BTEC Operations and Project Management: RTA Metro Project Analysis
VerifiedAdded on 2023/03/20
|18
|5404
|21
Report
AI Summary
This report provides a critical review of the implementation of operations management principles within the context of the RTA metro project in Sharjah. It explores the application of various operational management principles, including reality, company, fundamentals, accountability, variance, casualty, managed passion, humility, and success, as well as methodologies such as Six Sigma and lean principles. The report analyzes the stages of the Project Life Cycle (PLC) with a business case, project plan, and work breakdown structure. It assesses the effectiveness of PLC in project application and proposes a continuity improvement plan based on the review and analysis, focusing on promotional events and marketing strategies. The report aims to provide insights into the application of operations management to enhance efficiency and achieve project goals.

OPERATION AND PROJECT
MANAGEMENT
MANAGEMENT
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Contents
INTRODUCTION...........................................................................................................................1
TASK 1............................................................................................................................................1
P1 Critical review regarding implementation of operations principle in organisation context. .1
P2 Continuity in improvement plan based on review and analysis............................................5
TASK 4............................................................................................................................................8
P3 Stages of PLC with business case, project plan and work breakdown structure...................8
TASK 4..........................................................................................................................................10
P4. Effectiveness of PLC in application of project...................................................................10
CONCLUSION..............................................................................................................................11
REFERENCE ................................................................................................................................12
INTRODUCTION...........................................................................................................................1
TASK 1............................................................................................................................................1
P1 Critical review regarding implementation of operations principle in organisation context. .1
P2 Continuity in improvement plan based on review and analysis............................................5
TASK 4............................................................................................................................................8
P3 Stages of PLC with business case, project plan and work breakdown structure...................8
TASK 4..........................................................................................................................................10
P4. Effectiveness of PLC in application of project...................................................................10
CONCLUSION..............................................................................................................................11
REFERENCE ................................................................................................................................12

INTRODUCTION
Operation management is most important factor which aids to perform various activities
of organisation. There are different department which perform various functions of organisation
in order to expand business in different place which aids to enhance profit level. (Bahn, 2013).
Its main objective is to allocate different resource such as raw material, capital human resource
and many other so that it helps to accomplish different types of task in a systematic manner. It
also helps to enhance the performance of different types of operation which are perform within
the organisation. The operational manager put their effort in order to perform different types of
operation in effective manner. They implement different types of strategies in order to convert
the raw materials into qualitative products. Proper utilisation of resource aids to provide
effective service to the different customer within stipulated time period. It also aids to retain
long term relationship with the customer by providing different types of service to them.
Implementation of new and advance technology aids to perform different types operation in short
time period. It aids to generate large number of revenues and make strong brand image in the
marketplace. The Road and transport Authority is the government authority which perform its
operation in expanding metro project in Sharjah. This authority already provide service in Dubai.
This unit has discussed about the work breakdown structure which is used in Project life Cycle
and also determine the effectiveness implementation of PLC.
TASK 1
P1 Critical review regarding implementation of operations principle in organisation context
The main objectives of operational management is to prepare effective plan to construct
the different part of the metro (Hatziargyriou, 2014). Every company has different types of
department which helps to perform different types of function of organisation and there are large
number of employee working in the organisation in order to perform various function within
organisation. In order to increase the productivity of the organisation the management of RTA
should implement new and innovative technology which aids to increase the skills and
knowledge of employee working in organisation. The manager of organisation prepare different
types of strategies in order to accomplish various operation of the company. These strategies and
policies aids to regulate different types of functions which are related to manufacture of
different part of the metro. These strategies are implemented in different department working
1
Operation management is most important factor which aids to perform various activities
of organisation. There are different department which perform various functions of organisation
in order to expand business in different place which aids to enhance profit level. (Bahn, 2013).
Its main objective is to allocate different resource such as raw material, capital human resource
and many other so that it helps to accomplish different types of task in a systematic manner. It
also helps to enhance the performance of different types of operation which are perform within
the organisation. The operational manager put their effort in order to perform different types of
operation in effective manner. They implement different types of strategies in order to convert
the raw materials into qualitative products. Proper utilisation of resource aids to provide
effective service to the different customer within stipulated time period. It also aids to retain
long term relationship with the customer by providing different types of service to them.
Implementation of new and advance technology aids to perform different types operation in short
time period. It aids to generate large number of revenues and make strong brand image in the
marketplace. The Road and transport Authority is the government authority which perform its
operation in expanding metro project in Sharjah. This authority already provide service in Dubai.
This unit has discussed about the work breakdown structure which is used in Project life Cycle
and also determine the effectiveness implementation of PLC.
TASK 1
P1 Critical review regarding implementation of operations principle in organisation context
The main objectives of operational management is to prepare effective plan to construct
the different part of the metro (Hatziargyriou, 2014). Every company has different types of
department which helps to perform different types of function of organisation and there are large
number of employee working in the organisation in order to perform various function within
organisation. In order to increase the productivity of the organisation the management of RTA
should implement new and innovative technology which aids to increase the skills and
knowledge of employee working in organisation. The manager of organisation prepare different
types of strategies in order to accomplish various operation of the company. These strategies and
policies aids to regulate different types of functions which are related to manufacture of
different part of the metro. These strategies are implemented in different department working
1

