Project Management Report: Analysis of Reward Card Software Project
VerifiedAdded on 2023/01/11
|11
|3025
|2
Report
AI Summary
This report provides a comprehensive analysis of a project focused on the implementation of reward card software within the aviation industry. It begins by outlining the project's objectives, assessing their achievement, and identifying both expected and unexpected benefits. The report examines whether the project adhered to its original scope, detailing any modifications made during its execution. It highlights the methodologies employed, particularly PRINCE2, and summarizes the key lessons learned, emphasizing factors contributing to project success. Furthermore, the report offers recommendations for future improvements, including enhanced communication, stakeholder management, and risk mitigation strategies. It concludes by identifying potential risks that could have been addressed earlier in the project lifecycle. The report also includes references to support the findings.

Project management
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Contents
TASK...............................................................................................................................................3
Outline the objectives of the project and indicate if they were achieved or not..........................3
Outline any benefits that have been achieved and if these were expected or unexpected...........3
Did the project stay within its original scope?.............................................................................4
Explain the changes that were made in the run up to the completion of the project. These are
changes made in original plan.....................................................................................................4
Summaries the lesson learnt during project and think about the project success........................5
Recommendation that improved the project in future.................................................................6
Risk which you felt could have identified earlier in project?......................................................7
REFERENCES................................................................................................................................8
TASK...............................................................................................................................................3
Outline the objectives of the project and indicate if they were achieved or not..........................3
Outline any benefits that have been achieved and if these were expected or unexpected...........3
Did the project stay within its original scope?.............................................................................4
Explain the changes that were made in the run up to the completion of the project. These are
changes made in original plan.....................................................................................................4
Summaries the lesson learnt during project and think about the project success........................5
Recommendation that improved the project in future.................................................................6
Risk which you felt could have identified earlier in project?......................................................7
REFERENCES................................................................................................................................8

TASK
Outline the objectives of the project and indicate if they were achieved or not.
The report is regarding the era market in level of having the intense level of coemptions in
the process of the respective decision-making aspects. There have been the requirement if
the continuous level of planning, organizing the direction in ore manner to have rage
recaching the respective destination in the perfect manner. The introduction the software in
the aviation industry have the required the major level of proficiency in order to have
development if the regrade card point by having the proper level acquisition o the customer
experience and option regarding the concept. IN context of Reward Point Card software, it
contains five-star rating and in which each star is belong to different level of satisfaction. The
elements which this software involves is that facilities of vehicles, treatment of driver
towards particular passengers, safety and security, drop and pick- up activities.
As per the objective of research can be concluded there PRINCE2 render for roper level of
business justification in the clear and transparent manner. This objective has been
achievement as it reflected the clear level of change in the defining the organizational
structure.
On the other hand, the next approach has the significant in terms of the product which is
based on the planning approach have not be achieved as it failed to the have proper level of
categorising the project into the manageable and controlled stages. There is another method
d of the imposing the providing the well as enable the business to have managing of project
risk mode. Hence, the organization the keep the major level can keep proper awareness while
introducing Reward Pint Card software within industry.
Outline any benefits that have been achieved and if these were expected or unexpected
From the research report, it have been analysed that’s there methodology have the proper
level of familiarization in the globe in order to give the execution of the plane in functional unity
by the proper minimising the more occurrence of the miscommunication to the misconceptions
The benefit of the process is such as there were the clear defining the organizational
culture which turning out to be complete in the basis of expectation on the emmantled manner
outlining the research objective. On the other hand, the PRINCE2 is regarded as a time
consuming and cost effective by leading the organization which is clearly stating the more level
of reasonability delegation and Comunicaciones without the analyse level of obstacles. On the
3
Outline the objectives of the project and indicate if they were achieved or not.
The report is regarding the era market in level of having the intense level of coemptions in
the process of the respective decision-making aspects. There have been the requirement if
the continuous level of planning, organizing the direction in ore manner to have rage
recaching the respective destination in the perfect manner. The introduction the software in
the aviation industry have the required the major level of proficiency in order to have
development if the regrade card point by having the proper level acquisition o the customer
experience and option regarding the concept. IN context of Reward Point Card software, it
contains five-star rating and in which each star is belong to different level of satisfaction. The
elements which this software involves is that facilities of vehicles, treatment of driver
towards particular passengers, safety and security, drop and pick- up activities.
