P,
H.M, J.D & B.M
2- Payments issues A.S, A.K, S.S, T.A, M.O, 75
H.I, R.A,S.K, H.A, M.H,
A.P, H.M, B.I, J.D & B.M
3- Personal beliefs and traits of the T.A, M.O, S.K, M.H, I.M, 35
employees B.I & B.M
4- Impolite words and behaviors A.A & S.S 15
5- Profitable Business Culture A.K 5
6- Organization policies, procedures S.S, M.O, S.K,H.A, A.P, 35
and culture J.D, B.M
7- Exploiting power and position A.S, S.S, R.G, T.A, M.O, 80
authorities to impose unfair H.I, S.H, R.A, S.K, H.A,
conditions and situations. M.H, A.P, H.M, B.I, J.D &
B.M
8- Lack of management knowledge A.A, A.K, S.S, R.G, H.I, 80
and professionalism. S.H, R.A, M.Q, A.P, I.M
& B.M
Table #5.7: Respect Motivators, Opportunities and Challenges across the Five Case-studies
Most interviewees confirm that ‘Commitments with work scope and responsibilities’ is the most
important motivator that pushes to show respect for the other parties in the project, with a weight
of eighty percent (80%). It means that when the organization complies with its commitments and
responsibilities towards the project, it motivates the other parties to respect and appreciate this
organization accordingly. A.A in the project #1 states that “behaviors and actions of the other
parties and people in the project ……..usually affect the type of our actions and behaviors”. This
ID- 2013000439 Page 94

mentality of the parties in the projects i.e. their influence by each other behaviors and actions
assert the great importance of the early articulation of the behaviors and relationship between the
project parties to be respectful and effective within an integrative , cooperative and professional
approaches.
Moreover, organizations should focus on adopting, communicating and tracking code of
conducts and ethics internally within their divisions and employees, and externally with the other
organizations and partners. These codes of conducts and ethics are in direct relation and contact
with human rights and dignity that automatically affect the level of respect and satisfaction in the
relations between project parties. On the other hand, these case-studies show a significant role of
religion and personal traits and beliefs in motivating or hindering respect behaviors with others.
This calls all organizations to focus on building an effective culture of cooperation, integration
and partnership within win-win and sustainable relationships. These concepts, mentalities and
initiatives of respect in the construction projects can improve the level of stakeholders’
satisfaction, employees’ productivity and work performance.
Furthermore, the interviewees have highlighted that showing respect in the relationships between
the project parties, lead to many opportunities and consequences, such as: achieving good
business reputation, building trust between the organizations, minimizing conflicts and disputes,
increasing employees’ productivity, improving the work performance and increasing the
probability of projects success and parties mutual benefits. These outputs are consistent with the
literature finding, as summarized in table #3.1 above, about the direct relation between practicing
respect with other parties in the project and increasing the levels of cooperation and
collaboration, initiating and maintaining effective relationships, improving work performance
and higher levels of project success and stakeholders satisfaction.
On the other hand, the case-studies reveal that ‘lack of management knowledge and
professionalism’, ‘exploiting power and position authorities to impose unfair conditions and
situations’, ‘payment issues’ and the ‘profitability and selfish perspective of some project
parties’ are the main challenges and constrains that stand against showing and practicing respect
in the projects.
ID- 2013000439 Page 95
assert the great importance of the early articulation of the behaviors and relationship between the
project parties to be respectful and effective within an integrative , cooperative and professional
approaches.
Moreover, organizations should focus on adopting, communicating and tracking code of
conducts and ethics internally within their divisions and employees, and externally with the other
organizations and partners. These codes of conducts and ethics are in direct relation and contact
with human rights and dignity that automatically affect the level of respect and satisfaction in the
relations between project parties. On the other hand, these case-studies show a significant role of
religion and personal traits and beliefs in motivating or hindering respect behaviors with others.
This calls all organizations to focus on building an effective culture of cooperation, integration
and partnership within win-win and sustainable relationships. These concepts, mentalities and
initiatives of respect in the construction projects can improve the level of stakeholders’
satisfaction, employees’ productivity and work performance.
Furthermore, the interviewees have highlighted that showing respect in the relationships between
the project parties, lead to many opportunities and consequences, such as: achieving good
business reputation, building trust between the organizations, minimizing conflicts and disputes,
increasing employees’ productivity, improving the work performance and increasing the
probability of projects success and parties mutual benefits. These outputs are consistent with the
literature finding, as summarized in table #3.1 above, about the direct relation between practicing
respect with other parties in the project and increasing the levels of cooperation and
collaboration, initiating and maintaining effective relationships, improving work performance
and higher levels of project success and stakeholders satisfaction.
On the other hand, the case-studies reveal that ‘lack of management knowledge and
professionalism’, ‘exploiting power and position authorities to impose unfair conditions and
situations’, ‘payment issues’ and the ‘profitability and selfish perspective of some project
parties’ are the main challenges and constrains that stand against showing and practicing respect
in the projects.
ID- 2013000439 Page 95

In addition, tables #5.6 and #5.7, show many other aspects, motivators and challenges that were
highlighted by the interviewees but with low percentages, i.e. less than 50% of the interviewees
have considered these as aspects, motivators or challenges. Nevertheless, all these items still of
significant value in business and projects due to their crucial role in creating trust and effective
relationships between the projects parties, and their role in achieving higher levels of
productivity, work performance and projects success.
All these respect elements, motivators, opportunities and challenges, as asserted by the parties
through the case –studies, are of significant meanings, values and roles that are related to the
organizations and their employees’ practices and initiatives within the environment of the MEP
projects and construction industry in general. These aspects of respect, as highlighted by many
experts and practitioners in the case-studies, are of great importance and critical roles in
articulating the relationships between the parties in the MEP projects and on the success or
failure of the projects. They are related to the scope of each party in the project, work quality and
progress and the project schedule, besides their direct relation with the stakeholders’ dignity,
rights, values and satisfaction.
5.3.3 Comparison and Discussion across the Outputs of the Case-studies and
the Conceptual Model:
A comparison between the outputs of the adopted conceptual framework and the aggregated
outputs of the case-studies is held in order to examine the level of consistency in the results and
to shed more light on the aspects and practices of respect in the MEP projects in the UAE. This
comparison grants high levels of understanding and realization of the actual value of respect in
the construction industry by highlighting its crucial role in articulating effective and sustainable
relationships between the project parties and improving the opportunity of delivering successful
projects within high levels of dignity and satisfaction.
ID- 2013000439 Page 96
highlighted by the interviewees but with low percentages, i.e. less than 50% of the interviewees
have considered these as aspects, motivators or challenges. Nevertheless, all these items still of
significant value in business and projects due to their crucial role in creating trust and effective
relationships between the projects parties, and their role in achieving higher levels of
productivity, work performance and projects success.
All these respect elements, motivators, opportunities and challenges, as asserted by the parties
through the case –studies, are of significant meanings, values and roles that are related to the
organizations and their employees’ practices and initiatives within the environment of the MEP
projects and construction industry in general. These aspects of respect, as highlighted by many
experts and practitioners in the case-studies, are of great importance and critical roles in
articulating the relationships between the parties in the MEP projects and on the success or
failure of the projects. They are related to the scope of each party in the project, work quality and
progress and the project schedule, besides their direct relation with the stakeholders’ dignity,
rights, values and satisfaction.
5.3.3 Comparison and Discussion across the Outputs of the Case-studies and
the Conceptual Model:
A comparison between the outputs of the adopted conceptual framework and the aggregated
outputs of the case-studies is held in order to examine the level of consistency in the results and
to shed more light on the aspects and practices of respect in the MEP projects in the UAE. This
comparison grants high levels of understanding and realization of the actual value of respect in
the construction industry by highlighting its crucial role in articulating effective and sustainable
relationships between the project parties and improving the opportunity of delivering successful
projects within high levels of dignity and satisfaction.
ID- 2013000439 Page 96
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

5.3.3.1 Respect Elements and Components:
Table #5.8, below, links respect aspects, that have been raised by the parties in the projects, with
respect elements and components that have been adopted in the conceptual model.
Matching between Respect Components(of the Conceptual Model)
and the Respect Aspects and Issues (From the Case-Studies)
Respect Elements and
Respect Aspects and Issues in the MEP
Components (Literature
Projects – Case-studies
Findings)
A- Recognition and Fairness and transparency in performance and
Admiration of the
evaluation criteria.
importance, quality, Fair performance evaluation of suppliers and
abilities and achievements
subcontractors (by XY).
of others. Polite communication methods with other
project parties.
Respecting others during the business
B- Due regard , acceptance
meetings.
and tolerance towards Caring about the human rights and dignity of
others’ rights, cultures and
the other parties.
traditions Polite communication methods with other
project parties.
Respecting others during the business
meetings.
Caring about the human rights and dignity of
C- Obligation towards the other parties.
Adopting codes of conduct and ethics by
Humanitarian Values, organizations
Rights and Dignity Proper tools in communicating, tracking and
measuring the adopted codes of conduct and
respect, internally and externally.
Polite communication methods with other
project parties
Commitments with each party work scope and
D- Complying with responsibilities.
Paying others on time and as per the
professional manners and agreements.
business commitments.
Caring about other parties’ profits and benefits.
Table #5.8, below, links respect aspects, that have been raised by the parties in the projects, with
respect elements and components that have been adopted in the conceptual model.
Matching between Respect Components(of the Conceptual Model)
and the Respect Aspects and Issues (From the Case-Studies)
Respect Elements and
Respect Aspects and Issues in the MEP
Components (Literature
Projects – Case-studies
Findings)
A- Recognition and Fairness and transparency in performance and
Admiration of the
evaluation criteria.
importance, quality, Fair performance evaluation of suppliers and
abilities and achievements
subcontractors (by XY).
of others. Polite communication methods with other
project parties.
Respecting others during the business
B- Due regard , acceptance
meetings.
and tolerance towards Caring about the human rights and dignity of
others’ rights, cultures and
the other parties.
traditions Polite communication methods with other
project parties.
Respecting others during the business
meetings.
Caring about the human rights and dignity of
C- Obligation towards the other parties.
Adopting codes of conduct and ethics by
Humanitarian Values, organizations
Rights and Dignity Proper tools in communicating, tracking and
measuring the adopted codes of conduct and
respect, internally and externally.
Polite communication methods with other
project parties
Commitments with each party work scope and
D- Complying with responsibilities.
Paying others on time and as per the
professional manners and agreements.
business commitments.
Caring about other parties’ profits and benefits.