in the organisation which are involving in different department of the company (Fang, Han
and Chen, 2012).
In order to perform different types of functions operational manager of the needs to redesign
structure of the organisation as well is its culture in order to accomplish different types of
operations in effective manner. The manager of RTA should prepare new and innovative
strategies in order to determine the condition of market trends and measure the existing
operation processes. To construct new and innovative products it leads to determine the various
strategies which are implemented by different rivals present in the marketplace.
Operation management Principles: In order to manufacture new products in the different
country there some principle which are followed by the operational management in order to
implement different types of strategies which are describe below:
Reality: The introduction of new tools and techniques the management and operation
related to condition in order to find the different issues which are arises in different sector of of
the company. The manager of organisation needs to implement different types of strategies in
order to resolve or modify different problems. Instead of backing out of from different issues,
manger of RTA needs to find proper solution to these issues (Bullinger and Warschat, 2012).
Company: A company has different department whose responsibility is to perform
various functions in order to accomplish different types of task in effective manner. As different
department in organisation are interdependent to each other and all the operation of department
are accomplish their functions in logical manner. So that they can perform their different types
of functions in parallel manner. Especially in construction department all functions are
interrelated to each other.
Fundamentals: The main fundamental concept about construction sector to accomplish
different types of operation can be performed in a systematic manner. It also aids to manage the
different types of record, documents, and all operation of the construction are performed in
proper manner within stipulated time period. The fundamental concept tof construction which
are implemented by the RTA is to create various opportunity in order to survival of the
business at the marketplace. Because these strategies aids to construct different product and
services by giving relevant information (Rolstadås, and et. al, 2014).
Accountability: The manager of the RTA needs to set rules and regulations by
comparing metric for determination of the actual output against expected targets. This is
2
and Chen, 2012).
In order to perform different types of functions operational manager of the needs to redesign
structure of the organisation as well is its culture in order to accomplish different types of
operations in effective manner. The manager of RTA should prepare new and innovative
strategies in order to determine the condition of market trends and measure the existing
operation processes. To construct new and innovative products it leads to determine the various
strategies which are implemented by different rivals present in the marketplace.
Operation management Principles: In order to manufacture new products in the different
country there some principle which are followed by the operational management in order to
implement different types of strategies which are describe below:
Reality: The introduction of new tools and techniques the management and operation
related to condition in order to find the different issues which are arises in different sector of of
the company. The manager of organisation needs to implement different types of strategies in
order to resolve or modify different problems. Instead of backing out of from different issues,
manger of RTA needs to find proper solution to these issues (Bullinger and Warschat, 2012).
Company: A company has different department whose responsibility is to perform
various functions in order to accomplish different types of task in effective manner. As different
department in organisation are interdependent to each other and all the operation of department
are accomplish their functions in logical manner. So that they can perform their different types
of functions in parallel manner. Especially in construction department all functions are
interrelated to each other.
Fundamentals: The main fundamental concept about construction sector to accomplish
different types of operation can be performed in a systematic manner. It also aids to manage the
different types of record, documents, and all operation of the construction are performed in
proper manner within stipulated time period. The fundamental concept tof construction which
are implemented by the RTA is to create various opportunity in order to survival of the
business at the marketplace. Because these strategies aids to construct different product and
services by giving relevant information (Rolstadås, and et. al, 2014).
Accountability: The manager of the RTA needs to set rules and regulations by
comparing metric for determination of the actual output against expected targets. This is
2
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

procedure is to determine the structure and initiate various action in according to the guidance.
The manger needs to determine various aspects of the resources which are used in constructing
the metro at Sharjah. These aspects aids to manage accountability of the RTA helps to
predicting forecasting also (Aaltonen, 2011).
Variance: It determine the difference between the actual result and result which is
expected. If any variability shows less variation then it aids to promote some creativity if
effectiveness not maintained the manager needs to implement some change in the existing
process system.
Casualty: There are various types of issues which faces many problems like urgent
material needed for construction, late quota, extra expenditure and many other which needs to
concentrate over these issues which is monitor manager of organisation in effective manner.
Managed Passion: Human resource are foremost driver of any company who have possessed
needs to require skills and knowledge as well as passion for their job. In order to attain quality
of products. RTA organisation needs to launch best talented workforce so that they can aids to
attain the growth in effective manner (Alexander, 2013).
Humility: Manager needs to control and manage to create positive environment in a
organisation which aids the perform various functions of organisation in order to implement
different types of functions of the organisation in effective manner. The manager needs to get
recognise the different issues which are arise during performing various activities in organisation
or at the constructing sites. There fore RTA always assures its employee about the
environment of organisation. The management do not perform any discriminating activity among
the employee working in the organisation and the manager needs to create healthy atmosphere
within the company for completion of every work in effective manner.
Success: The success of the organisation is depend upon the number of customer who ascertain
different types of products and services which is provided by the organisation which are related
to the construction. The management of organisation implement various strategies in order to
recognise the trends of market. This aids to implement different types of changes occurs in the
marketplace. The manager of the organisation needs to determine the demand and desire in
order to construct metro accordingly. Along with this company needs to implement new and
innovative technology in order to construct the different parts of the metro.
SIX SIGMA:
3
The manger needs to determine various aspects of the resources which are used in constructing
the metro at Sharjah. These aspects aids to manage accountability of the RTA helps to
predicting forecasting also (Aaltonen, 2011).
Variance: It determine the difference between the actual result and result which is
expected. If any variability shows less variation then it aids to promote some creativity if
effectiveness not maintained the manager needs to implement some change in the existing
process system.
Casualty: There are various types of issues which faces many problems like urgent
material needed for construction, late quota, extra expenditure and many other which needs to
concentrate over these issues which is monitor manager of organisation in effective manner.
Managed Passion: Human resource are foremost driver of any company who have possessed
needs to require skills and knowledge as well as passion for their job. In order to attain quality
of products. RTA organisation needs to launch best talented workforce so that they can aids to
attain the growth in effective manner (Alexander, 2013).
Humility: Manager needs to control and manage to create positive environment in a
organisation which aids the perform various functions of organisation in order to implement
different types of functions of the organisation in effective manner. The manager needs to get
recognise the different issues which are arise during performing various activities in organisation
or at the constructing sites. There fore RTA always assures its employee about the
environment of organisation. The management do not perform any discriminating activity among
the employee working in the organisation and the manager needs to create healthy atmosphere
within the company for completion of every work in effective manner.
Success: The success of the organisation is depend upon the number of customer who ascertain
different types of products and services which is provided by the organisation which are related
to the construction. The management of organisation implement various strategies in order to
recognise the trends of market. This aids to implement different types of changes occurs in the
marketplace. The manager of the organisation needs to determine the demand and desire in
order to construct metro accordingly. Along with this company needs to implement new and
innovative technology in order to construct the different parts of the metro.
SIX SIGMA:
3

