This report presents a Statement of Work analysis for the Pyrmont Swing Bridge Replacement and Construction project in Sydney, Australia. The project, valued at AUD $31,474,000.00, involves replacing the existing swing bridge to improve transport between the city and western suburbs while maintaining access to Darling Harbour. The report outlines project objectives, including modernization, cost reduction, and enhanced connectivity, and details major deliverables such as Work Breakdown Structure, milestone schedules, and procurement strategies. It evaluates various project delivery methods (Design-Bid-Build, Design-Build, and CM@Risk), financial contract types (Lump Sum, GMP, CPFF), and procurement methods (Competitive, Negotiated, Best Value) based on criteria like project delivery speed, cost control, product quality, and selection flexibility. The report concludes that Design-Build is the best project delivery system, GMP is the best financial contract, and Negotiated is the best procurement method for this project. The project is scheduled to start on 11/09/2017 and finish by 05/12/2017 with a total budget of AUD $31,474,000.00.