As per the objective of research can be concluded there PRINCE2 render for roper level of
business justification in the clear and transparent manner. This objective has been
achievement as it reflected the clear level of change in the defining the organizational
structure.
On the other hand, the next approach has the significant in terms of the product which is
based on the planning approach have not be achieved as it failed to the have proper level of
categorising the project into the manageable and controlled stages. There is another method
d of the imposing the providing the well as enable the business to have managing of project
risk mode. Hence, the organization the keep the major level can keep proper awareness while
introducing Reward Pint Card software within industry.
Outline any benefits that have been achieved and if these were expected or unexpected
From the research report, it have been analysed that’s there methodology have the proper
level of familiarization in the globe in order to give the execution of the plane in functional unity
by the proper minimising the more occurrence of the miscommunication to the misconceptions
The benefit of the process is such as there were the clear defining the organizational
culture which turning out to be complete in the basis of expectation on the emmantled manner
outlining the research objective. On the other hand, the PRINCE2 is regarded as a time
consuming and cost effective by leading the organization which is clearly stating the more level
of reasonability delegation and Comunicaciones without the analyse level of obstacles. On the
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

other hand there is unexpected level of disadvantage which is starting to be there that there is the
major level of avoidance in the soft skills for the project managers by facing the major issues in
order to quivering the activity in improved manner. Hence there is enabling the company to have
the allocations the introduction of Rewards Point Card for air travel industry. Moreover, firm
take an initiative to create a project management plan in regard of Rewards Point Card
Did the project stay within its original scope?
Ye the situation in the marketplace , the project stated to be in the part as taking the
innovation and the respective advancement of technology which is the essential level of the
aspect by gaining the proper level of competitive advantage among the differ rivalries The
company is there succeeded in the scope by the more level of noble ideas and innovation
huge benefits by the potentiality which is stating the level of proficiency ratio. The scope
has been succeeding in the significant manner by the assisting the software application in
more way of the proper level of evaluation of their business and market scenario by the best
level of strategic shortcoming or drawbacks. There is more level of variable resources which
have not the way of proper justification un the ai of the several issues by nit justifying the
opinion of the customer and target public. Due to such initiation, establishment can enrich its
overall performance and also can maintain its volume of sales among rivalries in an
innovative or creative style. Hence the action have the enabling or the lead o team
managers by controlling an obsidian the unnecessary by looking the unnecessary expenses to
obtain increased level of revenue and income inside current marketplace.
Explain the changes that were made in the run up to the completion of the project. These are
changes made in original plan.
On the other hand, the PRINCE2 is regarded as a time consuming and cost effective by
leading the organization which is clearly stating the more level of reasonability delegation
and Comunicaciones without the analyse level of obstacles. As identified the various
methodologies in project development such as Agile, CCPM and PRINCE2 but choose an
appropriate PRINCE2 because it provides the better opportunities to focus on initial to end
point.
During project, learning occurs which gained from process of performing the project and
lean from the card application project on the basis of experience. Project manager, staff
members and other leadership are participating in project execution. The lesson learned
4
major level of avoidance in the soft skills for the project managers by facing the major issues in
order to quivering the activity in improved manner. Hence there is enabling the company to have
the allocations the introduction of Rewards Point Card for air travel industry. Moreover, firm
take an initiative to create a project management plan in regard of Rewards Point Card
Did the project stay within its original scope?
Ye the situation in the marketplace , the project stated to be in the part as taking the
innovation and the respective advancement of technology which is the essential level of the
aspect by gaining the proper level of competitive advantage among the differ rivalries The
company is there succeeded in the scope by the more level of noble ideas and innovation
huge benefits by the potentiality which is stating the level of proficiency ratio. The scope
has been succeeding in the significant manner by the assisting the software application in
more way of the proper level of evaluation of their business and market scenario by the best
level of strategic shortcoming or drawbacks. There is more level of variable resources which
have not the way of proper justification un the ai of the several issues by nit justifying the
opinion of the customer and target public. Due to such initiation, establishment can enrich its
overall performance and also can maintain its volume of sales among rivalries in an
innovative or creative style. Hence the action have the enabling or the lead o team
managers by controlling an obsidian the unnecessary by looking the unnecessary expenses to
obtain increased level of revenue and income inside current marketplace.