ID- 2013000439 Page 97

Showing professionalism in managing works
and activities.
Confidentiality of business deals and prices.
Giving the other parties an adequate and
reasonable time to complete their tasks.
E- Not to exercise power or
Not to exploit weakness of other parties during
position against others for some stages of the project to achieve or
personal benefits. impose unfair situations
Respecting others during the business
meetings.
Paying others on time and as per the
agreements.
F- Doing the best to Proper tools in communicating, tracking and
understand, appreciate and measuring the adopted codes of conduct and
treat others in an respect.
appropriate way. Caring about other parties’ profits and benefits.
Polite communication methods with other
project parties.
G- Invest in people
development, health and
------------------------------------------
safety issues, and proper
work environment.
Table #5.8: Matching Respect Aspects of the Case-studies with Literature Findings.
As shown in the above table #5.8, the researcher categorizes most respect issues that interviewees
remark and talk about in the five projects under similar elements of respect that are concluded from
the literature. Each respect element that is mentioned in the conceptual model and shown in table
#5.8 has many aspects and items that are highlighted and asserted by the interviewees in the projects.
The interviewees in the case-studies talk about many issues, aspects and practices of respect
according to their practical experiences and daily involvement in the projects activities. Therefore,
many raised aspects and issues that belong to the same comprehensive meaning are classified under
one general element or item of the conceptual model. Furthermore, it is clear in table #5.8 that the
same respect aspect, as has been raised by the interviewees, is categorized under
ID- 2013000439 Page 98
and activities.
Confidentiality of business deals and prices.
Giving the other parties an adequate and
reasonable time to complete their tasks.
E- Not to exercise power or
Not to exploit weakness of other parties during
position against others for some stages of the project to achieve or
personal benefits. impose unfair situations
Respecting others during the business
meetings.
Paying others on time and as per the
agreements.
F- Doing the best to Proper tools in communicating, tracking and
understand, appreciate and measuring the adopted codes of conduct and
treat others in an respect.
appropriate way. Caring about other parties’ profits and benefits.
Polite communication methods with other
project parties.
G- Invest in people
development, health and
------------------------------------------
safety issues, and proper
work environment.
Table #5.8: Matching Respect Aspects of the Case-studies with Literature Findings.
As shown in the above table #5.8, the researcher categorizes most respect issues that interviewees
remark and talk about in the five projects under similar elements of respect that are concluded from
the literature. Each respect element that is mentioned in the conceptual model and shown in table
#5.8 has many aspects and items that are highlighted and asserted by the interviewees in the projects.
The interviewees in the case-studies talk about many issues, aspects and practices of respect
according to their practical experiences and daily involvement in the projects activities. Therefore,
many raised aspects and issues that belong to the same comprehensive meaning are classified under
one general element or item of the conceptual model. Furthermore, it is clear in table #5.8 that the
same respect aspect, as has been raised by the interviewees, is categorized under
ID- 2013000439 Page 98
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

many respect elements from literature. This is mainly due to the interference of the meanings of
many aspects of respect in the case-studies with many respect elements and components in the
conceptual model. For example, ‘Paying others on time and as per the agreements’ is one of respect
aspects in the case-studies. The researcher classified it under item #D: ‘Complying with professional
manner and business commitments’ when we look at the payments issues from professional
perspective. However, this payment issue is categorized under item #F: ‘Doing the best to
understand, appreciate and treat others in an appropriate way’ when looking at the payments issues as
a component of treating others in an appropriate way. Within this context, many aspects of respect
that are concluded from the case-studies, tables #5.7 and #5.8, belong and are classified under the
same element or aspect of respect in the conceptual model. Accordingly, table #5.8 shows high levels
of consistency between the outputs of the case-studies and the conceptual model.
Case-studies show more details and implementations of respect issues and aspects that
organizations face in their relationships and grant a deep understanding and knowledge about the
status of respect in the MEP project, specifically, and construction projects in general. For
example, respect element #F, in table #5.8, ‘Doing the best to understand, appreciate and treat
others in an appropriate way’, appears in projects relationships, as highlighted by the
interviewees, as five (5) separate aspects, namely: ‘Respecting others during the business
meetings’, ‘Paying others on time and as per the agreements’, Proper tools in communicating,
tracking and measuring the adopted codes of conduct and respect’, ‘Caring about other parties’
profits and benefits’ and ‘Polite communication methods with other project parties’. These
details and components of each respect element are of high significance since they show and
clarify different respect issues and aspects that the parties are usually involved in and practice
during their activities in the construction projects.
Furthermore, form table # 5.8 above, it is clear that while health and safety issues within a proper
work environment is considered as an element and component of respect as per literature findings,
and despite stimulating the Interviewees in many occasions during the interviews to talk about this
issue, they did not show adequate concerns to intercalate this issue in the relationships between the
parties in the case-studies. They did not remark any role for health and safety issues regarding their
respect practices within the MEP projects. This may be because of the nature of this element which is
mostly related to the internal relationships of the organization itself with its’ employees.
ID- 2013000439 Page 99
many aspects of respect in the case-studies with many respect elements and components in the
conceptual model. For example, ‘Paying others on time and as per the agreements’ is one of respect
aspects in the case-studies. The researcher classified it under item #D: ‘Complying with professional
manner and business commitments’ when we look at the payments issues from professional
perspective. However, this payment issue is categorized under item #F: ‘Doing the best to
understand, appreciate and treat others in an appropriate way’ when looking at the payments issues as
a component of treating others in an appropriate way. Within this context, many aspects of respect
that are concluded from the case-studies, tables #5.7 and #5.8, belong and are classified under the
same element or aspect of respect in the conceptual model. Accordingly, table #5.8 shows high levels
of consistency between the outputs of the case-studies and the conceptual model.
Case-studies show more details and implementations of respect issues and aspects that
organizations face in their relationships and grant a deep understanding and knowledge about the
status of respect in the MEP project, specifically, and construction projects in general. For
example, respect element #F, in table #5.8, ‘Doing the best to understand, appreciate and treat
others in an appropriate way’, appears in projects relationships, as highlighted by the
interviewees, as five (5) separate aspects, namely: ‘Respecting others during the business
meetings’, ‘Paying others on time and as per the agreements’, Proper tools in communicating,
tracking and measuring the adopted codes of conduct and respect’, ‘Caring about other parties’
profits and benefits’ and ‘Polite communication methods with other project parties’. These
details and components of each respect element are of high significance since they show and
clarify different respect issues and aspects that the parties are usually involved in and practice
during their activities in the construction projects.
Furthermore, form table # 5.8 above, it is clear that while health and safety issues within a proper
work environment is considered as an element and component of respect as per literature findings,
and despite stimulating the Interviewees in many occasions during the interviews to talk about this
issue, they did not show adequate concerns to intercalate this issue in the relationships between the
parties in the case-studies. They did not remark any role for health and safety issues regarding their
respect practices within the MEP projects. This may be because of the nature of this element which is
mostly related to the internal relationships of the organization itself with its’ employees.
ID- 2013000439 Page 99

This respect element, ‘Invest in people development, health and safety issues, and proper work
environment’, has more practices and implementations in the organization’s relationships with its
staff and employees than between the parties in the projects. Each organization should care about
the proper work environment and health and safety issues in the projects, so this will be
noticeable more in the internal relations of the organization with its employees than its external
relations with the other parties in the project. Of course, XY should warrant health and safety
issues and the proper work environment for all the employees in the project even suppliers and
subcontractors, as they are all under its general MEP contract. Considering this point of view,
health and safety issue is still applicable to be part of the other parties’ rights and an important
respect component in the relationships between the parties in the construction projects.
5.3.3.2 Respect Motivators:
Table #5.9, below, shows that the interviewees have highlighted that there are six (6) respect
motivators within the five (5) case-studies. These six motivators are categorized under four (4)
respect motivators from literature. For example; ‘Religion and beliefs’, ‘Personal traits, nature,
beliefs and culture’ and ‘Actions and behaviors of the other parties’ are highlighted by the
interviewees as three separate motivators , but they are actually covered by one broader
motivator in literature ; item #4 ‘Cultures (individual, organization, society and global)’.
Moreover, there are two respect motivators concluded from literature, namely: ‘Procurement
Methods’ that are based on integration, collaboration and partnering, and ‘Corporate Social
Responsibility (CSR) and Shared Value’, as shown in Table #5.9, but are not asserted by any
interviewee in the five projects despite the researcher’s trials to push the interviewees to talk
about. This is mostly due to insufficient awareness and knowledge of the employees and their
organizations about the importance and roles of CSR and procurement methods in the project
ID- 2013000439 Page 100
environment’, has more practices and implementations in the organization’s relationships with its
staff and employees than between the parties in the projects. Each organization should care about
the proper work environment and health and safety issues in the projects, so this will be
noticeable more in the internal relations of the organization with its employees than its external
relations with the other parties in the project. Of course, XY should warrant health and safety
issues and the proper work environment for all the employees in the project even suppliers and
subcontractors, as they are all under its general MEP contract. Considering this point of view,
health and safety issue is still applicable to be part of the other parties’ rights and an important
respect component in the relationships between the parties in the construction projects.
5.3.3.2 Respect Motivators:
Table #5.9, below, shows that the interviewees have highlighted that there are six (6) respect
motivators within the five (5) case-studies. These six motivators are categorized under four (4)
respect motivators from literature. For example; ‘Religion and beliefs’, ‘Personal traits, nature,
beliefs and culture’ and ‘Actions and behaviors of the other parties’ are highlighted by the
interviewees as three separate motivators , but they are actually covered by one broader
motivator in literature ; item #4 ‘Cultures (individual, organization, society and global)’.
Moreover, there are two respect motivators concluded from literature, namely: ‘Procurement
Methods’ that are based on integration, collaboration and partnering, and ‘Corporate Social
Responsibility (CSR) and Shared Value’, as shown in Table #5.9, but are not asserted by any
interviewee in the five projects despite the researcher’s trials to push the interviewees to talk
about. This is mostly due to insufficient awareness and knowledge of the employees and their
organizations about the importance and roles of CSR and procurement methods in the project
ID- 2013000439 Page 100

