ISY3002 Project Report: Supreme Chauffeurs Website Development Plan
VerifiedAdded on  2022/11/17
|22
|3419
|388
Report
AI Summary
This report details the development of a website for Supreme Chauffeurs, covering the project management plan (PMP) and software requirements specification (SRS). It outlines the project's aim to bridge the gap between customer queries and services, aiming to improve customer service and generate more business. The report includes a project charter, work breakdown structure (WBS), project schedule, and risk management plan. It also defines user, system, domain, functional, and non-functional requirements, alongside a use case diagram. The project's constraints, including budget and timeframe, are also discussed. The report provides an overview of the website's development lifecycle, from initiation to deployment, emphasizing key deliverables and success criteria.

Supreme chauffeurs
Website development
Website development
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Supreme chauffeurs website
Table of Contents
Abstract.............................................................................................................................3
Introduction......................................................................................................................4
Aim....................................................................................................................................5
Project Management Plan.................................................................................................6
Project charter............................................................................................................................6
Work Breakdown Structure.......................................................................................................8
Project schedule........................................................................................................................10
Risk Management............................................................................................................12
Requirements Document..................................................................................................16
User Requirements..........................................................................................................16
System Requirements.......................................................................................................16
Domain Requirements.....................................................................................................17
Functional Requirements................................................................................................17
Non-Functional Requirements.........................................................................................18
Performance..............................................................................................................................18
Scalability..................................................................................................................................18
Maintainability..........................................................................................................................18
Usability....................................................................................................................................18
Reliability..................................................................................................................................19
Use case diagram.......................................................................................................................19
Conclusion......................................................................................................................19
References.......................................................................................................................21
1
Table of Contents
Abstract.............................................................................................................................3
Introduction......................................................................................................................4
Aim....................................................................................................................................5
Project Management Plan.................................................................................................6
Project charter............................................................................................................................6
Work Breakdown Structure.......................................................................................................8
Project schedule........................................................................................................................10
Risk Management............................................................................................................12
Requirements Document..................................................................................................16
User Requirements..........................................................................................................16
System Requirements.......................................................................................................16
Domain Requirements.....................................................................................................17
Functional Requirements................................................................................................17
Non-Functional Requirements.........................................................................................18
Performance..............................................................................................................................18
Scalability..................................................................................................................................18
Maintainability..........................................................................................................................18
Usability....................................................................................................................................18
Reliability..................................................................................................................................19
Use case diagram.......................................................................................................................19
Conclusion......................................................................................................................19
References.......................................................................................................................21
1

Supreme chauffeurs website
Abstract
The project report would be prepared based on the data available to us as well as the forecasts
provided by other project management software and experts. The real-world situation could
be slightly different based on the given circumstances. The members who are working in the
provided team would be receiving fixed remuneration at the end of the given project. Any
deduction or inclusion would be possible as there is a buffer laid out for that. Gantt chart was
utilized in order to prepare for the risk management strategy as well as project schedule by
making use of Microsoft excel. Best of the efforts have been applied for each scenario and
positives as well as negatives have been considered. Despite of all this, the report is not
meant to be the ultimate document as there would still be room for improvement.
2
Abstract
The project report would be prepared based on the data available to us as well as the forecasts
provided by other project management software and experts. The real-world situation could
be slightly different based on the given circumstances. The members who are working in the
provided team would be receiving fixed remuneration at the end of the given project. Any
deduction or inclusion would be possible as there is a buffer laid out for that. Gantt chart was
utilized in order to prepare for the risk management strategy as well as project schedule by
making use of Microsoft excel. Best of the efforts have been applied for each scenario and
positives as well as negatives have been considered. Despite of all this, the report is not
meant to be the ultimate document as there would still be room for improvement.
2
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Supreme chauffeurs website
Introduction
The report aims at developing a website for the Supreme chauffeurs which bridges the gap
between customer queries and services. The website shall be used by all users and it will have
admin user from the management team of the company. Least waiting time in query
resolution is one of the key advantages of the website. Maximum efforts have been given to
estimate expenses, however there are few exceptions which are explained in the report. Apart
from this, the website shall be providing 24 x 7 support. Though cost can be minimized in
this section but there will be a maintenance cost which needs to be given priority over cost.
