SBM4201: Case Study - System Analysis and Design for Gold Cinema

Verified

Added on  2022/08/22

|17
|2638
|31
Case Study
AI Summary
This case study provides a comprehensive analysis and design plan for Gold Cinema's new online ticket booking system. The report meticulously outlines the System Development Life Cycle (SDLC) phases, including requirement gathering, system design, implementation, testing, deployment, and maintenance. It includes a detailed Work Breakdown Structure (WBS) to manage project tasks and a PERT chart for project scheduling. Furthermore, the case study incorporates a cost/benefit analysis, calculating Net Present Value (NPV), Return on Investment (ROI), and payback period to assess the financial viability of the project. Use case diagrams are also provided to illustrate system functionalities and user interactions, offering a complete overview of the proposed system's design and functionality. The case study also includes the design of the front-end and back-end interfaces, user interface, and security analysis of the system.
Document Page
Running head: INNOVATION AND TECHNOLOGIES
Innovation and Technologies: For SBM4201 System Analysis and Design
Name of Student-
Name of University-
Author’s Note-
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1INNOVATION AND TECHNOLOGIES
Table of Contents
Introduction......................................................................................................................................1
Six Core processes of SDLC...........................................................................................................1
Work Breakdown Structure.............................................................................................................2
Pert Chart.........................................................................................................................................9
Net present value, payback period, Return on investment............................................................10
Use Case Diagram.........................................................................................................................14
Conclusion.....................................................................................................................................14
Bibliography..................................................................................................................................16
Document Page
2INNOVATION AND TECHNOLOGIES
Introduction
The case study that is included in this project is the case study of Gold Cinema that wants
to implement a new online system of ticket booking. The system wants to automate the booking
of ticket to the customer who can view their shows running and can select their show timing
accordingly. This report states the system analysis and design for the GC system that is to be
developed. System analysis includes the analysis of the system that includes understanding the
need of human from the system and the input of data that the humans need to give in the system
(Dennis, Wixom and Roth 2018). This report include system design where the system analysts
needs to identify the problems and the find out proper solution to solve the problems. This report
helps to design, analyze as well as implement the improvements that are needed to support the
system (Putri 2017). This system analysis helps to make improvements in the system and
accomplish all such features that the user needs from the new system. This report also states the
different processes of system development that are needed to complete developing a system. As
developing of new system includes very crucial processes and those have to be managed by the
project manager (Oyelere et al. 2018). Those processes are being managed with six processes
and this report describes all the processes that are needed to develop the system.
Six Core processes of SDLC
SDLC includes a framework that helps to define all the important steps that are needed to
develop the system. This phase includes detailed planning for building the system, planning it
and maintaining the software process of the system (Egwoh and Nonyelum 2017). The six
processes that are to be included in the development process of the gold Cinema system are
Document Page
3INNOVATION AND TECHNOLOGIES
1. Analyzing the requirement of the system and gathering the requirement: In this phase,
requirement is being gathered from the client and those requirement are to be analyzed so as to
start the development of the project.
2. Designing the system: This phase include system designing where the system that is to
be developed is to be designed as per the client requirement and the SRS document for the
system is to be written so that it gets complete within time.
3. Implementation and the coding phase: The system development needs implementation
of the project and including coding for the project (Saeed and Memon 2018). The software
design of the system is translated to coding in this phase.
4. Testing phase of the system: In the testing phase, the systems that are being coded and
programmed are tested within the system development. This project testing is once carried out
before integrating the sub-systems and them final testing is to be done when the system gets
completed and all integration process is being completed in the project.
5. Deployment phase: Deployment test includes deploying the system in the environment
that is it is being tested whether it satisfies the user acceptance criteria for the system (Kennedy
2019).
6. Maintenance phase: maintenance phase helps to maintain the security and helps to fix
all the issues that might be included in the project.
Work Breakdown Structure
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4INNOVATION AND TECHNOLOGIES
Figure 1: Work Breakdown Structure
(Source: Created by Author)
Project ID
Description Duration of each
task
Developing Gold Cinema
System
31 days
Starting of Project
This phase states the starting of the project.
There are many sub-activities those are
under this activity. The activities that are
needed to perform at the starting of the
project are stated in this phase.
5 days
Design the business case of Project business case is designed in this 2 days
Document Page
5INNOVATION AND TECHNOLOGIES
the project
activity. The project is being developed for
satisfying the business need and that have
to be documented in this phase.
Assigning a project
manager for project
Projects are controlled by project managers
and project manager are to be allocated in