relationships, or it can be interpreted as low level of sensibility of these two motivators within
the daily activities of the employees in the projects. Also, this may be due to the nature of the
relationships between the parties in the MEP projects which usually start after signing the
contract by the top managements of organizations, thus the procurement methods to some extent
are of low tangibility with respect to the employees in the projects within their daily activities
and relationships. These two issues may reflect some aspects of business immaturity within the
environment of the construction projects in general and the MEP projects specifically in the UAE
(Al Ameemi 2011; Ali 2009; Ghalib 2009).
5.3.3.3 Respect Opportunities:
Regarding respect opportunities, table #5.9 shows that the outputs of the case-studies and the
conceptual model are in full consistency. Trust, effective relationships, low amounts of conflicts
and disputes, good business reputation, long-term relationships, high levels of work performance
and success are the main consequences and opportunities that can be achieved as a result of the
respectful practices between the project parties. It means that respect within the organizations’
relationships has a great value not only because of its ethical value and being a code of conducts,
but also as an actual opportunity and a crucial factor for higher work performance and better
mutual benefits and satisfaction of all parties in the projects. Table #5.7 above shows that
hundred percent (100%) of the interviewees have asserted the direct relation between the level of
respect in the relationships of the project parties and the level of productivity, performance and
satisfaction of the parties in the project. These respect practices and implementations are of great
importance in the context of construction projects and business relationships besides being an
ethical issue. It has a reliable and critical role in creating trust between the parties in the project
and in elevating the levels of employees’ productivity, work performance, projects success and
stakeholders satisfaction.
5.3.3.4 Respect Challenges:
ID- 2013000439 Page 101
the daily activities of the employees in the projects. Also, this may be due to the nature of the
relationships between the parties in the MEP projects which usually start after signing the
contract by the top managements of organizations, thus the procurement methods to some extent
are of low tangibility with respect to the employees in the projects within their daily activities
and relationships. These two issues may reflect some aspects of business immaturity within the
environment of the construction projects in general and the MEP projects specifically in the UAE
(Al Ameemi 2011; Ali 2009; Ghalib 2009).
5.3.3.3 Respect Opportunities:
Regarding respect opportunities, table #5.9 shows that the outputs of the case-studies and the
conceptual model are in full consistency. Trust, effective relationships, low amounts of conflicts
and disputes, good business reputation, long-term relationships, high levels of work performance
and success are the main consequences and opportunities that can be achieved as a result of the
respectful practices between the project parties. It means that respect within the organizations’
relationships has a great value not only because of its ethical value and being a code of conducts,
but also as an actual opportunity and a crucial factor for higher work performance and better
mutual benefits and satisfaction of all parties in the projects. Table #5.7 above shows that
hundred percent (100%) of the interviewees have asserted the direct relation between the level of
respect in the relationships of the project parties and the level of productivity, performance and
satisfaction of the parties in the project. These respect practices and implementations are of great
importance in the context of construction projects and business relationships besides being an
ethical issue. It has a reliable and critical role in creating trust between the parties in the project
and in elevating the levels of employees’ productivity, work performance, projects success and
stakeholders satisfaction.
5.3.3.4 Respect Challenges:
ID- 2013000439 Page 101
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Moreover, table #5.9 shows many challenges that interviewees have highlighted compared with
the challenges that were concluded from the literature findings. Interviewees highlight seven (7)
aspects of respect challenges within the relationships between the project parties. But five
aspects of these are categorized in table #5.9 under one general item of respect challenges from
literature findings since these five aspects have a common issue and meaning that is related to
unethical behaviors, dominant culture and poor-value cultures in general. Consequently, these
five aspects which are: ‘Profitability and selfish perspective of some project parties’, ‘Personal
beliefs and traits of the employees’, ‘Impolite words and behaviors’, ‘Profitable Business
Culture’ and ‘Organization policies, procedures and culture’ are shown in table #5.9 under one
aspect of respect challenges, which is concluded from literature, namely: ‘Capitalism, Unethical
Behaviours and Poor-values Cultures’.
These five constrains against respectful relationships in the projects are in line with literature
findings about the critical role of capitalism and poor-values cultures and beliefs in hindering and
resisting respect initiatives and practices within the projects activities and parties relationships.
Within the same context, the interviewees talk about the dominant perspective of selfish and
profitability in the relationships of the MEP projects. This perspective is an extension to the
general capitalism perspective that prevails globally within business sector. This agrees with the
findings of Klein (2001), Hofstede (2003), Karlberg (2004), Zue, Zhao and Zillante (2008),
Elmualim (2010), Clegg, Kornberger and Pitsis (2011) and Porter and Kramer (2011) about the
perspective of capitalism in general, its impacts on the business sector and its responsibility for
some bold behaviours of selfish and pure profitable mentalities of organizations as a dominant
trend in business, globally.
Matching between Respect Motivators, Opportunities and Challenges (in the Literature Findings and
the Case-studies)
Respect Motivators (Literature) Respect Motivators (Case-studies)
1- Code of Conducts and Ethics Organization’s Code of conducts
Commitments with Work Scope and
2- Professionalism Responsibilities
ID- 2013000439 Page 102
the challenges that were concluded from the literature findings. Interviewees highlight seven (7)
aspects of respect challenges within the relationships between the project parties. But five
aspects of these are categorized in table #5.9 under one general item of respect challenges from
literature findings since these five aspects have a common issue and meaning that is related to
unethical behaviors, dominant culture and poor-value cultures in general. Consequently, these
five aspects which are: ‘Profitability and selfish perspective of some project parties’, ‘Personal
beliefs and traits of the employees’, ‘Impolite words and behaviors’, ‘Profitable Business
Culture’ and ‘Organization policies, procedures and culture’ are shown in table #5.9 under one
aspect of respect challenges, which is concluded from literature, namely: ‘Capitalism, Unethical
Behaviours and Poor-values Cultures’.
These five constrains against respectful relationships in the projects are in line with literature
findings about the critical role of capitalism and poor-values cultures and beliefs in hindering and
resisting respect initiatives and practices within the projects activities and parties relationships.
Within the same context, the interviewees talk about the dominant perspective of selfish and
profitability in the relationships of the MEP projects. This perspective is an extension to the
general capitalism perspective that prevails globally within business sector. This agrees with the
findings of Klein (2001), Hofstede (2003), Karlberg (2004), Zue, Zhao and Zillante (2008),
Elmualim (2010), Clegg, Kornberger and Pitsis (2011) and Porter and Kramer (2011) about the
perspective of capitalism in general, its impacts on the business sector and its responsibility for
some bold behaviours of selfish and pure profitable mentalities of organizations as a dominant
trend in business, globally.
Matching between Respect Motivators, Opportunities and Challenges (in the Literature Findings and
the Case-studies)
Respect Motivators (Literature) Respect Motivators (Case-studies)
1- Code of Conducts and Ethics Organization’s Code of conducts
Commitments with Work Scope and
2- Professionalism Responsibilities
ID- 2013000439 Page 102

3- Humanitarian Values, Human Rights
Commitment with Human Rights
and Dignity.
Religion and beliefs
Personal traits, nature, beliefs and
4- Cultures( individual, organization, culture.
society and global) Actions and behaviors of the other
parties
5- Procurement Methods (that are based
on integration, collaboration and ------------------------------------
partnering)
6- Corporate Social Responsibility
--------------------------------------
(CSR) and Shared Value
Respect Opportunities (Case-
Respect Opportunities (Literature) studies)
1- Trust Trust
Good business reputation.
2- Effective Relationships and high levels of Low level of conflicts and disputes
and high levels of productivity,
Performance and Success performance and success.
e- Respect Challenges(Literature ) Respect Challenges (Case-studies)
Profitability and selfish perspective
of some project parties.
Personal beliefs and traits of the
1- Short-termism, Unethical Behaviours and
employees.
Poor-values Cultures. Impolite words and behaviors.
Profitable Business Culture.
Organization policies, procedures
and culture
2- Power Matrices (unbalanced power Exploiting power and position
structure). authorities to impose unfair
conditions and situations.
Payments Issues
3- Inappropriate Procurement Methods, Poor Lack of management knowledge and
Management Knowledge and Poor professionalism.
Experience
Table #5.9: Respect Motivators, Opportunities and Challenges; comparison between the case-
studies and literature findings.
ID- 2013000439 Page 103
Commitment with Human Rights
and Dignity.
Religion and beliefs
Personal traits, nature, beliefs and
4- Cultures( individual, organization, culture.
society and global) Actions and behaviors of the other
parties
5- Procurement Methods (that are based
on integration, collaboration and ------------------------------------
partnering)
6- Corporate Social Responsibility
--------------------------------------
(CSR) and Shared Value
Respect Opportunities (Case-
Respect Opportunities (Literature) studies)
1- Trust Trust
Good business reputation.
2- Effective Relationships and high levels of Low level of conflicts and disputes
and high levels of productivity,
Performance and Success performance and success.
e- Respect Challenges(Literature ) Respect Challenges (Case-studies)
Profitability and selfish perspective
of some project parties.
Personal beliefs and traits of the
1- Short-termism, Unethical Behaviours and
employees.
Poor-values Cultures. Impolite words and behaviors.
Profitable Business Culture.
Organization policies, procedures
and culture
2- Power Matrices (unbalanced power Exploiting power and position
structure). authorities to impose unfair
conditions and situations.
Payments Issues
3- Inappropriate Procurement Methods, Poor Lack of management knowledge and
Management Knowledge and Poor professionalism.
Experience
Table #5.9: Respect Motivators, Opportunities and Challenges; comparison between the case-
studies and literature findings.
ID- 2013000439 Page 103