3
Introduction
The report aims at developing a website for the Supreme chauffeurs which bridges the gap
between customer queries and services. The website shall be used by all users and it will have
admin user from the management team of the company. Least waiting time in query
resolution is one of the key advantages of the website. Maximum efforts have been given to
estimate expenses, however there are few exceptions which are explained in the report. Apart
from this, the website shall be providing 24 x 7 support. Though cost can be minimized in
this section but there will be a maintenance cost which needs to be given priority over cost.
3
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Supreme chauffeurs website
Aim
The proposed website aims at providing a platform for:
ï‚· Speedy resolution of the queries of the customers.
ï‚· Create brand image in the market
ï‚· 24x7 availability
ï‚· Scaling in customer base.
4
Aim
The proposed website aims at providing a platform for:
ï‚· Speedy resolution of the queries of the customers.
ï‚· Create brand image in the market
ï‚· 24x7 availability
ï‚· Scaling in customer base.
4

Supreme chauffeurs website
Project Management Plan
Project charter
Project Charter
Project Name: Supreme chauffeurs Website
development.
Project Manager: [Project Manager]
Background: The purpose of the project is to develop a website which bridges the gap
between customer queries and services.
Objective: The objectives of the proposed
website are as follows:
ï‚· Generates more business.
ï‚· Generates builds company brand.
ï‚· Creates user-interface
ï‚· Proper resource management
Success Criteria: The success criteria of the
proposed website are as follows:
ï‚· Holds meetings regularly to ensure
that timesheets are up to date.
ï‚· Timesheets should be completed as
required by the mentioned deadline.
ï‚· Staff should be trained efficiently
with proficient training plan.
Deliverables: The key deliverables of the
proposed website are as follows:
ï‚· Informative page on frequently
asked queries of the customer.
ï‚· Informative page on services offered
by supreme chauffeurs.
ï‚· Access to local history.
ï‚· Open discussion environment.
ï‚· Secure community pages accessible
to guests and registered users.
ï‚· Pages on articles, journals, research
papers, journals, etc.
Exclusion:
The proposed website development project
will have to deal with resource scarcity
because the company does not have any
staff that can perform the website tasks. As
a result of which, external hosting has be to
hired which can provide support 24x7. It
will increase the cost of the project by
36000 AUD. Along with this, two dedicated
server instead of XEON high speed server
because of limited funding. Getting a
sponsor is another big task.
Benefits Expected: The benefits of the
proposed website are as follows:
• Increase in sales.
• Potential to gain new customers.
• Exceptional customer service for
(Inter) Dependencies / Interfaces
There are external and internal
dependencies:
 External dependency – These
dependencies include tasks such as
5
Project Management Plan
Project charter
Project Charter
Project Name: Supreme chauffeurs Website
development.
Project Manager: [Project Manager]
Background: The purpose of the project is to develop a website which bridges the gap
between customer queries and services.
Objective: The objectives of the proposed
website are as follows:
ï‚· Generates more business.
ï‚· Generates builds company brand.
ï‚· Creates user-interface
ï‚· Proper resource management
Success Criteria: The success criteria of the
proposed website are as follows:
ï‚· Holds meetings regularly to ensure
that timesheets are up to date.
ï‚· Timesheets should be completed as
required by the mentioned deadline.
ï‚· Staff should be trained efficiently
with proficient training plan.
Deliverables: The key deliverables of the
proposed website are as follows:
ï‚· Informative page on frequently
asked queries of the customer.
ï‚· Informative page on services offered
by supreme chauffeurs.
ï‚· Access to local history.
ï‚· Open discussion environment.
ï‚· Secure community pages accessible
to guests and registered users.
ï‚· Pages on articles, journals, research
papers, journals, etc.
Exclusion:
The proposed website development project
will have to deal with resource scarcity
because the company does not have any
staff that can perform the website tasks. As
a result of which, external hosting has be to
hired which can provide support 24x7. It
will increase the cost of the project by
36000 AUD. Along with this, two dedicated
server instead of XEON high speed server
because of limited funding. Getting a
sponsor is another big task.
Benefits Expected: The benefits of the
proposed website are as follows:
• Increase in sales.
