This document presents a comprehensive NEBOSH IG2 risk assessment conducted for Abdul Rahman AL-Otaishan & Sons Group (ARO), a construction company operating in Saudi Arabia. The assessment focuses on concrete and masonry work within the Jubail City, Ibn Zahr plant. The document begins with a background section describing the organization's activities, workforce, and the scope of the risk assessment. It then details the risk assessment process, including hazard identification, assessment of who might be harmed, and existing control measures. The core of the assessment is a detailed risk assessment table, which includes hazards such as vibration, load handling, work equipment, and hazardous substances. For each hazard, the assessment identifies potential harms, current controls, and required actions with associated timescales and responsible personnel. The assessment prioritizes three key actions, justifying their selection through moral, legal, and financial arguments, along with considerations of likelihood and severity. Finally, the document outlines plans for review, communication, and follow-up to ensure the effectiveness of the risk assessment and implemented control measures.
Document Page
Unit IG2: Risk assessment
Declaration: by submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming

that the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further

information).

Part 1: Background

Include in here the organisation’s name* and location* and number of workers. You must then go on to give a description of the main

activities/products/services carried out. You must also describe the area to be risk assessed eg, whole site, and anything else that you consider

relevant (approximately 150 to 200 words):

My company is known as Abdul Rahman AL-Otaishan & Sons Group (ARO). It is located in the kingdom of Saudi Arabia with 15 branches and

2,500 employees. I am working on Jubail City at the Ibn Zahr plant.

ARO Group is a very big company construction company in both Industrial and Transportation services. The company is involved in different

businesses and in service areas like Insulation, painting, coating, refractory, concrete repair, asphalting and many others. And working for big a

company such as SABIC and ARAMCO Plants handling big projects in asphalt as the company has its product and equipment for asphalting also

very high skill and experience employees. More than that, working in a maintenance job with more than 30 plants such as concrete repair and

leaking of water, etc. Therefore, it is involved in both shutdown and Turn around for several sectors one of them is Insulation and specialized on the

mechanical system insulation in different applications such as Boilers, process piping, and fittings, storage Tank and Vessels. Workers have been

divided into two shifts first one is the day shift from 6 am to 6 pm and another one is night shift from 6 pm to 6 am as the company provides 24 hour

services for their clients.

Learner number: Learner name: Page 1 of 12
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
The risk assessment area that I am looking to cover is about Concrete and Masonry work.
You must now give a brief outline on how you completed the risk assessment (approximately 200 words):

I have involved in various concrete and masonry work so I decided to cover this area and I have been looking in Osha website as professional

standard for both of them. Osha is one of the trusted website in the world and it very reach in term of information on Health and safety and it give

step by step process to make sure that you have safely work and here is the link for it
https://www.osha.gov/Publications/3106.html it is very good
guide website to follow.
I identified the hazards that could cause harm through assessing health and safety risks that workers were faced with.
These includes mental risks, physical risks, chemical risks and biological risks. I also identify who was at the risks of being harmed. For instance,

visitors, employers, operators of machineries and clients. The members of the public were identified too. Repetitive tasks in slips, lift loads were

places that were assessed in depth. I considered how each risks were likely to cause damage or injury to different individuals. It assisted me to

determine how I could reduce the risk level. I then decided on the measures to undertake to prevent such risk from cause damage and injuries to

employees, supervisors and workshop operates.

Therefore, I have asked several experience staff that they have been worked on this area and they discover many things to be used while doing any

kind of work on concrete job which they were not using it or even wear it such as leather gloves to protect their hands. I have discovered many

incidents happen during of these kind of job and it happen more than one time which mean this need to be consider.

Learner number: Learner name: Page 2 of 12
Document Page
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.

Learner number: Learner name: Page 3 of 12
Document Page
Part 2: Risk Assessment
Organisation name:

Date of assessment:

Scope of risk assessment:

Hazard

category and

hazard

Who might be harmed

and how?

What are you already doing?
What further controls/actions are
required?

Timescales for

further actions

to be

completed

(within …)

Responsible

person’s job

title

Vibration

Grinding

activities

All workers in the

workshop and visitors on

site as well as the entire

public

When handheld tools are

used in excess, they cause

vibration thus resulting to

Hand-arm-vibration i.e.

the vibration white finger.