Furthermore, power allocation and unbalanced power structure between the parties, besides some
parties’ interpretation and misunderstanding of power matrix analysis are highlighted through the
case studies as great concerns of the parties, specially the suppliers and subcontractors. These
concerns about the power matrices and allocation are in full agreement with some literature
findings like the findings of Ertel (1999), Wild (2002) and Lau and Rowlinson (2009). Power-
interest analysis can serve project success and empower respect value and practices in projects if
interpreted positively as an efficient tool in developing integration, collaboration and partnership
between the project parties instead of being an advantage of some parties against others.
Despite the role of the inappropriate procurement methods as a challenge that faces initiating and
practicing respectful and cooperative relations (CO 2014; OGC 2007; Rendon 2008; Zue, Zhao
and Zillante 2008), and despite that the main MEP contracts in the five projects were conducted
according to the design, tender and build traditional procurement methods as mentioned in the
projects details and tables #4.3, 4.4, 4.5, 4.6 and 4.7 above, it is worthy to highlight that none of
the interviewees in the five case-studies mentioned or talked about these inappropriate
procurement methods as challenges or constrains against showing respectful relations. This, as
clarified while discussing respect motivators, is due, to some extent, to insufficient awareness of
the MEP contractor and his suppliers and subcontractors about the role of the procurement
methods in empowering or hindering the initiatives of respect, integration, collaboration and
partnering between the organizations. Also, this may be due to the dominant nature of these
traditional methods in procurement, globally and in the UAE, which is conceived, by default, as
the only available procurement choice (Al Kukhun 2012; Elmualim 2010; Morledge, Smith and
Kashiwagi 2006). Nevertheless, the interviewees in the five MEP projects assert the literature
findings that lack of professionalism and management knowledge besides the poor experience, of
the organizations and their employees, are main challenges of harmful impacts against initiating
and developing respect initiatives and practices within the parties’ activities and relationships in
the construction projects.
ID- 2013000439 Page 104
parties’ interpretation and misunderstanding of power matrix analysis are highlighted through the
case studies as great concerns of the parties, specially the suppliers and subcontractors. These
concerns about the power matrices and allocation are in full agreement with some literature
findings like the findings of Ertel (1999), Wild (2002) and Lau and Rowlinson (2009). Power-
interest analysis can serve project success and empower respect value and practices in projects if
interpreted positively as an efficient tool in developing integration, collaboration and partnership
between the project parties instead of being an advantage of some parties against others.
Despite the role of the inappropriate procurement methods as a challenge that faces initiating and
practicing respectful and cooperative relations (CO 2014; OGC 2007; Rendon 2008; Zue, Zhao
and Zillante 2008), and despite that the main MEP contracts in the five projects were conducted
according to the design, tender and build traditional procurement methods as mentioned in the
projects details and tables #4.3, 4.4, 4.5, 4.6 and 4.7 above, it is worthy to highlight that none of
the interviewees in the five case-studies mentioned or talked about these inappropriate
procurement methods as challenges or constrains against showing respectful relations. This, as
clarified while discussing respect motivators, is due, to some extent, to insufficient awareness of
the MEP contractor and his suppliers and subcontractors about the role of the procurement
methods in empowering or hindering the initiatives of respect, integration, collaboration and
partnering between the organizations. Also, this may be due to the dominant nature of these
traditional methods in procurement, globally and in the UAE, which is conceived, by default, as
the only available procurement choice (Al Kukhun 2012; Elmualim 2010; Morledge, Smith and
Kashiwagi 2006). Nevertheless, the interviewees in the five MEP projects assert the literature
findings that lack of professionalism and management knowledge besides the poor experience, of
the organizations and their employees, are main challenges of harmful impacts against initiating
and developing respect initiatives and practices within the parties’ activities and relationships in
the construction projects.
ID- 2013000439 Page 104
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Chapter Six- Conclusion and Recommendations:
6.1 Conclusion:
Respectful relationships between the parties in the projects are of crucial role in delivering projects
with high levels of success and stakeholders satisfaction. This direct relation between respect
practices and the level of work performance in the construction projects reflects the great importance
of detecting and investigating respect initiatives and practices within the business relationships and
projects activities. Literature findings present many elements and aspects that encourage showing and
presenting respect between people, in general, and during their relationships while participating in
the execution of the construction projects specifically. Besides, literature findings disclose many
meanings, aspects and elements of respect, that in case of being
ID- 2013000439 Page 105
6.1 Conclusion:
Respectful relationships between the parties in the projects are of crucial role in delivering projects
with high levels of success and stakeholders satisfaction. This direct relation between respect
practices and the level of work performance in the construction projects reflects the great importance
of detecting and investigating respect initiatives and practices within the business relationships and
projects activities. Literature findings present many elements and aspects that encourage showing and
presenting respect between people, in general, and during their relationships while participating in
the execution of the construction projects specifically. Besides, literature findings disclose many
meanings, aspects and elements of respect, that in case of being
ID- 2013000439 Page 105

cared about in the relationships between the organizations, will promote the levels of work
performance, projects success and stakeholders satisfaction.
Findings of this research case-studies show many aspects and respect practices that organizations
usually face during their business relations with the other parties in the same project. In addition, the
results of the case-studies assert the high value and the significant role of respect and its aspects,
components and practices in articulating the business relationships between the organizations within
the MEP projects specifically and the construction projects in general.
This research provided evidence to the significance of respect, as a value and practice, which stems
mainly from two great values; the human rights and dignity as a human being who deserves respect
and appreciation regardless of any other considerations and from a professional perspective for better
work performance and higher levels of projects success and stakeholders’ satisfaction.
Respect between projects parties is not a mere element of an ethical system or code of conducts,
but in the context of organizations relationships and construction projects there are fourteen (14)
aspects and practices of respect within the construction projects, as shown in table #5.6 above,
such as: ‘Caring about other parties’ profits and benefits’, ‘Paying others on time as per the
agreements’, ‘Commitment with each party’s scope of work and responsibilities’, ‘Respecting
others during the business meetings’, ‘Not to exploit weakness of other parties to achieve or
impose unfair situations’, ‘Caring about the human rights and dignity of the other parties’ and
‘Showing professionalism in managing works and activities’.
In Addition, these fourteen (14) aspects of respect are categorized under six (6) general meanings
and elements of respect as shown in table #5.8 above, namely: ‘Complying with a professional
manner and business commitments’, ‘Obligation towards humanitarian values and rights’,
‘Recognition and admiration of the importance, abilities and achievements of other parties’, ‘Not
to exercise power or position against others for personal or selfish benefits’, ‘To do one’s best to
understand, appreciate and treat the other parties in an appropriate way’, ‘Due regard, acceptance
and tolerance towards others’ rights, cultures and traditions’ and to ‘Invest in people health and
safety issues’. On the other hand, research shows that there are many challenges against showing
and empowering respectful behaviours and relations in the projects such as: ‘short-termism,
poor-value cultures and unethical behaviours’, ‘power matrices; unbalanced power structure’ and
‘inappropriate procurement methods, poor management knowledge and poor experience’.
ID- 2013000439 Page 106
performance, projects success and stakeholders satisfaction.
Findings of this research case-studies show many aspects and respect practices that organizations
usually face during their business relations with the other parties in the same project. In addition, the
results of the case-studies assert the high value and the significant role of respect and its aspects,
components and practices in articulating the business relationships between the organizations within
the MEP projects specifically and the construction projects in general.
This research provided evidence to the significance of respect, as a value and practice, which stems
mainly from two great values; the human rights and dignity as a human being who deserves respect
and appreciation regardless of any other considerations and from a professional perspective for better
work performance and higher levels of projects success and stakeholders’ satisfaction.
Respect between projects parties is not a mere element of an ethical system or code of conducts,
but in the context of organizations relationships and construction projects there are fourteen (14)
aspects and practices of respect within the construction projects, as shown in table #5.6 above,
such as: ‘Caring about other parties’ profits and benefits’, ‘Paying others on time as per the
agreements’, ‘Commitment with each party’s scope of work and responsibilities’, ‘Respecting
others during the business meetings’, ‘Not to exploit weakness of other parties to achieve or
impose unfair situations’, ‘Caring about the human rights and dignity of the other parties’ and
‘Showing professionalism in managing works and activities’.
In Addition, these fourteen (14) aspects of respect are categorized under six (6) general meanings
and elements of respect as shown in table #5.8 above, namely: ‘Complying with a professional
manner and business commitments’, ‘Obligation towards humanitarian values and rights’,
‘Recognition and admiration of the importance, abilities and achievements of other parties’, ‘Not
to exercise power or position against others for personal or selfish benefits’, ‘To do one’s best to
understand, appreciate and treat the other parties in an appropriate way’, ‘Due regard, acceptance
and tolerance towards others’ rights, cultures and traditions’ and to ‘Invest in people health and
safety issues’. On the other hand, research shows that there are many challenges against showing
and empowering respectful behaviours and relations in the projects such as: ‘short-termism,
poor-value cultures and unethical behaviours’, ‘power matrices; unbalanced power structure’ and
‘inappropriate procurement methods, poor management knowledge and poor experience’.
ID- 2013000439 Page 106