• Potential to gain new customers.
• Exceptional customer service for
(Inter) Dependencies / Interfaces
There are external and internal
dependencies:
 External dependency – These
dependencies include tasks such as
5
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Supreme chauffeurs website
existing customers.
• 24/7 availability of bookings to
potential and existing customers.
availability of coding standards as
without proper standards,
programming language cannot be
selected.
 Internal dependency – These
dependencies include time and
budget. On the basis of available
time and budget, project manager
ensures the required number of
resources to be hired and what tasks
should executed in which order to
ensure critical tasks are completed
first while managing the cost of the
project
Assumptions: Following are key
assumptions of the proposed website
development project:
ï‚· Content Delivery Network (CDN)
will be used for content speedy
delivery.
ï‚· Huge and sensitive data shall be kept
at local server for safety.
ï‚· The proposed website shall have
access to all the data of Supreme
chauffeurs systems.
ï‚· The website shall have cPanel /
administrative panels to the
company’s management so that
super-admin will be able to update
data on the website.
ï‚· The hosting will be able to support
24x7.
Constraints: Following are key constraints
of the proposed website development
project:
 Tight schedule – There is a little
room for changing any scope item,
i.e. schedule, change orders, etc.
because of tight schedule.
ï‚· The required documents, plans and
processes should be produced to
achieve approval at first review in
order to avoid any unnecessary time-
consuming revisions.
ï‚· In case required permits are not
obtained as per the project plan, the
entire project may get compromised.
ï‚· No sufficient buffer is kept for
deliverables.
ï‚· The project must be executed with in
6
existing customers.
• 24/7 availability of bookings to
potential and existing customers.
availability of coding standards as
without proper standards,
programming language cannot be
selected.
 Internal dependency – These
dependencies include time and
budget. On the basis of available
time and budget, project manager
ensures the required number of
resources to be hired and what tasks
should executed in which order to
ensure critical tasks are completed
first while managing the cost of the
project
Assumptions: Following are key
assumptions of the proposed website
development project:
ï‚· Content Delivery Network (CDN)
will be used for content speedy
delivery.
ï‚· Huge and sensitive data shall be kept
at local server for safety.
ï‚· The proposed website shall have
access to all the data of Supreme
chauffeurs systems.
ï‚· The website shall have cPanel /
administrative panels to the
company’s management so that
super-admin will be able to update
data on the website.
ï‚· The hosting will be able to support
24x7.
Constraints: Following are key constraints
of the proposed website development
project:
 Tight schedule – There is a little
room for changing any scope item,
i.e. schedule, change orders, etc.
because of tight schedule.
ï‚· The required documents, plans and
processes should be produced to
achieve approval at first review in
order to avoid any unnecessary time-
consuming revisions.
ï‚· In case required permits are not
obtained as per the project plan, the
entire project may get compromised.
ï‚· No sufficient buffer is kept for
deliverables.
ï‚· The project must be executed with in
6
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Supreme chauffeurs website
the allotted budget keeping in view
the first-ever launch of website of
Supreme chauffeurs.
Timeframe
150 days
Cost estimate / Budget
$150,000
Dated approved / Sign-offs Project manager Sign off & Date
Work Breakdown Structure
WBS
Code Task Name Start Date Finish Date
Duratio
n
Estimated
Cost
1.1 Project initiation Mon 9/23/19 Mon 10/7/19 11 days $6,720.00
1.1.1 Requirement analysis Mon 9/23/19 Wed 9/25/19 3 days $2,640.00
1.1.2 Create project charter Thu 9/26/19 Mon 9/30/19 3 days $2,640.00
1.1.3
Obtain approval for
project charter Tue 10/1/19 Wed 10/2/19 2 days $1,440.00
1.1.4 Review project charter Thu 10/3/19 Fri 10/4/19 2 days $0.00
1.1.5 Sign-off Mon 10/7/19 Mon 10/7/19 1 day $0.00
1.2 Project planning Tue 10/8/19 Fri 11/1/19 19 days $14,400.00
1.2.1 Create scope statement Tue 10/8/19 Mon 10/14/19 5 days $4,400.00
1.2.2 Hire project team Tue 10/15/19 Thu 10/17/19 3 days $2,640.00
1.2.3
Kick-off project initial
meeting Fri 10/18/19 Fri 10/18/19 1 day $880.00
1.2.4
Evaluation of current
system Mon 10/21/19 Wed 10/23/19 3 days $1,920.00
1.2.5 Create project plan Thu 10/24/19 Mon 10/28/19 3 days $4,560.00
1.2.6 Approve project plan Tue 10/29/19 Wed 10/30/19 2 days $0.00
1.2.7 Sign-off Thu 10/31/19 Fri 11/1/19 2 days $0.00
1.3 Project execution Mon 11/4/19 Thu 2/20/20 79 days $64,520.00
1.3.1
Development of
requirements Mon 11/4/19 Fri 12/6/19 25 days $26,040.00
1.3.1.1 Business requirements Mon 11/4/19 Thu 11/7/19 4 days $9,360.00
1.3.1.1.1 Purchase domain name Mon 11/4/19 Wed 11/6/19 3 days $1,680.00
7
the allotted budget keeping in view
the first-ever launch of website of
Supreme chauffeurs.