Six sigma is the procedure which is used by determine fault in productions in order to
enhance the performance of the employee working in the organisation (Weglarz, 2012). This
methods aids to construct different types of building part. This procedure aids to produce
various types of products and services therefore in high end engineering and constructing sector
it is better process. It is concerned with six major tools via Define, Measure, Analyse, Improve
and control (DMAIC). Implementation this techniques RTA able to construct the different
sections of the metro which are free from any defects and sustain to exert pressure.
Define- it is define the demand which is made by the people at the marketplace and give
proper guidance to accomplish different types of task in effective manner.
Measure : this step is to consider current state of construction as well as implement
modifications in the existing which are used for modification in the existing construction plan.
The manager needs to accomplish the target within stipulate time period.
Analyse- it is the steps by which it determine the basic issues which are arises in
performing different types of operation which aids to determine the necessity of change so the
company can attain its target in stipulated time period.
Improve – in order to attain the goals and objective of organisation it looks out all
possibilities for the modification and improvement.
Control- this the main method by which the all activities of the overall operations in
organisation can be accomplished in right time.
Lean principle:
The management of the RTA also follow the lean principle which aids to innovative
new idea within the construction process. It is accomplished in the five steps which are like
Define value, Map value stream, Crate flow, Establish pull and Pursuit perfection. At present
company wants to manufacture new metro at Sharjah therefore this process can be helped in
effective manner
Define value – This process determine demand made by customer for the necessity of
metro in Sharjah where it entails a organisation that number of people can pay for the tickets
for the travelling in the metro therefore constructionist new metro it is mandatory for the
organisation to determine the different production cost by the reductant of waste in effective
manner. It also aids to reduce the expenditure cost which aids to maximise the level of profit.
4
enhance the performance of the employee working in the organisation (Weglarz, 2012). This
methods aids to construct different types of building part. This procedure aids to produce
various types of products and services therefore in high end engineering and constructing sector
it is better process. It is concerned with six major tools via Define, Measure, Analyse, Improve
and control (DMAIC). Implementation this techniques RTA able to construct the different
sections of the metro which are free from any defects and sustain to exert pressure.
Define- it is define the demand which is made by the people at the marketplace and give
proper guidance to accomplish different types of task in effective manner.
Measure : this step is to consider current state of construction as well as implement
modifications in the existing which are used for modification in the existing construction plan.
The manager needs to accomplish the target within stipulate time period.
Analyse- it is the steps by which it determine the basic issues which are arises in
performing different types of operation which aids to determine the necessity of change so the
company can attain its target in stipulated time period.
Improve – in order to attain the goals and objective of organisation it looks out all
possibilities for the modification and improvement.
Control- this the main method by which the all activities of the overall operations in
organisation can be accomplished in right time.
Lean principle:
The management of the RTA also follow the lean principle which aids to innovative
new idea within the construction process. It is accomplished in the five steps which are like
Define value, Map value stream, Crate flow, Establish pull and Pursuit perfection. At present
company wants to manufacture new metro at Sharjah therefore this process can be helped in
effective manner
Define value – This process determine demand made by customer for the necessity of
metro in Sharjah where it entails a organisation that number of people can pay for the tickets
for the travelling in the metro therefore constructionist new metro it is mandatory for the
organisation to determine the different production cost by the reductant of waste in effective
manner. It also aids to reduce the expenditure cost which aids to maximise the level of profit.
4