Explain the changes that were made in the run up to the completion of the project. These are
changes made in original plan.
On the other hand, the PRINCE2 is regarded as a time consuming and cost effective by
leading the organization which is clearly stating the more level of reasonability delegation
and Comunicaciones without the analyse level of obstacles. As identified the various
methodologies in project development such as Agile, CCPM and PRINCE2 but choose an
appropriate PRINCE2 because it provides the better opportunities to focus on initial to end
point.
During project, learning occurs which gained from process of performing the project and
lean from the card application project on the basis of experience. Project manager, staff
members and other leadership are participating in project execution. The lesson learned
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

process is to determine the valuable for future project and also learn about the project
management, resources, technical, communication, requirements, testing, implementation
and external area
Project manager is dedicated towards the project risk, threat by implementing suitable
strategies for eliminating the complex risk within card application. In order to support for
improving the overall project. To facilitate the project with such ambitious and primary aim is to
change the view point of air industry towards reward card software. It allows for optimal
collaborative and learning among implementing, documenting and conceptual methodologies for
development.
Hence the have the sever level of change sin the plan with the proper level of mitigation in
the perspective manner Moreover, clearly defined purpose help each personnel to share their own
views related to the enrichment of Reward Point Card software for airline industry and aid them
to attain sustainable enrichment in profit margin ratio.
Summaries the lesson learnt during project and think about the project success.
According to case study, it has been demonstrating the innovative idea of formulating a
new software development project. It is based on the reward point card for air Travel Company.
It is the most suitable application which providing the better opportunities for increasing the
demand of business in global marketplace. After completing the project, summarised that have
learnt many things in step by step manner. Initially, it has identified the most suitable method
such as prince2 of project management (Federici and et.al., 2019). It is clearly defined the scope,
budget and essential resources requirement. In order to achieve the goal and objective within
specific time intervals. Moreover, it has learnt about the strength of software so that travel
industry take so much initiative to develop the reward card application. In order to satisfy the
user’s need as well as requirement in proper manner.
As identified the various methodologies in project development such as Agile, CCPM and
PRINCE2 but choose an appropriate PRINCE2 because it provide the better opportunities to
focus on initial to end point. Furthermore, learnt about the significant role of PRINCE2
methodology which always supports for calculating overall budget, scope, resources. It give an
accurate estimation so that it become easier for investing money on reward card application.
During project, learning occurs which gained from process of performing the project and
lean from the card application project on the basis of experience. Project manager, staff members
5
management, resources, technical, communication, requirements, testing, implementation
and external area
Project manager is dedicated towards the project risk, threat by implementing suitable
strategies for eliminating the complex risk within card application. In order to support for
improving the overall project. To facilitate the project with such ambitious and primary aim is to
change the view point of air industry towards reward card software. It allows for optimal
collaborative and learning among implementing, documenting and conceptual methodologies for
development.
Hence the have the sever level of change sin the plan with the proper level of mitigation in
the perspective manner Moreover, clearly defined purpose help each personnel to share their own
views related to the enrichment of Reward Point Card software for airline industry and aid them
to attain sustainable enrichment in profit margin ratio.
Summaries the lesson learnt during project and think about the project success.
According to case study, it has been demonstrating the innovative idea of formulating a
new software development project. It is based on the reward point card for air Travel Company.
It is the most suitable application which providing the better opportunities for increasing the
demand of business in global marketplace. After completing the project, summarised that have
learnt many things in step by step manner. Initially, it has identified the most suitable method
such as prince2 of project management (Federici and et.al., 2019). It is clearly defined the scope,
budget and essential resources requirement. In order to achieve the goal and objective within
specific time intervals. Moreover, it has learnt about the strength of software so that travel
industry take so much initiative to develop the reward card application. In order to satisfy the
user’s need as well as requirement in proper manner.
As identified the various methodologies in project development such as Agile, CCPM and
PRINCE2 but choose an appropriate PRINCE2 because it provide the better opportunities to
focus on initial to end point. Furthermore, learnt about the significant role of PRINCE2
methodology which always supports for calculating overall budget, scope, resources. It give an
accurate estimation so that it become easier for investing money on reward card application.