In conclusion, this research reveals the great value of respect aspects and practices between the
parties in the construction projects and its important role in creating, developing and maintaining
win-win, long-term and sustainable relationships which lead to better work performance and
higher levels of projects success and stakeholders’ satisfaction, in addition of being a matter of
ethics and code of conducts.
As these case-studies are conducted in the UAE, and the interviewees, within the case-studies, are
mostly of Arab nationalities within the MEP-construction projects, this to some extent may limit the
outcomes of being in full coverage and generalization with respect to other countries, industries and
environments with different levels of business characteristics, maturity, traditions, customs and
cultures. Moreover, it is worth highlighting that the case-studies represent MEP organizations within
the private sector, and the generalization of the research findings on the public sector should be
carried out with caution as the public sector may show different situations and considerations.
6.2 Recommendations:
Based on the findings of this research, the following recommendations can be suggested for the
construction organizations, practitioners, professional associations and regulatory bodies:
Organizations should create, develop and maintain a culture of respecting others as
human beings regardless of any monetary or profitable perspective.
Organizations should adopt and implement new approaches and methods, in
procurement, which are based on integration, collaboration and partnership at the early
stages of projects.
Organizations and clients should use the evaluation of other parties’ performances and
appraisals as an efficient tool to promote and empower the work performance and not to
punish or impose conditions.
Organizations should adopt, communicate and implement the code of conducts and ethics
with its employees and partners as a priority towards sustainable benefits and high levels
of human rights and dignity.
ID- 2013000439 Page 107
parties in the construction projects and its important role in creating, developing and maintaining
win-win, long-term and sustainable relationships which lead to better work performance and
higher levels of projects success and stakeholders’ satisfaction, in addition of being a matter of
ethics and code of conducts.
As these case-studies are conducted in the UAE, and the interviewees, within the case-studies, are
mostly of Arab nationalities within the MEP-construction projects, this to some extent may limit the
outcomes of being in full coverage and generalization with respect to other countries, industries and
environments with different levels of business characteristics, maturity, traditions, customs and
cultures. Moreover, it is worth highlighting that the case-studies represent MEP organizations within
the private sector, and the generalization of the research findings on the public sector should be
carried out with caution as the public sector may show different situations and considerations.
6.2 Recommendations:
Based on the findings of this research, the following recommendations can be suggested for the
construction organizations, practitioners, professional associations and regulatory bodies:
Organizations should create, develop and maintain a culture of respecting others as
human beings regardless of any monetary or profitable perspective.
Organizations should adopt and implement new approaches and methods, in
procurement, which are based on integration, collaboration and partnership at the early
stages of projects.
Organizations and clients should use the evaluation of other parties’ performances and
appraisals as an efficient tool to promote and empower the work performance and not to
punish or impose conditions.
Organizations should adopt, communicate and implement the code of conducts and ethics
with its employees and partners as a priority towards sustainable benefits and high levels
of human rights and dignity.
ID- 2013000439 Page 107
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Organizations should adopt proper tools to measure the efficiency and effectiveness of
implementing and practicing respect, code of conducts and ethics.
Regulatory bodies and professional associations should empower respect as a value and
behavior in business not only as a compliance with code of conducts and ethics, but also
as a requisite for effective relationships and higher levels of work performance and
projects success.
Organizations and practitioners should recognize and deal with power-interest matrices
and analysis as an effective tool to attain the integration and partnerships with other
parties, and not to show power or impose wills.
Organizations and practitioners should recognize the danger of some dominant concepts
and aspects of poor-values cultures in business, which encourage the logic of power,
unethical behaviors, short-termism and selfish benefits regardless of others’ benefits and
interests.
Regulatory bodies, professional associations and organizations should adopt and carry
out training programs, seminars and conferences about all respect issues to elevate the
awareness of respect value and empower respect initiatives and practices in projects and
business.
Finally, the following areas are recommended for further researches that are important
and in direct relation with this paper:
The aspects and effects of the dominant cultures and concepts on showing respect and
articulating the business relationships between organizations.
The role of power-interest matrices and their analysis in creating and empowering the
integration and partnerships mentalities between organizations.
Comparison between the status of respect in the construction industry in the UAE and
other parts of the world.
ID- 2013000439 Page 108
implementing and practicing respect, code of conducts and ethics.
Regulatory bodies and professional associations should empower respect as a value and
behavior in business not only as a compliance with code of conducts and ethics, but also
as a requisite for effective relationships and higher levels of work performance and
projects success.
Organizations and practitioners should recognize and deal with power-interest matrices
and analysis as an effective tool to attain the integration and partnerships with other
parties, and not to show power or impose wills.
Organizations and practitioners should recognize the danger of some dominant concepts
and aspects of poor-values cultures in business, which encourage the logic of power,
unethical behaviors, short-termism and selfish benefits regardless of others’ benefits and
interests.
Regulatory bodies, professional associations and organizations should adopt and carry
out training programs, seminars and conferences about all respect issues to elevate the
awareness of respect value and empower respect initiatives and practices in projects and
business.
Finally, the following areas are recommended for further researches that are important
and in direct relation with this paper:
The aspects and effects of the dominant cultures and concepts on showing respect and
articulating the business relationships between organizations.
The role of power-interest matrices and their analysis in creating and empowering the
integration and partnerships mentalities between organizations.
Comparison between the status of respect in the construction industry in the UAE and
other parts of the world.
ID- 2013000439 Page 108

References
Alkukhun, A. O. (2012). Green procurement of construction industry in the United Arab
Emirates. MSc. Thesis. The British University in Dubai.
Allan, A. & Davidson, G. R. (2013). Respect for the dignity of people: what does this principle
mean in practice. Australian Psychologist, vol. 48 (5), pp. 345-352.
Almahmoud, E.S. &Doloi, H.K.(2012). Social sustainability health check: a model for
integrating stakeholders' interests in evaluating and optimising social sustainability performance
of construction projects.Proceedings of CIB W070, W092 and TG72 International Conference:
Delivering Value to the Community. Department of Construction Economics and Management,
University of Cape Town: Cape Town, South Africa. 23rd. -25th. January.
Amindoust, A., Ahmed, S. & Saghafinia, A. (2012). Supplier selection and performance
evaluation of telecommunication company. American Journal of Engineering and Applied
Sciences, vol. 5 (1), pp. 49-52.
Balkau, F. & Sonnemann, G. (2011). Addressing sustainability issues through enhanced supply-
chain management. Journal of Supply Chain Management – New Perspective, vol. , pp. 379-400.
Bartlett, A. & Preston, D. (2000). Can ethical behaviour really exist in business. Journal of
Business Ethics, vol. 23 (2), pp. 199-209.
Burt, D.N. (1989). Managing suppliers up to speed. Harvard Business Review, vol. 67(4),
pp.127-135.
ID- 2013000439 Page 109
Alkukhun, A. O. (2012). Green procurement of construction industry in the United Arab
Emirates. MSc. Thesis. The British University in Dubai.
Allan, A. & Davidson, G. R. (2013). Respect for the dignity of people: what does this principle
mean in practice. Australian Psychologist, vol. 48 (5), pp. 345-352.
Almahmoud, E.S. &Doloi, H.K.(2012). Social sustainability health check: a model for
integrating stakeholders' interests in evaluating and optimising social sustainability performance
of construction projects.Proceedings of CIB W070, W092 and TG72 International Conference:
Delivering Value to the Community. Department of Construction Economics and Management,
University of Cape Town: Cape Town, South Africa. 23rd. -25th. January.
Amindoust, A., Ahmed, S. & Saghafinia, A. (2012). Supplier selection and performance
evaluation of telecommunication company. American Journal of Engineering and Applied
Sciences, vol. 5 (1), pp. 49-52.
Balkau, F. & Sonnemann, G. (2011). Addressing sustainability issues through enhanced supply-
chain management. Journal of Supply Chain Management – New Perspective, vol. , pp. 379-400.
Bartlett, A. & Preston, D. (2000). Can ethical behaviour really exist in business. Journal of
Business Ethics, vol. 23 (2), pp. 199-209.
Burt, D.N. (1989). Managing suppliers up to speed. Harvard Business Review, vol. 67(4),
pp.127-135.
ID- 2013000439 Page 109

