This report comprehensively analyzes risk management strategies applicable to both NHS and construction projects. It begins by outlining various risk management methods, including the risk register and probability/impact matrix, providing a foundation for understanding risk assessment. The report then delves into the application of these methods, utilizing SWOT, PESTLE, and brainstorming techniques to identify threats and opportunities within the context of the NHS and a construction project. It examines the strengths, weaknesses, opportunities, and threats (SWOT) and the political, economic, social, technological, legal, and environmental (PESTLE) factors affecting each project. Furthermore, it explores stakeholder mapping and impact grids to assess stakeholder attitudes towards risk and their influence on project outcomes. The report also includes a prioritization matrix to rank threats and opportunities and concludes by summarizing the key findings and the importance of these tools in effective project management. Finally, the report presents a conclusion that underscores the significance of these methods in mitigating project risks and ensuring successful outcomes.
Document Page
AMP 2
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of Contents
INTRODUCTION...........................................................................................................................3
8.1 Methods used for risk management in project ......................................................................3
8.2 (i) Swot, pestle and brainstorming for NHS and Construction project .................................3
Prioritization of threat and opportunities of NHS and Construction project and ranking matrix6
Stakeholder mapping and impact grid ........................................................................................6
CONCLUSION................................................................................................................................7
REFERENCES................................................................................................................................1
Document Page
INTRODUCTION
Project management is the procedure of applying knowledge and skills to complete any
project. In this report two project have been discussed such as NHS and construction. This report
shows risk management, swot, pestle for both the projects. Qualitative and quantitative
techniques have been explained here.
8.1 Methods used for risk management in project
Risk management in project is the procedure of recognizing, analysing and
acknowledging risk which occurs in the life span of the project.
There are various methods of analysing such risks
Risk register
It is a tool of project management which helps to control the risk in any project. The main
work of risk register is to recognise, identifies and describes the risk after that defines the impact
of such risk in the project, provide planes to overcome those risks. Moreover, risk register
assists the project manager to highlight the risk and assign to someone who can resolve the
occurred risk. In short, risk register collects all the data related to risk, which the project manager
and team is expecting then after it provides a method to sort out them so that the risk doesn’t
pop-up in the project.
Probability and impact matrix
It is the another tool to identify the risk. These methods concentrate on those risk which
are important so the project manager don't need to waste time to follow small risk and find
solution to eliminate such risk from the project. This technique basically provides ranking to
each and every risk and as per the rank, project manager solves the risk. This matrix comes in
the form of box in which the probability of occurrence of the risk range from top to bottom and
box get coloured. Green colour shows less risk, while yellow shows medium risk and red shows
high risk.
8.2 (i) Swot, pestle and brainstorming for NHS and Construction project
Strength of NHS project
Document Page
Figure 1swot analysis
Strength
NHS is providing healthcare
services at low cost.
Accident and emergency services of
NHS is unique as compared to the
other private hospitals of UK.
Weaknesses
lack of technology
Unable to fulfil the medical
needs of all the people due to
the increased population
Opportunities
Can implement marketing strategies
to raise profit
Threat
Employee turnover is getting
increased
Pestle of NHS project
Political
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
The government of UK try to bring new technology and healthcare equipment to NHS so
that they can provide better services to public.
Economic
Due to 2008 crisis, NHS is facing lack of resources and bound to reduce the salary of the
staff. Even not able to contribute in the economy of UK.
Social
As the diseases such as cancer and diabetes is increasing in people and NHS is not able to
provide quality treatment to society.
Technological
NHS is facing lack of technology as compared to private hospitals of UK. They are
having all the tools, machines and equipment which needs to provide quality services.
Legal
Patients who are not satisfied with the health care services of NHS, taking legal actions
against them.
Environmental
NHS is evolving toxic waste in the environment and affecting the climate as well.
Brainstorming
This method assesses the risk which can impact the NHS project. The risk occurred in
this project is lack of technology and people are not satisfy with the healthcare services provided
by NHS.
Risk matrix of NHS
Identified
Hazard
Likelihood
of
Occurrence
Severity of
Occurrence
Estimated
Level of
Risk
Mitigating actions Risk
Ownership
High
employee
turnover
5 4 15
Urgent meeting to
know the reason
behind employee
urnover and try to
mitigate
NHS is
liaable
Lack of
technology 4 3 10
Should change the
old technology and
use updated
technology
NHS
Document Page
Trust issues
among
people
3 2 2
To make them
people trust in NHS,
they should provide
excellent healthcare
services
NHS
Swot of construction project
Strength
In this construction project, high
quality raw- material has used in
making roads.
This construction project is providing
employment opportunities
Weaknesses
Lack of technology
Warehouse facility is poor to
keep the tools and
machineries used in making
roads.
Opportunities
Huge demand of proper roads
Lack of competition
Threat
Strike of labour union
Absence of proper
technology
Document Page
Pestle of Construction project
Political
Government is in favour of making roads so that people don't have to face issues in
transportation. So approval of project from the government was quick and easy.
Economical
It is beneficial for the economy of the country as the government will earn transportation
tax.
Social
This project is helping the society by providing employment opportunity and reducing the
issues of roads and transportation.
Technological
This factor is a big issue for this construction project as they don't have proper
technology therefore it is taking more time in the completion of the project.
Legal
when the worker doesn’t get their wages on time, their union go for strike and take legal
actions that is also a reason for the delay of this project.
Environmental
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
The machinery and equipment are producing dust in the environment, which is harmful
for the society and environment.
Brainstorming
With the help of Brainstorming, the project manager can identify the risk such as absence
of proper technology and issues faced by labour is a big challenge in the completion of this
project.