Map value stream- According to its name the values stream innovate an idea which
draws on the map and process flow which aids in attain the goals and objectivities of
organisation. It pr0ovice effective steps which which helps to every PLC which can start from
buying of allocating resource to dispatch of the products. It aids to the management to determine
the different process like designing, manufacturing, manpower, administration and customer
services (Yang, Chen, and Wang, 2012).
Create flow- After recognising the value stream create flow implement the different
physical process to function of operation without any interruption. It helps to manage different
types of operation in the systematic manner so that construction process can be accomplish in
time.
Establish pull: This process follow the different type of rules and regulation which are
related to just in time approach which helps to provide service as per the demand made by the
different customer demand made by the people living in the Sharjah.
Purse Perception: it is not occasionally possible for the organisation to have the quality
of products so it mandatory to keep changes which aids in improving active on the daily basis
purpose gradually.
TASK 2
P2 Continuity in improvement plan based on review and analysis
Continuous Improvement And Its Meaning
Continuous improvement related to the most essential part of a organisation
which is concerned with the change in the structure of the business by determining the feedback
and reviews of the different customers employer and employees. Slow modification aids to
attract large number of customer and it also aids to accomplish demand and desire of various
customer. In order to maximise level of profit an organisation needs to prepare continuous
improvement in the different types of strategies which helps to provide better path to explore
new products this methods aids to attain the objective of the organisation also.
COUNTINEOUS IMPORVMENT PLAN
Source Anticipated outcome Recent performance
level
Improvement in
strategies
Promotional event Since the RTA do not If an organisation do In order to construct
5
draws on the map and process flow which aids in attain the goals and objectivities of
organisation. It pr0ovice effective steps which which helps to every PLC which can start from
buying of allocating resource to dispatch of the products. It aids to the management to determine
the different process like designing, manufacturing, manpower, administration and customer
services (Yang, Chen, and Wang, 2012).
Create flow- After recognising the value stream create flow implement the different
physical process to function of operation without any interruption. It helps to manage different
types of operation in the systematic manner so that construction process can be accomplish in
time.
Establish pull: This process follow the different type of rules and regulation which are
related to just in time approach which helps to provide service as per the demand made by the
different customer demand made by the people living in the Sharjah.
Purse Perception: it is not occasionally possible for the organisation to have the quality
of products so it mandatory to keep changes which aids in improving active on the daily basis
purpose gradually.
TASK 2
P2 Continuity in improvement plan based on review and analysis
Continuous Improvement And Its Meaning
Continuous improvement related to the most essential part of a organisation
which is concerned with the change in the structure of the business by determining the feedback
and reviews of the different customers employer and employees. Slow modification aids to
attract large number of customer and it also aids to accomplish demand and desire of various
customer. In order to maximise level of profit an organisation needs to prepare continuous
improvement in the different types of strategies which helps to provide better path to explore
new products this methods aids to attain the objective of the organisation also.
COUNTINEOUS IMPORVMENT PLAN
Source Anticipated outcome Recent performance
level
Improvement in
strategies
Promotional event Since the RTA do not If an organisation do In order to construct
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

spend large capital on
the promotion and
advertising. Due to
which it is not easy for
the management to
attract large number of
customer in effective
manner. it seems to
loss the position in the
marketplace (Shaheen,
InterDigital
Technology Corp,
2014).
not marketing its new
metro in the Sharjah
properly then the
customer fails to know
about the construction
in same manner. In the
case of construction
organisation needs to
get the review of the
customer before
construction of
metro.
new metro in the
Sharhjah authority
needs to promote the
same using effective
marketing strategies.
They should be strong
tools ,and techniques
for the promotional
activities of
organisation proper
manner in order to
attract large number of
customer.
After sales services Customer have the
different perception as
well as different
concept in order to
avail the service in
effective manner.
Organisation is not
responsive after selling
of different
commodities.
Generally organisation
determine views given
by people for
construction of metro
so that every activities
can be accomplish in
stipulated time period.
In order to construct
the metro organisation
needs to open its
accommodation centre
beside the site where
the project is going to
be started. It will help
to accomplish various
operation of
organisation in
effective manner and
the venture is get
accomplish within
stipulated time period.
Effect of the continuous improvement plan
6
the promotion and
advertising. Due to
which it is not easy for
the management to
attract large number of
customer in effective
manner. it seems to
loss the position in the
marketplace (Shaheen,
InterDigital
Technology Corp,
2014).
not marketing its new
metro in the Sharjah
properly then the
customer fails to know
about the construction
in same manner. In the
case of construction
organisation needs to
get the review of the
customer before
construction of
metro.
new metro in the
Sharhjah authority
needs to promote the
same using effective
marketing strategies.
They should be strong
tools ,and techniques
for the promotional
activities of
organisation proper
manner in order to
attract large number of
customer.
After sales services Customer have the
different perception as
well as different
concept in order to
avail the service in
effective manner.
Organisation is not
responsive after selling
of different
commodities.
Generally organisation
determine views given
by people for
construction of metro
so that every activities
can be accomplish in
stipulated time period.
In order to construct
the metro organisation
needs to open its
accommodation centre
beside the site where
the project is going to
be started. It will help
to accomplish various
operation of
organisation in
effective manner and
the venture is get
accomplish within
stipulated time period.
Effect of the continuous improvement plan
6

The above mention plan is being carry out by management of RTA in order to operate
every functions of the company in effective manner. Because of this management needs to
implement new and innovative idea in order to in construction of the metro at Sharjah. This aids
to deliver the new and innovative idea in proper manner. With this assistance of these tends
organisation needs to implement different types of research methodology which helps to improve
the performance of the organisation in effective manner. Research and development division of
the company aids to determine demand made customer. Along with this it has been observed as
that management must plan better promotional activities also for marketing its different types
of service (Stark, 2015).
The main objectives of organisation is to expand its business in Sharjah. The
management needs to introduce different types of service outlets in order to resolve different
demand and desire of the customer in effective manner. These services are implemented for
overcome from different problem which arise during performing different types of organisation
ineffective manner.
Implementation of effective strategies in order to continuous improvement plan.
In this process the operational manager of the organisation needs to gain feedback from
the different customer who avail the service of metro. Feedback of the people will aids to
implement different types of steps in order to improve the performance of the metro at Sharjah as
well as existing metro services which provide by the RTA in Dubai. Taking reviews helps to
provide loyalty and satisfaction among the different customer. Along with this there are different
activities which aids to accomplish further improvement which are mentioned below:
Good employee- employer relationship In order to attain the better place in the
marketplace it leads to implement various strategies in order to built effective relationship with
the employee and management level. This would increase in the accomplishment of different
activity in effective time period and it also helps to explore the business of construction in
different area in proper manner (White, 2016).
Proper communication channel: By giving different types of information to the different types
of customer leads to recognise the new introduction of metro by RTA. In this context it leads to
accomplish different types demand and desire made by customer in effective manner.
Management needs to conduct timely meeting in order to know the different types of issues
which are related to the employee working in organisation in proper manner.
7
every functions of the company in effective manner. Because of this management needs to
implement new and innovative idea in order to in construction of the metro at Sharjah. This aids
to deliver the new and innovative idea in proper manner. With this assistance of these tends
organisation needs to implement different types of research methodology which helps to improve
the performance of the organisation in effective manner. Research and development division of
the company aids to determine demand made customer. Along with this it has been observed as
that management must plan better promotional activities also for marketing its different types
of service (Stark, 2015).
The main objectives of organisation is to expand its business in Sharjah. The
management needs to introduce different types of service outlets in order to resolve different
demand and desire of the customer in effective manner. These services are implemented for
overcome from different problem which arise during performing different types of organisation
ineffective manner.
Implementation of effective strategies in order to continuous improvement plan.
In this process the operational manager of the organisation needs to gain feedback from
the different customer who avail the service of metro. Feedback of the people will aids to
implement different types of steps in order to improve the performance of the metro at Sharjah as
well as existing metro services which provide by the RTA in Dubai. Taking reviews helps to
provide loyalty and satisfaction among the different customer. Along with this there are different
activities which aids to accomplish further improvement which are mentioned below:
Good employee- employer relationship In order to attain the better place in the
marketplace it leads to implement various strategies in order to built effective relationship with
the employee and management level. This would increase in the accomplishment of different
activity in effective time period and it also helps to explore the business of construction in
different area in proper manner (White, 2016).
Proper communication channel: By giving different types of information to the different types
of customer leads to recognise the new introduction of metro by RTA. In this context it leads to
accomplish different types demand and desire made by customer in effective manner.
Management needs to conduct timely meeting in order to know the different types of issues
which are related to the employee working in organisation in proper manner.
7