Cabinet Office. (2014). New models of construction procurement. London: Cabinet Office.
Cambridge dictionaries [online]. Available at:
http://dictionary.cambridge.org/dictionary/british/respect.
Carroll, A.B. (1994). The pyramid of corporate social responsibility: toward the moral
management of organisational stakeholders. Journal of Business Horizon, vol. 34 (4), pp. 39-48.
Castka, P., Bamber, C.J., Bamber, D.J. & Sharp, J.M. (2004). Integrating corporate social
responsibility (CSR) into ISO management systems – in search of a feasible CSR management
system framework. The TQM Magazine, vol. 16 (3), pp. 216-224.
Child, J. (1998). Trust and international strategic alliances: the cases of Sino-Foreign Joint
Ventures” in Lane, C. and Bachmann, R. (eds). Trust within and between Organizations. Oxford:
Oxford University Press.
Chinyio, E. & Olomolaiye, P. (eds.). (2010). Construction stakeholder management. West
Sussex: Wiley-Blackwell.
Clarke, N. (2008). Respect in leadership: the increasing need for empathy in managers [online].
Highfield, Southampton: University of Southampton. [Accessed 5 November 2014]. Available
at: http://www.ufhrd.co.uk/wordpress/wp-content/uploads/2008/06/608-respect-in-leadership-
the-increasing-need-for-empathy-i.pdf.
Clegg, S., Kornberger, M. & Pitsis, T. (2011). Managing & organizations: an introduction
to theory & practice. 3rd edn. London: SAGE publications.
Department for Environment, Food and Rural Affairs. (2011). Ethical procurement policy
statement. London: Secretary of State for Environment, Food and Rural Affairs.
Department of Foreign Affairs and Trade (DFAT). (2012). Procurement operational handbook.
Australia: Department of Foreign Affairs and Trade.
Deshpande, A. (2012). Supply chain management dimension, supply chain performance and
organizational performance: an integrated framework. International Journal of Business and
Management, vol. 7 (8), pp. 2-17.
Dulaimi, M. (2013). Effective procurement of construction projects. BIGPROJECT, July 2013,
pp. 44-48. [Accessed 26 November 2014]. Available at:
http://buid.ac.ae/buid_web_10/uploads/userfiles/file/Big_Projects.pdf.
Elmualim, A.A. (2010). ‘Culture and leadership in stakeholder management’, in Chinyio, E. &
Olomolaiye, P. (eds.). Construction stakeholder management. West Sussex: Wiley-Blackwell,
pp. 174-192.
ID- 2013000439 Page 110
Cambridge dictionaries [online]. Available at:
http://dictionary.cambridge.org/dictionary/british/respect.
Carroll, A.B. (1994). The pyramid of corporate social responsibility: toward the moral
management of organisational stakeholders. Journal of Business Horizon, vol. 34 (4), pp. 39-48.
Castka, P., Bamber, C.J., Bamber, D.J. & Sharp, J.M. (2004). Integrating corporate social
responsibility (CSR) into ISO management systems – in search of a feasible CSR management
system framework. The TQM Magazine, vol. 16 (3), pp. 216-224.
Child, J. (1998). Trust and international strategic alliances: the cases of Sino-Foreign Joint
Ventures” in Lane, C. and Bachmann, R. (eds). Trust within and between Organizations. Oxford:
Oxford University Press.
Chinyio, E. & Olomolaiye, P. (eds.). (2010). Construction stakeholder management. West
Sussex: Wiley-Blackwell.
Clarke, N. (2008). Respect in leadership: the increasing need for empathy in managers [online].
Highfield, Southampton: University of Southampton. [Accessed 5 November 2014]. Available
at: http://www.ufhrd.co.uk/wordpress/wp-content/uploads/2008/06/608-respect-in-leadership-
the-increasing-need-for-empathy-i.pdf.
Clegg, S., Kornberger, M. & Pitsis, T. (2011). Managing & organizations: an introduction
to theory & practice. 3rd edn. London: SAGE publications.
Department for Environment, Food and Rural Affairs. (2011). Ethical procurement policy
statement. London: Secretary of State for Environment, Food and Rural Affairs.
Department of Foreign Affairs and Trade (DFAT). (2012). Procurement operational handbook.
Australia: Department of Foreign Affairs and Trade.
Deshpande, A. (2012). Supply chain management dimension, supply chain performance and
organizational performance: an integrated framework. International Journal of Business and
Management, vol. 7 (8), pp. 2-17.
Dulaimi, M. (2013). Effective procurement of construction projects. BIGPROJECT, July 2013,
pp. 44-48. [Accessed 26 November 2014]. Available at:
http://buid.ac.ae/buid_web_10/uploads/userfiles/file/Big_Projects.pdf.
Elmualim, A.A. (2010). ‘Culture and leadership in stakeholder management’, in Chinyio, E. &
Olomolaiye, P. (eds.). Construction stakeholder management. West Sussex: Wiley-Blackwell,
pp. 174-192.
ID- 2013000439 Page 110
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Ertel , D. (1999). Turning negotiation into a corporate capability. Harvard Business Review, vol.
77(3), pp. 55-60, 62-70, 213.
Fisher, R. & Ury, W. (1981). Getting to yes: negotiating agreement without giving in. 1st edn.
New York: Penguin.
Freytag, P.V. & Grunbaum, N.n. (2008). The outstanding supplier: buyers' perception of good
supplier performance. Journal of Customer Behaviour, vol. 7 (1), pp. 51-70.
Friedman, M. (1970). The social responsibility of business is to increase its profits, New York
Times Magazine, 13 September.
Gelderman, C.J. & Semeijn, J. (2006). Managing the global supply base through purchasing
portfolio management. Journal of Purchasing and Supply Management, vol. 12 (4), pp. 209-217.
Grosse, C.U. (2005). US-Asian communication strategies to develop trust in business
relationships. Global Business Languages, vol. 10 (1), pp. 40-52.
Harris, F. (2010). ‘A historical overview of stakeholder management’, in Chinyio, E. &
Olomolaiye, P. (eds.). Construction stakeholder management. West Sussex: Wiley-Blackwell,
pp. 41-55.
Hong Kong Housing Authority (HKHA). (2000). Quality Housing: Partnering for Change,
Public Consultation. Hong Kong: HKHA.
Ihlen, P. & Berntzen, P. (2007). When lobbying backfires: balancing Lobby efforts with insights
from stakeholder theory. Journal of Communication Management, vol. 11 (3), pp. 235-246.
Janvier-James, A.M. (2012). A new introduction to supply chain and supply chain management:
definitions and theories perspective. International Business Research, vol. 5 (1), pp. 194-207.
Johnson, G. Scholes, K. & Whittington, R. (2005). Exploring corporate strategy: texts and
cases. 7th edn. Harlow: Financial Times Prentice-Hall.
Kain, P. (2009). Kant’s defence of human moral status. Journal of the History of Philosophy,
vol. 47 (1), pp. 59–102.
Lau, E. and Rowlinson, S. (2009). Provisions of insight of mutual trust to enable an innovative
process collaboration to achieve continuous improvements in construction projects. In: Global
Innovation in Construction Conference. [online] United Kingdom: Loughborough University,
Civil and Building Engineering, pp.459-470. [Accessed 20 Apr. 2015]. Available at:
http://www.irbnet.de/daten/iconda/CIB15624.pdf.
Liker, K.L. & Choi, T.Y. (2004). Building deep supplier relationships. Harvard Business
Review, vol. 82 (12), pp. 104-113.
ID- 2013000439 Page 111
77(3), pp. 55-60, 62-70, 213.
Fisher, R. & Ury, W. (1981). Getting to yes: negotiating agreement without giving in. 1st edn.
New York: Penguin.
Freytag, P.V. & Grunbaum, N.n. (2008). The outstanding supplier: buyers' perception of good
supplier performance. Journal of Customer Behaviour, vol. 7 (1), pp. 51-70.
Friedman, M. (1970). The social responsibility of business is to increase its profits, New York
Times Magazine, 13 September.
Gelderman, C.J. & Semeijn, J. (2006). Managing the global supply base through purchasing
portfolio management. Journal of Purchasing and Supply Management, vol. 12 (4), pp. 209-217.
Grosse, C.U. (2005). US-Asian communication strategies to develop trust in business
relationships. Global Business Languages, vol. 10 (1), pp. 40-52.
Harris, F. (2010). ‘A historical overview of stakeholder management’, in Chinyio, E. &
Olomolaiye, P. (eds.). Construction stakeholder management. West Sussex: Wiley-Blackwell,
pp. 41-55.
Hong Kong Housing Authority (HKHA). (2000). Quality Housing: Partnering for Change,
Public Consultation. Hong Kong: HKHA.
Ihlen, P. & Berntzen, P. (2007). When lobbying backfires: balancing Lobby efforts with insights
from stakeholder theory. Journal of Communication Management, vol. 11 (3), pp. 235-246.
Janvier-James, A.M. (2012). A new introduction to supply chain and supply chain management:
definitions and theories perspective. International Business Research, vol. 5 (1), pp. 194-207.
Johnson, G. Scholes, K. & Whittington, R. (2005). Exploring corporate strategy: texts and
cases. 7th edn. Harlow: Financial Times Prentice-Hall.
Kain, P. (2009). Kant’s defence of human moral status. Journal of the History of Philosophy,
vol. 47 (1), pp. 59–102.
Lau, E. and Rowlinson, S. (2009). Provisions of insight of mutual trust to enable an innovative
process collaboration to achieve continuous improvements in construction projects. In: Global
Innovation in Construction Conference. [online] United Kingdom: Loughborough University,
Civil and Building Engineering, pp.459-470. [Accessed 20 Apr. 2015]. Available at:
http://www.irbnet.de/daten/iconda/CIB15624.pdf.
Liker, K.L. & Choi, T.Y. (2004). Building deep supplier relationships. Harvard Business
Review, vol. 82 (12), pp. 104-113.
ID- 2013000439 Page 111

