This project presents a comprehensive quality management plan developed for an IT project, likely within an educational setting. It outlines the purpose of the plan, which is to ensure the quality of project deliverables, including a secure website login, improved data sharing, easier access to student information, and a faster internet connection. The project details roles and responsibilities, quality planning, quality assurance activities, and quality control measures. The quality assurance section includes a table that specifies processes subject to quality assurance, quality standards, stakeholder expectations, the type of assurance activity, the timing of the activity, and the responsible individual. The report also covers the implementation of the quality plan, including a step-by-step guide and strategic details for quality assurance and control. A continuous improvement plan is also presented, which includes areas of benchmark adjustments, corrective actions, and responsible persons to ensure quality improvement. The project emphasizes the importance of continuous review and documentation for effective quality management.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: ADVANCE DIPLOMA OF IT
ADVANCE DIPLOMA OF IT
Name of the student:
Name of the university:
Author note:
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
2ADVANCE DIPLOMA OF IT
Table of Contents
Step 1: Quality Management Plan.........................................................................................................3
1. Purpose of the Project Quality Management Plan.........................................................................3
2. Role and responsibilities:...............................................................................................................3
3. Quality planning.............................................................................................................................4
4. Quality Assurance..........................................................................................................................5
5. Quality Control..............................................................................................................................7
Step 2:.................................................................................................................................................10
A Report on Project Quality Plan Implementation...........................................................................10
Step 3: continuous improvement plan................................................................................................12
Document Page
3ADVANCE DIPLOMA OF IT
Step 1: Quality Management Plan
1. Purpose of the Project Quality Management Plan
The purpose of the quality management plan is to develop a detailed plan for the
quality assurance and the quality control for delivering the following deliverables for the
project.
Secure and private website login for trainer and students
Improved data sharing among the network
Ease of access of student information for resolving online queries
Improved and faster internet connection
2. Role and responsibilities:
Name Role Quality responsibility
Peter jones Project manager To ensure that the quality
control audits are being
performed properly
Web analyst To ensure that website
quality testing is accurate
and performed in timely
manner. In addition to that
proper
Network architect To ensure that network
quality testing is accurate
and performed in timely
manner
Document Page
4ADVANCE DIPLOMA OF IT
Data analyst To ensure the scalability and
security of the database
Quality control manager To ensure that the
documentation of the quality
checking is perfect and
properly communicated to
the stakeholders. In addition
to that the quality control
manger needs to ensure that
effective plan is made by
both web and network
analyst in case breakdown
occurs
Project Deliverables
and Project Processes
Project deliverables defines the parameters that needs to
delivered successfully after the project completion and
Project process is the step by step approach to ensure that
project scope is properly met with stakeholder satisfaction
Deliverable
Quality
Standards
Standards to meet the quality of the project deliverables
defined for the project
Process
Quality
Standards and
Standards to meet the quality of the project process required
for delivering quality of the project and the expectation that
the stakeholders have or the requirement that the
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
5ADVANCE DIPLOMA OF IT
Stakeholder
Expectations
stakeholders set for the project
Quality Control Activities Activities required to make the outcome of the project
comply with all the required standards
Quality Assurance
Activities
Activities required to assure that the project will be able to
deliver quality product
3. Quality planning
4. Quality Assurance
Project
Process
Process
Quality
Standards/
Stakehol
der
Expecta
tions
Quality
Assura
nce
Activity
Frequency/
Interval
Who is
Responsi
ble and
what
means
will be
utilized
to report
to them?
Correctiv
e actions
if
breakdo
wns
occur
Website
design
assessmen
t
Proper
assessment for
quality
compliance
website
design
review
Before the
database design
is reviewed and
for 2 days after
the initiation of
web analyst
and
communicat
ion through
electronic
Reassessm
ent right
after the
faults is
identified
Document Page
6ADVANCE DIPLOMA OF IT
the process
quality assurance
activity
documentati
on via email
Website
diagnosis
including
assessmen
t of virus
software
Compliance with
Australia
standard for
website security
Virus
software
security
review
After website
design review is
completed and
will be conducted
for 4 days
Website
security
expert with
specializatio
n in
computer
hardware
and
communicat
ion will be
done
through
electronic
documentati
on via email
Reassessm
ent after
reporting
Network
infrastruct
ure
assessmen
t including
network
equipment
Proper and
effective
assessment of
network
infrastructure
network
design
After the website
design and
security
assessment is
completed and
will span for 3
days
Network
analyst
specializing
in Network
design and
security.