Such tools include

Conducting training programs

for all workers on how to

operate such hand-held tools

Buying tools that have been

designated to prevent the risks

of Hand-arm-vibration

disorders

Maintaining hand-held tools

often

1.
Reduce the time for using
vibration tools

2.
Shift workers between
activities and design an

elaborate work shift table

3.
Affected workers to be taken
care of by offering medical

assistance to them

4.
Talks related to tool-box to be
conducted annually to workers

4 months

6 months

1 month

Stores

managers and

workshop

managers

Finance

director

Workshop

manager

Finance

director and

Learner number: Learner name: Page 4 of 12
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title

grinders, disc cutters and

sanders among others

using the hand-held tools

5.
Purchase suitable tools and
create a policy that ascertains

that tool purchased are able to

prevent the likelihood of HAVs

6.
Conduct evaluation on the level
of exposure to ascertain that it

does not exceed the daily

exposure value

1 month

1 month

1 month

workshop

manager

Finance

director

Load handling

equipment

Working at the

loading

vehicles and

conveyor belts

Workers operating in

conveyor belts and

loading machines such as

forklifts are likely to incur

sprains, bruises and

serious injuries such as

Train workers on how to handle

load handling equipment

1.
Assess possible risks associated
with such machines and

introduce safe systems

2.
Ensure all workers are
sensitized on the dangers

associated with such equipment

6 months

4 months

Workshop

managers and

finance

directors

Learner number: Learner name: Page 5 of 12
Document Page
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title

internal bleeding

depending on the loads

that might fall on them

3.
All workers given protective
gears such as helmets that

should be mandatory worn by

all of them

4.
Medical treatment given to
workers affected by injuries

incurred on the site

Well controlled risks hence

does not require further action

6 months

1 month

1 week

Work

equipment and

machinery

Falling

components

and vehicles

Workers handling

equipment and

maintenance sessions

when equipment fails

could suffer injuries such

as fractures and bruises

that could lead to death if

such equipment fails to

Maintenance of equipment and

repair of vehicles

1.
Inspect all vehicles and remove
unworthy vehicles for repair

2.
Inspect all machinery and
purchase new machinery to

supplement worn out ones

3.
Ensure lift equipment have
insurance

4.
Train workers on how to
6 months

2 months

1 month

1 month

Finance

manager

Workshop

manager

Workshop

manager

Workshop

Learner number: Learner name: Page 6 of 12
Document Page
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title

function
operate machines annually
5.
Ensure machines are operated
by skilled workers and vehicles

are driven by skilled drivers

1 month

manager

Hazardous

substances

Inhaling paint

mist with

isocyanates

components

Employees entering

booths areas during

spraying sessions

The workers are exposed

to hazardous paint mists

risks their chances of

suffering respiratory

conditions such as asthma

Ensure spraying is done in

enclosed area

Spraying done by professionals

1.
Only spraying workers are
allowed in spray areas during

spraying time

2.
Put a bold posture to guide
those entering the place with

entrance and exit directories in

place

3.
Introduce protective clothing to
spraying workers

4.
Introduce first aid assistance to
persons affected by inhaling

paint mist

1 month

6 months

4 months

1 month

workshop

managers

and finance

director

workshop

manager

Learner number: Learner name: Page 7 of 12
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title

5.
Workers are monitored to
prevent non-compliance issues

by unauthorized workers

related to entering the spraying

areas

1 month

Learner number: Learner name: Page 8 of 12
Document Page
Part 3: Prioritise three actions and justification for the selection
You must pick the
three highest priority/most urgent actions and justify your choice. Your justification must include moral, legal and financial
arguments (500 to 700 words); consideration of likelihood and probable severity of injury, ill-health and/or harm (150 to 250 words);

description of how effective each action is likely to be in controlling the risk (250 to 350 words).

Learner number: Learner name: Page 9 of 12
Document Page
Part 4: Review, communicate and check
You must now give a review date for your risk assessment and say why you have chosen this date (10 to 50 words).

Learner number: Learner name: Page 10 of 12
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
You must now indicate how the risk assessment findings will be communicated (including who needs to know the information) (100 to 150 words).
You must now indicate how you will follow-up on the risk assessment to check that the actions have been carried out (100 to 150 words).

Learner number: Learner name: Page 11 of 12
Document Page
Learner number: Learner name: Page 12 of 12
chevron_up_icon
1 out of 12
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]