Luu. D.T., Thomas, S.N & Chen, S.E. (2003). Parameters governing the selection of procurement
system – an empirical survey. Engineering, Construction and Architectural Management, vol. 3,
pp. 209 – 218.
Malhotra, D. (2009). When contracts destroy trust. Harvard Business Review, May, P. 25.
Manowong, E. & Ogunlana, S. (2010). ‘Strategies and tactics for managing construction
stakeholders’, in Chinyio, E. & Olomolaiye, P. (eds.). Construction stakeholder management.
West Sussex: Wiley-Blackwell, pp. 174-192.
Menard, R. (2010). What is green procurement and is it valuable to the purchasing profession
[online]. [Accessed 25 October 2014] Available at:
http://purchasingnegotiationtraining.com/purchasing/what-is-green-procurement-and-is-it-
valuable-to-the-purchasing-profession/.
Merriam-Webster’s dictionary [online]. Available at: http://www.merriam-
webster.com/dictionary/respect.
Narayanan, V.G. & Raman, A. (2004). Aligning incentives in supply chains. Harvard Business
Review, November , pp. 94-102.
Oberlender, G.D. (2000). Project management for engineering and construction. 2nd.edn.
Singapore: McGraw-Hill.
Office of Government Commerce (OGC). (2007). Health and safety, guide 10. UK: OGC.
Office of Government Commerce (OGC). (2007). Improving performance: project evaluation
and benchmarking: achieving excellence in construction procurement, guide 08. UK: OGC.
Office of Government Commerce (OGC). (2007). The integrated project team: teamworking and
partnering: achieving excellence in construction procurement, guide 05. UK: OGC.
Office of Government Commerce. (2007). Construction Projects pocketbook: achieving
excellence in construction [online]. London. [Accessed 20 April 2015]. Available at:
http://webarchive.nationalarchives.gov.uk/20110601212617/http://www.ogc.gov.uk/documents/
CP0060AEConstructionPocketbook.pdf.
Office of Government Commerce. (2007). The integrated project Team-teamworking and
partnering: achieving excellence in construction procurement guide [online].London. [Accessed
20 April 2015]. Available at:
http://webarchive.nationalarchives.gov.uk/20110601212617/http://www.ogc.gov.uk/documen
ts/CP0065AEGuide5.pdf.
ID- 2013000439 Page 112
system – an empirical survey. Engineering, Construction and Architectural Management, vol. 3,
pp. 209 – 218.
Malhotra, D. (2009). When contracts destroy trust. Harvard Business Review, May, P. 25.
Manowong, E. & Ogunlana, S. (2010). ‘Strategies and tactics for managing construction
stakeholders’, in Chinyio, E. & Olomolaiye, P. (eds.). Construction stakeholder management.
West Sussex: Wiley-Blackwell, pp. 174-192.
Menard, R. (2010). What is green procurement and is it valuable to the purchasing profession
[online]. [Accessed 25 October 2014] Available at:
http://purchasingnegotiationtraining.com/purchasing/what-is-green-procurement-and-is-it-
valuable-to-the-purchasing-profession/.
Merriam-Webster’s dictionary [online]. Available at: http://www.merriam-
webster.com/dictionary/respect.
Narayanan, V.G. & Raman, A. (2004). Aligning incentives in supply chains. Harvard Business
Review, November , pp. 94-102.
Oberlender, G.D. (2000). Project management for engineering and construction. 2nd.edn.
Singapore: McGraw-Hill.
Office of Government Commerce (OGC). (2007). Health and safety, guide 10. UK: OGC.
Office of Government Commerce (OGC). (2007). Improving performance: project evaluation
and benchmarking: achieving excellence in construction procurement, guide 08. UK: OGC.
Office of Government Commerce (OGC). (2007). The integrated project team: teamworking and
partnering: achieving excellence in construction procurement, guide 05. UK: OGC.
Office of Government Commerce. (2007). Construction Projects pocketbook: achieving
excellence in construction [online]. London. [Accessed 20 April 2015]. Available at:
http://webarchive.nationalarchives.gov.uk/20110601212617/http://www.ogc.gov.uk/documents/
CP0060AEConstructionPocketbook.pdf.
Office of Government Commerce. (2007). The integrated project Team-teamworking and
partnering: achieving excellence in construction procurement guide [online].London. [Accessed
20 April 2015]. Available at:
http://webarchive.nationalarchives.gov.uk/20110601212617/http://www.ogc.gov.uk/documen
ts/CP0065AEGuide5.pdf.
ID- 2013000439 Page 112

Ohdar, R. & Ray, P.K. (2012). Suppliers' performance evaluation and ranking in a supply chain:
an analytical hierarchy process-based approach, The IUP Journal of Supply Chain Management,
vol. 9 (1), pp. 73-90.
Oxford dictionaries [online]. Available at:
http://www.oxforddictionaries.com/definition/american_english/respect.
Parkash, S. & Kaushik, V.K. (2011). Supplier performance monitoring and improvement (SPMI)
through SIPOC analysis and PDCA model to the ISO 9001 QMS in sports goods manufacturing
industry. Scientific Journal of Logistics, vol. 7 (4), pp. 1-15.
Perez-Lopez, J. F. (1993). Promoting international respect for worker rights through business
code of conduct. Fordham International Law Journal, vol. 17 (1), pp. 1-23.
Porter, M. E. & Kramer, M. R. (2011).The big idea: creating shared value. How to reinvent
capitalism—and unleash a wave of innovation and growth. Harvard Business Review, vol. 89
(1), pp. 62-77.
Project Management Institute (PMI). (2008). A guide to the project management body of
knowledge (PMBOK guide). 4thedn. Project Management Institute.
Project Management Institute (PMI). (2008). Code of ethics and professional code of conduct
[online]. [Accessed 28 June 2015]. Available at:
http://www.pmi.org/About-Us/~/media/PDF/Ethics/PMI-Code-of-Ethics-and-Professional-
Conduct.ashx
Purdum, T. (2007). Purchasing card fraud. Industry Week/IW [online] May, p.23. [Accessed 11
November 2013]. Available at:
http://web.ebscohost.com.ezproxy.buid.ac.ae/ehost/pdfviewer/pdfviewer?sid=52652802-ddca-
4c5d-a619-f751fdaa69fb%40sessionmgr4002&vid=5&hid=4207.
Rendon, R. G. (2008). Procurement process maturity: key to performance measurement. Journal
of Public Procurement, vol. 8 (2), pp. 200-214.
Ross, A. & Buffa, F.P. (2009). Supplier post performance evaluation: the effects of buyer
performance weight variance. International Journal of Production Research, vol. 47 (16), pp.
4351-4371.
Saettaa, S., Paolinia, L., Tiaccia, L. & Atiokb, T. (2012). A decomposition approach for the
performance analysis of a serial multi-echelon supply chain. International Journal of Production
Research, vol. 50 (9), pp. 77-96.
Saunders, M., Lewis,P. & Thornhill, A. (2012). Research methods for business students. 6th edn.
Harlow: Pearson.
Simpson, D. P. (1971). Cassell’s new Latin-English dictionary. 5th edn. London: Cassell.
ID- 2013000439 Page 113
an analytical hierarchy process-based approach, The IUP Journal of Supply Chain Management,
vol. 9 (1), pp. 73-90.
Oxford dictionaries [online]. Available at:
http://www.oxforddictionaries.com/definition/american_english/respect.
Parkash, S. & Kaushik, V.K. (2011). Supplier performance monitoring and improvement (SPMI)
through SIPOC analysis and PDCA model to the ISO 9001 QMS in sports goods manufacturing
industry. Scientific Journal of Logistics, vol. 7 (4), pp. 1-15.
Perez-Lopez, J. F. (1993). Promoting international respect for worker rights through business
code of conduct. Fordham International Law Journal, vol. 17 (1), pp. 1-23.
Porter, M. E. & Kramer, M. R. (2011).The big idea: creating shared value. How to reinvent
capitalism—and unleash a wave of innovation and growth. Harvard Business Review, vol. 89
(1), pp. 62-77.
Project Management Institute (PMI). (2008). A guide to the project management body of
knowledge (PMBOK guide). 4thedn. Project Management Institute.
Project Management Institute (PMI). (2008). Code of ethics and professional code of conduct
[online]. [Accessed 28 June 2015]. Available at:
http://www.pmi.org/About-Us/~/media/PDF/Ethics/PMI-Code-of-Ethics-and-Professional-
Conduct.ashx
Purdum, T. (2007). Purchasing card fraud. Industry Week/IW [online] May, p.23. [Accessed 11
November 2013]. Available at:
http://web.ebscohost.com.ezproxy.buid.ac.ae/ehost/pdfviewer/pdfviewer?sid=52652802-ddca-
4c5d-a619-f751fdaa69fb%40sessionmgr4002&vid=5&hid=4207.
Rendon, R. G. (2008). Procurement process maturity: key to performance measurement. Journal
of Public Procurement, vol. 8 (2), pp. 200-214.
Ross, A. & Buffa, F.P. (2009). Supplier post performance evaluation: the effects of buyer
performance weight variance. International Journal of Production Research, vol. 47 (16), pp.
4351-4371.
Saettaa, S., Paolinia, L., Tiaccia, L. & Atiokb, T. (2012). A decomposition approach for the
performance analysis of a serial multi-echelon supply chain. International Journal of Production
Research, vol. 50 (9), pp. 77-96.
Saunders, M., Lewis,P. & Thornhill, A. (2012). Research methods for business students. 6th edn.
Harlow: Pearson.
Simpson, D. P. (1971). Cassell’s new Latin-English dictionary. 5th edn. London: Cassell.
ID- 2013000439 Page 113
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Smallwood, J.J. & Venter, D. (2001). The performance of contractors: clients’
perceptions.Proceedings of the CIB World Building Congress Performance in Product and
Practice. Wellington, New Zealand. 2nd.–6th. April, CD-Rom-HPT 32.
Smallwood, J.J. (2004). Respect for people. Proceedings of CIB World Building
Congress.Toronto, Canada. 1-7 May.
Smith, A.D. (2007). Effective supplier selection and management issues in modern manufacturing
and marketing service environments. Services Marketing Quarterly, vol. 29 (2), pp. 45-65.
Supply Chain Challenges: Building Relationships. (2003). Harvard Business Review, vol. 81 (7),
pp. 64-73. [Accessed 29 November 2014]. Available at:
http://web.ebscohost.com.ezproxy.buid.ac.ae/ehost/pdfviewer/pdfviewer?vid=5&sid=52652802-
ddca-4c5d-a619-f751fdaa69fb%40sessionmgr4002&hid=4207.
Talluri, S. & Sarkis, J. (2002). A model for performance monitoring of suppliers. International
Journal of Production Research, vol. 40 (16), pp. 4257-4269.
Trevino, L. K. (1986). Ethical decision making in organisations: a person-situation interactionist
model. Academy of Management Review, vol. 11 (3), pp. 601-617.
Turner, J.R. (1995). The commercial project manager: Managing owners, sponsors, partners,
supporters, stakeholders, contractors and consultants. Glasgow: McGraw-Hill.
United Nations. (1948). Universal Declaration of Human Rights (UDHR) [online]. Geneva: UN.
[Accessed 23 October 2014]. Available at: http://www.un.org/en/documents/udhr/
United Nations Educational, Scientific and Cultural Organization(2014).Teaching respect for all
implementation guide [online]. France: UNESCO [Accessed 12 October 2014]. Available at:
http://unesdoc.unesco.org/images/0022/002279/227983e.pdf.
Wagner, S.M. (2000). A strategic approach to professional supplier management. National
Productivity Review, vol. 19 (3), pp. 21-28.
Walker, D.H.T. & Rowlinson, S. (2008). Procurement systems: across-industry project
management perspective. New York: Taylor & Francis.
Watt, D.J., Kayes, B. & willey, K. (2010). The relative important of tender evaluation and contractor
selection criteria. International Journal of Project Management, vol. 28 (1), pp. 51-60.
Yang, L., Huang, C. & Hsu, T. (2013). Knowledge leadership to improve project and
organization performance. International Journal of Project Management, vol. 32 (1), pp. 40-53.
Zuo, J., Zhao, Z.Y. & Zillante, G. (2008). Prospects of relationship contracting in China – lessons
learned from Australia. International Conference on Multi-national Construction Projects:
ID- 2013000439 Page 114
perceptions.Proceedings of the CIB World Building Congress Performance in Product and
Practice. Wellington, New Zealand. 2nd.–6th. April, CD-Rom-HPT 32.
Smallwood, J.J. (2004). Respect for people. Proceedings of CIB World Building
Congress.Toronto, Canada. 1-7 May.
Smith, A.D. (2007). Effective supplier selection and management issues in modern manufacturing
and marketing service environments. Services Marketing Quarterly, vol. 29 (2), pp. 45-65.
Supply Chain Challenges: Building Relationships. (2003). Harvard Business Review, vol. 81 (7),
pp. 64-73. [Accessed 29 November 2014]. Available at:
http://web.ebscohost.com.ezproxy.buid.ac.ae/ehost/pdfviewer/pdfviewer?vid=5&sid=52652802-
ddca-4c5d-a619-f751fdaa69fb%40sessionmgr4002&hid=4207.
Talluri, S. & Sarkis, J. (2002). A model for performance monitoring of suppliers. International
Journal of Production Research, vol. 40 (16), pp. 4257-4269.
Trevino, L. K. (1986). Ethical decision making in organisations: a person-situation interactionist
model. Academy of Management Review, vol. 11 (3), pp. 601-617.
Turner, J.R. (1995). The commercial project manager: Managing owners, sponsors, partners,
supporters, stakeholders, contractors and consultants. Glasgow: McGraw-Hill.
United Nations. (1948). Universal Declaration of Human Rights (UDHR) [online]. Geneva: UN.
[Accessed 23 October 2014]. Available at: http://www.un.org/en/documents/udhr/
United Nations Educational, Scientific and Cultural Organization(2014).Teaching respect for all
implementation guide [online]. France: UNESCO [Accessed 12 October 2014]. Available at:
http://unesdoc.unesco.org/images/0022/002279/227983e.pdf.
Wagner, S.M. (2000). A strategic approach to professional supplier management. National
Productivity Review, vol. 19 (3), pp. 21-28.
Walker, D.H.T. & Rowlinson, S. (2008). Procurement systems: across-industry project
management perspective. New York: Taylor & Francis.
Watt, D.J., Kayes, B. & willey, K. (2010). The relative important of tender evaluation and contractor
selection criteria. International Journal of Project Management, vol. 28 (1), pp. 51-60.
Yang, L., Huang, C. & Hsu, T. (2013). Knowledge leadership to improve project and
organization performance. International Journal of Project Management, vol. 32 (1), pp. 40-53.
Zuo, J., Zhao, Z.Y. & Zillante, G. (2008). Prospects of relationship contracting in China – lessons
learned from Australia. International Conference on Multi-national Construction Projects:
ID- 2013000439 Page 114