Timeframe
150 days
Cost estimate / Budget
$150,000
Dated approved / Sign-offs Project manager Sign off & Date
Work Breakdown Structure
WBS
Code Task Name Start Date Finish Date
Duratio
n
Estimated
Cost
1.1 Project initiation Mon 9/23/19 Mon 10/7/19 11 days $6,720.00
1.1.1 Requirement analysis Mon 9/23/19 Wed 9/25/19 3 days $2,640.00
1.1.2 Create project charter Thu 9/26/19 Mon 9/30/19 3 days $2,640.00
1.1.3
Obtain approval for
project charter Tue 10/1/19 Wed 10/2/19 2 days $1,440.00
1.1.4 Review project charter Thu 10/3/19 Fri 10/4/19 2 days $0.00
1.1.5 Sign-off Mon 10/7/19 Mon 10/7/19 1 day $0.00
1.2 Project planning Tue 10/8/19 Fri 11/1/19 19 days $14,400.00
1.2.1 Create scope statement Tue 10/8/19 Mon 10/14/19 5 days $4,400.00
1.2.2 Hire project team Tue 10/15/19 Thu 10/17/19 3 days $2,640.00
1.2.3
Kick-off project initial
meeting Fri 10/18/19 Fri 10/18/19 1 day $880.00
1.2.4
Evaluation of current
system Mon 10/21/19 Wed 10/23/19 3 days $1,920.00
1.2.5 Create project plan Thu 10/24/19 Mon 10/28/19 3 days $4,560.00
1.2.6 Approve project plan Tue 10/29/19 Wed 10/30/19 2 days $0.00
1.2.7 Sign-off Thu 10/31/19 Fri 11/1/19 2 days $0.00
1.3 Project execution Mon 11/4/19 Thu 2/20/20 79 days $64,520.00
1.3.1
Development of
requirements Mon 11/4/19 Fri 12/6/19 25 days $26,040.00
1.3.1.1 Business requirements Mon 11/4/19 Thu 11/7/19 4 days $9,360.00
1.3.1.1.1 Purchase domain name Mon 11/4/19 Wed 11/6/19 3 days $1,680.00
7

Supreme chauffeurs website
1.3.1.1.2 Create marketing plan Mon 11/4/19 Thu 11/7/19 4 days $2,400.00
1.3.1.1.3 Frame process Mon 11/4/19 Wed 11/6/19 3 days $1,920.00
1.3.1.1.4
Frame regulatory
processes Mon 11/4/19 Wed 11/6/19 3 days $1,920.00
1.3.1.1.5
Frame legal
requirements Mon 11/4/19 Wed 11/6/19 3 days $1,440.00
1.3.1.2
Technical
requirements Fri 11/8/19 Fri 12/6/19 21 days $16,680.00
1.3.1.2.1 Design development Fri 11/8/19 Fri 12/6/19 21 days $16,680.00
1.3.1.2.1.
1 Create wireframes Fri 11/8/19 Wed 11/13/19 4 days $1,760.00
1.3.1.2.1.
