Samsung Knox Project Report: Requirements Analysis and Design

Verified

Added on  2025/09/06

|11
|1791
|491
AI Summary
Desklib provides solved assignments and past papers to help students succeed.
Document Page
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
Introduction......................................................................................................................................3
Executive summary.........................................................................................................................4
Strategy analysis..............................................................................................................................4
Collaboration and elicitation............................................................................................................4
RASCI matrix of Samsung Knox................................................................................................4
Requirements lifecycle management...............................................................................................6
Requirement analysis template....................................................................................................6
Requirement traceability matrix..................................................................................................6
Requirements analysis and design definition..................................................................................7
Recommended design with justification......................................................................................9
Conclusion.....................................................................................................................................10
References......................................................................................................................................11
List of tables
Table 1 RASCI matrix of Samsung KNOX....................................................................................5
Table 2 Requirement analysis template...........................................................................................6
Table 3 Requirement traceability matrix.........................................................................................6
List of figures
Figure 1First design.........................................................................................................................8
Figure 2 Second design....................................................................................................................8
Document Page
Introduction
The report is helpful to manage and identify the requirements for the fulfillment of business
requirements. This includes possible solutions and recommendations with the justification. The
selected project for the business requirement is Samsung Knox. This report will cover the
strategic analysis of the project along with the required identification. Various diagrams and
matrix will be used to support the discussions and justifications.
Document Page
Executive summary
The report is based on the evaluation of Samsung Company. The opportunity identified for
change in the company is Samsung Knox. The report will cover the strategy analysis of the
company. The change is required as cognitive analysis cause various challenges for the
operators. It also includes the list of potential stakeholders list which will be showed with the
help of RASCI matrix. The list of requirements will also be given in the report according to
perspective of various stakeholders. This will include a template for requirement analysis for the
organization and management of requirements. Two show the linking of the requirements with
the designs, requirement traceability matrix is used. Analysis of requirements is done using use
cases, sequence diagrams, process modeling, etc. The selected solution is using 5G technologies
as it is able to deliver services at high speed. This gives strength to the company.
Strategy analysis
The current aim of the company is to provide an enterprise mobility solution that is able to meet
the requirement of business. The company aims to provide controlled solutions for mobile
teaching in order to improve the experience of learning. Also it aims to offer a solution for the
protection of money. The main objective of the company is to provide an advanced security-
based platform. Samsung Knox is a platform which is able to handle basic security issues that are
found in the platform of android. These strategies allow companies to collaborate and distribute
data related to business. MAM strategy is able to manage the applications and lock the data to
maintain security but does not lock the device. Another strategy is able to encrypt the data in
order to protect it and only allowed the authorized and permitted applications to transmit or
access it (Mirkovic, 2019).
The platform of Knox uses a strong strategy of mobile security that is able to support the range
of Samsung devices. This is called MDM (Mobile device management strategy). This includes
mobile device administration. Different strategies of Samsung Knox include Mobile content
management, application management, and information management. Samsung Knox supports
all of these strategies.
Collaboration and elicitation
RASCI matrix of Samsung Knox
The following matrix shows the responsibilities of the individuals that are part of the project or
change in Samsung. R stands for responsible, A stands for accountable, S stands for support, C
stands for consulted and I stands for informed. This shows the allocation of responsibilities of
team members (Kantor, 2018)This also refers to the competence model.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table 1 RASCI matrix of Samsung KNOX
Project
sponsor
steering
committee
Project
manager
Functional
lead
Project
team
member
Business
analyst
Technical
lead
Consulta
nt
Business
case
I I R/A C C C C
Create
schedule
I I R/A C C C C C
Finance
plan
I I R/A I I I C
Implemen
tation of
Samsung
Knox
C/I C/I R/A R/A R/A A/C
Launchin
g
C/I C/I R/A R/A R/A A/C
Create a
status
report
I I R/A R/A R/A C
Perform
change
managem
ent
C R A A C
Create a
project
closure
report
I I R/A I I I
The table given above shows the list of stakeholders of Samsung Knox project. This also reflects
the prioritization of stakeholders in the change.
Requirements for change include mainly technical and human resources. Technical resources are
required to embed 5G technology in the project and human resources are required. Apart from
these, there are other requirements that are necessary for effective change. Various hardware and
software requirements are necessary to effectively implement and manage change. Different
security tools and techniques are required in the Samsung Knox project as it aimed to improve
the security level of the services. Different stakeholders of the project have different
requirements. Users of the products need a platform for an improved experience of learning,
monetary protection, etc. The government wants assurance for the employees of government to
assure the safety of mobile devices from malicious applications and cyber attacks. The project
team wants an interface to share information in a secure manner. Requirements also include
