This project plan, developed by a student, outlines the implementation of SAP S/4HANA for Yes Chemist Pty Ltd. It details the project scope, which includes hardware installation, SAP system configuration, testing, and staff training. The business case justifies the project by highlighting the need to reduce operational complexities and improve information management. The plan also presents a project schedule, resource management details, and a budget. Risk assessment, communication strategies, and quality management activities are also included. The agile project management framework is adopted for rigorous testing. The project aims to streamline operations, improve information processing, and enhance overall efficiency. The project includes a detailed glossary, and bibliography. This report is an educational example of a project plan, showcasing various aspects of project management, and is available on Desklib, a platform providing AI-based study tools for students.
Document Page
VUIS CONSULTING PTY LTD.
PROJECT PLAN [1]
[SAP in Yes Chemist]
[21-05-19]
[INSERT AUTHOR NAME HERE]
[Project Manager]
[INSERT AUTHOR EMAIL HERE]
The following template is for educational purposes only.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
Glossary............................................................................................................................. 3
Introduction......................................................................................................................... 4
Project scope......................................................................................................................4
Business case..................................................................................................................... 5
Project Schedule and Approach (Rollout strategy)..............................................................5
Project knowledge base......................................................................................................8
Resource managements.....................................................................................................8
Budget.............................................................................................................................. 10
Risk................................................................................................................................... 12
Communication................................................................................................................. 13
Quality management.........................................................................................................14
Summary.......................................................................................................................... 14
Bibliography...................................................................................................................... 15
VUIS Consulting Project Plan Page 2
[Insert Author name here]
Document Page
Glossary
Term Definition
Business
Case
Business case identifies the need of project implementation and
execution
Project Scope The scope identifies the major deliverables of a particular project
VUIS Consulting Project Plan Page 3
[Insert Author name here]
Document Page
Introduction
The project execution plan for project “SAP in Yes Chemist” is developed that defines the
scope and the need of carrying out the undertaken project. The need of SAP implementation
project is to considerably reduce the operational issues that the organization has been
facing. The project plan identifies the scope and the business case to justify the needs of
execution of this project. The project plan further identifies the risks and the communication
strategy that will be followed to ascertain that the SAP project is being pulled off in a planned
way.
Project scope
The project aims in deployment of SAP S/4HANA for SAP Business All-in-one for the
pharmacy Yes Chemist Pty Ltd. The in-scope of the SAP project is indicated below-
Delivering as well as installing the necessary hardware
Installing and Configuring the SAP system
Testing of the system
Training to the head office staffs along with the inter-state store pharmacies will be
provided
The aim of the SAP project is to fulfil all the above functionalities. The deliverables of this
SAP project and their associated quality standards are indicated in the matrix below-
Deliverable Quality Standard Required
Requirements Analysis The detailed requirement of the project is
needed to be gathered
Preparation of the server Room The demolition and server room preparation
should take no more than 15 days
Data Conversion The data conversion should be linked with
the legacy data structure.
Testing of the Functional Modules The testing phase should be linked with
each functional modules
Training The training should be completed prior to
the launch
Launch Delivery and installation of all the hardware
and system configuration should be
completed prior to the launch.
Assumptions: The deliverables will be met within the set timeline
The project will start no later than 25th July 2019
VUIS Consulting Project Plan Page 4
[Insert Author name here]
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
The main constraint of the project is that training will be delivered only once and there is less
scope of project maintenance.
Business case
The project is needed and justified as with the business growth the operational complexity of
the organization increases as well. The implementation of SAP HANA will help in better
management of those complex operations.
Benefit Realization Criteria
The complex operational issues will be
simplified.
Significant reduction in operational issues
(at least 25% in 3 months)
Better Information storage Proper storage of the existing information in
the new system.
Faster information processing The information processing speed is
increased by 50% in 6 months
The dis-benefits of the project are as follows-
The huge cost of implementation
Decrease in production till the staffs understands the basic operation of the new SAP
system
Project Schedule and Approach (Rollout strategy)
The SAP project implementation will follow a planned approach. The deliverables and the
mile stone of the SAP project is indicated as follows-
VUIS Consulting Project Plan Page 5
[Insert Author name here]
Document Page
Figure 1: Representing Deliverables and Milestone
The schedule Gantt chart of the SAP project are showcased in the figure below-
VUIS Consulting Project Plan Page 6
[Insert Author name here]
Document Page
Figure 2: The Tracking Gantt chart of the SAP project
The baseline of the project is set and the actual start and completion of demolition of the
server room is provided in the Gantt chart. Since the project is yet to start, the other tasks
are showing 0% completion in the above figure.
The schedule Gantt chart of the project is illustrated as follows-
VUIS Consulting Project Plan Page 7
[Insert Author name here]
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Figure 3: The schedule Gantt chart of the SAP project
Project knowledge base
The project management framework that would be adaptable in this project is agile. This
methodology is based on delivery of the requirements in an iterative and in an incremental
manner throughout the execution of the entire lifecycle of the project. The choice of the
methodology is justified as the project needs rigorous testing that is followed in agile
approach. Thu adopting the agile method will be beneficial for the project team.
Resource managements
The resources considered for this project along with their cost are showcased as follows-
VUIS Consulting Project Plan Page 8
[Insert Author name here]
Document Page
Figure 4: Representing the Resources
The following report identifies the resources overview of the SAP project-
Figure 5: Representing the Resource Overview
VUIS Consulting Project Plan Page 9
[Insert Author name here]
Document Page
The figure above represent that work time allocated to each of the project resources. Since
the project has not started yet, the matrix represents the remaining work to be executed by
the staffs of the organization.
Budget
The cost of the SAP project is illustrated as follows-
VUIS Consulting Project Plan Page 10
[Insert Author name here]
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Figure 6: Illustrating the Project Cost
The report below represents the resource cost overview of the SAP implementation project-
VUIS Consulting Project Plan Page 11
[Insert Author name here]
Document Page
Figure 7: Resource Cost Overview
Risk
The major risks that the SAP project might face are indicated in the following table-
Risks Severity Probability of
Occurrence
Risk Response
R1: Technical
Failure
High High Avoid
R2: Budget Issues High Medium Transfer
R3: Schedule Issues Medium Medium Avoid
R4: Resource
shortage
Medium Low Avoid
R5: Operational
Issues
Medium High Avoid