During project, learning occurs which gained from process of performing the project and
lean from the card application project on the basis of experience. Project manager, staff members
5

and other leadership are participating in project execution. In order to review the report and make
decision on how to use knowledge. Sharing the experience among project team which
automatically prevent the negative aspects. It allows them to take benefit, advantage of achieving
the project success. Lesson learned will be mainly used to improve the future project and easily
handle complexity within different stages (Cakmakci, 2019). Sometimes, it is not necessary to
wait unit the project will complete but identified lesion at any point during project development.
It should be conducted at multiple time frames on the basis of complexity.
The lesson learned process is to determine the valuable for future project and also learn
about the project management, resources, technical, communication, requirements, testing,
implementation and external areas (Federici and et.al., 2019). Moreover, Project success is
mainly depending on the essential requirement that can easily maintain or control the possible
result/ outcome. Project manager is dedicated towards the project risk, threat by implementing
suitable strategies for eliminating the complex risk within card application. In order to support
for improving the overall project.
Recommendation that improved the project in future
A final lesson as well as recommendation that always supports for enhancing the
capabilities of project. Therefore, project manager initiative undertaken by improving project in
future. It can be possible while performing suggestive actions which relevant to the project
enhancement.
It has been recommendations for future initiative to improve the project in future.
To facilitate the project with such ambitious and primary aim is to change the view point
of air industry towards reward card software. It allows for optimal collaborative and
learning among implementing, documenting and conceptual methodologies for
development.
The appropriate use of communication that help for identified and tested through various
stages. It is almost important to achieve improvement in future growth and development.
It has suggested to use sufficient time, promote and support the feedback mechanism
among the project development stages (Pollard, 2019). Sometimes, it is very difficult for
providing the reliability and flexibility in project so as implementing the intervention. In
order to contribute to enhance as well as sustained accountability.
6
decision on how to use knowledge. Sharing the experience among project team which
automatically prevent the negative aspects. It allows them to take benefit, advantage of achieving
the project success. Lesson learned will be mainly used to improve the future project and easily
handle complexity within different stages (Cakmakci, 2019). Sometimes, it is not necessary to
wait unit the project will complete but identified lesion at any point during project development.
It should be conducted at multiple time frames on the basis of complexity.
The lesson learned process is to determine the valuable for future project and also learn
about the project management, resources, technical, communication, requirements, testing,
implementation and external areas (Federici and et.al., 2019). Moreover, Project success is
mainly depending on the essential requirement that can easily maintain or control the possible
result/ outcome. Project manager is dedicated towards the project risk, threat by implementing
suitable strategies for eliminating the complex risk within card application. In order to support
for improving the overall project.
Recommendation that improved the project in future
A final lesson as well as recommendation that always supports for enhancing the
capabilities of project. Therefore, project manager initiative undertaken by improving project in
future. It can be possible while performing suggestive actions which relevant to the project
enhancement.
It has been recommendations for future initiative to improve the project in future.
To facilitate the project with such ambitious and primary aim is to change the view point
of air industry towards reward card software. It allows for optimal collaborative and
learning among implementing, documenting and conceptual methodologies for
development.
The appropriate use of communication that help for identified and tested through various
stages. It is almost important to achieve improvement in future growth and development.
It has suggested to use sufficient time, promote and support the feedback mechanism
among the project development stages (Pollard, 2019). Sometimes, it is very difficult for
providing the reliability and flexibility in project so as implementing the intervention. In
order to contribute to enhance as well as sustained accountability.
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

The project is to create common understanding among different stakeholders,
participants, project manager and team members focus on the project development
phases. Afterwards, project may improve in future while performing different activities
such as planning, implementation, and technical management.
Another important action is to identify the significant role of stakeholder and also
categorised on the basis of their skill or knowledge (Federici and et.al., 2019). Project
manager is quickly assessment of stakeholder and give prioritise where to concern,
develop a plan of addressing the relationship between different stakeholders. In this way,
they can achieve the project success and improving its performance, efficiency in future
Risk which you felt could have identified earlier in project?
In my view there are several risk which can occur in project. These risk needs to be
identified so that it becomes easy to mitigate its impact. Besides that, measures and action are
taken to solve them. Similarly, in project of reward point card software, there were different risk
which were determined by me. The main was failure of project in which entire software
developed may get failed. This can occur due to technical error which is not possible to solve.