Priority of employee needs : Determine needs to employee leads to create effective
environment in organisation in proper manner. This helps to maintain coordination between
employee working in the organisation in the effective manner.
Proper guidance and direction: In order to achieve the target in stipulated time period the
management needs to give proper direction to perform different types of activities in
organisation. This leads to accomplish various task in proper manner.
Operational Theories, Models and Concepts
Operational manager needs to prepare different types of plans and policies in order to
perform different type of task in the organisation in proper manner . There are different types of
theories and concepts which are used by the operational manager in order to accomplish different
types of task which is assigned by the organisation in systematic manner. These theories are like
scientific , bureaucratic theories and classical theories will helps to perform different types of
functions of the organisation in effective manner. These theories aids to give proper guidance to
the employee working in the organisation. It also helps to guide different employee working in
the organisation in effective manner.
Process of quality control : There are different types of process which are involve in the
production process . By this approach it is determine about the different methods which are
used in minimising the wastage of manufacturing of metro project. There three aspects which are
emphasis on to improve the quality:
Element like controls, job management, define and well managed process and integrated criteria
competency like knowledge and skills.
Soft element like personnel, integrity confidence, and many others which helps to attain goals
and objectives of organisation.
TASK 4
P3 Stages of PLC with business case, project plan and work breakdown structure
In present era the Dubai metro wants to expand its operations in Sharjah which aids to
maximise the level of profit of the organisation. The Authority take helps of different contractor
which prepare blue print of metro and constructing effective plan in order to accomplish the
different types of operation of the organisation in effective manner. In order to extend metro
service in Sharjah Dubai metro implement different types of resource which are used by the
management in order to maximise the level of profit of company. The management of RTA
8
environment in organisation in proper manner. This helps to maintain coordination between
employee working in the organisation in the effective manner.
Proper guidance and direction: In order to achieve the target in stipulated time period the
management needs to give proper direction to perform different types of activities in
organisation. This leads to accomplish various task in proper manner.
Operational Theories, Models and Concepts
Operational manager needs to prepare different types of plans and policies in order to
perform different type of task in the organisation in proper manner . There are different types of
theories and concepts which are used by the operational manager in order to accomplish different
types of task which is assigned by the organisation in systematic manner. These theories are like
scientific , bureaucratic theories and classical theories will helps to perform different types of
functions of the organisation in effective manner. These theories aids to give proper guidance to
the employee working in the organisation. It also helps to guide different employee working in
the organisation in effective manner.
Process of quality control : There are different types of process which are involve in the
production process . By this approach it is determine about the different methods which are
used in minimising the wastage of manufacturing of metro project. There three aspects which are
emphasis on to improve the quality:
Element like controls, job management, define and well managed process and integrated criteria
competency like knowledge and skills.
Soft element like personnel, integrity confidence, and many others which helps to attain goals
and objectives of organisation.
TASK 4
P3 Stages of PLC with business case, project plan and work breakdown structure
In present era the Dubai metro wants to expand its operations in Sharjah which aids to
maximise the level of profit of the organisation. The Authority take helps of different contractor
which prepare blue print of metro and constructing effective plan in order to accomplish the
different types of operation of the organisation in effective manner. In order to extend metro
service in Sharjah Dubai metro implement different types of resource which are used by the
management in order to maximise the level of profit of company. The management of RTA
8
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

