Unit 5 Assignment 2: Construction Phase Safe Systems of Work Report
VerifiedAdded on 2022/01/20
|19
|8128
|178
Report
AI Summary
This report, a student submission available on Desklib, focuses on the development of safe systems of work within a construction phase. It begins with an overview of key concepts such as construction phase health and safety plans, hazard identification, risk assessments, and method statements. The report then details how to calculate probability and severity in risk assessment, along with various methods for hazard identification, including the use of accident data and direct observation. It includes specific risk assessments and method statements for scenarios like working at height and asbestos handling, emphasizing the importance of PPE, education, and training. The report further addresses fire hazards, site safety procedures (such as tool talks), and waste management. Statistical data on accidents and building revites are also provided. The final sections of the report focus on evaluating the effectiveness of the implemented safety measures, incorporating additional statistics, and drawing conclusions about the overall safety management within the construction project.