remote control the Samsung devices. Stakeholders require a platform that is able to provide and
support powerful networks and improve the level of public safety. The requirement of the project
includes a platform that can guarantee the performance.
Document Page
Requirements lifecycle management
Requirement analysis template
The requirement analysis template given below shows the requirement for change. This includes
a brief introduction to the project. This also covers functional and non-functional requirements of
the change. This document also includes the constraints of project.
Table 2 Requirement analysis template
Requirement analysis Document
Introduction: The project is of Samsung company. The opportunity identified for change in the company
is Samsung Knox. The change is required in the project because cognitive analysis took a lot of time and
efforts.
Functional requirements: The functional requirements of the project includes the enhanced speed of the
services delivery, improved security of the mobile platforms, an integrated network for the devices and
consumers.
Non-functional requirements: Non-functional requirement includes the implementation of change
without any legal issues.
Constraints of the project: Human resources, lack of skills in5G technology implementation, user
acceptance towards change, etc.
Requirement traceability matrix
The following table given below describes the requirements. The matrix is helpful to trace the
requirements. This includes the name of modules, stakeholders and their roles in that module, ID
of test case and description of the module (Samsungknox.com, 2018).
Table 3 Requirement traceability matrix
SN# Name of module Roles Test case ID Description
SN1 Secured platform Project Manager T67 The project manager
needs a secure mobile
platform.
SN2 Encryption Stakeholder
Project manager
T89 A user wants
encryption of data to
enhance security.
SN3 Run time protection Customer
Project manager
T66 A project manager
wants to provide run
time protection to the
customer’s data
SN4 Improved speed Manager T45 The customer wants
improved speed for
the services.
SN5 Multiple business
services
Stakeholders
Customer
Project manager
T86 Stakeholders require
different business
services from one
platform.
Document Page
Requirements analysis and design definition
Following use stories shows the requirement specifications for change. These user stories define
the requirement of stakeholders. The table given below includes the list of user requirements and
priority
User stories
Need Priority
US1: As a project manager I want to provide a
powerful network
High
US2: As a user, I want a secure platform High
US3: As a Project manager I want to integrate the
latest technologies
Critical
US4: As a user, I want to speed up the process High
US5: As a stakeholder, I want multiple business
services from one platform
High
US6: As a Project manager I want to protect the
sensitive information from the malicious activities
High
US7: As a stakeholder, I want to safeguard
consumer devices.
Critical
US8: As a user, I want an interactive and
understandable interface.
Low
US9: As a user, I want Run time protection and
encryption
Critical
US10: As a stakeholder, I want a management
framework.
High
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
First design:
Figure 1First design
This suggested design is able to provide a secure platform. This includes MAG technology. This
design includes APIs. This has a control center to manage the activities. The app directory
includes different apps. But this design is not able to meet all the requirements of the
stakeholders like it is not able to provide faster services. This design does not include any
technology to boost up the service delivery and performance. This is able to manage the mobile
container. There are different commands to perform a different operation such as creation and
deletion of Knox containers, installation of applications that are approved, validation of the
android system integrity (Stockton, 2019).
Second design:
Figure 2 Second design
This second design for the requirement implementation includes “Samsung Knox manage”. This
is able to provide run-time security with the help of encryption. This offers security
Document Page
improvements. As per the stakeholder’s requirement this also boosts up the service delivery with
the incorporation of 5G technology. This also provides a management framework. The Samsung
Knox manage includes Knox configure, mobile, E-fota, manage and enrollment.
Recommended design with justification
After the analysis of both the design suggestions, the second design is selected for the project.
The recommended design includes 5g Technology in the Samsung Knox. This technological
design is selected as it is able to deliver high-speed services and can support fast download. This
enhances the experience of customer. This allows working a number of devices work together.
Another reason behind the selection of this specific design is that it provides a positive strength
to the company. The chosen design for the solution has military-grade security for mobile
platform. This is able to secure 1 billion+ Samsung devices and consumers. As per eth
requirements of stakeholders it also provides various business services. The chosen design will
provide a defending mechanism to protect sensitive data from malicious threats and activities.
The recommended design provides a powerful network. The involvement of 5G technology will
enable the improved propagation of IoT.
Document Page
Conclusion
The report was based on the change identification and implementation that is related to IT. The
project selected for this report was Samsung Knox. The project required changes as the
analytical analysis took a lot of efforts and time. Two different design approaches were
proposed. The selected approach for the change project was the implementation and
incorporation of 5G technology. In order to meet stakeholder’s requirements, it is able to achieve
high speed services. It also provides a secured platform and supports powerful networks. This
also improves the performance of the project application. This provides a simple and easy
development.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
References
Kantor, B., 2018. The RACI matrix: Your blueprint for project success. [online] CIO. Available
at: https://www.cio.com/article/2395825/project-management-how-to-design-a-successful-raci-
project-plan.html [Accessed 24 Sep. 2019].
Mirkovic, M., 2019. Internal Analysis: Every strategy should start with one. [online]
Executestrategy.net. Available at: https://www.executestrategy.net/blog/internal-analysis
[Accessed 24 Sep. 2019].
Samsungknox.com., 2018. Samsung Knox: Read our new White Paper | Samsung Knox. [online]
Available at: https://www.samsungknox.com/en/blog/samsung-knox-read-our-new-white-paper
[Accessed 24 Sep. 2019].
Stockton, D., 2019. Samsung Knox: Providing a Secure Mobile Environment for Public Safety.
[online] Samsung Business Insights. Available at:
https://insights.samsung.com/2019/07/16/samsung-knox-providing-a-secure-mobile-
environment-for-public-safety-2/ [Accessed 24 Sep. 2019].
chevron_up_icon
1 out of 11
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]