For
Document Page
7ADVANCE DIPLOMA OF IT
communicat
ion
electronic
document
through
email will
be used
Database
design
assessmen
t
Proper
assessment for
faster database
access and
detailed
documentation
database
design
review
After the website
design and
security
assessment and
will take 3 days
Data
analyst and
same
communicat
ion method
as specified
for
communicat
ing with
other
experts in
the projects
Reassessm
ent once
identified
Internet
connectio
n review
Proper
assessment for
identifying cause
for slow network
connection and
improvement for
internet
connectio
n review
against
different
traffic
After all the
process quality
activities is
finished and it
will take 4 days
Network
analyst and
communicat
ion through
email
throughout
Reassessm
ent after
the faults
reported
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
8ADVANCE DIPLOMA OF IT
the same the project
5. Quality Control
Project
Deliverab
le
Deliverable
Quality
Standards/
Stakehold
er
Satisfacti
on
Qualit
y
Contr
ol
Activit
y
Frequency/
Interval
Who is
Responsib
le
Secure
website
login
Website should
protect the privacy
of the users when
storing user
information
Website
testing
while
simulating
data theft
activities
such as
data theft
regarding
the
password
and
username
Weekly web analyst,
Website security
expert
Faster
internet
Internet speed should
be constant above
Simulation
of internet
Weekly Network analyst
Document Page
9ADVANCE DIPLOMA OF IT
connection the minimum speed
as preferred
connection
for quality
audit
Improved
network for
faster data
sharing
Data should be
shared quickly while
ensuring the data
security
Testing of
network
speed with
different
data traffic
and
updating
network
equipment
Weekly Network analyst
Scalable
database
for faster
data access
Database should be
scalable to support
faster data access
and integrate data
security measures
testing the
scalability
of database
while
simulating
the data
access with
different
test users
along with
ability of
database to
defend data
Weekly Data analyst
Document Page
10ADVANCE DIPLOMA OF IT
breach
activity
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
11ADVANCE DIPLOMA OF IT
Step 2:
A Report on Project Quality Plan Implementation
Aim of the report:
After obtaining approval for the project management plan from the director of SCEI,
the project process has been started which is aimed at fulfilling the quality assurance and
quality control for the project. In this report a step by step guide and the framework that has
been planned to be followed for the project has been discussed in detail. The report will
particularly contain the strategic implementation details for quality assurance and quality
control set for the project.
Introduction:
The quality assurance as well as quality control plan is important for ensuring overall
quality of any project. However in order to implement that proper strategy is needed along
with a robust plan. Hence after the development of the plan a well-planned strategy has been
developed as well.
Discussion:
Details of the strategy:
In order to implement the plan following strategy has been developed
Rigorous assessment of the website design technologies with detailed documentation.
If any issues with the website design is found including the code for website design it
will be redesigned. However while designing the code it will be make sure that the
code is not copied from any other source to avoid copyright issue and lawsuit due to
the violation of the intellectual property. This will help to comply with the IEC
Document Page
12ADVANCE DIPLOMA OF IT
62014-5:2015Australian standard for copyright and intellectual property of electronics
document ("intellectual property - Standards Australia", 2018).
The software used for protecting the computers will be identified and if flaws found
will be replaced. Update will be provided if required after installing the new software.
This will be done to ensure that the data stored in the local computer storage is safe
and secure which is a recommended step for as per the ISO 27001 standard.
Identifying the flaws in the network design and apply appropriate measure to improve
that such as replacing old equipment with new one for faster network speed and better
resource allocation within the network. Additionally the security of the network will
also be checked as per the data security measure so that the network design comply
with the AS/NZS ISO/IEC 18028.1-2008 Australia standard for network security
standard ("network security - Standards Australia", 2018).
The design for the database will be reviewed and if required the design will be
updated with the newer edition of database technology. If storage upgrade to the
database is needed cloud storage will be integrated as well.
The internet connection will be tested against different traffic to understand the
capacity of the network devices and based on that the capacity of the network
equipment will be modified for increasing the internet speed.
Details about corrective measure:
If breakdown occurs during review for each of the section such as website security,
network speed, internet connection, it will be solved and if other process are already initiated
that will continue and corrections will be made based on the requirement in concurrent
manner. This will ensure that the quality assurance process is not delayed and each section is
given proper is given proper attention for quality assurance in each of the process. The same
procedure will be followed for quality control activity as well.
Document Page
13ADVANCE DIPLOMA OF IT
Step 3: continuous improvement plan Actual performance with standard
Standard Actual performance
Secure website login Performed well after some adjustment in
the website code and framework during
quality process improvement
Faster data sharing through network
with proper security
Issues was not found when upgraded
with newer network equipment and
network bandwidth increased. Security
was improved after firewall was
deployed for the network
Secure database for data security Improved compared to previous one
after integrating encryption though cloud
server and hosting the database in cloud
scalable server
Breakdowns and corrective action
Breakdowns Corrective action
(to avoid the
issue)
Corrective
action
(if the issue
occurs )
Website is accessed without authorization Regular check of
website login
Report to the
website security
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
14ADVANCE DIPLOMA OF IT
activity expert
Unauthorized access to institute network Continuous
assessment of
network activity
and performance
Report to
network security
expert
Data in the local storage encrypted in
hack
Separate backup
of important data
Report to the
cloud service
provider
Database is hacked Securing the data
base with strong
database
administration
Report to the
cloud service
provider and
legal reporting
Review and benchmark adjustment
Area of benchmark Adjustment
Website security Security was increased with integrating
the web server backend with the Linux
server
Software credibility and security
considered for the computers
Software needed improvement and up
gradation including latest antivirus
software for better computer security
Security of the local database Cloud server needed to implement for
Document Page
15ADVANCE DIPLOMA OF IT
better data security, data availability and
the data scalability
Cost for the software and network
equipment update
The estimated cost needed to increase
for improving the overall quality of the
network
Quality improvement responsible persons
To ensure the quality improvement the users and website, network admin have
to make sure proper security guidelines is being followed as recommended by experts.
Apart from that if issues occurs the persons responsible to improve that are the web
analyst, network analyst and the data analyst. Quality results documentation
Quality results will be documented with the help of excel sheet and
spreadsheet and the documents will be shared to the respective authorities through
email. Business process review frequency
In order to effectively implement the improvement plan in continuous basis
the Business process will be reviewed in weekly as well as monthly basis.
Document Page
16ADVANCE DIPLOMA OF IT
References:
Network security - Standards Australia. (2018). Retrieved from
https://www.standards.org.au/search?q=network+security&mode=allwords&sort=relevance
Intellectual property- Standards Australia. (2018). Retrieved from
https://www.standards.org.au/search?
q=intellectual+property&mode=allwords&sort=relevance&filter=standards
chevron_up_icon
1 out of 16
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]