determine the different types of element which are considered by the organisation in order to
choose the locations to start the metro place at proper place. Capital investment in this projects,
regulations of human resource which are used to complete the projects in stipulated time period.
The management implement different types of strategies which are used to construct the metro
for the people. This leads to conduct different types of research and develop department in
effective manner. This leads to accomplish goals and objectives of organisation in proper
manner. In order to construct new metro government ascertain various functions as per the stage
of projects which helps to determine the issues and problems which are used by the organisation
in effective manner. For the operational manager it is necessary for the manager to implement
different ideas of project life cycle
Project life cycle (PLC): it is most important assets of any project by which it aid to
execute the different stages of project life cycle. This aids to accomplish goals and objectives of
organisation in effective manner. This project life cycle helps to control and manage different
types of activities of company which are involve in completing the project at stipulated time
period. There are various phases of project life cycle which are mentioned below:
Initiation phase: This is the first phase in which the RTA is allocate different types of
resources which are used by the operational manager in order to start the new metro project by
Sharjah. This aid to define the roles and responsibility of various employee working in the
organisation. These efforts helps to perform different functions of company in proper manner.
There are various types of strategies which are implemented in the project life cycles. The
operational manager for company plan to implement to implement different types of resource
which are used by the organisation in order to accomplish goals and objectives of organisation in
effective manner.
Planning stage: This stage is related to execute different types of steps which are used
in the research process. These processes are like starting of preparation of different types of
material which are used in constructing different part of metro project in a systematic manner.
The manager examine various material which are used by the organisation in order to accomplish
goals and objectives of organisation. The manager allocate different resource to different places
where metro train is going to complete the metro project in proper manner. As the RTA
communicate with five contractor which helps to complete the different operations of project in
effective manner. This phase is also concerned with the proper allocation of funds in effective
9
choose the locations to start the metro place at proper place. Capital investment in this projects,
regulations of human resource which are used to complete the projects in stipulated time period.
The management implement different types of strategies which are used to construct the metro
for the people. This leads to conduct different types of research and develop department in
effective manner. This leads to accomplish goals and objectives of organisation in proper
manner. In order to construct new metro government ascertain various functions as per the stage
of projects which helps to determine the issues and problems which are used by the organisation
in effective manner. For the operational manager it is necessary for the manager to implement
different ideas of project life cycle
Project life cycle (PLC): it is most important assets of any project by which it aid to
execute the different stages of project life cycle. This aids to accomplish goals and objectives of
organisation in effective manner. This project life cycle helps to control and manage different
types of activities of company which are involve in completing the project at stipulated time
period. There are various phases of project life cycle which are mentioned below:
Initiation phase: This is the first phase in which the RTA is allocate different types of
resources which are used by the operational manager in order to start the new metro project by
Sharjah. This aid to define the roles and responsibility of various employee working in the
organisation. These efforts helps to perform different functions of company in proper manner.
There are various types of strategies which are implemented in the project life cycles. The
operational manager for company plan to implement to implement different types of resource
which are used by the organisation in order to accomplish goals and objectives of organisation in
effective manner.
Planning stage: This stage is related to execute different types of steps which are used
in the research process. These processes are like starting of preparation of different types of
material which are used in constructing different part of metro project in a systematic manner.
The manager examine various material which are used by the organisation in order to accomplish
goals and objectives of organisation. The manager allocate different resource to different places
where metro train is going to complete the metro project in proper manner. As the RTA
communicate with five contractor which helps to complete the different operations of project in
effective manner. This phase is also concerned with the proper allocation of funds in effective
9

manner. Company faces different types of issues and problems which are impacted the different
operations of project in effective way. The manager also faces different issues which are related
to distribution of funds which are involve in manufacturing of different part of projects in
effective manner. In this stage it is also concerned with execution of different stages of
research. There are various engineers, various software which are acquired by the management
in order to perform different types of task in effective manner. They implement new and
innovative technology which aids to perform different types of functions of organisation in
effective manner.
Execution phase: In this phase there are different types of process are concerned on to
implement different types of strategies which are related to performing different functions of
company. This phase is related to the Dubai metro which are concerned with the different
process of organisation which are related to extension of metro after all process are accomplish
in proper manner. This leads to make coordination among different contractors and the employee
who are involve in performing different functions of projects. All the steps of venture are are
monitored the process of new metro project in effective manner. The manager of project
deployed their employee to dug up the ground while performing functions they face violation
by the people living in society. The management give some compensation amount to them in
order to start the project in proper manner.
Closure phase: This phase is considered as the final phase of project life cycle in this phase all
operation are completed which are involve in establishment of metro. There are various steps
which are determine by the manager in order to final check up of different types of stage of
organisation in proper manner.
All activities of project are completed and ready for final test. All the activities are
supposed to take different types of initiatives which are ascertain by the organisation in order to
complete the project in time. In this phase the projects are open for public used and it took
various types of initiatives which are used during the execution of different steps involve in
projects. Here are the given work breakdown structure which helps to complete the task in small
section which aids to complete the project in stipulated time period. This work break down
structure aids to accomplish different types of strategies which aids to accomplish the different
operations of projects in effective way. They faces lots of challenges issues while completions of
10
operations of project in effective way. The manager also faces different issues which are related
to distribution of funds which are involve in manufacturing of different part of projects in
effective manner. In this stage it is also concerned with execution of different stages of
research. There are various engineers, various software which are acquired by the management
in order to perform different types of task in effective manner. They implement new and
innovative technology which aids to perform different types of functions of organisation in
effective manner.
Execution phase: In this phase there are different types of process are concerned on to
implement different types of strategies which are related to performing different functions of
company. This phase is related to the Dubai metro which are concerned with the different
process of organisation which are related to extension of metro after all process are accomplish
in proper manner. This leads to make coordination among different contractors and the employee
who are involve in performing different functions of projects. All the steps of venture are are
monitored the process of new metro project in effective manner. The manager of project
deployed their employee to dug up the ground while performing functions they face violation
by the people living in society. The management give some compensation amount to them in
order to start the project in proper manner.
Closure phase: This phase is considered as the final phase of project life cycle in this phase all
operation are completed which are involve in establishment of metro. There are various steps
which are determine by the manager in order to final check up of different types of stage of
organisation in proper manner.
All activities of project are completed and ready for final test. All the activities are
supposed to take different types of initiatives which are ascertain by the organisation in order to
complete the project in time. In this phase the projects are open for public used and it took
various types of initiatives which are used during the execution of different steps involve in
projects. Here are the given work breakdown structure which helps to complete the task in small
section which aids to complete the project in stipulated time period. This work break down
structure aids to accomplish different types of strategies which aids to accomplish the different
operations of projects in effective way. They faces lots of challenges issues while completions of
10