Another risk which was identified was lack of funds. In project it get delayed due to insufficient
funds. This will highly impact on project quality. There may be requirement of additional funds
either in cash, HR, or any other. Furthermore, schedule risk can also occur in it. Here, project
activities may not be completed within specific time. This will affect on further task or entire
project. Thus, it may led to delay in completion of project.
So, identifying all these risk I felt that there were some risk which could have been find
out earlier in project. This is because it would have helped in maintaining smooth flow of tasks
and successful completion of project. Besides that, project can be finished on time. Therefore,
risk of lack of funds could be identified earlier. It is because it would have led to allocating of
funds as per project activities. Moreover, at initial stage planning can be done accordingly that
what measures are to be taken in this case and back up is required or not. Through that, it could
have been easy to determine variation in budget which can occur. Also, appropriate financial
planning can be done of resources within project.
Besides that, I think that schedule risk can also be determined earlier. This will be helpful
in preparing of tasks in such a way that this risk can be minimised at initial level. In addition to
it, changes can be made into schedule at that time. So, it would have given insight on start and
7
participants, project manager and team members focus on the project development
phases. Afterwards, project may improve in future while performing different activities
such as planning, implementation, and technical management.
Another important action is to identify the significant role of stakeholder and also
categorised on the basis of their skill or knowledge (Federici and et.al., 2019). Project
manager is quickly assessment of stakeholder and give prioritise where to concern,
develop a plan of addressing the relationship between different stakeholders. In this way,
they can achieve the project success and improving its performance, efficiency in future
Risk which you felt could have identified earlier in project?
In my view there are several risk which can occur in project. These risk needs to be
identified so that it becomes easy to mitigate its impact. Besides that, measures and action are
taken to solve them. Similarly, in project of reward point card software, there were different risk
which were determined by me. The main was failure of project in which entire software
developed may get failed. This can occur due to technical error which is not possible to solve.
Another risk which was identified was lack of funds. In project it get delayed due to insufficient
funds. This will highly impact on project quality. There may be requirement of additional funds
either in cash, HR, or any other. Furthermore, schedule risk can also occur in it. Here, project
activities may not be completed within specific time. This will affect on further task or entire
project. Thus, it may led to delay in completion of project.
So, identifying all these risk I felt that there were some risk which could have been find
out earlier in project. This is because it would have helped in maintaining smooth flow of tasks
and successful completion of project. Besides that, project can be finished on time. Therefore,
risk of lack of funds could be identified earlier. It is because it would have led to allocating of
funds as per project activities. Moreover, at initial stage planning can be done accordingly that
what measures are to be taken in this case and back up is required or not. Through that, it could
have been easy to determine variation in budget which can occur. Also, appropriate financial
planning can be done of resources within project.
Besides that, I think that schedule risk can also be determined earlier. This will be helpful
in preparing of tasks in such a way that this risk can be minimised at initial level. In addition to
it, changes can be made into schedule at that time. So, it would have given insight on start and
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

end time of tasks and eliminating risk from it. Henceforth, project failure could have been found
out so that necessary steps can be taken and areas is identified due to which project gets failed.
Hence, accordingly its severity is evaluated and person responsible for it is assigned role or duty.
It would have been easy to mitigate affect of project failure and finish reward point software in
successfully and in specified time. So, these all can be found at earlier stage.
I think there were some elements which prevented me from identifying those risk. First is
that I did not have any knowledge about how to allocate resources. Also, I expected that this risk
may not occur as there are enough resources and they are allocated as per requirement. Along
with it, I was not having detailed info of how much resource is allocated to which tasks. Due to
it, I was not able to make identify it. Other than this, I was not having schedule of project
activities. Hence, I was confused in it and was not able to analyse that project may get delay. In
my view, labor was sufficient enough and all procedure was done in effective way. So, I did not
identified risk in it. Additionally, I did not know abut risk assessment and what type of risk can
occur in software development project. Therefore, it prevented me to find out risk.
the risk determined by me was not avoidable. This is because these are common risk
which occur in project and it highly impact on its completion. There is always a high chance that
project get delay due to certain issue like conflict, miscommunication, etc hence, it is necessary
to find out what type of risk can occur and how it will affect on project. Also, I think that lack of
fund is not avoidable as in project funds may be insufficient. So, for that measure needs to be
taken. The project failure risk is predictable as there may occur technical errors. Due to it, project
gets failed. So, all these risk were unavoidable.