Securing high Performance through Cultural awareness and Dispute Avoidance. Shanghai,
China. 21st.-23rd. November.
Appendices
Appendix A: Interviewees’ profiles in the Case- Studies
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
A.A(p1) Sr. Private
Intervie Procureme Male Jordanian 15 MEP Contractor (+8000)
wee # 1 nt (in projects #1)
Manager
Intervie A.S(p1) Account Female Jordanian 12 Supplier1- in Private (+150)
wee # 2 Manager Project #1
Intervie A.K (p1) Sr. Sales Male Iraqi 12 Supplier2- in Private (+100)
wee #3 Manager Project #1
Intervie S.S(p1) Sr. Project Male Palestinian 15 Subcontractor- Private (+200)
wee #4 Manager in project #1
Intervie R.G(p2) Project Male Jordanian 10 MEP Contractor Private
wee #5 Manager (in projects #2) (+8000)
Intervie T.A(p2) Sr. sales Male Pakistani 20 Supplier1- in Private (+50)
wee #6 Manager Project #2
Intervie M.O(p2) Sales Male Palestinian 18 Supplier2- in Private (+100)
wee #7 Manager Project #2
ID- 2013000439 Page 115
China. 21st.-23rd. November.
Appendices
Appendix A: Interviewees’ profiles in the Case- Studies
Name Years of Organization
experien Type &
initials Position Gender Nationality Industry
ce Size
(project#) (employees)
A.A(p1) Sr. Private
Intervie Procureme Male Jordanian 15 MEP Contractor (+8000)
wee # 1 nt (in projects #1)
Manager
Intervie A.S(p1) Account Female Jordanian 12 Supplier1- in Private (+150)
wee # 2 Manager Project #1
Intervie A.K (p1) Sr. Sales Male Iraqi 12 Supplier2- in Private (+100)
wee #3 Manager Project #1
Intervie S.S(p1) Sr. Project Male Palestinian 15 Subcontractor- Private (+200)
wee #4 Manager in project #1
Intervie R.G(p2) Project Male Jordanian 10 MEP Contractor Private
wee #5 Manager (in projects #2) (+8000)
Intervie T.A(p2) Sr. sales Male Pakistani 20 Supplier1- in Private (+50)
wee #6 Manager Project #2
Intervie M.O(p2) Sales Male Palestinian 18 Supplier2- in Private (+100)
wee #7 Manager Project #2
ID- 2013000439 Page 115

Intervie H.I(p2) Contracts Male Lebanese 12 Subcontractor- Private (+150)
wee #8 Manager in project #2
Intervie S.H (p3) Sr. Project Male Palestinian 18 MEP Contractor Private
wee #9 Manager (in projects #3) (+8000)
Intervie R.A(p3) Account Female Lebanese 11 Supplier1- in Private (+50)
wee #10 Manager Project #3
Intervie S.K(p3) account Male Indian 15 Supplier2- in Private (+50)
wee #11 Manager Project #3
Intervie H.A(p3) Sr. Subcontractor- Private (+150)
Technical Male Jordanian 12
wee #12 in project #3
Manager
Intervie M.Q (p4) Project Male Iraqi 12 MEP Contractor Private
wee #13 Manager (in projects #4) (+8000)
Intervie M.H(p4) Sales Male Iraqi 13 Supplier1- in Private (+50)
wee #14 Manager Project #4
Intervie A.P(p4) Sales Male Indian 13 Supplier2- in Private (+100)
wee #15 Manager Project #4
Intervie H.M(p4) Project Male Egyptian 15 Subcontractor- Private (+100)
wee #16 Manager in project #4
Intervie I.M (p5) Constructi MEP Contractor Private
on Male Jordanian 12 (+8000)
wee #17 (in projects #5)
Manager
Intervie B.I(p5) Developm Supplier1- in Private (+50)
ent Male Jordanian 11
wee #18 Project #5
Manager
Intervie J.D(p5) Sr. Project Female Indian 14 Supplier2- in Private (+100)
wee #19 Manager Project #5
Intervie B.M(p5) Sr. Project Male Palestinian 12 Subcontractor- Private (+100)
wee #20 Manager in project #5
ID- 2013000439 Page 116
wee #8 Manager in project #2
Intervie S.H (p3) Sr. Project Male Palestinian 18 MEP Contractor Private
wee #9 Manager (in projects #3) (+8000)
Intervie R.A(p3) Account Female Lebanese 11 Supplier1- in Private (+50)
wee #10 Manager Project #3
Intervie S.K(p3) account Male Indian 15 Supplier2- in Private (+50)
wee #11 Manager Project #3
Intervie H.A(p3) Sr. Subcontractor- Private (+150)
Technical Male Jordanian 12
wee #12 in project #3
Manager
Intervie M.Q (p4) Project Male Iraqi 12 MEP Contractor Private
wee #13 Manager (in projects #4) (+8000)
Intervie M.H(p4) Sales Male Iraqi 13 Supplier1- in Private (+50)
wee #14 Manager Project #4
Intervie A.P(p4) Sales Male Indian 13 Supplier2- in Private (+100)
wee #15 Manager Project #4
Intervie H.M(p4) Project Male Egyptian 15 Subcontractor- Private (+100)
wee #16 Manager in project #4
Intervie I.M (p5) Constructi MEP Contractor Private
on Male Jordanian 12 (+8000)
wee #17 (in projects #5)
Manager
Intervie B.I(p5) Developm Supplier1- in Private (+50)
ent Male Jordanian 11
wee #18 Project #5
Manager
Intervie J.D(p5) Sr. Project Female Indian 14 Supplier2- in Private (+100)
wee #19 Manager Project #5
Intervie B.M(p5) Sr. Project Male Palestinian 12 Subcontractor- Private (+100)
wee #20 Manager in project #5
ID- 2013000439 Page 116
1 out of 127
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.