project but they took different initiatives in order to resolve those issues which helps to
accomplish functions of metro projects.
Gantt Chart
In order to perform different types of activities in effective manner following chart
company which is shown in horizontal and vertical axis
These are concepts and theories which are used by different authority of RTA in organisation
which aids to construction as well as enhance position of commodity at marketplace.
Below work down structure is mentioned below for new commodity
11
accomplish functions of metro projects.
Gantt Chart
In order to perform different types of activities in effective manner following chart
company which is shown in horizontal and vertical axis
These are concepts and theories which are used by different authority of RTA in organisation
which aids to construction as well as enhance position of commodity at marketplace.
Below work down structure is mentioned below for new commodity
11
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

(Source: “Work Break Down Structure 2018” )
TASK 4
P4. Effectiveness of PLC in application of project
The organisation needs to determine the different application of the PLC while entering
into new market (Becker, Kugeler and Rosemann, M. 2013). There are different types of
application which are used by RTA. In order to accomplish goals and objectives of organisation
in effective manner. There are different types of approaches and theories which are used by the
organisation in order to improve the quality of manufacture the bridge in effective manner.
These approaches are like Total quality management, six sigma approaches and lean
management which helps to accomplish goals and objectives of organisation. These are the
approaches which are implemented by operational manager of organisation. This aids to perform
different types of work of organisation in a systematic manner (Pryke, and Smyth, 2012 ).
Total quality management: This approaches are used by RTA in order to improve the
quality of operations of company. There are different types of initiative steps which are taken by
manager of operation which helps to accomplish various functions of project. This approaches is
used by develop the metro in stipulated time period. This helps to maintain effectiveness in
performing different types of activities of company.
Six sigma approaches: This approaches are used by management in order to improve the
quality of different types of functions which involve in the extension of metro in effective
manner. This leads to perform different types of functions of company in stipulated time. Dubai
metro ascertain this approach for enhancing the quality of different approaches which aids to
accomplish various functions of metro in less time. This helps to attain goals and objectives of
company in effective manner. This helps to maximise the rate of accomplish operation. There
are two applications which are used by company in order to measure the quality of different
products and services in effective manner. These applications are DMAIC are describe below:
D= Define
M= Measure
A= Analyses
12
TASK 4
P4. Effectiveness of PLC in application of project
The organisation needs to determine the different application of the PLC while entering
into new market (Becker, Kugeler and Rosemann, M. 2013). There are different types of
application which are used by RTA. In order to accomplish goals and objectives of organisation
in effective manner. There are different types of approaches and theories which are used by the
organisation in order to improve the quality of manufacture the bridge in effective manner.
These approaches are like Total quality management, six sigma approaches and lean
management which helps to accomplish goals and objectives of organisation. These are the
approaches which are implemented by operational manager of organisation. This aids to perform
different types of work of organisation in a systematic manner (Pryke, and Smyth, 2012 ).
Total quality management: This approaches are used by RTA in order to improve the
quality of operations of company. There are different types of initiative steps which are taken by
manager of operation which helps to accomplish various functions of project. This approaches is
used by develop the metro in stipulated time period. This helps to maintain effectiveness in
performing different types of activities of company.
Six sigma approaches: This approaches are used by management in order to improve the
quality of different types of functions which involve in the extension of metro in effective
manner. This leads to perform different types of functions of company in stipulated time. Dubai
metro ascertain this approach for enhancing the quality of different approaches which aids to
accomplish various functions of metro in less time. This helps to attain goals and objectives of
company in effective manner. This helps to maximise the rate of accomplish operation. There
are two applications which are used by company in order to measure the quality of different
products and services in effective manner. These applications are DMAIC are describe below:
D= Define
M= Measure
A= Analyses
12

I=Improve
C= Control
it helps to take corrective measures to improve the quality of different work which are related to
improve the quality of different types of work in effective manner.
Lean management: This is theory which are used by the RTA in order to focus on to
core activities of organisation. This helps to perform different types of activities in effective
manner. There are various types of activities of organisation. While starting of project the
manager and leaders of organisation focus on to core operations which helps to execute the
different types of services of organisation in short stipulated time period. This aids to accomplish
different types of functions of company. This also aids to reduce the wastage of different
products in manufacturing of metro project.
Market research can be a challenge as the external factors keeps on changing and it is
crucial to find that what can be used for implementing on a long run. It acts as a barrier as
whenever any change in the present system take place. It restricts the capacity of the business
idea to expand and give favourable returns to business.
Benchmarking can be done through which the standards of the total work done can be raised as
in this system higher targets are set taken from the same industry which helps in setting
accountability too of the work force. These are initiative steps helps to complete this project in
appropriate time period (Pryke and Smyth, 2012).
In this venture execution of different steps need to estimate practical and theoretical part
of the work in order to accomplish aims and objective of organisation.
CONCLUSION
As per this mentioned project it has been assumed that implementation of new and
innovative technology aids to accomplish different types of activities in effective manner the
organisation needs to make proper strategies which helps to accomplish different functions of the
organisation in order to accomplish in the stipulated time period. There are different types of
theories and concept involve in the projects helps to increase the productivity of the organisation
13
C= Control
it helps to take corrective measures to improve the quality of different work which are related to
improve the quality of different types of work in effective manner.
Lean management: This is theory which are used by the RTA in order to focus on to
core activities of organisation. This helps to perform different types of activities in effective
manner. There are various types of activities of organisation. While starting of project the
manager and leaders of organisation focus on to core operations which helps to execute the
different types of services of organisation in short stipulated time period. This aids to accomplish
different types of functions of company. This also aids to reduce the wastage of different
products in manufacturing of metro project.
Market research can be a challenge as the external factors keeps on changing and it is
crucial to find that what can be used for implementing on a long run. It acts as a barrier as
whenever any change in the present system take place. It restricts the capacity of the business
idea to expand and give favourable returns to business.
Benchmarking can be done through which the standards of the total work done can be raised as
in this system higher targets are set taken from the same industry which helps in setting
accountability too of the work force. These are initiative steps helps to complete this project in
appropriate time period (Pryke and Smyth, 2012).
In this venture execution of different steps need to estimate practical and theoretical part
of the work in order to accomplish aims and objective of organisation.
CONCLUSION
As per this mentioned project it has been assumed that implementation of new and
innovative technology aids to accomplish different types of activities in effective manner the
organisation needs to make proper strategies which helps to accomplish different functions of the
organisation in order to accomplish in the stipulated time period. There are different types of
theories and concept involve in the projects helps to increase the productivity of the organisation
13