REFERENCES
Books and Journals
Online
Federici, F.M. and et.al., 2019. International network in crisis translation-Recommendations on
policies.
8
out so that necessary steps can be taken and areas is identified due to which project gets failed.
Hence, accordingly its severity is evaluated and person responsible for it is assigned role or duty.
It would have been easy to mitigate affect of project failure and finish reward point software in
successfully and in specified time. So, these all can be found at earlier stage.
I think there were some elements which prevented me from identifying those risk. First is
that I did not have any knowledge about how to allocate resources. Also, I expected that this risk
may not occur as there are enough resources and they are allocated as per requirement. Along
with it, I was not having detailed info of how much resource is allocated to which tasks. Due to
it, I was not able to make identify it. Other than this, I was not having schedule of project
activities. Hence, I was confused in it and was not able to analyse that project may get delay. In
my view, labor was sufficient enough and all procedure was done in effective way. So, I did not
identified risk in it. Additionally, I did not know abut risk assessment and what type of risk can
occur in software development project. Therefore, it prevented me to find out risk.
the risk determined by me was not avoidable. This is because these are common risk
which occur in project and it highly impact on its completion. There is always a high chance that
project get delay due to certain issue like conflict, miscommunication, etc hence, it is necessary
to find out what type of risk can occur and how it will affect on project. Also, I think that lack of
fund is not avoidable as in project funds may be insufficient. So, for that measure needs to be
taken. The project failure risk is predictable as there may occur technical errors. Due to it, project
gets failed. So, all these risk were unavoidable.
REFERENCES
Books and Journals
Online
Federici, F.M. and et.al., 2019. International network in crisis translation-Recommendations on
policies.
8

Cakmakci, M., 2019. Interaction in Project Management Approach Within Industry 4.0.
In Advances in Manufacturing II (pp. 176-189). Springer, Cham.
Pollard, C.E., 2019. Lessons learned from client projects in an undergraduate project
management course. Journal of Information Systems Education. 23(3). p.3.
Mousaei, M. and Javdani, T., 2018. A new project risk management model based on scrum
framework and Prince2 methodology. International Journal of Advanced Computer
Science and Applications, 9.
Saad, S and et,al., 2014. PRINCE2 Methodology: An Innovative way for improving performance
of malaysian automotive industry. The Journal of Technology Management and
Technopreneurship (JTMT). 1(1).
Saadé, R. G., Dong, H. and Wan, J., 2015. Factors of project manager success. Interdisciplinary
Journal of Information, Knowledge, and Management, 10. pp.63-80.
Ahern, T., Leavy, B. and Byrne, P. J., 2014. Complex project management as complex problem
solving: A distributed knowledge management perspective. International Journal of
Project Management. 32(8). pp.1371-1381.
Conforto, E. and et.al2014. Can agile project management be adopted by industries other than
software development?. Project Management Journal. 45(3). pp.21-34.
9
In Advances in Manufacturing II (pp. 176-189). Springer, Cham.
Pollard, C.E., 2019. Lessons learned from client projects in an undergraduate project
management course. Journal of Information Systems Education. 23(3). p.3.
Mousaei, M. and Javdani, T., 2018. A new project risk management model based on scrum
framework and Prince2 methodology. International Journal of Advanced Computer
Science and Applications, 9.
Saad, S and et,al., 2014. PRINCE2 Methodology: An Innovative way for improving performance
of malaysian automotive industry. The Journal of Technology Management and
Technopreneurship (JTMT). 1(1).
Saadé, R. G., Dong, H. and Wan, J., 2015. Factors of project manager success. Interdisciplinary
Journal of Information, Knowledge, and Management, 10. pp.63-80.
Ahern, T., Leavy, B. and Byrne, P. J., 2014. Complex project management as complex problem
solving: A distributed knowledge management perspective. International Journal of
Project Management. 32(8). pp.1371-1381.
Conforto, E. and et.al2014. Can agile project management be adopted by industries other than
software development?. Project Management Journal. 45(3). pp.21-34.
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

11
1 out of 11
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2026 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.