2
Conduct competitive
analysis Thu 11/14/19 Tue 11/19/19 4 days $1,600.00
1.3.1.2.1.
3
Analyse content
requirements Wed 11/20/19 Mon 11/25/19 4 days $1,600.00
1.3.1.2.1.
4
Create information
architecture Tue 11/26/19 Fri 11/29/19 4 days $3,520.00
1.3.1.2.1.
5
Prepare navigation
scheme Mon 12/2/19 Fri 12/6/19 5 days $2,400.00
1.3.1.2.1.
6 Prepare content design Mon 12/2/19 Fri 12/6/19 5 days $2,400.00
1.3.1.2.1.
7 Prepare visual design Mon 12/2/19 Fri 12/6/19 5 days $3,400.00
1.3.2 Website Development Mon 12/9/19 Thu 1/23/20 34 days $28,040.00
1.3.2.1 Choose IDE Mon 12/9/19 Wed 12/11/19 3 days $1,440.00
1.3.2.2 Create interface design Thu 12/12/19 Wed 12/18/19 5 days $2,200.00
1.3.2.3 Create database model Thu 12/19/19 Wed 12/25/19 5 days $3,600.00
1.3.2.4 Code Generation Thu 12/26/19 Thu 12/26/19 1 day $0.00
1.3.2.5 Unit Testing Fri 12/27/19 Thu 1/9/20 10 days $14,000.00
1.3.2.6 Bug Fixes Fri 1/10/20 Thu 1/23/20 10 days $6,800.00
1.3.3 Website Testing Fri 1/24/20 Thu 2/6/20 10 days $3,200.00
1.3.3.1 Create test plan Fri 1/24/20 Tue 1/28/20 3 days $960.00
1.3.3.2 Conduct UAT Wed 1/29/20 Mon 2/3/20 4 days $1,280.00
8
1.3.1.1.2 Create marketing plan Mon 11/4/19 Thu 11/7/19 4 days $2,400.00
1.3.1.1.3 Frame process Mon 11/4/19 Wed 11/6/19 3 days $1,920.00
1.3.1.1.4
Frame regulatory
processes Mon 11/4/19 Wed 11/6/19 3 days $1,920.00
1.3.1.1.5
Frame legal
requirements Mon 11/4/19 Wed 11/6/19 3 days $1,440.00
1.3.1.2
Technical
requirements Fri 11/8/19 Fri 12/6/19 21 days $16,680.00
1.3.1.2.1 Design development Fri 11/8/19 Fri 12/6/19 21 days $16,680.00
1.3.1.2.1.
1 Create wireframes Fri 11/8/19 Wed 11/13/19 4 days $1,760.00
1.3.1.2.1.
2
Conduct competitive
analysis Thu 11/14/19 Tue 11/19/19 4 days $1,600.00
1.3.1.2.1.
3
Analyse content
requirements Wed 11/20/19 Mon 11/25/19 4 days $1,600.00
1.3.1.2.1.
4
Create information
architecture Tue 11/26/19 Fri 11/29/19 4 days $3,520.00
1.3.1.2.1.
5
Prepare navigation
scheme Mon 12/2/19 Fri 12/6/19 5 days $2,400.00
1.3.1.2.1.
6 Prepare content design Mon 12/2/19 Fri 12/6/19 5 days $2,400.00
1.3.1.2.1.