a project to manage the project. All the
work are to be assigned by the project
manager to the resources in the project.
2 days
Implement technique of
project management
There are different techniques of project
management and different way about how
a project development can be successfully
completed. Project manager has the
responsibility to implement the project
management technique in the project and
follow it similarly.
1 day
Planning phase of project 5 days
Initial Planning
This is the initial phase of developing the
GC system and this also includes list of
activities that are needed to complete
the project.
3 days
Prepare the WBS for the
project
WBS states the structure of developing the
project and the system engineering. This is
1 day
Document Page
6INNOVATION AND TECHNOLOGIES
a deliverable breakdown that divides the
project in to smaller parts and to track
down the project, WBS is needed to
complete the project.
Plan a project schedule
for project
Project schedule includes all the activities
that are needed to complete the project and
their starting date along with their ending
date. The project schedule is also to be
developed in the project to add resources
in the project and prepare the project
budget. Project scheduling is done with
MS project.
1 day
Plan Resource schedule
for the project
The project schedule include the resource
schedule of the project and resources are to
be added in the resource sheet of the
project schedule in MS project.
2 days
Plan Budget for project
The budget planning can also be done
using MS Project. This is done to estimate
the total cost for developing the project.
2 days
Performing Supply Plan
for project
Each project has a supply planning and
that is t be done to ensure proper
successful delivery of the project. The
2 days
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7INNOVATION AND TECHNOLOGIES
total time that is taken to complete the
supply plan of this project is 2 days.
Planning Risk assessment
for project
Every project needs risk assessment plan
and risks are to be measured while
developing a project. In this phase, the risk
in the project is included and the risk
management strategies are to be included
in risk assessment plan.
1 day
Planning Change
management plan for the
project
Every project should include a change
management plan in the project in case of
any change occurs in the project. This
project also needs to include the change
management in the project and proper
change management plan is to be
established in the project by project
manager.
1 day
Designing phase and
analyzing phase
This is the main phase of the project
which states to design the system and
analyze the designed system.
12 days
Develop the application
system design
The system that is to be developed by GC
includes system design that is to be
designed by the developers before
1 day
Document Page
8INNOVATION AND TECHNOLOGIES
completing the project.
Determining functional and
the non-functional requirements
for the system
Every system has functional and non-
functional requirements that is to be
satisfied in the project. For developing the
system for GC, there is need to define the
functional and the non-functional
requirement for the project. This project
should include functional requirement that
is specified by the client of the project.
2 days
Designing the use case
Use case design is to be made in the
project as because designing use case, the
developers get to know about the activities
that will be carried out by the actors
included in the project. Use case will
include a diagram stating the actors and the
activities that will be performed by the
user using the system.
1 day
Designing front end of GC
system
Every system has backend and front end
and the both are to be designed and
developed by the system developer. This
phase develops the front end of the system
where the customer will view the interface
2 days
Document Page
9INNOVATION AND TECHNOLOGIES
and the admin viewing the interface.
Designing back end
interface of GC system
The back end of the system includes the
database and all other programming done
by the developers to develop the system.
3 days
Designing user interface of
the system
The interface that is t be designed for the
GC system is to be user friendly so that
customers can find it easy to use the
system.
3 days
Performing the system
security analysis
All systems are to be secured and
development of GC also includes security
of data that are included in the project.
1 day
Testing phase
Testing phase includes the testing of the
system
8 days
Testing all sub-systems
Testing the system includes testing the
sub-systems that are to be developed in the
project. Testing includes testing different
systems separately.
3 days
Integrating all tested sub-
systems
All subsystem are to be integrated after
they have completed testing.
2 days
Test after integration After integrating all the systems, it is
needed to test the whole system and so that
3 days
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10INNOVATION AND TECHNOLOGIES
it work properly.
End phase 1 day
Documentation for project
The documentation of the project is to
done that includes project completion
1 day
Signing off the project
Project sign off is to be done by the project
manager and the head of Gold Cinema
who needs the project.
0 days
Table 1: Task Description
(Source: Created by Author)
Pert Chart
Document Page
11INNOVATION AND TECHNOLOGIES
Figure 2: Pert Chart
(Source: Created by Author Using Visio)
The above diagram shows the pert chart for the activities that are involved in developing
the project. In the above diagram, the red path that is included in the project is the critical path
and that is the longest path that project needs to complete with all necessary activities to
complete the project. The critical path and the critical activities are shown in the diagram above.
The diagram also shows the early start, early finish and the slack of the activities included in the
project schedule. The total time to complete the project 31 days and all different phases has
different completing time.
Net present value, payback period, Return on investment
Cost/Benefit Analysis for the Gold Cinema System
Total Cost for the project
Development cost of project 15000
Cost of carrying out the project 15000
Year wise plan
Initi
al
year
1st
year
2nd
year
3rd
year
4th
year
5th
year
Total
cost
Net economic benefit of developing
the system
$0.0
0
$9,00
0.00
$9,00
0.00
$9,00
0.00
$9,0
00.0
$9,0
00.0
chevron_up_icon
1 out of 17
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]