Stakeholder matrix
Government
Government will get earning
in the form of
transportation tax. There
for government has keen
interest in this project.
Tourism will increase if the
country have proper road
facility.
Community
Local people have interst in
this project as they will get
proper roads.
Local authorities
They are also a stakeholder
who have interest as they get
benefited by project.
They will get proper road
facility.
Suppliers & workers
Suppliers will get a chance to
supply row material to this big
project and will earn profit.
Workers will get employment
opportunity.
Prioritization of threat and opportunities of NHS and Construction project and ranking matrix
The biggest opportunity for NHS project is that people have trust in their health care
services so they can make more marketing strategies to promote their services. On the other hand
Document Page
the opportunity for construction project is immense demand for proper roads and the competition
in constructing roads is less.
Threat for NHS project is increased employee turnover as NHS is not able to provide
salary to its employees. And for construction project unavailability of technology.
Ranking matrix
It is a tool which provides rank to the activities of the project according to this
importance. For example – for constructing a road labours are important and they will be the
priority of the project manager because in the absence labours work will not complete on time.
So the labours will get higher ranks as compared to others.
In NHS project the staff and professionals will get higher rank because in the absence of proper
staff who will look after the patients.
Stakeholder mapping and impact grid
This is the procedure of identifying those individuals and stakeholders who shows their
interest in the project. Stakeholders can be government, public, competitors and employees.
In NHS have not shown so much interest in the project as the people are not happy with the
services and employees don't get their salaries on time. NHS is not able to contribute in the
economy of the country as well.
Despite NHS, stakeholder has shown interest in the construction project as it is profitable
for the government and economy of the country, people are also happy with this project as they
are getting proper road facility.
Influence – impact grid
This method shows, how active the stakeholders and how they influence the decision
making and try to bring change in the project. In case of NHS, stakeholders are not so interested
so they don't influence this project but in construction project government has shown their
interest and make changes in the decision making.
8.2 (4) Assessing stakeholders' attitude to risk
Stakeholders play a vital role in project success and failure. It is important to know their interest
and it can be known by developing risks questionnaire. On the basis of interpretation on answers
given by stakeholder towards risks, actions can be taken accordingly. Different stakeholders play
different roles and it is being identified from stakeholder analysis or matrix tool. In regard to
Document Page
construction industry stakeholders shown their interest towards risk and progress of project that
is:
Employees: Majority of employees said in regards to risk mitigation that they will
cooperate to contractor and sub-contractors in reducing risks. By suggesting different ways and
effective tools, technical errors can be reduced to the great extent. They said that rather
avoiding, they will accept will try to find the best solution (Xia and et.al., 2017).
Government: Government is the main stakeholder and it is stated that by implementing
policies and providing fund, risks will be managed. Funding and financial stability can solve any
kind of problems so, by taking help of the government, technical errors related risk can be
reduced by employing qualified technical solution provider.
Suppliers: Suppliers shown less interest in solving problems and some suppliers also did
not respond in an effective manner.
For another NHS public project for making people aware about infectious or virus disease,
responses have been known of stakeholder regarding risks. By knowing responses of
stakeholders their interest can be known towards risk mitigation. Some risks that have been
found were: Climate change and changes in political condition.
Local people: From survey and answers given by people it is known that they are health
conscious but still are not aware regarding protective measures of virus. They do not take care of
themselves and their country. They showed lack of interest in solving problems and supporting.
CONCLUSION
It is concluded that how project manager can use swot, pestle and brainstorming to
reduce the risk from the project. How stakeholder inference decision making inn the project.
Importance of Monte Carlo, decision trees for assessing risk have been elaborated in this project.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
REFERENCES
Books and journal
Burke, S.A. and Trock, S.C., 2018. Use of influenza risk assessment tool for prepandemic
preparedness. Emerging infectious diseases. 24(3). p.471.
Gürel and et.al, 2017. SWOT analysis: a theoretical review. Journal of International Social
Research. 10(51).
Muriana and et.al, 2017. Project risk management: A deterministic quantitative technique for
assessment and mitigation. International Journal of Project Management. 35(3).pp.320-340
Perera, R., 2017. The PESTLE analysis. Nerdynaut.
Radujković and et.al, 2017. Project management success factors. Procedia engineering. 196.
pp.607-615.
Rutkai, G. and et.al., 2017. ms2: A molecular simulation tool for thermodynamic properties,
release 3.0. Computer Physics Communications. 221. pp.343-351.
Steck and et.al, 2019. Gaussian ranking using matrix factorization. U.S. Patent 10,180,968.
Suleri, S., 2020, April. Brainstorming 101: An Introduction to Ideation Techniques. In Extended
Abstracts of the 2020 CHI Conference on Human Factors in Computing Systems (pp. 1-4).
Xia, N. and et.al., 2017. Assessment of stakeholder-related risks in construction projects:
Integrated analyses of risk attributes and stakeholder influences. Journal of construction
engineering and management. 143(8). p.04017030.
Online
PEESTLE Analysis., 2020 [Online]. Available through:
<https://corporatefinanceinstitute.com/resources/knowledge/strategy/pestel-analysis/>
Pruitte, B., 2020 covid 19 swot analysis : SWOT Analysis in a Pandemi [online].Available
through: <https://www.rhythmsystems.com/blog/4-steps-to-swot-a-pandemic>
What’s Stakeholder Mapping and Why It’s Important?, 2020 [Online]. Available
through:<https://www.copperproject.com/2017/11/whats-stakeholder-mapping-important/>
1
Document Page
2
chevron_up_icon
1 out of 12
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]