14
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

REFERENCE
Books and Journals
Aaltonen, K., 2011. Project stakeholder analysis as an environmental interpretation process.
International journal of project management. 29(2). pp.165-183.
Alexander, K. ed., 2013. Facilities management: theory and practice. Routledge.
Bahn, S., 2013. Workplace hazard identification and management: The case of an underground
mining operation. Safety science. 57. pp.129-137.
Becker, J., Kugeler, M. and Rosemann, M. eds., 2013. Process management: a guide for the
design of business processes. Springer Science & Business Media.
Bullinger, H. J. and Warschat, J. eds., 2012. Concurrent simultaneous engineering systems: the
way to successful product development. Springer Science & Business Media.
Das, S. C., 2011. Project management and control. PHI Learning Pvt. Ltd..
Fang, H., Han, D., He, G. and Chen, M., 2012. Flood management selections for the Yangtze
River midstream after the Three Gorges Project operation. Journal of hydrology. 432,
pp.1-11.
Hatziargyriou, N. ed., 2014. Microgrids: architectures and control. John Wiley & Sons.
Pryke, S. and Smyth, H., 2012. The management of complex projects: A relationship approach.
John Wiley & Sons.
Rolstadås, A., and et. al, 2014. Understanding project success through analysis of project
management approach. International journal of managing projects in business. 7(4).
pp.638-660.
Shaheen, K. M., InterDigital Technology Corp, 2014. Method and apparatus for resource
management in handover operation. U.S. Patent 8,817,741.
Stark, J., 2015. Product lifecycle management. In Product Lifecycle Management (Volume 1)
(pp. 1-29). Springer, Cham.
Weglarz, J. ed., 2012. Project scheduling: recent models, algorithms and applications (Vol. 14).
Springer Science & Business Media.
White, P., 2016. Public transport: its planning, management and operation. Taylor & Francis.
Yang, L. R., Chen, J. H. and Wang, H. W., 2012. Assessing impacts of information technology
on project success through knowledge management practice. Automation in
Construction. 22. pp.182-191.
Online
Introduction to Operations Management. 2018. [Online]. Available through:
<https://www.coursera.org/learn/wharton-operations>.
Internal and External factor. 2018. [Online]. Available through: <http://teawater-
fci.blogspot.in/2011/08/change-management.html>.
15
Books and Journals
Aaltonen, K., 2011. Project stakeholder analysis as an environmental interpretation process.
International journal of project management. 29(2). pp.165-183.
Alexander, K. ed., 2013. Facilities management: theory and practice. Routledge.
Bahn, S., 2013. Workplace hazard identification and management: The case of an underground
mining operation. Safety science. 57. pp.129-137.
Becker, J., Kugeler, M. and Rosemann, M. eds., 2013. Process management: a guide for the
design of business processes. Springer Science & Business Media.
Bullinger, H. J. and Warschat, J. eds., 2012. Concurrent simultaneous engineering systems: the
way to successful product development. Springer Science & Business Media.
Das, S. C., 2011. Project management and control. PHI Learning Pvt. Ltd..
Fang, H., Han, D., He, G. and Chen, M., 2012. Flood management selections for the Yangtze
River midstream after the Three Gorges Project operation. Journal of hydrology. 432,
pp.1-11.
Hatziargyriou, N. ed., 2014. Microgrids: architectures and control. John Wiley & Sons.
Pryke, S. and Smyth, H., 2012. The management of complex projects: A relationship approach.
John Wiley & Sons.
Rolstadås, A., and et. al, 2014. Understanding project success through analysis of project
management approach. International journal of managing projects in business. 7(4).
pp.638-660.
Shaheen, K. M., InterDigital Technology Corp, 2014. Method and apparatus for resource
management in handover operation. U.S. Patent 8,817,741.
Stark, J., 2015. Product lifecycle management. In Product Lifecycle Management (Volume 1)
(pp. 1-29). Springer, Cham.
Weglarz, J. ed., 2012. Project scheduling: recent models, algorithms and applications (Vol. 14).
Springer Science & Business Media.
White, P., 2016. Public transport: its planning, management and operation. Taylor & Francis.
Yang, L. R., Chen, J. H. and Wang, H. W., 2012. Assessing impacts of information technology
on project success through knowledge management practice. Automation in
Construction. 22. pp.182-191.
Online
Introduction to Operations Management. 2018. [Online]. Available through:
<https://www.coursera.org/learn/wharton-operations>.
Internal and External factor. 2018. [Online]. Available through: <http://teawater-
fci.blogspot.in/2011/08/change-management.html>.
15

16
1 out of 18
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.