7 Prepare visual design Mon 12/2/19 Fri 12/6/19 5 days $3,400.00
1.3.2 Website Development Mon 12/9/19 Thu 1/23/20 34 days $28,040.00
1.3.2.1 Choose IDE Mon 12/9/19 Wed 12/11/19 3 days $1,440.00
1.3.2.2 Create interface design Thu 12/12/19 Wed 12/18/19 5 days $2,200.00
1.3.2.3 Create database model Thu 12/19/19 Wed 12/25/19 5 days $3,600.00
1.3.2.4 Code Generation Thu 12/26/19 Thu 12/26/19 1 day $0.00
1.3.2.5 Unit Testing Fri 12/27/19 Thu 1/9/20 10 days $14,000.00
1.3.2.6 Bug Fixes Fri 1/10/20 Thu 1/23/20 10 days $6,800.00
1.3.3 Website Testing Fri 1/24/20 Thu 2/6/20 10 days $3,200.00
1.3.3.1 Create test plan Fri 1/24/20 Tue 1/28/20 3 days $960.00
1.3.3.2 Conduct UAT Wed 1/29/20 Mon 2/3/20 4 days $1,280.00
8
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Supreme chauffeurs website
1.3.3.3 Resulr documentation Tue 2/4/20 Thu 2/6/20 3 days $960.00
1.3.4 Website Deployment Fri 2/7/20 Thu 2/20/20 10 days $7,240.00
1.3.4.1
Create hosting
agreement Fri 2/7/20 Tue 2/11/20 3 days $1,680.00
1.3.4.2
Integration of
applications Wed 2/12/20 Fri 2/14/20 3 days $2,040.00
1.3.4.3 Finalize operations Mon 2/17/20 Thu 2/20/20 4 days $3,520.00
1.4 Project closure Fri 2/21/20 Thu 3/26/20 25 days $25,000.00
1.4.1 Release resources Fri 2/21/20 Thu 2/27/20 5 days $5,000.00
1.4.2 User manual Fri 2/28/20 Thu 3/5/20 5 days $5,000.00
1.4.3
Create admin
documentation Fri 3/6/20 Thu 3/12/20 5 days $5,000.00
1.4.4
Prepare disaster
recovery plan Fri 3/13/20 Thu 3/26/20 10 days $10,000.00
1.5 Go live Fri 3/27/20 Wed 4/1/20 4 days $11,040.00
Project schedule
The project starts from 23rd September 2019 and ends on 1st April 2020 with total duration of
138 days. The project has 4 key phases as mentioned below with their respective start and
finish date.
WBS Task Name Duration Start Finish
1 Supreme chauffeurs
Website development
138 days Mon 9/23/19 Wed 4/1/20
1.1 Project initiation 11 days Mon 9/23/19 Mon 10/7/19
1.2 Project planning 19 days Tue 10/8/19 Fri 11/1/19
1.3 Project execution 79 days Mon 11/4/19 Thu 2/20/20
1.4 Project closure 25 days Fri 2/21/20 Thu 3/26/20
1.5 Go live 4 days Fri 3/27/20 Wed 4/1/20
9
1.3.3.3 Resulr documentation Tue 2/4/20 Thu 2/6/20 3 days $960.00
1.3.4 Website Deployment Fri 2/7/20 Thu 2/20/20 10 days $7,240.00
1.3.4.1
Create hosting
agreement Fri 2/7/20 Tue 2/11/20 3 days $1,680.00
1.3.4.2
Integration of
applications Wed 2/12/20 Fri 2/14/20 3 days $2,040.00
1.3.4.3 Finalize operations Mon 2/17/20 Thu 2/20/20 4 days $3,520.00
1.4 Project closure Fri 2/21/20 Thu 3/26/20 25 days $25,000.00
1.4.1 Release resources Fri 2/21/20 Thu 2/27/20 5 days $5,000.00
1.4.2 User manual Fri 2/28/20 Thu 3/5/20 5 days $5,000.00
1.4.3
Create admin
documentation Fri 3/6/20 Thu 3/12/20 5 days $5,000.00
1.4.4
Prepare disaster
recovery plan Fri 3/13/20 Thu 3/26/20 10 days $10,000.00
1.5 Go live Fri 3/27/20 Wed 4/1/20 4 days $11,040.00
Project schedule
The project starts from 23rd September 2019 and ends on 1st April 2020 with total duration of
138 days. The project has 4 key phases as mentioned below with their respective start and
finish date.
WBS Task Name Duration Start Finish
1 Supreme chauffeurs
Website development
138 days Mon 9/23/19 Wed 4/1/20
1.1 Project initiation 11 days Mon 9/23/19 Mon 10/7/19
1.2 Project planning 19 days Tue 10/8/19 Fri 11/1/19
1.3 Project execution 79 days Mon 11/4/19 Thu 2/20/20
1.4 Project closure 25 days Fri 2/21/20 Thu 3/26/20
1.5 Go live 4 days Fri 3/27/20 Wed 4/1/20
9
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Supreme chauffeurs website
10
10

Supreme chauffeurs website
11
11
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 22
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential